Amendment 0004.pdf
PDF 40 KB Posted
- Attached to
- Construction of P447 Explosive Railcar Yard
- Solicitation number
- N40085-20-R-0048
About this file
This amendment modifies a solicitation for the construction of a P447 Explosive Railcar Holding Yard at Crane Army Ammunition Activity in Crane, Indiana. The amendment responds to four questions by extending the period of performance from 365 days to 775 days, providing a geotechnical report and hazardous materials report as attachments, and confirming the duration is 775 calendar days. The work includes demolition at an existing railcar site and construction of a new railcar holding yard, Defense Logistics Agency disposition site with operations and storage buildings, and associated site work such as rail track, signage, and pavement. The Naval Facilities Engineering Command is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Design-Bid-Build, Construction of P447 Explosive Railcar Holding Yard, Crane, Indiana.
SEE BLOCK 14 CONTINUATION PAGE.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008520R0048
X 9B. DATED (SEE ITEM 11)
29-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Jun-2020
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008520R0048
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
The purpose of this amendment is to provide the following:
1. Response to PPIs
2. To incorporate the following attachments:
Geotechnical Report
Hazmat Report
1. Response to PPIs
Date
Submitted
LEAVE
BLANK
Reference
No. Page Section Paragraph Question Response
1 06/18/2020 15 4 4.1.2
The Solicitation states that a pre-proposal conference call will take place prior to the date of the site visit. Can you confirm the date and time?
There will not be a pre-proposal conference call.
2 06/18/2020 13 2 2.3(i)
The Solicitation states on pg. 13 of
36 that the project duration is 775 calendar days.
Section 52.211-10
pg. 39 of 36 states that the entire work is to be completed in 365 calendar days. Can you please clarify which duration is correct?
The duration is
775 days.
3 06/18/2020 571 30 05 23 1.5.1
The specification section states
"anticipated soil conditions indicated in the geotechnical report included in the contract documents". The
Please see attached the
Geotechnical
Report.
N4008520R0048 geotechnical report cannot be found in the contract documents. Can you please provide?
4 06/18/2020 Vol. 2; D0012 2.10.4 N/A
The top of plan sheet D0012 (Vol.
2) has a note that states-"refer to hazardous material report (available electronically) for further detail". Can you provide a copy of the report?
Please see attached the
Hazmat Report.
SECTION 00010 - SOLICITATION CONTRACT FORM
The contractor period of performance end date has increased by 410 days from 365 days to 775 days.
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the
Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 775 Calenar Days after award. The time stated for completion shall include final cleanup of the premises.
(End of clause)
(End of Summary of Changes)
File details come from the government source that posted it. Updated .