This document provides amendments and revisions to drawings and specifications for a federal construction contract to build an explosive railcar yard at Naval Support Activity Crane in Crane, Indiana. The project involves demolishing existing buildings and rail infrastructure at the current railcar site and constructing a new railcar holding yard with associated site work. It also includes building a new storage and operations facility for the Defense Logistics Agency with additional site improvements at a separate disposition site. Revisions include changes to drawings, specifications for insulated rail joints, demolition requirements, and removal of sections on work restrictions and sustainability reporting. The contract is awarded through the Department of the Navy Naval Facilities Engineering Command for construction services to upgrade infrastructure and relocate facilities for handling explosive railcars and disposition activities at Crane Army Ammunition Activity.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTINUATION SHEET
Section 34 11 00 RAILROAD TRACK AND ACCESSORIES
2.10.4 INSULATED JOINTS
Replace the text in this section with the text below:
“Insulated joints shall conform to applicable portions of Chapter 4, Part 2 of AREMA Engineering
Manual.”
2.10.4.1 INSULATED JOINT BARS
Replace the text in this section with the text below:
“Insulated joints shall consist of a pair of 6-hole polyurethane bonded joint bars. The bars shall be one-piece polyurethane bonded. Tensile strength shall be a minimum of 105,000 psi. Flexural strength shall be a minimum of 125,000 psi, compressive strength shall be a minimum of 72,200 psi. Dielectric strength shall be 750 volts/mil at 50% RH and 72 degrees F. A pair of 6 hole polyurethane bonded insulated joint bars, l insulating end post, and 6 button-head-oval neck track bolts, nuts and washers, shall all furnished in a kit package.”
Document 00 01 15 LIST OF DRAWINGS
1.2 CONTRACT DRAWINGS
On NAVFAC Dwg. No. 12805221 (C5071)
Detail C1: Added “NOTE 4. DOWEL SIDEWALK INTO BUILDING FOUNDATION AT
OPENINGS. PROVIDE 8” THICKENED SLAB AT DOWELS – SEE STRUCTURAL FOR
DOWEL SIZING AND SPACING.”
Detail D2: Added “NOTE 1. DOWEL PAVEMENT INTO BUILDING FOUNDATION AT
OPENINGS. PROVIDE 8” THICKENED SLAB AT DOWELS – SEE STRUCTURAL FOR
DOWEL SIZING AND SPACING.”
On NAVFAC Dwg. No. 12805316 (D1032)
Detail C1: Remove linework callout for “52784 OIL WATER SEP”.
On NAVFAC Dwg. No. 12805329 (C1032)
Keynote 17: At end of Keynote, add “PRIOR TO WORK BEGINNING ON THE RAILCAR SITE.
PROPANE TANKS TO REMAIN ACTIVE UNTIL NEW DLA SITE IS OCCUPIED.”
On NAVFAC Dwg. No. 12805328 (C1022) and 12805329 (C1032)
Keynote 19: At the end of Keynote, add “INCLUDING ALL POSTS AND POST
FOUNDATIONS.”
On NAVFAC Dwg. No. 12805366 (R1112)
Note 14: Replace “UP Standard For Sliding Wheel with Derail Crowder Detail 2007F” with “UP
Standard For Sliding Wheel with Derail Crowder Detail 2007G”
The following drawings are revised as of 29 June 2020 and 30 June 2020:
NAVFAC DWG NO. TITLE
12805237 Structural, Typical Details, Revised 6/29/2020
12805328 Civil, Demolition Plan, Revised 6/30/20
12805329 Civil, Demolition Plan, Revised 6/30/20
12805330 Civil, Demolition Plan, Revised 6/30/20
12805340 Civil, Overall Grading and Drainage Plan, 6/30/20
12805341 Civil, Grading and Drainage Plan, 6/30/20
12805342 Civil, Grading and Drainage Plan, 6/30/20
12805343 Civil, Grading and Drainage Plan, 6/30/20
These revised Drawings accompany this Amendment
Section 02 41 00 DEMOLITION
3.1 EXISTING FACILITIES TO BE REMOVED
Add paragraph at the end of this section with the text below:
“Equipment, totes, crates and other items not shown as to be removed in the plans will be re-used by the government at the new DLA site. Additionally, there are items located within the existing buildings that require removal. Relocation of these items will be done by the government, prior to construction at this site.”
3.3.1 TITLE TO MATERIALS
After the text “Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property”, add the text below:
“Any other items in the buildings and on the site to be maintained by the Government will be removed prior to construction at the respective sites”
Section 01 14 00 WORK RESTRICTIONS
1.3 SECURITY REQUIREMENTS
Delete this paragraph in its entirety.
Section 01 33 29 SUSTAINABILITY REPORTING
Appendix 4 ML DESIGN & CONSTRUCTION ENVIRONMENTAL COMPLIANCE
GUIDELINES
Delete this appendix in its entirety.