Amendment 0007_200708 Amendment-civil dwgs.pdf
PDF 3 MB Posted
- Attached to
- Construction of P447 Explosive Railcar Yard
- Solicitation number
- N40085-20-R-0048
About this file
This document package includes plans for the demolition and remediation of an existing railcar yard and construction of a new explosive railcar yard and Defense Logistics Agency disposition site. The project involves demolishing existing buildings, rail lines, and site infrastructure at the railcar yard site; remediating munitions and explosives concerns in accordance with safety plans; and constructing a new railcar holding yard with signage and pavement. It also includes building a new operations building and storage building with loading ramp at the Defense Logistics Agency disposition site, along with associated site work and fiber infrastructure extending to an existing building. Radiation detection equipment will be relocated from the railcar yard site to the new disposition site. Demolition and construction details are provided in the civil drawings.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Wx
Wx
Wx
Wx
Wx
Wx Wx
Wx
FO FO
FO
FO
532.26
#1247 - TIP OF FROG
N: 1308482.2109
E: 3028452.9432
24" CMP
INV = 516.02'
S
D
S
D
10" CMP
INV = 539.10'
24" CMP
INV = 513.15'
Ex
Ex
E x Ex
Ex
Ex
Ex Ex
Ex
Ex E x
E x Ex
E
Cx Cx Cx
Cx
531.40
#1195 - ℄ TRACK @ T.R.
N: 1308413.7663
E: 3028446.9236
531.96'
#1198 - POINT OF SWITCH
N: 1308413.5848
E: 3028449.5350
Wx Wx Wx Wx Wx
Wx
Wx
Wx Wx
Wx Wx
Wx Wx x
B-03
B-02
B-01
APPROXIMATE END OF
PREVIOUSLY CAPPED
EXISTING TRANSITE
WATER LINE
B-2943
N:1308800.50 E:3028196.24
N:1308800.50 E:3028290.58
501 North Broadway
Saint Louis, MO 63102
(314) 335-4000
LAUREN SHIPMAN
CRANE ARMY AMMO ACTIVITY
11/21/2019
N
60'15' 30'
1" = 30'
1" = 30'
A1
DEMOLITION PLAN
GENERAL SHEET NOTES
1. SEE SHEET C0012 FOR GENERAL NOTES.
2. REFER TO GENERAL DEMOLITION SHEETS FOR BUILDING AND SEPTIC TANK
DEMOLITION DETAILS.
3. EXISTING UTILITY AND TOPO MAPPING PROVIDED BY BRCJ. SEE EXISTING
CONDITION / SURVEY SHEETS FOR AS SURVEYED CONDITIONS (V1012
THROUGH V1042).
4. DEMO OF ELECTRICAL AND TELECOM MUST BE COORDINATED WITH
ELECTRICAL AND TELECOM PLANS.
5. THE TOP 12" OF ALL MATERIAL TO BE REMOVED WITHIN THE SWMU 21
BOUNDARY, REGARDLESS OF ITS FINAL DISPOSITION, MUST BE PROCESSED
FOR MUNITIONS AND EXPLOSIVES CONCERN (MEC) AND MATERIAL
POTENTIALLY PRESENTING AN EXPLOSIVE HAZARD (MPPE) IN ACCORDANCE
WITH THE EXPLOSIVE SAFETY SUBMISSION. RADIOLOGICAL ACTIVITIES TO BE
PERFORMED CONCURRENTLY WITH UNEXPLODED ORDINANCE/MUNITIONS
AND EXPLOSIVES OF CONCERN (UXO/MEC) SURVEYS IN ACCORDANCE WITH
THE SPECIFICATION.
KEYNOTES
DEMOLISH AND REMOVE BUILDING B-2943 (SEE DEMOLITION DRAWINGS FOR DETAILS).
ONE (1) EXISTING #115 TURNOUT AND RAILS TO BE CAREFULLY REMOVED AND TURNED OVER
TO THE GOVERNMENT. ALL OTHER TURNOUTS TO BE REMOVED AND DISPOSED OF.
WETLAND - 0.08 TOTAL ACRES ON SITE TO BE REMOVED.
REMOVE TRUCK SCALE RAMPS AND GUARDRAILS.
REMOVE EXISTING METAL SHED AND CONCRETE PAD (SEE DEMOLITION DRAWINGS)
REMOVE EXISTING TRUCK SCALE.
REMOVE EXISTING RAIL SCALE.
REMOVE CONCRETE PAVEMENT, SIDEWALK AND STAIRS.
REMOVE ASPHALT PAVEMENT.
REMOVE GRAVEL.
REMOVE STORM SEWER PIPE.
REMOVE CATCH BASIN / MANHOLE.
WETLAND - DO NOT DISTURB.
EXISTING 6" TRANSITE WATER LINE TO BE ABANDONED AND FILLED WITH FLOWABLE FILL.
TEMPORARY CONSTRUCTION FENCE, SEE A4/C5012.
REMOVE FIRE HYDRANT.
NOT USED.
REMOVE CONCRETE BARRIER.
REMOVE CHAIN LINK FENCE/GATE INCLUDING ALL POSTS AND POST FOUNDATIONS.
REMOVE EXISTING TRACK.
NOT USED.
REMOVE RADIATION MONITOR. RADIATION MONITOR TO BE SALVAGED AND RELOCATED TO
THE NEW DLA SITE (BY CONTRACTOR).
NOT USED.
REMOVE POWER POLE / LIGHT POLE.
REMOVE OVERHEAD POWER LINE.
REMOVE UNDERGROUND POWER LINE.
REMOVE UNDERGROUND FIBER OPTIC/COMMUNICATIONS LINE.
NOT USED.
NOT USED.
SAWCUT.
REMOVE HEADWALL/RETAINING WALL.
REMOVE BOLLARD (TYP)
LEGEND
EXISTING UTILITY REMOVAL
EXISTING UTILITY
ABANDONMENT
EXISTING FENCE REMOVAL
EXISTING RAILROAD TRACK
REMOVAL
LIMITS OF DISTURBANCE
ASPHALT PAVEMENT
REMOVAL
CONCRETE PAVEMENT,
SIDEWALK, STAIRS AND
DOCK REMOVAL
BUILDING REMOVAL
GRAVEL REMOVAL
MA
TC
HL
INE
C -10
GRAPHIC SCALE
L
O D
A
N
T
E
R
E V
I S
E
1NOTE:
TREE CLEARING ALLOWED ONLY BETWEEN THE DATES OF OCTOBER 1ST AND
MARCH 31ST. COORDINATE WITH CONTRACTING OFFICER PRIOR TO BEGINNING
WORK.
LIMIT OF DISTURBANCE BOUNDARY UPDATED IN REVISION 1
T
E
R
E V
I S
MARK
GE
Ex
FO
Wx Wx Wx
Wx Wx
Wx Wx
Wx Wx Wx
W x
FO
FO
FO
FO
FOFO FO FO
FO
16" CMP
INV = 566.08'
8" CMP
INV = 552.45'
8" CMP
INV = 554.19'
Ex Ex
Ex
Cx
G
G Cx
Ex Ex
Ex Ex
Ex
Wx
W x W x
W x W x
Wx Wx
Wx Wx
Wx Wx
Wx Wx Wx
B-10 B-11
B-09
B-07
OFFSET
B-07
B-05
B-06
B-03
B-02
B-04
B-08
CUT AND REMOVE 50 PAIR COPPER CABLE FROM ORIGINATION
POINT BACK TO SPLICE POINT AT POLE IDE-27. CUT AND
BACKPULL 24-STRAND SINGLEMODE FIBER OPTIC CABLE TO
BUILDING 2703, BACK TO UTILITY POLE IDEA 1-2 AND COIL UP FOR
FUTURE USE. COORDINATE ALL WORK WITH THE GOVERNMENT
PRIOR TO REMOVAL OF ANY CABLE.
B-3248
B-3249
B-2703
ELECTRIC LINE CONDUIT TO REMAIN
UNKNOWN UTILITY - CONTRACTOR SHALL VERIFY TYPE, SIZE AND
DEPTH OF UTILITY AND COORDINATE WITH CONTRACTING
OFFICER PRIOR TO REMOVAL.
501 North Broadway
Saint Louis, MO 63102
(314) 335-4000
LAUREN SHIPMAN
CRANE ARMY AMMO ACTIVITY
11/21/2019
1" = 30'
A1
DEMOLITION PLAN
MA
TC
HL
INE
C -10
MA
TC
HL
INE
C -10
GENERAL SHEET NOTES
KEYNOTES
APPROXIMATE LOCATION OF SEPTIC TANK. SEE D0012 AND D1032 FOR MORE INFORMATION.
DEMOLISH AND REMOVE BUILDING B-3248 (SEE DEMOLITION DRAWINGS FOR DETAILS).
DEMOLISH AND REMOVE BUILDING B-3249 (SEE DEMOLITION DRAWINGS FOR DETAILS).
DEMOLISH AND REMOVE BUILDING B-2703 (SEE DEMOLITION DRAWINGS FOR DETAILS).
DEMOLISH AND REMOVE FOUNDATION AND ASSOCIATED UNDERGROUND CHAMBER OF
FORMER BUILDING B-2704 (SEE DEMOLITION DRAWINGS FOR DETAILS).
APPROXIMATELY 190' OF EXISTING WATER LINE TO BE ABANDONED IN PLACE.
EXISTING WETLAND - DO NOT DISTURB
REMOVE CONCRETE PAVEMENT, SIDEWALK AND STAIRS.
REMOVE ASPHALT PAVEMENT.
EXISTING 8" TRANSITE WATER LINE TO BE ABANDONED AND FILLED WITH FLOWABLE FILL.
REMOVE STORM SEWER PIPE.
REMOVE CATCH BASIN / MANHOLE.
REMOVE LOADING DOCK (SEE DEMOLITION DRAWINGS FOR DETAILS).
EXISTING 6" TRANSITE WATER LINE TO BE ABANDONED AND FILLED WITH FLOWABLE FILL.
CUT AND CAP EXISTING WATER LINE.
REMOVE FIRE HYDRANT.
CONCRETE PAD TO BE REMOVED. EXISTING PROPANE TANKS ON PAD TO BE REMOVED BY
GOVERNMENT OR GOVERNMENT ASSIGNED CONTRACTOR PRIOR TO WORK BEGINNING ON THE
RAILCAR SITE. PROPANE TANKS TO REMAIN ACTIVE UNTIL NEW DLA SITE IS OCCUPIED.
REMOVE CONCRETE BARRIER.
REMOVE CHAIN LINK FENCE/GATE INCLUDING ALL POSTS AND POST FOUNDATIONS.
REMOVE EXISTING TRACK.
REMOVE GUARD RAIL.
WETLAND - 0.08 TOTAL ACRES ON SITE TO BE REMOVED.
WETLAND - DO NOT DISTURB.
REMOVE POWER POLE / LIGHT POLE.
REMOVE OVERHEAD POWER LINE.
REMOVE UNDERGROUND POWER LINE.
REMOVE UNDERGROUND FIBER OPTIC/COMMUNICATIONS LINE.
REMOVE COMMUNICATIONS MANHOLE.
CLEAR AND GRUB VEGETATION TO LIMITS OF DISTURBANCE LINE AS SHOWN - SEE GENERAL
NOTE 6 FOR ALLOWABLE TIME FRAME FOR TREE REMOVAL.
REMOVE UNDERGROUND GAS LINE.
REMOVE HEADWALL/RETAINING WALL.
REMOVE BOLLARD (TYP)
N
60'15' 30'
1" = 30'
LEGEND
EXISTING UTILITY
REMOVAL/ABANDONMENT
EXISTING FENCE REMOVAL
EXISTING RAILROAD TRACK
REMOVAL
GRAVEL REMOVAL
ASPHALT PAVEMENT
REMOVAL
CONCRETE PAVEMENT,
SIDEWALK, STAIRS AND
DOCK REMOVAL
BUILDING REMOVAL
LIMITS OF DISTURBANCE
GRAPHIC SCALE
1. SEE SHEET C0012 FOR GENERAL NOTES.
2. REFER TO GENERAL DEMOLITION SHEETS FOR BUILDING AND SEPTIC TANK
DEMOLITION DETAILS.
3. EXISTING UTILITY AND TOPO MAPPING PROVIDED BY BRCJ. SEE EXISTING
CONDITION / SURVEY SHEETS FOR AS SURVEYED CONDITIONS (V1012
THROUGH V1042).
4. DEMO OF ELECTRICAL AND TELECOM MUST BE COORDINATED WITH
ELECTRICAL AND TELECOM PLANS.
5. THE TOP 12" OF ALL MATERIAL TO BE REMOVED WITHIN THE SWMU 21
BOUNDARY, REGARDLESS OF ITS FINAL DISPOSITION, MUST BE PROCESSED
FOR MUNITIONS AND EXPLOSIVES CONCERN (MEC) AND MATERIAL
POTENTIALLY PRESENTING AN EXPLOSIVE HAZARD (MPPE) IN ACCORDANCE
WITH THE EXPLOSIVE SAFETY SUBMISSION. RADIOLOGICAL ACTIVITIES TO BE
PERFORMED CONCURRENTLY WITH UNEXPLODED ORDINANCE/MUNITIONS
AND EXPLOSIVES OF CONCERN (UXO/MEC) SURVEYS IN ACCORDANCE WITH
THE SPECIFICATION.
NOTE:
TREE CLEARING ALLOWED ONLY BETWEEN THE DATES OF OCTOBER 1ST AND
MARCH 31ST. COORDINATE WITH CONTRACTING OFFICER PRIOR TO BEGINNING
WORK.
L
A
T
E
R
E V
I S
LIMIT OF DISTURBANCE BOUNDARY UPDATED IN REVISION 1
T
E K
E Y
N O
T
R
V
I S
MARK
GE
| Sheets and Views |
| C1022 |
File details come from the government source that posted it. Updated .