This federal solicitation seeks construction services for two sites at Crane Army Ammunition Activity in Crane, Indiana. One site is for a new railcar holding yard that will include demolition of existing buildings and site work such as rail track, retaining walls, and signage. The other site is for a new Defense Logistics Agency disposition facility consisting of an operations building, storage building with loading ramp, and associated site work like aggregate and concrete storage areas. The solicitation also includes relocating an existing radiation detector and off-site fiber/support structures. Responses are due by July 21, 2020 according to the instructions provided.

View the file

Other files

File Type Posted
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
Amendment 0008.pdf PDF
Amendment 0007_200708 Amendment_Continuation Sheet.pdf PDF
Amendment 0007_200708 Amendment-civil dwgs.pdf PDF
Amendment 0006_Reference drawings B3248_B3249.pdf PDF
Amendment 0006_Reference drawings B2703_B2943.pdf PDF
Amendment 0006_Photo Attachment_Truck Scale Rad Detector.JPG JPG image
Amendment 0006_Photo Attachment Truck Scale RadDetector_Bldg 2943_03.JPG JPG image
Amendment 0006_Photo Attachment Bldg 2703 Internal 03.jpg JPG image
Amendment 0006_Reference drawings B2704.pdf PDF
Amendment 0006.pdf PDF
Amendment 0006_Photo Attachment Truck Scale RadDetector_Bldg 2943_02.JPG JPG image
Amendment 0006_200702 Structural Drawings.pdf PDF
Amendment 0006_Continuation Sheet 2 July 2020.pdf PDF
Amendment 0006_Photo Attachment Bldg 2703 External.jpg JPG image
Amendment 0006_Photo Attachment Bldg 2943 Internal.jpg JPG image
Amendment 0006_ ESS_DRAFT_REPORT.pdf PDF
Amendment 0006_Photo Attachment Bldgs 3248-3249 External.jpg JPG image
Amendment 0006_200630 Civil Drawings.pdf PDF
Amendment 0006_ Photo Attachment_Truck Scale.jpg JPG image
Amendment 0006_Photo Attachment Bldg 2943 External.jpg JPG image
Amendment 0006_Photo Attachment Bldg 2703 Internal 02.jpg JPG image
Amendment 0006_Photo Attachment Truck Scale_RadDetector_Bldg 2943_01.JPG JPG image
Amendment 0006_Photo Attachment Bldg 2703 Internal 01.jpg JPG image
Amendment 0005.pdf PDF
Amendment 0004_Geotechinical Report.pdf PDF
Amendment 0004_Hazmat Report.pdf PDF
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Amendment 0003_Bid Form.pdf PDF
Amendment 0003_200615 Amendment.pdf PDF
Amendment 0002.pdf PDF
Amendment 1.pdf PDF
Attachment G-1596603dwg05of11_E-T-O.pdf PDF
Attachment G-1596603dwg10of11_C.pdf PDF
Attachment G-1596603dwg01of11_G-V-B.pdf PDF
Attachment B - SECNAV_5512_1_11787-One Day Past Request.pdf PDF
Attachment G-1596603spc01of01.pdf PDF
Attachment G- 1596603dwg02of11_C.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment G-1596603dwg04of11_S-A-I-F-P-M.pdf PDF
Attachment E - Small Business Subcontracting Plan.docx DOCX document
Attachment G-1596603dwg09of11_C.pdf PDF
Attachment G-1596603dwg07of11_H-D.pdf PDF
Attachment G-1596603dwg08of11_V-B.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Attachment G-1596603dwg03of11_C.pdf PDF
Attachment G-1596603dwg11of11_R-E-T.pdf PDF
Attachment F - PPF.docx DOCX document
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Design-Bid-Build, Construction of P447 Explosive Railcar Holding Yard, Crane, Indiana

SEE BLOCK 14 CONTINUATION PAGE

POC: Michelle Corsino, michelle.a.corsino@navy.mil, 757-410-7887

1. CONTRACT ID CODE PAGE OF PAGES

J 1 67

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Jul-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008520R0048

X 9B. DATED (SEE ITEM 11)

29-May-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Jul-2020

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008520R0048

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0007

The purpose of Amendment 0007 is to provide the following:

1. Response to PPIs 91 through 126

2. Update the PROPOSAL DELIVERY INSTRUCTIONS

3. Provide Site Visit Sign-in Sheet

4. Provide updated Wage Determination

5. To incorporate the following attachments:

200708 Amendment_ Continuation Sheet

200708 Amendment_ Civil Drawings

1. Response to PPIs

Date

Submitted

LEAVE

BLANK

Reference

No. Page Section Paragraph Question Response

91 07/01/20 N/A N/A N/A Requesting a bid extension to July 31, 2020?

An extension was granted until July 21, 2020.

92 07/01/20

Dra wing C502

1, C504

Drawing C5021 gives specific lengths of underdrain in the bioretention basin. Detail A3 on C5041 shows two underdrain pipes which would double the pipe lengths on C5021. Are there actually two pipes stacked as shown in detail

A3/C5041 ?

Refer to Section A-A of Detail

A1/C5041. The second underdrain pipe is only present for the pipe run between the last cleanout and the outlet structure.

93 06/30/20 6 01 78

3.1

In specification section 01 78 00 Closeout Submittals Page 6, Paragraph 3.1 states that As-Built

Drawings are to be scanned in color and provided to the contracting officer in pdf format. In specification section 01 78 00 Closeout Submittals Page 8, Paragraph 3.2 states that Record

Drawings are to be prepared in a single bookmarked pdf file directly from the CADD authoring software.

Is the Contractor responsible for preparing both As-Builts and

Record Drawings? If so, since this is a design/bid/build project will the DOR provide the Contractor with the CADD files free of charge so that the Record Drawings can be prepared?

As noted in, 01 78 00 paragraph

1.2.1 "As-built drawings are developed and maintained by the Contractor . . . " Paragraph 3.2 RECORD

DRAWINGS notes, "Prepare and submit the CADD Record Drawings in accordance with

FC 1-300-09N, chapter 12 and exception noted below."

Paragraph, 1.3 SOURCE

DRAWING FILES notes, "Request the full set of electronic drawings, in the source format, for Record

Drawing preparation, after award and at least 30 days prior to required use." There is no charge for the files.

94 06/30/20 4 01 50

2.3 & 2.3.1

In Specification Section 01 50 00

Temporary Construction Facilities and Controls Page 4, Paragraph 2.3 states that "Safety fencing must be provided at wetlands to identify where wetlands may and may not be disturbed." The last sentence of

Paragraph 2.3.1 Polyethylene Mesh Safety Fencing states that "Fencing must remain rigid and taut with a

Specification Section 01 50 00,

2.3.1 details the requirements for safety fencing. Details

A4/C5091 and A4/C5102 are provided to detail what is required to demarkate the extents of the wetlands that are not to be disturbed. This fence is not a safety fence and therefore does not need to meet minimum of 200 pounds of force exerted on it from any direction with less than 4 inches of deflection."

However, drawing detail A4/C5091 and A4/C5102 show a detail of how the fencing is to be installed which would not meet the deflection criteria if a 200 pound force was exerted on it. Can you please confirm that the standard detail shown in the drawings is acceptable to identify the wetland areas, and that the fencing does not have to meet the deflection criteria in the specification?

the deflection criteria in the specification.

95 06/30/20 1 01 14

1.1.a

The second sentence in the second paragraph of paragraph 1.1.a in

Specification section 01 14 00 states

"Minor work such as tree removal may be scheduled at the Railcar Site during the DLA site construction period if approved by the

Contracting Officer." So that we can properly plan and schedule the project can you please confirm that the Contracting Officer will approve that minor work such as tree removal can be performed during the DLA site construction period?

Can you also describe any special conditions that may be required in order to perform tree removal at the

Railcar site during DLA site construction?

Delete the sentence in paragraph 1.1.a in Specification section 01 14 00, "Minor work such as tree removal may be scheduled at the Railcar Site during the DLA site construction period if approved by the Contracting Officer."

96 07/01/20

Bid

Solic itatio n

Attac hme nt F

(Am end ment

3)

CLIN

Can you please confirm that all pole replacement included in the Offsite Fiber drawings will be performed by others and is not be included in

CLIN 0005 Option pricing? Can you please also confirm that all other work shown in the Offsite Fiber drawings is to be included in CLIN 0005 Option pricing?

CLIN 0005 is to delete the replacement of 24 of the damaged poles identified on

Sheet O5011, associated electrical hardware and transferring the existing wires to these poles. The following note to be added to Sheet O5011, table EXISTING WOOD

POLES TO BE REPLACED,

“NOTE: All 27 existing damaged poles to be replaced and all other work shown in the

Off-site Fiber drawings is to be provided as part of the base project. The Option is to deleted the last 24 poles noted on this table.” The labels listed as “BASE CONTRACT” and

“OPTIONS CONTRACT” will be deleted.

97 06/30/20

C132

2, C133

2, C134 2, R101

Note 12 on drawings C1322, C1332, and C1342 states, “Area beneath ballast shall be overexcavated 12”

(min.) and backfilled with existing gravel material that was previously removed”. Drawing R1012, Detail

A4 indicates that the subgrade under the ballast should be INDOT Type 2A on Geotextile Fabric. The existing gravel may not be comprised entirely of INDOT Type 2A. Should this area be filled with the existing gravel or should INDOT

Type 2A material be purchased

INDOT Type 2A is in reference to the type of geotextile fabric, not the aggregate, that is to be placed on top of the compacted subgrade as called out in Detail A4/R1012.

instead? If the existing gravel is to be used, can both the crushed stone and sand and gravel indicated on the boring logs be used or is only the crushed stone acceptable?

98 06/30/20

Does debris from clearing and grubbing opertions remain on site?

If so, where should it be stockpiled?

Spoils from the DLA site must be disposed of off-site as described in Specifications 31

11 00, Section 3.4.

99 06/30/20

Where are any remaining spoils to be stockpiled?

Spoils from the DLA site must be disposed of off-site as described in Specifications 31

11 00, Section 3.4. All spoil material for the Railcar site shall be stockpiled in the designated on-site stockpile areas (refer to General Note 13 on Sheet C1322).

100 06/30/20 A60

08 71

Drawing A6011 calls out Door Hardware types S3 and S4, which are not defined in spec section 08 71

00. Please provide specifications fotr these two types of hardware.

The door schedule on A6011 will be revised to reflect the following: Delete hardware

Type S2 from all OH type doors. Delete hardware Type

S3 from door S-102a and replace with hardware Type S1.

Delete hardware Type S4 from door S-103 and replace with hardware Type S2. Hardware types S3 and S4 do not exist;

overhead door hardware is covered in the overhead door specification.

101 06/30/20 Is it possible to schedule another site visit?

At this time, NAVFAC cannot support another site visit.

102 06/30/20

C111 2 -

C114

2, C131

2-

C134

The limits of disturbance shown on drawings C1112 thru C1142 do not match the limits shown on drawings

C1312 thru C1342. Please clarify which limits of disturbance should be adhered to for this project.

Limits of disturbance were revised. See Amendment 0006.

103 06/30/20

2.1 E

Scale manufacturers will only supply a scale with 3 anchor bolts per load cell as opposed to the 2 anchor bolt maximum specified in specification 10 88 00. Please clarify that 3 anchor bolts are acceptable.

Two anchor bolt designs are available, and in fact standard, from at least one major manufacturer. 3 anchor bolt designs are also acceptable.

104 06/30/20

2.1/2.4 C/6

Scale manufacturers have indicated that Section 2.1 of specification 10

88 00 is in conflict with Section 2.4 and no scale is available meeting both of these criteria. Please provide clarification.

The second paragraph of Section 2.4, “The load cell shall not require a junction box to communicate ….” Is waived and not required. Other paragraphs of 2.4 are still required pending review of specific concerns when provided. Section 2.1.c is also waived.

105 06/30/20

2.1 F

Can the bumper plates be embedded into the concrete in lieu of bolting them to the concrete?

Section 2.1.f states, “The scale shall be a full electronic design, with internal self-checking weigh bridge. Weighbridges using bumper bolts, externally fixed check rods, or embedded bumper plates in the end walls will not be permitted.” The intent is that bumper plates will not be permitted whether embedded or bolted. The fourth paragraph of section 2.4 prohibits rocker type load cells requiring check rods, or bumper bolts and is intended to also preclude bumper plates.

106 06/30/20

Specification 10 88 00 does not specify any side rails on the scales, however the existing scale referenced has side rails. Are side rails required?

Siderails are not required.

107 06/30/20

2.2

It is stated that there shall be no bolted connection between the load cell and weighbridge assemblies. All the manufacturers we have reached out to require bolted connections between each weighbridge. Are bolted connections acceptable?

The fourth paragraph of Section

2.4 says. “Suspension system shall allow self-centering and free-floating platform.” This would preclude bolting load cells to the weigh bridge assemblies.

108 06/30/20

Will the existing truck scales be resued? If so where will they need to be taken and stored?

Per keynote 2 on drawing

D1012 the existing vehicle scale and associated components are to be removed.

109 06/30/20

Is a quantity of 8 load cells acceptable in lieu of the specified 10?

Scales with 8 load cells are acceptable provided they meet other requirements regarding load cell capacity and design.

110 06/30/20 C103

Drawing C1032 Note 5 states

"Demolish and remove foundation and associated underground chamber of former building B-2704

(See demolition drawings for detail).

This note is shown in 2 locations on the drawings, one at the septic tanks location and one at the bump-out of the retaining wall. Which is the correct location? Additionally, please provide details or a description of this underground chamber.

Note 5 is correct for both locations. However, Note 1, identifying the septic tank location will be relocated to the south in the amendment.

Available drawings of the existing building B-2704 were provided for reference in a previous amendment.

111 06/30/20

Adde ndu m

Addendem 0005 states that Price Proposals shall be uploaded to the

DOD Safe site on July 14, 2020, 2:00PM and hard copies are due Jule 21, 2020, 12:00PM. Is the entire proposal including Factors 1 thru 4 to be uploaded to the DOD Safe Site or just the Price Proposal portion?

Please see attached updated Proposal Instructions.

112 06/30/20

Adde ndu

Addendum 0005 states that only the Price Proposal is to be uploaded to the DOD Safe Site by July 14, 2020, 2:00PM. Are the other portions, Factors 1 thru 4, still required to be submitted in hard copy format by

July 14, 2020, 2:00PM?

Please see attached updated Proposal Instructions.

113 06/30/20

Solic itatio n (52.2

28-1)

Does the Government have a bid bond template or list of acceptable sureties for this project?

Please Refer to FAR 28.106-1 Bonds and bond-related forms.

A list of certified companies can be found here https://www.fiscal.treasury.gov/ surety-bonds/list-certified-companies.html

114 06/30/20 C102

Note 5

Is a munitions scan required to a depth of 12" below the bottom of existing asphalt paved areas or does the 12" scan depth include the depth of the asphalt?

The top 12” MEC/MPPEH

Removal effort includes the asphalt.

115 06/30/20

Adde ndu

The response to PPI number 2 in

Addendum 0003 states, "The attached Wage determination includes Martin County, Indiana", however no attachment was with a wage determination for Martin county was provided. Please provide the wage determination for

Martin County.

Please see attachments.

116 06/26/20

02 41

02 84

31 11

Is there a designated spoil location for tree disposal from the new holding yard site?

PLEASE SEE AMENDMENT

0006 RESPONSE 70.

117 06/26/20 02 84

Where on base can clean concrete and asphalt debris be disposed?

PLEASE SEE AMENDMENT

0006 RESPONSE 71.

118 06/26/20

31 23

00.00

Is there a location on base or another project area that has topsoil available?

PLEASE SEE AMENDMENT

0006 RESPONSE 72.

119 06/26/20 02 84

For the building demolition debris, is this material to be hauled to the on-base landfill for disposal or hauled off base?

PLEASE SEE AMENDMENT

0006 RESPONSE 73.

120 06/26/20

No

Spec/02 84 33

There appears to be no specific spec sections or drawings defining CLIN 0001 AE & AF scope. Can we get more information of the owners expectations of contractor completed activities?

PLEASE SEE AMENDMENT

0006 RESPONSE 74.

121 06/26/20 No

Spec

Reference CLIN 0001AE. Price for the Railcar Site MEC Clearance and Construction Support. The MEC

Clearance will be performed in accordance with the NOSSA endorsed and DDESB approved

Explosives Safety Submission

(ESS). Who is supplying the ESS, the government or the contractor?

PLEASE SEE AMENDMENT

0006 RESPONSE 75.

122 06/26/20 No

Spec

Reference Background data. Please provide any historical data of anticipated MEC/MPPEH at the project sites to include munition type, size, anticipated depth, etc.

PLEASE SEE AMENDMENT

0006 RESPONSE 76.

123 06/26/20

Wag e

Scale

RFP

With regard to the construction wage scale, will the government demand "Paid Sick Leave" over and above the scale listed for this project?

See Section 00700 - Contract Clauses 52.222-62 Paid Sick

Leave Under Executive Order

13706 JAN 2017

124 06/30/20 264100

Lightning Protection; Is a UL

Certification required for Lightning Protection System?

Yes, refer to E0013, Section

1.4.4. Lightning Protection

System (LPS) inspection certificate by UL or another third-party. UFC 3-575-01, Chapter 3 instructs that if facility is required to have an

LPS, then it must receive an Underwriters Laboratory (UL)

Inspection Certificate as being certified to NFPA 780.

125 06/30/20 264100

Lightning Protection; Several bore samples indicate failed depth due to possible concrete fill or existing concrete foundations. Will it be the contractors responsibility to remove obstructions to achieve depth for poles and utilities?

Boring Logs B-04 and B-07 indicate auger refusal at a depth of approximately 6'. No lightning protection poles are proposed in these locations, however, storm sewer ST-3 to

ST-7 is near these boring locations. The depth of this proposed storm sewer is approximately 7'-8' and may require obstruction removal to install.

126 06/30/20 283163 2.1.10.2

Calls for 48 hour and 10 minute battery back up. Base standard has always been 60 hour and 15 minute.

Is the 48 hour and 10 minute acceptable for this project.

Paragraph 2.1.10.2 will be revised in spec section 28 31

63.00 20 to address the base standard of 60 hours and 15 minutes.

2. Update the PROPOSAL DELIVERY INSTRUCTIONS

PROPOSAL delivery instructions

DOD Safe Site Information for Electronic Proposal Delivery

Contractors shall send their Electronic Proposal submission to Michelle Corsino through the DOD Safe Site (safe.apps.mil). Only DoD SAFE is authorized for the submission of the electronic original proposal in response to this solicitation. Further guidance is provided below for submission of hard copy submissions.

The contractor shall send the contract specialist, Michelle Corsino at michelle.a.corsino@navy.mil, the email address of the offeror’s point of contact who will be receiving the Drop-Off invitation to upload proposals to the DOD Safe Site no later than Thursday, July 16, 2020 by 2:00 p.m. EDT, unless that date and time are changed via Solicitation Amendment. It is the offeror’s responsibility to confirm that the Point of Contact information is received.

The Contract Specialist, Michelle Corsino, will “Request a Drop-Off” through DoD SAFE utilizing the provided offeror’s point of contact email address. The recipient will receive an automated email containing the information for the request and instructions for uploading. Requests from DoD SAFE will be sent on Friday, July 17, 2020 no later than 2:00 p.m. EDT. If you do not receive an email containing drop off instructions on that date, please contact the Contract Specialist, Michelle Corsino. Only the identified POC will be able to drop-off proposals or proposal revisions in DOD SAFE. Failure to provide accurate POC information will preclude the offeror from using DoD SAFE. Note: only two email addresses may be provided per Offeror.

To submit the proposal, the offeror will utilize the link provided in the automated email to take you to DoD SAFE at https://safe.apps.mil. The system will allow for inclusion of a short note to the Recipient and then the offeror will click to add files or drag and drop them.

Click “Drop-Off Files” to send the files to the recipient. You should receive a notification on the site “Drop-Off Completed” “Your files have been sent successfully.” Please keep this for your records. The file(s) are uploaded and an email will be sent to the recipient notifying them of the “drop-off”. [Additional details can be viewed in the DoD SAFE User Guide available at https://safe.apps.mil]. Note that the submission of any proposal must be completed no later than the due date and time, unless the date and time are changed via Solicitation Amendment, using the link sent by the contract specialist via DOD Safe. The DoD SAFE system will record the date and time of package submittal. The date and time of package submittal recorded in DoD SAFE shall govern the timeliness of any proposal submission.

Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened, or are otherwise missing the required content are the responsibility of offerors. The maximum file size of a package is 8 GB. Up to 25 packages may be uploaded per link.

It is the sole responsibility of the Offeror to obtain the RFP files, along with any amendments, from Opportunities (www.beta.sam.gov).

Mailed Hard Copies

In addition, one (1) original and one (1) copy of the hard copy proposal shall be delivered by mail on the date and time listed below, respectively, unless those dates are changed via Solicitation Amendment.

Proposal shall be labeled “PROPOSAL FOR RFP N4008520R0048, ATTN: Michelle Corsino; DO NOT OPEN IN MAIL ROOM”.

Hand delivered proposals will not be accepted.

Express Mail to:

Naval Facilities Engineering Command, Mid-Atlantic

9324 Virginia Avenue Building Z-140, Room

216 Norfolk, Virginia

23511 Attn: Michelle Corsino, ACQ22

Price Proposal Due Date

Electronic Copy of complete Proposal due: Tuesday, July 21, 2020, 2:00 p.m. EDT

Hard Copy of complete Proposal due: Tuesday, July 28, 2020, 12:00 p.m. EDT

3. Provide Site Visit Sign-in Sheet

Sign In Sheet

Meeting Topic: Railholding and DLA Site Visit

Date / Time: 6/19/2020 08:30-4:30

Name Company E-mail

T.J. Presley Railworks ARolf@railworks.com

Jeff Ooley Weddle Bros.

ARolf@railworks.com

Brady Phillips Kokosing

Industrial bjp@kokosing.biz

Adam Bakewell Kokosing Industrial jab@kokosing.biz

Tim Britts Kokosing Industrial tsb@kokosing.biz

Ryan Allen SSI Services, LLC jsmith2@kokosing.biz

Jesse Smith Kokosing Industrial jsmith2@kokosing.biz

Chad Hammel Renascent, Inc.

jsmith2@kokosing.biz

Jeff Stanger F.H. Paschen JStanger@FHPaschen.com

Bob Barrington DBK bbarrington@dbkenyon.com

Alan Schragal KWEST Group AlanSchragal@kwestgroup.com

Jordan Dant Seufert Construction lwehr@seufertconstruction.com

Luke Wehr Seufert

Construction lwehr@seufertconstruction.com

Kyle Chase Seufert

Construction lwehr@seufertconstruction.com

Bill Krempp KCI const@krempp.net

Jarret Parkes B&D greg@bdelectricinc.com;

tony@bdelectricinc.com;

bdelec@bdelectricinc.com

Kelly Holland Mastercraft mastercraft@mastercraftmechanical.com

Kevin Boyd Mastercraft mastercraft@mastercraftmechanical.com mailto:AlanSchragal@kwestgroup.com

Keith Provo AllTrack alltrack@frontier.com

Frank Faith AllTrack alltrack@frontier.com

John Krempp Krempp const@krempp.net

Ryan Kerns Kerns Exc const@krempp.net

Cory Earhart Kerns Exc const@krempp.net

Stephens Goins E&B Paving const@krempp.net

4. Provide Updated Wage Determination

"General Decision Number: IN20200006 07/03/2020

Superseded General Decision Number: IN20190006

State: Indiana

Construction Types: Heavy and Highway

Counties: Adams, Allen, Bartholomew, Benton, Blackford, Boone, Brown, Carroll, Cass, Clark, Clay, Clinton, Crawford, Daviess, Dearborn, Decatur, DeKalb, Delaware, Dubois, Elkhart, Fayette, Floyd, Fountain, Franklin, Fulton, Gibson, Grant, Greene, Hamilton, Hancock, Harrison, Hendricks, Henry, Howard, Huntington, Jackson, Jasper, Jay, Jefferson, Jennings, Johnson, Knox, Kosciusko, Lagrange, Lawrence, Madison, Marion, Marshall, Martin, Miami, Monroe, Montgomery, Morgan, Newton, Noble, Ohio, Orange, Owen, Parke, Perry, Pike, Posey, Pulaski, Putnam, Randolph, Ripley, Rush, Scott, Shelby, Spencer, Starke, Steuben, Sullivan, Switzerland, Tippecanoe, Tipton, Union, Vanderburgh, Vermillion, Vigo, Wabash, Warren, Warrick, Washington, Wayne, Wells, White and Whitley Counties in Indiana.

* EXCEPT LAKE, LAPORTE, PORTER AND ST. JOSEPH COUNTIES HEAVY

AND HIGHWAY CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year

2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the

Davis-Bacon Related Acts, including those set forth at 29 CFR

5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/03/2020

1 01/24/2020

2 02/07/2020

3 02/14/2020

4 02/21/2020

5 04/03/2020

6 05/01/2020

7 05/15/2020

8 06/05/2020

9 06/12/2020

10 07/03/2020

ASBE0008-004 03/01/2020

DEARBORN, FAYETTE, FRANKLIN, OHIO, RIPLEY SWITZERLAND AND UNION

COUNTIES

Rates Fringes

Asbestos Workers/Insulator

(Includes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems).....$ 30.07 18.75

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wettings, stripping, removal, scrapping, vacuuming, bagging

& disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 25.00 13.70

ASBE0017-008 06/01/2019

NEWTON COUNTY:

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 50.50 27.80

HAZARDOUS MATERIAL HANDLER

(INCLUDES PREPARATION,

WETTING, STRIPPING REMOVAL

SCRAPPING, VACUUMING, BAGGING

AND DISPOSAL OF ALL

INSULATION MATERIALS, WHETHER

THEY CONTAIN ASBESTOS OR NOT,

FROM MECHAINCAL SYSTEMS).........$ 37.80 24.54

ASBE0018-005 06/01/2019

BROWN, BARTHOLOMEW, BENTON, BOONE, CARROLL, CASS, CLAY,

CLINTON, DECATUR, DELAWARE, ELKHART. FOUNTAIN, FULTON, GREENE,

HAMILTON, HANCOCK, HENDRICKS, HENRY, HOWARD, JASPER, JOHNSON,

KOSCIUSKO, LAGRANGE, MARSHALL, MADISON, MARION, MONROE,

MONTGOMERY, MORGAN, OWEN, PARKE, PULASKI, PUTNAM, RUSH, SHELBY,

STARKE, TIPPECANOE, TIPTON, VERMILLION, VIGO, WARREN and WHITE

Counties

INSULATOR (includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)..............$ 32.20 21.38

HAZARDOUS MATERIAL HANDLER

(includes preparation, wettings, stripping, removal, scrapping, vacuuming, bagging

& disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 23.00 14.40

ASBE0037-004 04/02/2020

DAVIESS, DUBOIS, GIBSON, KNOX, MARTIN, PIKE, POSEY, SPENCER,

SULLIVAN, VANDERBURGH AND WARRICK COUNTIES

application of all insulating materials protective coverings, coatings an finishes to all types of mechanical systems. Also the application of firestopping, material openings and penetrations in walls, floors, ceilings, curtain walls and all lead abatement.)...$ 31.36 20.62

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems).........$ 23.00 14.40

ASBE0041-002 07/01/2019

ADAMS, ALLEN, BLACKFORD, DE KALB, GRANT, HUNTINGTON, JAY,

MIAMI, NOBLE, STEUBEN, WABASH, WELLS AND WHITLEY COUNTIES:

application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)..............$ 29.50 16.89

HAZARDOUS MATERIAL HANDLER

(includes preparation, wettings, stripping, removal, scrapping, vaccuming, bagging

& disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 23.00 14.40

ASBE0051-003 03/01/2020

CLARK, CRAWFORD. FLOYD, HARRISON, JACKSON, JEFFERSON, JENNINGS,

LAWRENCE, ORANGE, PERRY, SCOTT, and WASHINGTON Counties

INSULATOR (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)..............$ 25.81 17.19

HAZARDOUS MATERIAL HANDLER

(includes preparation, wettings, stripping, removal, scrapping, vaccuming, bagging

& disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 19.80 13.30

ASBE0079-002 07/01/2017

RANDOLPH AND WAYNE COUNTIES

INSULATOR (Includes application of all insulating materials, protective coverings, coatings & finishings to all types of mechanical systems)..............$ 22.25 8.89

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging

& disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)).............$ 25.00 13.70

BRIN0003-001 06/01/2019

INDIANAPOLIS

BOONE, HANCOCK, HENDRICKS, JOHNSON, MARION, MONTGOMERY, MORGAN

and SHELBY COUNTIES

Bricklayer, Stone Mason, Pointer, Caulking................$ 32.16 14.35

TERRAZZO FINISHER................$ 20.23 10.26

TERRAZZO WORKER/SETTER...........$ 32.27 14.02

Tile & Marble Finisher...........$ 21.02 9.37

Tile, Marble Setter..............$ 31.61 13.92

BRIN0004-004 06/01/2019

FORT WAYNE

ADAMS, ALLEN, DEKALB, HUNTINGTON, NOBLE, STEUBEN, WELLS AND

WHITLEY COUNTIES:

BRICKLAYER (STONE MASON,

MARBLE MASONS, POINTER,

CLEANER, AND CAULKER)............$ 30.37 16.23

Terrazzo Grinder Finisher........$ 27.00 12.74

Terrazzo Worker Mechanic.........$ 31.00 16.42

Tile Setter & Marble Mason

Mechanic.........................$ 26.88 14.26

Tile, Marble & Terrazzo

Finisher.........................$ 23.63 12.34

BRIN0004-005 06/01/2017

CRAWFORD, DUBOIS, PERRY, POSEY, SPENCER, VANDERBURGH, and

WARRICK Counties

BRICKLAYER.......................$ 30.00 14.71

TILE FINISHER....................$ 20.31 12.00

TILE SETTER......................$ 26.69 12.00

BRIN0004-009 06/01/2019

BARTHOLOMEW, BROWN, DEARBORN, DECATUR, JENNINGS, MONROE, OHIO,

OWENS, RIPLEY and SWITZERLAND COUNTIES

Bricklayer, Stonemason...........$ 29.01 14.32

TERRAZZO FINISHER................$ 20.23 10.26

TERRAZZO WORKER/SETTER...........$ 32.27 14.02

Tile & Marble Finisher...........$ 21.02 9.37

Tile, Marble Setter..............$ 31.61 13.92

BRIN0004-010 06/01/2019

CLARK, FLOYD, and HARRISON Counties

BRICKLAYER

BRICKLAYERS, STONEMASONS

AND CEMENT MASONS...........$ 28.00 13.92

BRIN0004-015 08/23/2019

TERRE HAUTE

CLAY, DAVIESS, GIBSON, GREENE, KNOX, MARTIN, PARKE, PIKE,

PUTNAM, SULLIVAN, VERMILLION and VIGO COUNTIES

BRICKLAYER

BRICKLAYERS, STONE MASONS

and POINTER/

CLEANER/CAULKER.............$ 32.16 14.27

CEMENT MASON (Greene and

Sullivan Counties)..........$ 27.78 11.02

CEMENT MASON (REMAINING

COUNTIES)...................$ 31.16 14.27

TERRAZO FINISHER............$ 20.23 10.26

TERRAZZO WORKER.............$ 32.27 14.02

TILE LAYER, MARBLE MASON,

MOSAIC WORKER...............$ 31.61 13.92

BRIN0004-016 06/01/2019

MUNCIE

BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HAMILTON, HENRY, JAY,

MADISON, RANDOLPH, RUSH, TIPTON, UNION and WAYNE COUNTIES

Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 30.78 16.07

TERRAZZO FINISHER................$ 20.23 10.26

TERRAZZO WORKER/SETTER...........$ 32.27 14.02

Tile & Marble Finisher...........$ 21.02 9.37

Tile & Marble Setter; Mosaic

Worker...........................$ 31.17 13.01

BRIN0006-001 06/01/2019

JASPER, NEWTON & STARKE COUNTIES

BRICKLAYER (Including

Stonemason, and Pointer, Caulker & Cleaner)...............$ 38.12 24.40

Tile, Marble & Terrazzo Worker...$ 37.05 21.64

BRIN0011-001 06/01/2019

LAFAYETTE

BENTON, CARROLL, CLINTON, FOUNTAIN, TIPPECANOE, WARREN and

WHITE COUNTIES

Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 29.62 17.05

TERRAZZO FINISHER................$ 20.23 10.26

TERRAZZO WORKER/SETTER...........$ 32.27 14.02

Tile & Marble Finisher...........$ 21.02 9.37

Tile & Marble Setter; Mosaic

Worker...........................$ 31.61 13.92

BRIN0018-002 06/01/2019

CASS, ELKHART, FULTON, GRANT, HOWARD, KOSCUISKO, LAGRANGE,

MARSHALL, MIAMI, PULASKI, WABASH

Bricklayer, Caulker, Cleaner, Pointer..........................$ 29.49 16.77

CARP0002-023 04/01/2019

DEARBORN, JACKSON, JENNINGS, OHIO, RIPLEY AND SWITZERLAND

CARPENTER........................$ 25.91 23.88

CARP0133-001 04/01/2020

BOONE, CLAY, FOUNTAIN, MONROE, MONTGOMERY, MORGAN, OWEN,

PARKE, PUTNAM, VERMILLION AND VIGO COUNTIES

CARPENTER........................$ 27.75 22.73

CARP0133-003 04/01/2020

HAMILTON, HANCOCK, HENDRICKS, JOHNSON (Townships of Clark, Camp

Atterbury north of Hospital Road, Pleasant, White River), and

MARION Counties

CARPENTER........................$ 28.86 22.73

CARP0175-004 04/01/2020

CLARK, FLOYD, HARRISON, JEFFERSON,SCOTT AND WASHINGTON COUNTIES

CARPENTER........................$ 25.34 24.48

CARP0215-002 04/01/2020

BENTON, CARROLL, CLINTON, PULASKI, TIPPECANOE, WARREN AND WHITE

CARPENTER........................$ 28.88 21.56

CARP0224-011 04/01/2020

CRAWFORD, DUBOIS, PERRY, PIKE, POSEY, SPENCER, VANDERBURGH AND

WARRICK COUNTIES:

CARPENTER........................$ 25.41 24.41

CARP0224-012 04/01/2020

DAVIESS, GIBSON, GREENE, KNOX, LAWRENCE, MARTIN, ORANGE AND

SULLIVAN COUNTIES:

CARPENTER........................$ 25.76 24.46

CARP0232-003 04/01/2020

ALLEN, DEKALB, LAGRANGE, NOBLE, STEUBEN and WHITLEY COUNTIES

CARPENTER........................$ 27.81 21.97

CARP0301-001 04/01/2020

BARTHOLOMEW, BROWN,(Camp Atterbury south of Hospital Road), DECATUR, FRANKLIN, JOHNSON (Townships of Blue River, Franklin, Hensley, Needham, Nineveh, Union) , RUSH AND SHELBY COUNTIES

CARPENTER........................$ 27.31 22.73

CARP0413-003 04/01/2020

ADAMS, CASS, ELKHART, FULTON, GRANT, HOWARD, HUNTINGTON,

KOSCIUSKO, MARSHALL, MIAMI, TIPTON, WABASH AND WELLS COUNTIES:

CARPENTER........................$ 28.13 21.80

CARP0999-001 06/01/2017

JASPER, NEWTON, AND STARKE COUNTIES

CARPENTER........................$ 37.56 26.42

CARP1016-001 04/01/2020

BLACKFORD, DELAWARE, FAYETTE, HENRY, JAY, MADISON, RANDOLPH,

UNION AND WAYNE COUNTIES

CARPENTER........................$ 27.61 22.73

CARP1076-004 04/01/2016

HAMILTON and MARION Counties, and the following Townships in

JOHNSON County: Camp Atterbury (North of Hospital Rd.), Clark, Pleasant, and White River

MILLWRIGHT.......................$ 26.81 19.28

CARP1076-005 06/01/2017

JASPER, NEWTON, PULASKI, and STARKE Counties

MILLWRIGHT.......................$ 37.66 26.42

CARP1076-006 06/01/2018

BARTHOLOMEW, BLACKFORD, BOONE, BROWN, CLAY, DECATUR, DELAWARE,

FAYETTE, FOUNTAIN, FRANKLIN, HAMILTON, HANCOCK, HENDRICKS,

HENRY, JAY, JOHNSON, MADISON, MARION, MONROE, MONTGOMERY,

MORGAN, OWEN, PARKE, PUTNAM, RANDOLPH, RUSH, SHELBY, UNION,

VERMILLION, VIGO, AND WAYNE COUNTIES

MILLWRIGHT.......................$ 28.18 22.39

CARP1080-001 06/01/2018

GIBSON, GREENE, POSEY, SULLIVAN, VANDERBURGH and WARRICK

MILLWRIGHT

ZONE 1

POSEY, VANDERBURGH and

WARRICK COUNTIES...........$ 28.57 23.01

ZONE 2

GIBSON, GREENE AND

SULLIVAN COUNTIES..........$ 27.29 23.95

ELEC0016-003 04/01/2019

CRAWFORD, DAVIESS, DUBOIS, GIBSON, LAWRENCE, MARTIN, ORANGE,

PERRY, PIKE, POSEY, SPENCER, VANDERBURGH, WARRICK

ELECTRICIAN......................$ 38.02 17.61

ELEC0016-006 06/01/2019

CRAWFORD, DAVIESS, DUBOIS, GIBSON, LAWRENCE, MARTIN, ORANGE,

PERRY, PIKE, POSEY, SPENCER, VANDERBURGH, WARRICK

ELECTRICIAN (Communication

Technician Only).................$ 28.03 15.04

ELEC0071-006 01/02/2019

DEARBORN, OHIO, and SWTIZERLAND COUNTIES

Line Construction:

Equipment Operator..........$ 33.62 13.46

Groundman...................$ 24.17 11.38

Lineman & Cable Splicers....$ 38.27 14.48

ELEC0153-003 06/01/2020

ELKHART, KOSCIUSKO and MARSHALL COUNTIES

Communication Technician.........$ 26.50 18.33

ELECTRICIAN......................$ 35.25 25.42

Includes the installation, operation, inspection, modification, maintenance and repair of systems used for the transmission and reception of signals of any nature, for any purpose, including but not limited to , sound and voice transmission/transference systems, communication systems that transmit or receive information and /or control systems, television and video systems, micre-processor controlled fire alarm systems, and security systems and the performance of any task directly related to such installation or service. The scope of work shall exclude the installation of electrical power wiring and the installation of conduit raceways exceeding fifteen (15) feet in length.

ELEC0212-002 11/26/2018

DEARBORN, OHIO, and SWITZERLAND COUNTIES

Technician Only).................$ 24.35 10.99

ELEC0212-009 06/03/2019

DEARBORN, OHIO, and SWITZERLAND COUNTIES

ELECTRICIAN......................$ 30.18 18.89

ELEC0305-003 01/01/2020

ADAMS, ALLEN, DE KALB, HUNTINGTON, LAGRANGE, NOBLE, STEUBEN,

WELLS, and WHITLEY COUNTIES

ELECTRICIAN......................$ 33.44 18.14

ELEC0305-004 06/01/2019

ADAMS, ALLEN, DE KALB, HUNTINGTON, LAGRANGE, NOBLE, STEUBEN,

WELLS, and WHITLEY COUNTIES

Technician Only).................$ 28.00 15.98

ELEC0369-005 05/29/2019

CLARK, FLOYD, HARRISON, JACKSON, JEFFERSON, SCOTT, and

WASHINGTON Counties

ELECTRICIAN......................$ 32.44 17.22

ELEC0481-003 05/27/2019

BARTHOLOMEW, BOONE, DECATUR, HAMILTON, HANCOCK, HENDRICKS,

JENNINGS, JOHNSON, MADISON, MARION, MONTGOMERY, MORGAN, PUTNAM,

RIPLEY, RUSH AND SHELBY COUNTIES

ELECTRICIAN......................$ 34.85 23.03

ELEC0481-004 06/01/2019

BARTHOLOMEW, BOONE, DECATUR, HAMILTON, HANCOCK, HENDRICKS,

JENNINGS, JOHNSON, MADISON, MARION, MONTGOMERY, MORGAN, PUTNAM,

RIPLEY, RUSH AND SHELBY COUNTIES

Technician Only).................$ 27.60 15.97

ELEC0531-002 05/27/2019

JASPER, PULASKI, and STARKE COUNTIES

ELECTRICIAN......................$ 40.15 26.45

ELEC0531-003 05/28/2018

JASPER, PULASKI, and STARKE COUNTIES

Technician Only).................$ 27.64 13.23

ELEC0538-005 01/01/2020

FOUNTAIN, VERMILLION, and WARREN Counties

ELECTRICIAN......................$ 35.30 21.36

ELEC0538-009 09/01/2018

FOUNTAIN, VERMILLION, and WARREN Counties

Technician Only).................$ 32.82 16.28

ELEC0668-001 06/01/2019

BENTON, CARROLL, CASS, FULTON, TIPPECANOE and WHITE COUNTIES

Technician Only).................$ 28.90 14.53

ELEC0668-002 06/01/2018

BENTON, CARROLL, CASS, FULTON, TIPPECANOE and WHITE COUNTIES

ELECTRICIAN......................$ 33.60 18.52

FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Memorial Day, July 4th, Labor Day, Veterans Day Thanksgiving Day and

Christmas Day

ELEC0697-003 08/26/2019

NEWTON COUNTY

Technician Only).................$ 34.00 26.70

* ELEC0697-006 06/01/2020

ELECTRICIAN......................$ 42.75 29.93

ELEC0702-003 12/30/2019

DUBOIS, GIBSON, PERRY, PIKE, POSEY, SPENCER AND VANDERBURGH

GROUNDMAN, Class A..........$ 28.58 29% + 7.75

GROUNDMAN-EQUIPMENT

OPERATOR (All other equipment)..................$ 36.35 29% + 7.75

HEAVY-EQUIPMENT OPERATOR

(All crawler type equipment D-4 and larger)...$ 41.49 29% + 7.75

LINEMAN.....................$ 50.63 29% + 7.75

ELEC0725-007 06/01/2018

BROWN, CLAY, GREENE, KNOX, MONROE, OWEN, PARKE, SULLIVAN AND

VIGO COUNTIES

Communication Technician.........$ 28.10 13.68

Includes the installation, operation, inspection, maintenance, repair and service of radio, television, recording, voice sound and vision production and reproduction apparatus, equipment and appliances used for domestic, commercial, education, entertainment and private telephone systems.

ELEC0725-014 03/01/2018

BROWN, CLAY, GREENE, KNOX, MONROW, OWEN, PARKE, SULLIVAN AND

VIGO COUNTIES

ELECTRICIAN......................$ 36.22 19.14

ELEC0855-002 06/01/2018

BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HENRY, JAY, RANDOLPH,

UNION and WAYNE Counties

Technician Only).................$ 27.64 14.15

ELEC0855-004 06/01/2019

BLACKFORD, DELAWARE, FAYETTE, FRANKLIN, HENRY, JAY, RANDOLPH,

UNION and WAYNE Counties

ELECTRICIAN......................$ 32.76 17.40

ELEC0873-001 06/01/2018

CLINTON, GRANT, HOWARD, MIAMI, TIPTON, AND WABASH COUNTIES

Technician Only).................$ 28.16 14.12

ELEC0873-002 03/01/2019

CLINTON, GRANT, HOWARD, MIAMI, TIPTON AND WABASH COUNTIES:

ELECTRICIAN......................$ 34.02 17.40

ELEC1393-001 12/02/2019

REMAINING COUNTIES

EQUIPMENT OPERATOR 1:

Diggers, 5th wheel type trucks, crawler type, D-4 and smaller, bucket trucks and live boom type line trucks......................$ 31.77 29%+6.75

EQUIPMENT OPERATOR 3

(Backhoes over 1/2 yard bucket capacity, cranes rated at 15 ton or more capacity) 95% J.L. rate.....$ 39.19 29%+6.75

GROUNDMAN TRUCK DRIVER......$ 26.14 29%+6.75

GROUNDMAN...................$ 25.04 29%+6.75

LINEMAN.....................$ 41.61 29%+6.75

ENGI0103-003 04/01/2017

INCLUDING UNDERGROUND AND UTILITY CONSTRUCTION

ADAMS, ALLEN, BENTON, BLACKFORD, CARROLL, CASS, CLINTON,

DEKALB, DELAWARE, FAYETTE, GRANT, HAMILTON, HANCOCK, HENRY,

HOWARD, HUNTINGTON, JAY, JOHNSON, MADISON, MARION, MIAMI,

RANDOLPH, RUSH, SHELBY, STEUBEN, TIPPECANOE, TIPTON, UNION,

WABASH, WAYNE, WELLS, WHITE AND WHITLEY COUNTIES

Power equipment operators:

GROUP 1.....................$ 34.05 17.50

GROUP 2.....................$ 32.33 17.50

GROUP 3.....................$ 31.41 17.50

GROUP 4.....................$ 29.91 17.50

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Air compressors in manifold with throttle valve;

Asphalt plant engineer; Auto grade or similar type machine;

Auto patrol; Backhoe or farm-type tractor, 45 hp and over;

Ballast regulator (RR); Bituminous mixer; Bituminous paver;

Bituminous plant engineer; Bulldozer; Caisson drilling machine; Cherry picker, 15 ton or over; Chip spreader;

Concrete mixer 21 cu. ft. or over; Core drilling machine;

Crane or derrick with any attachment (including clamshell, dragline, shovel, backhoe, etc.); Dredge engineer; Dredge operator; Drilling machine on which the drill is an integral part; Earth mover, rubber-tired (paddle wheel, 616, 631, TS-24 or similar type); Earth mover, rubber-tired, tandem

($0.50 per hour additional for each bowl); Elevating grader; Fork lift, 10 ton or over; P.C.C. formless paver post driver; Highlift shovel, 1 1/2 cu. yd. or over; Hoist, 2 drums and over; Helicopter, crew; Hydraulic boom truck;

keystone, skimmer scoop; Loader, self-propelled (belt, chain, wheel); Locomotive operator; Mechanic; Mucking machine; Panel board concrete plant, central mix type;

Paver, Hetherington; Pile driver, skid or crawler; Road paving mixer; Rock breaking plant; Rock crushing plant, portable; Roller (asphalt, waterbound macadam, bituminous macadam, brick surface); Roller with dozer blade; Root rake, tractor-mounted; Self-propelled widener; Stump remover, tractor-mounted; Surface heater and planer; Tandem push tractor ($0.50 per hour additional); Tractor, boom;

Winch or hoe head; Tractor, push; Tractor with scoop;

Tractor-mounted spreader; Tree mover; Trench machine, over

24""; Tug boat operator; Well drilling machine; Winch truck with A-frame

GROUP 2: Air compressor with throttle valve or clever brooks-type combination; Backfiller; Backhoe on farm-type tractor, under 45 hp; Bull float; Cherry picker under 15 ton; Chip spreader, self-propelled; Concrete pump; Concrete mesh depressor, independently operated; Concrete spreader, power-driven; End loader under 1

1/2 cu. yd.; Excavating loader, portable; Finishing machine and bull float; Gunite machine; Head greaser; Mesh or steel placer; Multiple tamping machine (RR); P.C.C. concrete belt placer; Pull grader, power control; Refrigerating machine, freezing operation; Ross carrier; Sheepfoot roller

(self-propelled); Tamper (multiple vibrating, asphalt, waterbound macadam, bituminous macadam, brick surface);

Trench machine, 24"" and under; Tube float; Welder

GROUP 3: Assistant plant engineer; Base paver (Jersey or similar type machine); Concrete finishing machine; Concrete mixer, less than 21 cu. ft.; Curb machine; Farm tractor, including farm tractor with all attachments except backhoe and including high lift end loaders of 1 cu. yd. capacity or less; Fire tender on boiler; Hoist, 1 drum; Operator, 5 pieces of minor equipment; Paving breaker; Power broom, self-propelled; Roller, earth and sub-base material; Slurry seal machine; Spike machine (RR); Tamper (multiple vibrating, earth and sub-base material); Throttle valve and fire tender combination on horizontal or upright boiler;

Tractaire with drill; Tractor, 50 h.p. or over; Well point system; Widener, APSCO or similar type

GROUP 4: Air compressor; Assistant to engineer, oiler;

Automatic dry batch plant; Bituminous distributor;

Bituminous patching tamper; Belt spreader; Broom and belt machine; Chair cart, self-propelled; Coleman-type screen;

Conveyor, portable; Digger post hole, power-driven; Fork lift, under 10 ton; Form grader; Form tamper, motor-driven;

Generator; Hetherington driver; Hydra seeder; Operator, 1 through 4 pieces of minor equipment; Outboard or inboard motor boat; Power curing spraying machine; Power saw, concrete, power-driven; Pug mill; Pull broom, power-type;

Seaman tiller; Straw blower or brush mulcher; Striping machine paint, motor-driven; Sub grader; Tractaire, tractor, below 50 h.p.; Truck crane oiler, driver;

Spreader; Water pump; Welding machine, 2 of 300 amps or over

ENGI0150-009 04/01/2020

HEAVY, HIGHWAY AND RAILROAD CONSTRUCTION

ELKHART, FULTON, JASPER, KOSCIUSKO, LAGRANGE, MARSHALL, NEWTON,

NOBLE, PULASKI, and STARKE COUNTIES

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 31.15 29.55

GROUP 2.....................$ 29.55 29.55

GROUP 3.....................$ 28.25 29.55

GROUP 4.....................$ 26.85 29.55

GROUP 5.....................$ 23.60 29.55

GROUP 1: Air compressors in manifold with throttle valve;

Auto patrol; Automatic Sub-Grade; Backhoe or farm type tractor, 45 hp and over; Ballast regulator (RR); Barrier

Wall Machine; Batch Plants (Concrete & Asphalt); B ituminous mixer; Bituminous paver; Bituminous plant engineer; Boring Machine; Bulldozer; Caisson drilling machine; Cherry picker, 15 ton or over; Chip spreader;

Concrete mixer, 21 cu. ft. or over; Concrete Belt Placer;

Concrete Paver; Concrete Pump (Truck Mounted); Concrete Saw

(track mounted); Concrete Spreader (power driven); Core drilling machine; Crane or derrick with any attachment

(including clamshell, dragline, shovel, backhoe, etc.);

Curb Machine; Gutter Machine; Dredge engineer; Dredge operator; Drilling machine on which the drill is an integral part; Earthmover, rubber-tired (paddle wheel, 616, 631, TS-24 or similar type); Earthmover, rubber-tired, tandem (.50 per hr. additional for each bowl); Elevating

Grader; Forklift (10 ton or over); P.C.C. Formless Paver;

Gradall; Gravel Processing Plant (portable); Operator of

Guard Rail Post Driver; Highlift Shovel 1-1/2 cu.yd. or over) Frame; Hoist (2 drum & over); Helicopter crew;

Hydraulic boom truck; Hydraulic Excavator; Loaded-Self propelled (belt chain wheel); Laser Screed; Locomotive operator; Mechanic; Mucking machine; P.C.C. Concrete Belt

Placer; Panel board concrete plant (central mix type);

Paver (Hetherington); Pavement Breaker; Pile driver, skid or crawler; Road paving mixer; Rock breaking plant; Rock crushing plant (portable); Roller (asphalt, waterbound macadam, bituminous macadam, brick surface); Roller with dozer blade; Road Widener; Root rake (tractor-mounted);

Roto Mill Grinder; Self-propelled widener; Stump remover;

Surface heater and planer; Tandem push tractor ($0.50 per hour additional); Tractor, boom; Winch or hoe head; Tractor

(push); Tractor with scoop; Tractor-mounted spreader; Tree mover; Trench machine, over 24""; Tug boat operator; Well drilling machine; Widener (Apsco or similar type); Winch truck with A-frame

GROUP 2: Air compressor with throttle valve or Clever Brooks type combination; Backfiller; Farm type tractor (under 45

H.P.); Cherry picker under 15 ton; Chip spreader

(self-propelled); Concrete pump (trailer type); Concrete mesh depressor, independently operated; End loader under 1

1/2 cu. yd.; Excavating loader (portable); Finishing machine and bull float; Gunite machine; Hydraulic Power unit; Head greaser; Mesh or steel placer; Multiple tamping backhoe on machine (RR); Bull float (bidwell Machine); Refrigerating machine-operation;

Ross Carrier; Sheepfoot roller (self-propelled);

Tamper-Multiple Vibrating (Asphalt, Waterbound, Macadam, Bituminous Macadam, Brick Surface); Trench machine (24"" and under); Tube float; Water Pull/Wagon; Welder

GROUP 3: Plant engineer; Base paver (Jersey or similar type machine); Concrete finishing machine; Concrete mixer, less than 21 cu. ft.; Curb machine; Farm tractor, including farm tractor with all attachments except backhoe and including high lift end loaders of 1 cu. yd. capacity or less;

Fireman, on boiler; Hoist, 1 drum; Operator, 3-5 pieces of minor equipment; Paving breaker; Power broom, self-propelled; Roller, earth and sub-base material; Power

Saw-Concrete (Power Driven); Slurry seal machine; Spike machine (RR); Sub-surface Material…