About this file

This file is an attachment to a federal contract solicitation for infrastructure upgrades at the San Antonio VA Medical Center. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas under number 36C77623B0064. It seeks construction services for EHRM infrastructure upgrades with a NAICS code of 236220. The solicitation has a Service-Disabled Veteran-Owned Small Business set-aside and responses are due by the date specified on SAM.gov. The attachment contains architectural drawings related to the required construction work.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS), newest first.
File Type Posted
S07 - Bid Abstract Page 2_OF1419A_EHRM San Antonio_06SEP2023.pdf PDF
S02 - Attchment 24 - EHRM San Antonio Bid Breakdown Table_31AUG2023.xlsx XLSX spreadsheet
S02 - Attachment 15 - STX Addendum 1 (Composite).pdf PDF
S02 - Attachment 22 - SF 25 Performance Bond Form.pdf PDF
S02 - Attachment 18 - 320523 Cement and Concrete for Exterior Improvements.pdf PDF
Amendment 0004_36C77623B0064_25AUG2023.pdf PDF
S02 - Attachment 21 - Addendum 1 - Technology.pdf PDF
S02 - Attachment 19 - 02821321 Asbestos Roofing Abatement.pdf PDF
S02 - Attachment 23 - SF 25A Payment Bond Form.pdf PDF
S02 - Attachment 20 - Addendum 1 - Mechanical.pdf PDF
S02 - Attachment 17 - 075100 Roofing Repair.pdf PDF
Amendment 0003 Attachment Warranty RoofCAD-VA San Antonio-RFI Q100.pdf PDF
Amendment 0003_36C77623B0064_23AUG2023.pdf PDF
S02 - Attachment 6(e) - Mechanical Cut Sheets - Data Center CRAC - N 1 Operation (8000 cfm).pdf PDF
S02 - Attachment 6(a) - Mechanical Cut Sheets - 3.0 Ton Split System.pdf PDF
S02 - Attachment 6(f) - Mechanical Cut Sheets - 2.0 Ton Split System.pdf PDF
Amendment 0002_36C77623B0064_18AUG2023.pdf PDF
S02 - Attachment 6(c) - Mechanical Cut Sheets - Clean Agent Data Sheet.pdf PDF
Pre-bid Site Visit Sign-in Sheet_11AUG2023.pdf PDF
Amendment 0001_36C77623B0064_02AUG2023.pdf PDF
S02 - Attachment 8(b) - OIT-InfrastrucStdTelecomSpaces_Part 2 of 3.pdf PDF
S02 - Attachment 8(a) - OIT-InfrastrucStdTelecomSpaces_Part 1 of 3.pdf PDF
S02 - Attachment 7(b) - Technology Cut Sheets - Part 2 of 11 Corning.pdf PDF
S02 - Attachment 7(f) - Technology Cut Sheets - Part 6 of 11 Ortronics.pdf PDF
S02 - Attachment 7(j) - Technology Cut Sheets - Part 10 of 11 HID.pdf PDF
S02 - Attachment 7(e) - Technology Cut Sheets - Part 5 of 11 Leviton.pdf PDF
S02 - Attachment 7(k) - Technology Cut Sheets - Part 11 of 11 Hubbell.pdf PDF
S02 - Attachment 7(i) - Technology Cut Sheets - Part 9 of 11 Cablofil.pdf PDF
S02 - Attachment 1(c) - 671-22-700 DRAWINGS Mechanical.pdf PDF
S02 - Attachment 4 - 230501 SAT_EHRM_100 percent final TechnicalReport.pdf PDF
S02 - Attachment 14(a) - Asbestos Survey Results 1st-4th Floors.pdf PDF
S02 - Attachment 11 - Wage Determination_Bexar CountyTX_14APR2023.pdf PDF
S02 - Attachment 12 - Submittal Register ENG Form 4288-R.pdf PDF
S02 - Attachment 9 - Contractor Safety and Environmental Record Form.docx DOCX document
S02 - Attachment 7(h) - Technology Cut Sheets - Part 8 of 11 Axis.pdf PDF
S02 - Attachment 1(a) - 671-22-700 DRAWINGS General Sheets.pdf PDF
S02 - Attachment 8(c) - OIT-InfrastrucStdTelecomSpaces_Part 3 of 3.pdf PDF
S02 - Attachment 7(c) - Technology Cut Sheets - Part 3 of 11 CPI.pdf PDF
S02 - Attachment 7(g) - Technology Cut Sheets - Part 7 of 11 Panduit.pdf PDF
S02 - Attachment 6 - Mechanical Cut Sheets.pdf PDF
S02 - Attachment 7(a) - Technology Cut Sheets - Part 1 of 11 APC.pdf PDF
S02 - Attachment 3 - 671-22-700 EHRM Infrastructure Upgrades- SOW Construction.pdf PDF
S02 - Attachment 5 - Electrical Cut Sheets.pdf PDF
Solicitation 36C77623B0064_28JUL2023.pdf PDF
S02 - Attachment 14(b) - Asbestos Survey Results Ground and 5th-7th Floors.pdf PDF
S02 - Attachment 13 - VA OEHRM Site Infrastructure and EUD Reqmts 2.0.pdf PDF
S02 - Attachment 10 - VA Notice Limitations on Subcontracting - Construction (JAN 2023) (DEV).docx DOCX document
S02 - Attachment 7(d) - Technology Cut Sheets - Part 4 of 11 CPI Cabinet.pdf PDF
S02 - Attachment 1(e) - 671-22-700 DRAWINGS Technology.pdf PDF
S02 - Attachment 1(d) - 671-22-700 DRAWINGS Electrical.pdf PDF
Show all 50

EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

-2 -7

.0 .A

S T

X E

H R

M .r v t

/1

/2

:3

:3

A

M

AD001

GENERAL DEMOLITION NOTES

Awen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX

671-22-700

GENERAL DEMOLITION NOTES

1. DEMOLITION IS INTENDED TO PREPARE THE BUILDING TO RECEIVE THE NEW WORK. THE

INFORMATION PROVIDED IN NO WAY INTENDS TO MEAN THAT DEMOLITION IS LIMITED ONLY TO THOSE ITEMS SPECIFICALLY IDENTIFIED. IT IS THE GENERAL CONTRACTOR'S RESPONSIBILITY

TO EXECUTE DEMOLITION WORK AS REQUIRED TO ALLOW THE EXECUTION OF NEW WORK.

REMOVE ALL EXISTING ITEMS OF CONSTRUCTION AND EQUIPMENT WITHIN THE PROJECT

AREA, INDICATED ON DEMOLITION PLAN, WHETHER SHOWN OR NOT INCLUDING BUT NOT

LIMITED TO FLOOR MATERIAL, BASE, WALLS, CEILINGS, DOORS, DOOR FRAMES, CASEWORK,

ELECTRICAL, MECHANICAL, PLUMBING FIXTURES AND SYSTEM, AS REQUIRED TO

ACCOMMODATE NEW CONSTRUCTION. ANY EXISTING WORK TO REMAIN, IF DAMAGED BY ANY

TRADE OR NEW CONSTRUCTION, SHALL BE PATCHED, REPAIRED OR REPLACED TO MATCH

EXISTING. COMPLY WITH APPLICABLE CODES AND REGULATIONS.

2. REMOVE MEANS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF

THEM OFF-SITE, UNLESS INDICATED TO BE REMOVED AND SALVAGED OR REMOVED AND

REINSTALLED.

3. REMOVE AND SALVAGE MEANS: DETACH ITEMS FROM EXISTING CONSTRUCTION AND

DELIVER THEM TO OWNER READY FOR REUSE.

4. REMOVE AND REINSTALL MEANS: DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE

THEM FOR REUSE, AND REINSTALL THEM WHERE INDICATED.

5. EXISTING TO REMAIN MEANS: EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE

REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND

SALVAGED, OR REMOVED AND REINSTALLED.

6. SCHEDULE WORK TO MINIMIZE DISRUPTION OF SERVICES. COORDINATE WORK SCHEDULE

WITH THE CONTRACTING OFFICERS REPRESENTATIVE.

7. COORDINATE WORK WITH ALL OTHER TRADES. VERIFY ALL EXISTING CONDITIONS PRIOR TO

BEGINNING WORK TO CONFIRM ACCURACY IN THE DRAWINGS. REPORT ANY DISCREPANCIES

TO THE CONTRACTING OFFICER REPRESENTATIVE.

8. THE DEMOLITION DRAWINGS ARE CONSIDERED SCHEMATIC. CONTRACTOR RESPONSIBLE FOR

FIELD VERIFYING EXISTING DEMOLITION WORK PRIOR TO SUBMISSION PROPOSAL.

9. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT CLEAN

AND FREE OF OBSTRUCTIONS AT ALL TIMES. ERECT BARRICADES AND WARNING SIGNS TO

DIVERT AND WARN PASSERS-BY OF THE CONSTRUCTION WORK. PROVIDE DUST PROOFING

ENCLOSURES TO SEPARATE WORK AREAS FROM THE EXISTING FACILITIES. VA TO APPROVE

BARRIER LOCATIONS; BARRIERS TO BE CONSTRUCTED AS INDICATED.

10. DURING DEMOLITION, PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS

TO REMAIN IN PLACE DURING THE RENOVATION WORK. SHOULD ANY DAMAGE OCCUR, PATCH

AND REPAIR TO MATCH EXISTING ADJACENT FINISHES. SUBSTANTIAL DAMAGES TO BE

REPORTED TO THE VA COR.

11. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR

REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.

12. ALL FINISHES INDICATED TO BE DEMOLISHED SHALL BE REMOVED IN THEIR ENTIRETY

INCLUDING RELATED COMPONENTS.

13. REMOVAL OF SUPPORTS TRACKS BUILT IN ITEMS (STORAGE CABINETS, CASEWORK, ETC.) WILL

BE THE RESPONSIBILITY OF THE CONTRACTOR, ALONG WITH THE NORMAL DEMOLITION WORK.

REMOVE AND TURN OVER TO OWNER FOR STORAGE ANY ANCILLARY PIECES SUCH AS (BUT

NOT LIMITED TO) MOUNTING BRACKETS, HARDWARE

14. MISC. SUPPORTS ITEMS, ETC. REQUIRED FOR THE REINSTALLATION OF EQUIPMENT

CONTRACTOR TO SEE EQUIPMENT BOOK FOR INFORMATION ON PLACEMENT INSTALLATION OF

EXISTING AND NEW EQUIPMENT.

15. ALL DEMOLISHED ITEMS ARE TO BE REMOVED IN THEIR ENTIRETY INCLUDING ALL ASSOCIATED

PIPING, WIRING, HANGERS, SUPPORTS, PROJECTIONS BOLTS NAILS, ETC. FROM EXISTING

SURFACES. PATCH ALL HOLES TO MATCH ADJACENT SURFACES OR PROVIDE NEW FINISHES

PER FINISH PLAN.

16. ALL STRUCTURAL INTERFERENCE OR STRUCTURAL WALLS, BEAMS, JOIST COLUMNS, ETC.

SHALL BE BROUGHT TO THE ATTENTION OF ARCHITECT FOR DECISION. NO FLOOR OR

STRUCTURAL MEMBERS SHALL BE CUT WITHOUT PERMISSION OF A REGISTERED STRUCTURAL

ENGINEER. ALL PROPOSED SLEEVE / CORING SHALL BE REVIEWED BY ARCHITECT.

17. REMOVE COMPLETELY ALL EXISTING FLOOR FINISHES AND ADHESIVE DOWN TO THE

CONCRETE SLAB AS REQUIRED INSTALLING SCHEDULED FLOOR FINISH. LEAVE FLOOR

SMOOTH FOR NEW FINISH. OBSERVE MANUFACTURER'S REQUIREMENTS FOR SUB-FLOOR

PREPARATION. TREATMENT OF EXISTING FLOOR FINISHES WITHIN AREAS OF DEMOLITION

SHALL BE AS FOLLOWS: CARPET: REMOVE ENTIRELY, INCLUDING PADDING. REMOVE

REMAINING GLUE RESIDUE AND PATCH FOR NEW FLOOR FINISH; VINYL: REMOVE ENTIRELY

AFTER MATERIAL HAS BEEN TESTED FOR ASBESTOS. REMOVE GLUE OR GROUT RESIDE.

PATCH TO PROVIDE LEVEL SURFACE; CERAMIC TILE: REMOVE ENTIRELY. PATCH AND REPAIR

FLOORS WITH A LATEX LEVELING COMPOUND TO PRODUCE A SMOOTH, LEVEL SURFACE TO

RECEIVE NEW FINISHES.

18. ALL EXISTING WALLS TO RECEIVE NEW FINISHES SHALL HAVE EXISTING FINISHES, INCLUDING

CERAMIC TILE, VINYL WALL COVERING, ETC. COMPLETELY REMOVED UNLESS NOTED

OTHERWISE. REMOVE COMPLETELY ALL EXISTING WALL BASE AND ADHESIVE AS REQUIRED

FOR NEW WALL BASE. LEAVE WALL SURFACE SMOOTH TO RECEIVE NEW FINISH. SEE FINISH

DRAWINGS AND/OR SCHEDULE.

19. REMOVE ALL EXISTING CEILINGS, OR PORTIONS INDICATED TO ALLOW FOR PROPER

INSTALLATION OF MECHANICAL, PLUMBING AND ELECTRICAL WORK. PATCH AND REPAIR

EXISTING CEILINGS TO MATCH EXISTING OR INSTALL NEW CEILINGS AS INDICATED ON THE

REFLECTED CEILING PLAN AND/OR FINISH PLAN.

20. WHERE NEW CEILING IS INDICATED, REMOVE ALL EXISTING CEILINGS TO ALLOW FOR PROPER

INSTALLATION OF AND NEW CEILINGS. PATCH AND REPAIR EXISTING WALL AS REQUIRED TO

INSTALL NEW FINISHES.

21. REFER TO MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL DOCUMENTS FOR

REQUIRED DEMOLITION WORK AS WELL AS EXISTING PIPING, CONDUITS, DUCTWORK, ETC. TO

REMAIN WITHIN AREAS OF DEMOLITION.

22. REMOVE WALL CONSTRUCTION IN ITS ENTIRETY FROM FLOOR TO STRUCTURE ABOVE

INCLUDING DOORS, DOOR FRAMES, VISION PANELS, WALL BASE, AND ASSOCIATED

ELECTRICAL, MECHANICAL AND PLUMBING WORK. PATCH REMAINING ADJACENT

CONSTRUCTION THAT HAS BEEN DISTURBED BY DEMOLITION AND PREPARE SURFACES TO

RECEIVE NEW FINISHES.

23. ANY FLOOR PENETRATIONS LEFT DUE TO REMOVAL OF PIPING OR CONDUIT SHALL BE FILLED

WITH AN U.L. APPROVED FIRE STOP MATERIAL.

24. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT COULD CHANGE THEIR

LOAD-CARRYING CAPACITY OR LOAD-DEFLECTION RATIO.

25. DO NOT CUT AND PATCH OPERATING ELEMENTS AND RELATED COMPONENTS IN A MANNER

THAT RESULTS IN REDUCING THEIR CAPACITY TO PERFORM AS INTENDED OR THAT RESULT IN

INCREASED MAINTENANCE OR DECREASED OPERATIONAL LIFE OR SAFETY. THESE INCLUDE

BUT ARE NOT LIMITED TO, PRIMARY OPERATIONAL SYSTEMS AND EQUIPMENT, AIR OR SMOKE

BARRIERS, FIRE-SUPPRESSION SYSTEMS, MECHANICAL SYSTEMS PIPING AND DUCTS,

CONTROL SYSTEMS, COMMUNICATION SYSTEMS, CONVEYING SYSTEMS, ELECTRICAL WIRING

SYSTEMS.

26. DO NOT CUT AND PATCH MISCELLANEOUS ELEMENTS OR RELATED COMPONENTS IN A

MANNER THAT COULD CHANGE THEIR LOAD-CARRYING CAPACITY, THAT RESULTS IN

REDUCING THEIR CAPACITY TO PERFORM AS INTENDED, OR THAT RESULT IN INCREASED

MAINTENANCE OR DECREASED OPERATIONAL LIFE OR SAFETY. THESE INCLUDE BUT ARE NOT

LIMITED TO, WATER, MOISTURE, OR VAPOR BARRIERS, MEMBRANES AND FLASHINGS,

EXTERIOR WALL CONSTRUCTION, EQUIPMENT SUPPORTS, PIPING, DUCTWORK, VESSELS, AND

EQUIPMENT, NOISE- AND VIBRATION-CONTROL ELEMENTS AND SYSTEMS.

27. DO NOT CUT AND PATCH CONSTRUCTION IN A MANNER THAT RESULTS IN VISUAL EVIDENCE OF

CUTTING AND PATCHING. DO NOT CUT AND PATCH CONSTRUCTION EXPOSED ON THE

EXTERIOR OR IN OCCUPIED SPACES IN A MANNER THAT WOULD, IN ARCHITECT'S OPINION,

REDUCE THE BUILDING'S AESTHETIC QUALITIES.

28. BEFORE PROCEEDING, MEET AT PROJECT SITE WITH PARTIES INVOLVED IN CUTTING AND

PATCHING, INCLUDING MECHANICAL AND ELECTRICAL TRADES. REVIEW AREAS OF POTENTIAL

INTERFERENCE AND CONFLICT. COORDINATE PROCEDURES AND RESOLVE POTENTIAL

CONFLICTS BEFORE PROCEEDING.

29. USE MATERIALS IDENTICAL TO IN-PLACE MATERIALS. FOR EXPOSED SURFACES, USE

MATERIALS THAT VISUALLY MATCH IN-PLACE ADJACENT SURFACES TO THE FULLEST EXTENT

POSSIBLE. IF IDENTICAL MATERIALS ARE UNAVAILABLE OR CANNOT BE USED, USE MATERIALS

THAT, WHEN INSTALLED, WILL MATCH THE VISUAL AND FUNCTIONAL PERFORMANCE OF IN-

PLACE MATERIALS.

30. EXAMINE SURFACES TO BE CUT AND PATCHED AND CONDITIONS UNDER WHICH CUTTING AND

PATCHING ARE TO BE PERFORMED. BEFORE PATCHING, VERIFY COMPATIBILITY WITH AND

SUITABILITY OF SUBSTRATES, INCLUDING COMPATIBILITY WITH IN-PLACE FINISHES OR

PRIMERS. PROCEED WITH INSTALLATION ONLY AFTER UNSAFE OR UNSATISFACTORY

CONDITIONS HAVE BEEN CORRECTED.

31. PROVIDE TEMPORARY SUPPORT OF WORK TO BE CUT.

32. PROTECT IN-PLACE CONSTRUCTION DURING CUTTING AND PATCHING TO PREVENT DAMAGE.

PROVIDE PROTECTION FROM ADVERSE WEATHER CONDITIONS FOR PORTIONS OF PROJECT

THAT MIGHT BE EXPOSED DURING CUTTING AND PATCHING OPERATIONS.

33. AVOID INTERFERENCE WITH USE OF ADJOINING AREAS OR INTERRUPTION OF FREE PASSAGE

TO ADJOINING AREAS.

34. WHERE EXISTING SERVICES/SYSTEMS ARE REQUIRED TO BE REMOVED, RELOCATED, OR

ABANDONED, BYPASS SUCH SERVICES/SYSTEMS BEFORE CUTTING TO PREVENT

INTERRUPTION TO OCCUPIED AREAS.

35. EMPLOY SKILLED WORKERS TO PERFORM CUTTING AND PATCHING. PROCEED WITH CUTTING

AND PATCHING AT THE EARLIEST FEASIBLE TIME, AND COMPLETE WITHOUT DELAY. CUT IN-

PLACE CONSTRUCTION TO PROVIDE FOR INSTALLATION OF OTHER COMPONENTS OR

PERFORMANCE OF OTHER CONSTRUCTION, AND SUBSEQUENTLY PATCH AS REQUIRED TO

RESTORE SURFACES TO THEIR ORIGINAL CONDITION.

36. CUT IN-PLACE CONSTRUCTION BY SAWING, DRILLING, BREAKING, CHIPPING, GRINDING, AND

SIMILAR OPERATIONS, INCLUDING EXCAVATION, USING METHODS LEAST LIKELY TO DAMAGE

ELEMENTS RETAINED OR ADJOINING CONSTRUCTION. IF POSSIBLE, REVIEW PROPOSED

PROCEDURES WITH ORIGINAL INSTALLER; COMPLY WITH ORIGINAL INSTALLER'S WRITTEN

RECOMMENDATIONS.

37. IN GENERAL, USE HAND OR SMALL POWER TOOLS DESIGNED FOR SAWING AND GRINDING,

NOT HAMMERING AND CHOPPING. CUT HOLES AND SLOTS AS SMALL AS POSSIBLE, NEATLY

TO SIZE REQUIRED, AND WITH MINIMUM DISTURBANCE OF ADJACENT SURFACES.

TEMPORARILY COVER OPENINGS WHEN NOT IN USE.

38. CUT OR DRILL FROM THE EXPOSED OR FINISHED SIDE INTO CONCEALED SURFACES.

39. CUT CONCRETE OR MASONRY USING A CUTTING MACHINE, SUCH AS AN ABRASIVE SAW OR

A DIAMOND-CORE DRILL.

40. CUT OFF PIPE OR CONDUIT IN WALLS OR PARTITIONS TO BE REMOVED. CAP, VALVE, OR

PLUG AND SEAL REMAINING PORTION OF PIPE OR CONDUIT TO PREVENT ENTRANCE OF

MOISTURE OR OTHER FOREIGN MATTER AFTER CUTTING. PROCEED WITH PATCHING AFTER

CONSTRUCTION OPERATIONS REQUIRING CUTTING ARE COMPLETE.

41. PATCH CONSTRUCTION BY FILLING, REPAIRING, REFINISHING, CLOSING UP, AND SIMILAR

OPERATIONS FOLLOWING PERFORMANCE OF OTHER WORK. PATCH WITH DURABLE SEAMS

THAT ARE AS INVISIBLE AS POSSIBLE.

42. RESTORE EXPOSED FINISHES OF PATCHED AREAS AND EXTEND FINISH RESTORATION INTO

RETAINED ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF

PATCHING AND REFINISHING.

43. CLEAN PIPING, CONDUIT, AND SIMILAR FEATURES BEFORE APPLYING PAINT OR OTHER

FINISHING MATERIALS. RESTORE DAMAGED PIPE COVERING TO ITS ORIGINAL CONDITION.

44. WHERE WALLS OR PARTITIONS THAT ARE REMOVED EXTEND ONE FINISHED AREA INTO

ANOTHER, PATCH AND REPAIR FLOOR AND WALL SURFACES IN THE NEW SPACE.

PROVIDE AN EVEN SURFACE OF UNIFORM FINISH, COLOR, TEXTURE, AND APPEARANCE.

REMOVE IN-PLACE FLOOR AND WALL COVERINGS AND REPLACE WITH NEW MATERIALS,

IF NECESSARY, TO ACHIEVE UNIFORM COLOR AND APPEARANCE. WHERE PATCHING

OCCURS IN A PAINTED SURFACE, APPLY PRIMER AND INTERMEDIATE PAINT COATS OVER

THE PATCH AND APPLY FINAL PAINT COAT OVER.

45. PROTECT ADJACENT SURFACES; FOR EXAMPLE, BUT NOT LIMITED TO, SILLS, JAMBS AND

HEAD FRAMES AT WINDOWS AND DOORS TO NAME A FEW.

46. REMOVAL OF FIRE ALARM, FIRE SUPPRESSION, PLUMBING, MECHANICAL, ELECTRICAL,

TELECOMMUNICATION, AND SECURITY SYSTEM SHOULD BE LIMITED TO WHAT IS NECESSARY

FOR SAFE REMOVAL OF THE INDICATED WALL OR CEILING. APPROPRIATE LIGHT FIXTURES

SHALL BE TEMPORARILY SUSPENDED TO PROVIDE ADEQUATE LIGHTING LEVELS FOR

CONSTRUCTION.

47. CONTRACTOR SHALL DEMOLISH ALL FIXTURES, CEILINGS, MECHANICAL, PLUMBING, AND

ELECTRICAL AS REQUIRED TO COMPLETE THE SCOPE OF WORK OUTLINED WITHIN THE

CONSTRUCTION DOCUMENTS.

48. REFER TO STRUCTURAL, FIRE ALARM, FIRE SUPPRESSION, PLUMBING, MECHANICAL,

ELECTRICAL, TELECOMMUNICATION, AND SECURITY SYSTEM DOCUMENTS, FOR ADDITIONAL

DEMOLITION INFORMATION AND WORK.

Revisions: Date: SHEET 26 of 431

ClarkGarrettAIANCARB Stamp

FLR 1

18' - 0"

FLR 2

36' - 0"

119 10

INT G-1

29' - 2 1/2"

6'

/2

/2

B18

D20

D04

EXISTING DATA

CENTER

I100.1

PUMP ROOM

N221.6

OR 4

N222

OR 5

N238.5

CORRIDOR

V213

BREAKROOM

P209.5

CT SCAN ROOM 3

H117.5A

EXISTING IT

OPERATIONS

I100.2

BULK STORAGE

P119.3

T O

T O

P O

F

E

R O

O F

D34

D33

D04

D21B32

9'

B31

B33

B34 B34B38

FLR 1

18' - 0"

FLR 2

36' - 0"

L L.2 GB

B36

B37

B35

D34

D04

D33

D16

D31

D04

D16

B34

B18B32

OR 4

N222

CORRIDOR

V213

OMNI CELL AREA

N236

EXISTING IT

OPERATIONS

I100.2

IT

I100.3

FLR 1

18' - 0"

FLR 2

36' - 0"

L L.2 GB

D32

D36

B34

D04

D34

D33

D04

D35

D33

B18B32

D36

B36

B37

D16

PUMP ROOM

N221.6

CORRIDOR

V213

OMNI CELL AREA

N236

EXISTING IT

OPERATIONS

I100.2

CORRIDOR

I100

WORK AREA

T112

FLR 1

18' - 0"

FLR 2

36' - 0"

L L.2 M.1 NGB GC

B36

B37

B35

D04

D31

D04

D20

B34

B18

B31

B33

D02

D04

D20 D20

EXISTING DATA

CENTER

I100.1

CONFERENCE

Z221.28

STR

Z221.31

OFFICE

Z221.23

CORRIDOR

V244

OR 5

N238.5

OR6

N232

CORRIDOR

V213

OMNI CELL AREA

N236

GENERAL

MICROBIOLOGY

T118.3

ULTRASOUND

ROOM 2

H119

SERVER

I100.1A

CORRIDOR

CORRIDOR

H

STORAGE

T118.1

EXISTING DATA

CENTER

I100.1

1. COORDINATE WITH FIRE PROTECTION, MECHANICAL, ELECTRICAL, PLUMBING,

TELECOMMUNICATIONS, AND SECURITY PLANS FOR ADDITIONAL REQUIREMENTS NOT SHOWN ON

THIS DRAWING.

2. REFER TO SHEET GC001, FIRE/SMOKE BARRIER DESCRIPTIONS, FOR REQUIREMENTS FOR

PENETRATIONS AND DOORS IN RATED PARTITIONS.

3. REFER TO INTERIOR ELEVATIONS FOR ADDITIONAL INFORMATION.

4. SOME SHEET KEYNOTES LISTED BELOW MAY NOT APPLY TO THIS SHEET.

5. DIMENSIONS PRECEDED BY A TILDE (~) ARE APPROXIMATE, SUBJECT TO FIELD VERIFICATION.

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

-2 -7

.0 .A

S T

X E

H R

M .r v t

/1

/2

:3

:0

A

M

AD351

DEMOLITION BUILDING SECTIONS

Awen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX

671-22-700

1/4" = 1'-0"

B1 SECTION THRU DATA CENTER

1/4" = 1'-0"

D5 SECTION THRU EXISTING IT OPERATIONS

1/4" = 1'-0"

D1 SECTION THRU EXISTING IT OPERATIONS

1/4" = 1'-0"

F1 SECTION THRU EXISTING DATA CENTER

SHEET KEYNOTES

A42 WALL SUPPORTED GYPSUM BOARD CEILING

B18 CONCRETE PAN JOIST SYSTEM TO REMAIN

B31 22-INCH BAR JOISTS TO REMAIN

B32 5-INCH THICK CONCRETE SLAB ON TOP OF STRUCTURAL SLAB TO REMAIN

B33 ROOF TO REMAIN (BUILT-UP ROOF, OVER TAPERED INSULATION, OVER 3/4-INCH PLYWOOD, OVER

1-1/2-INCH METAL DECK)

B34 CONCRETE MASONRY UNIT WALL TO REMAIN

B35 GYPSUM WALLBOARD OR PLASTER ON METAL STUD WALL TO REMAIN

B36 STEEL TRUSS TO REMAIN

B37 ORIGINAL 1970 HOSPITAL FAÇADE

B38 ONE-HOUR WALL TO REMAIN

D02 REMOVE WALL IN ITS ENTIRETY

D04 REMOVE ACOUSTICAL CEILING AND ASSOCIATED SUPPORT AND SEISMIC BRACING, FIXTURES, AND

ACCESSORIES, PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT SURFACES FOR

CONSTRUCTION INDICATED

D16 REMOVE FINISH FLOOR MATERIAL, PREP FLOOR TO RECEIVE FLOOR FINISH SPECIFIED

D20 REMOVE ACCESS FLOORING, ASSOCIATED SUPPORTS, AND SEISMIC BRACING

D21 REMOVE FINISH FLOOR MATERIAL, PREP FLOOR TO RECEIVE FLOOR FINISH SPECIFIED

D31 REMOVE CONCRETE MASONRY UNIT WALL IN ITS ENTIRETY

D32 REMOVE DOOR AND FRAME, SALVAGE ALL DOOR HARDWARE AND TURN OVER TO VA

D33 REMOVE ROOF IN ITS ENTIRETY (BUILT-UP ROOF, OVER TAPERED INSULATION, OVER 3/4-INCH

PLYWOOD, OVER 1-1/2-INCH METAL DECK)

D34 REMOVE (7) 22-INCH DEEP BAR JOISTS COMPLETE, INCLUDING ALL BRIDGING, PERIMETER ANGLES, SUPPLEMENTAL FRAMING, ET CETERA

D35 REMOVE 10-INCH BAR JOIST COMPLETE, INCLUDING ALL BRIDGING, PERIMETER ANGLES,

SUPPLEMENTAL FRAMING, ET CETERA

D36 REMOVE 24-INCH DEEP BOND BEAM ACROSS OPENING

Revisions: Date: SHEET 27 of 431

FLR 1

18' - 0"

FLR 2

36' - 0"

D41

S05

B34B48

OFFICE

P119.3

NEW DATA

CENTER

I100.2

D40

D33

S05

B49

D04 B01

B39

FLR 1

18' - 0"

FLR 2

36' - 0"

M.1GB

D41

S04

S05

B34B48

A41

D40

D33

WORK AREA

T112

NEW DATA

CENTER

I100.2

D04 B01

B39

D33

1 1 2

1" = 1'-0"

FEETSCALE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

-2 -7

.0 .A

S T

X E

H R

M .r v t

/1

/2

:3

:1

A

M

AD361

DEMOLITION WALL SECTIONS

Awen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX

671-22-700

SHEET KEYNOTES

1" = 1'-0" REF FROM: B1 / AE351

F6 DEMO SECTION AT NEW DATA CENTER EAST WALL

1" = 1'-0" REF FROM: F5 / AE351

F3 DEMO SECTION AT NEW DATA CENTER NORTH WALL

A41 GYPSUM WALLBOARD, 16 MM (5/8-INCH)

B01 ACOUSTICAL CEILING UNITS ON EXPOSED GRID SUSPENSION SYSTEM TO REMAIN

B34 CONCRETE MASONRY UNIT WALL TO REMAIN

B39 ACOUSTICAL CEILING UNITS OCONCRETE OVER METAL DECK INTERSTITIAL FLOOR (ENTIRE

FOOTPRINT ) TO REMAINN EXPOSED GRID SUSPENSION SYSTEM TO REMAIN

B39 CONCRETE OVER METAL DECK INTERSTITIAL FLOOR (ENTIRE FOOTPRINT ) TO REMAIN

B48 WALL FURRING TO REMAIN

B49 HSS TO BE REMOVED

D04 REMOVE ACOUSTICAL CEILING AND ASSOCIATED SUPPORT AND SEISMIC BRACING, FIXTURES, AND

ACCESSORIES, PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT SURFACES FOR

CONSTRUCTION INDICATED

D33 REMOVE ROOF IN ITS ENTIRETY (BUILT-UP ROOF, OVER TAPERED INSULATION, OVER 3/4-INCH

PLYWOOD, OVER 1-1/2-INCH METAL DECK)

D40 REMOVE STEEL JOISTS, METAL ROOF DECK, AND ASSOCIATED MISCELLANEOUS STEEL AFTER

WALL IS BRACED

D41 REMOVE 4-INCH COURSE OF CONCRETE MASONRY UNITS, 2x NAILER, AND EDGE FLASHING

S04 W24x104 TO REMAIN (PATCH/REPAIR FIREPROOFING DAMAGED DURING CONSTRUCTION)

S05 W18x71 AT ~7'-6" ON CENTER TO REMAIN (PATCH/REPAIR FIREPROOFING DAMAGED DURING

CONSTRUCTION)

Revisions: Date: SHEET 28 of 431

TR

H031

(E) 14' - 9 1/4"

(E

/4

D03

D14

D01

B02

B21

B03

TR

H031

TR

B20

D03

D02

D14

D01

B02

B03

B20

TR

TR

C013

RECREATIONAL

THERAPY

C012

D14

SCI3.8

VESTIBULE

USED AS

STORAGE

C015

D16 D15

D15

D03

D09

SCI3.8

D13

VESTIBULE

USED AS

STORAGE

C015

D04

M24

B01

B03

RECREATIONAL

THERAPY

C012

TR

C013

4.8

LAUNDRY

D017

TR

D016

B04

D14

4.8

B02

B03

LAUNDRY

D017

TR

D016

TR

F004

CORRIDOR

TLT

F005.1

OFFICE

F005

OFFICE

F003

D04

E08

E08

TR

F004

CORRIDOR

TLT

F005.1

OFFICE

F005

OFFICE

F003

D03

1. THESE DOCUMENTS DO NOT INDICATE ALL MINOR AREAS AFFECTED BY SELECTIVE DEMOLITION, THE

CONTRACTOR SHALL BE RESPONSIBLE FOR QUANTIFYING THE MATERIAL AND LABOR COSTS TO

DEMOLISH, PATCH, REPAIR ADJACENT AREAS AFFECTED BY THE CONSTRUCTION INDICATED TO A

"LIKE NEW" CONDITION.

2. COORDINATE WITH FIRE PROTECTION, MECHANICAL, ELECTRICAL, PLUMBING, TELECOMMUNICATIONS, AND SECURITY PLANS FOR ADDITIONAL SELECTIVE DEMOLITION REQUIREMENTS NOT SHOWN ON THIS

DRAWING.

3. SOME SHEET KEYNOTES LISTED BELOW MAY NOT APPLY TO THIS SHEET.

4. DIMENSIONS PRECEDED BY A TILDE (~) ARE APPROXIMATE, SUBJECT TO FIELD VERIFICATION.

CONSTRUCTION TO REMAIN

IN PLACE (SHOWN SOLID)

CONSTRUCTION TO BE

DEMOLISHED (SHOWN DASHED)

DEMOLITION LEGEND

TEMPORARY CONSTRUCTION

BARRIER (F5/AE523)

DEMOLITION BOUNDARY, IN ADDITION TO KEYNOTED ITEMS, PERFORM THE

DISMANTLING OF CONSTRUCTION IN A MANNER THAT WILL NOT DAMAGE

ADJACENT REMAINING CONSTRUCTION.

PATH OF EGRESS

OUT OF SCOPE AREAS, COORDINATE WITH FIRE PROTECTION, MECHANICAL,

ELECTRICAL, PLUMBING, TELECOMMUNICATIONS, AND SECURITY PLANS FOR

ADDITIONAL REQUIREMENTS WITHIN THIS AREA

REMOVE CEILING AND ASSOCIATED SUPPORT AND SEISMIC BRACING,

FIXTURES, AND ACCESSORIES, TYPICAL WITHIN DEMOLITION BOUNDARY.

PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT

SURFACES FOR CONSTRUCTION INDICATED

REMOVE GYPSUM BOARD CEILING AND ASSOCIATED

SUPPORT/SUSPENSION SYSTEM, FIXTURES, AND ACCESSORIES

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

P L A

N N

O R

T H

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

-2 -7

.0 .A

S T

X E

H R

M .r v t

/1

/2

:3

:2

A

M

AD401

DEMOLITION TR FLOOR AND

REFLECTED CEILING (RC) PLANSAwen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX

671-22-700

1/4" = 1'-0" REF FROM: - / AE121

C7 TR H031 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE122

F7 TR 030 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE124

F5 TR C013 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE124

C1 TR C015.1 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE129

C5 TR D016 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE125

F1 TR F004 FLOOR AND RC PLAN

B01 ACOUSTICAL CEILING UNITS ON EXPOSED GRID SUSPENSION SYSTEM TO REMAIN

B02 GYPSUM WALLBOARD OR PLASTER CEILING TO REMAIN

B03 LIGHT FIXTURE TO REMAIN

B04 POLISHED CONCRETE FLOOR TO REMAIN

B20 VOID SPACE

B21 HORIZONTAL CABLE TRAY TO REMAIN, SEE TELECOMMUNICATION DRAWINGS

D01 REMOVE FINISH FLOOR MATERIAL EXCEPT FLOORING DIRECTLY UNDER RACK(S) INDICATED TO

REMAIN AND PREP FLOOR TO RECEIVE FLOOR FINISH SPECIFIED

D02 REMOVE WALL IN ITS ENTIRETY

D03 REMOVE DOOR AND FRAME, SALVAGE ALL DOOR HARDWARE AND TURN OVER TO VA, VERIFY

FRAMING AND PROVIDE MODIFICATIONS NECESSARY IF DOOR INCREASES IN SIZE, PATCH

ADJACENT FINISHES TO MATCH EXISTING, PAINT AFFECTED WALL TO CLOSEST CORNER

D04 REMOVE ACOUSTICAL CEILING AND ASSOCIATED SUPPORT AND SEISMIC BRACING, FIXTURES, AND

ACCESSORIES, PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT SURFACES FOR

CONSTRUCTION INDICATED

D09 REMOVE BUILT-IN CASEWORK

D13 REMOVE LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS

D14 TELECOM RACK(S) TO BE REMOVED, PREP ADJACENT SURFACES FOR NEW CONSTRUCTION, SEE

TELECOM DRAWINGS

D15 REMOVE WINDOW AND FRAME

D16 REMOVE FINISH FLOOR MATERIAL, PREP FLOOR TO RECEIVE FLOOR FINISH SPECIFIED

E08 REMOVE LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS

M24 LINEAR DIFFUSER, SEE MECHANICAL DRAWINGS

SHEET KEYNOTES

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLANREFLECTED CEILING PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLANFLOOR PLAN

FLOOR PLAN

Revisions: Date: SHEET 29 of 431

L010.2

OFFICE

L011.3

ENVIRONMENTAL

CARE

L010

EMPLOYEE

UNIFORM CENTER

L029

ENVIRONMENTAL

MANAGEMENT

LO11

D03

D01

D03

TR

GB126.1

OFFICE

GB126.2

CORRIDOR

GLS205

STERILE

CONSUMABLES

STORAGE

FB31

LOGISTICS

GB126

D21

T O

F

LO

O R

T

IL

E J

O

IN

T

1'

/2

TR

GB101

ELEC

CG102

CORRIDOR

STORAGE

GB013

B04

D14

TR

D01

D14

D03

D21

D09

D26

S

IN

K

S TLT

1A143

OFFICE

1A141

TR

1A139

TR

1A138

DIRTY

UTILITY

1A137

HAC

1A140

D14

D09

D27

D03

D21

D09

D14

S

IN

K

TLT

2A142

TR

2A138

DIRTY

UTILITY

2A136

HAC

2A139

NURSE

PRACTIONERS

2A140

TR

2A137

LAUNDRY

2A141

D26

D09

TR

L010.2

OFFICE

L011.3

ENVIRONMENTAL

CARE

L010

ENVIRONMENTAL

MANAGEMENT

LO11

D13

D23

D04

F01

D13

B01

TR

GB126.1

OFFICE

GB126.2

LOGISTICS

GB126

STERILE

CONSUMABLES

STORAGE

FB31

CORRIDOR

GLS205

D13

D04

T O

C E

LI

N

G G

R

ID

2'

TR

GB101

ELEC

CG102

CORRIDOR

STORAGE

GB013

B16

TR

S TLT

B16

D13

D23 F01

D04

S TLT

1A143

OFFICE

1A141

TR

1A139

TR

1A138

DIRTY

UTILITY

1A137

HAC

1A140

D13 D13

D23

F01

D04

TLT

2A142

TR

2A138

DIRTY

UTILITY

2A136

HAC

2A139

NURSE

PRACTIONERS

2A140

TR

2A137

LAUNDRY

2A141

B01

1. THESE DOCUMENTS DO NOT INDICATE ALL MINOR AREAS AFFECTED BY SELECTIVE DEMOLITION, THE

CONTRACTOR SHALL BE RESPONSIBLE FOR QUANTIFYING THE MATERIAL AND LABOR COSTS TO

DEMOLISH, PATCH, REPAIR ADJACENT AREAS AFFECTED BY THE CONSTRUCTION INDICATED TO A

"LIKE NEW" CONDITION.

2. COORDINATE WITH FIRE PROTECTION, MECHANICAL, ELECTRICAL, PLUMBING, TELECOMMUNICATIONS, AND SECURITY PLANS FOR ADDITIONAL SELECTIVE DEMOLITION REQUIREMENTS NOT SHOWN ON THIS

DRAWING.

3. SOME SHEET KEYNOTES LISTED BELOW MAY NOT APPLY TO THIS SHEET.

4. DIMENSIONS PRECEDED BY A TILDE (~) ARE APPROXIMATE, SUBJECT TO FIELD VERIFICATION.

CONSTRUCTION TO REMAIN

IN PLACE (SHOWN SOLID)

CONSTRUCTION TO BE

DEMOLISHED (SHOWN DASHED)

DEMOLITION LEGEND

TEMPORARY CONSTRUCTION

BARRIER (F5/AE523)

DEMOLITION BOUNDARY, IN ADDITION TO KEYNOTED ITEMS, PERFORM THE

DISMANTLING OF CONSTRUCTION IN A MANNER THAT WILL NOT DAMAGE

ADJACENT REMAINING CONSTRUCTION.

PATH OF EGRESS

OUT OF SCOPE AREAS, COORDINATE WITH FIRE PROTECTION, MECHANICAL,

ELECTRICAL, PLUMBING, TELECOMMUNICATIONS, AND SECURITY PLANS FOR

ADDITIONAL REQUIREMENTS WITHIN THIS AREA

REMOVE CEILING AND ASSOCIATED SUPPORT AND SEISMIC BRACING,

FIXTURES, AND ACCESSORIES, TYPICAL WITHIN DEMOLITION BOUNDARY.

PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT

SURFACES FOR CONSTRUCTION INDICATED

REMOVE GYPSUM BOARD CEILING AND ASSOCIATED

SUPPORT/SUSPENSION SYSTEM, FIXTURES, AND ACCESSORIES

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

P L A

N N

O R

T H

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

-2 -7

.0 .A

S T

X E

H R

M .r v t

/1

/2

:3

:2

A

M

AD402

DEMOLITION TR FLOOR AND

REFLECTED CEILING (RC) PLANSAwen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX

671-22-700

1/4" = 1'-0" REF FROM: - / AE127

C7 TR L010.2 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE128

F7 TR GB126.1 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE128

F5 TR GB101 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE130

C5 TR 020 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE132

C1 TR 1A138 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE147

F1 TR 2A137 FLOOR AND RC PLAN

B01 ACOUSTICAL CEILING UNITS ON EXPOSED GRID SUSPENSION SYSTEM TO REMAIN

B04 POLISHED CONCRETE FLOOR TO REMAIN

B16 EXPOSED TO STRUCTURE, LIGHT FIXTURE(S) TO REMAIN

D01 REMOVE FINISH FLOOR MATERIAL EXCEPT FLOORING DIRECTLY UNDER RACK(S) INDICATED TO

REMAIN AND PREP FLOOR TO RECEIVE FLOOR FINISH SPECIFIED

D03 REMOVE DOOR AND FRAME, SALVAGE ALL DOOR HARDWARE AND TURN OVER TO VA, VERIFY

FRAMING AND PROVIDE MODIFICATIONS NECESSARY IF DOOR INCREASES IN SIZE, PATCH

ADJACENT FINISHES TO MATCH EXISTING, PAINT AFFECTED WALL TO CLOSEST CORNER

D04 REMOVE ACOUSTICAL CEILING AND ASSOCIATED SUPPORT AND SEISMIC BRACING, FIXTURES, AND

ACCESSORIES, PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT SURFACES FOR

CONSTRUCTION INDICATED

D09 REMOVE BUILT-IN CASEWORK

D13 REMOVE LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS

D14 TELECOM RACK(S) TO BE REMOVED, PREP ADJACENT SURFACES FOR NEW CONSTRUCTION, SEE

TELECOM DRAWINGS

D21 REMOVE FINISH FLOOR MATERIAL, PREP FLOOR TO RECEIVE FLOOR FINISH SPECIFIED

D23 REMOVE SUPPLY REGISTER, SEE MECHANICAL DRAWINGS

D26 REMOVE AND SALVAGE SOAP/HAND SANITIZER DISPENSER

D27 REMOVE AND SALVAGE WALL MOUNTED TELEPHONE

F01 FIRE SPRINKLER HEAD TO REMAIN, SEE FIRE PROTECTION DRAWINGS

SHEET KEYNOTES

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLANREFLECTED CEILING PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLANFLOOR PLAN

FLOOR PLAN

Revisions: Date: SHEET 30 of 431

C

X102

HAC

W101

VACANT

W103

CORRIDOR

OCC

RECEPTION

V178

B24

T08

D14

D

TR

S101

D21

D02

D02

D03

D38

B25

D14

TR

C132

TLT

C130

CORRIDOR

D03

D01

TR

GROUP ROOM

E114

CORRIDOR

STAIR 5

1S5

D03

D01

TR

H120A

XRAY 6

H122

EXAM

M108

B05

D14

L

D21

STAFF

H118

TR

H118.2

ULS 1

H118.1

D03

C

TR

X102

HAC

W101

VACANT

W103

CORRIDOR

OCC

RECEPTION

V178

B02

B03

TLT

C130

TR

C132

CORRIDOR

B02

D13

D13

TR

H120A

EXAM

M108

XRAY 6

H122

CORRIDOR

B02

L

STAFF

H118

TR

H118.2

ULS 1

H118.1

D13

D23

F01

D04

TR

GROUP ROOM

E114

CORRIDOR

D13

D23

D04

D

TR

S101

D04

D11

B01

1. THESE DOCUMENTS DO NOT INDICATE ALL MINOR AREAS AFFECTED BY SELECTIVE DEMOLITION, THE

CONTRACTOR SHALL BE RESPONSIBLE FOR QUANTIFYING THE MATERIAL AND LABOR COSTS TO

DEMOLISH, PATCH, REPAIR ADJACENT AREAS AFFECTED BY THE CONSTRUCTION INDICATED TO A

"LIKE NEW" CONDITION.

2. COORDINATE WITH FIRE PROTECTION, MECHANICAL, ELECTRICAL, PLUMBING, TELECOMMUNICATIONS, AND SECURITY PLANS FOR ADDITIONAL SELECTIVE DEMOLITION REQUIREMENTS NOT SHOWN ON THIS

DRAWING.

3. SOME SHEET KEYNOTES LISTED BELOW MAY NOT APPLY TO THIS SHEET.

4. DIMENSIONS PRECEDED BY A TILDE (~) ARE APPROXIMATE, SUBJECT TO FIELD VERIFICATION.

CONSTRUCTION TO REMAIN

IN PLACE (SHOWN SOLID)

CONSTRUCTION TO BE

DEMOLISHED (SHOWN DASHED)

DEMOLITION LEGEND

TEMPORARY CONSTRUCTION

BARRIER (F5/AE523)

DEMOLITION BOUNDARY, IN ADDITION TO KEYNOTED ITEMS, PERFORM THE

DISMANTLING OF CONSTRUCTION IN A MANNER THAT WILL NOT DAMAGE

ADJACENT REMAINING CONSTRUCTION.

PATH OF EGRESS

OUT OF SCOPE AREAS, COORDINATE WITH FIRE PROTECTION, MECHANICAL,

ELECTRICAL, PLUMBING, TELECOMMUNICATIONS, AND SECURITY PLANS FOR

ADDITIONAL REQUIREMENTS WITHIN THIS AREA

REMOVE CEILING AND ASSOCIATED SUPPORT AND SEISMIC BRACING,

FIXTURES, AND ACCESSORIES, TYPICAL WITHIN DEMOLITION BOUNDARY.

PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT

SURFACES FOR CONSTRUCTION INDICATED

REMOVE GYPSUM BOARD CEILING AND ASSOCIATED

SUPPORT/SUSPENSION SYSTEM, FIXTURES, AND ACCESSORIES

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

P L A

N N

O R

T H

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

-2 -7

.0 .A

S T

X E

H R

M .r v t

/1

/2

:3

:3

A

M

AD403

DEMOLITION TR FLOOR AND

REFLECTED CEILING (RC) PLANSAwen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX

671-22-700

1/4" = 1'-0" REF FROM: - / AE135

C7 TR X102 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE135

F3 TR S101 FLOOR AND RC PLAN

1/4" = 1'-0"

C5 ENLARGED PLAN AT TR C132

1/4" = 1'-0" REF FROM: - / AE139

F7 TR 105 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE140

C3 TR H120A FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE140

F5 TR H118.2 FLOOR AND RC PLAN

B01 ACOUSTICAL CEILING UNITS ON EXPOSED GRID SUSPENSION SYSTEM TO REMAIN

B02 GYPSUM WALLBOARD OR PLASTER CEILING TO REMAIN

B03 LIGHT FIXTURE TO REMAIN

B05 RESILIENT FLOORING TO REMAIN

B24 CERAMIC MOSAIC TILE FLOORING TO REMAIN

B25 ED FLOORING, KARNDEAN DESIGN FLOORING VAN GOGH COPPER GUM VGW33T TO REMAIN

D01 REMOVE FINISH FLOOR MATERIAL EXCEPT FLOORING DIRECTLY UNDER RACK(S) INDICATED TO

REMAIN AND PREP FLOOR TO RECEIVE FLOOR FINISH SPECIFIED

D02 REMOVE WALL IN ITS ENTIRETY

D03 REMOVE DOOR AND FRAME, SALVAGE ALL DOOR HARDWARE AND TURN OVER TO VA, VERIFY

FRAMING AND PROVIDE MODIFICATIONS NECESSARY IF DOOR INCREASES IN SIZE, PATCH

ADJACENT FINISHES TO MATCH EXISTING, PAINT AFFECTED WALL TO CLOSEST CORNER

D04 REMOVE ACOUSTICAL CEILING AND ASSOCIATED SUPPORT AND SEISMIC BRACING, FIXTURES, AND

ACCESSORIES, PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT SURFACES FOR

CONSTRUCTION INDICATED

D11 REMOVE GYPSUM BOARD CEILING, ASSOCIATED SUPPORT/SUSPENSION SYSTEM, FIXTURES, AND

ACCESSORIES, PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT SURFACES FOR

CONSTRUCTION INDICATED

D13 REMOVE LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS

D14 TELECOM RACK(S) TO BE REMOVED, PREP ADJACENT SURFACES FOR NEW CONSTRUCTION, SEE

TELECOM DRAWINGS

D21 REMOVE FINISH FLOOR MATERIAL, PREP FLOOR TO RECEIVE FLOOR FINISH SPECIFIED

D23 REMOVE SUPPLY REGISTER, SEE MECHANICAL DRAWINGS

D38 REMOVE FINISH FLOOR MATERIAL, PREP FLOOR TO RECEIVE FLOOR FINISH SPECIFIED (ACM: ~100

SQUARE FEET OF BLACK MASTIC UNDER TAN FLOOR TILE TO BE ABATED)

T08 DECOMMISSIONED TR, SEE TELECOMMUNICATIONS DRAWINGS

SHEET KEYNOTES

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLAN

Revisions: Date: SHEET 31 of 431

D02

D03

D05

TR

J104

OFFICE

J105.1

CORRIDOR

D14

D21

D03

D21

B19

1/

2"

T08 B05

D14

TR

P127

L

OFFICE

P124

TR

P125

M TLT

126.2

D21

OFFICE

P124

TR

P125

M TLT

126.2

CORRIDOR

D13

D04

D13

D13

E07

B02

TR

P127

TR

J104

OFFICE

J105.1

CORRIDOR

B01

B02

D04

1. THESE DOCUMENTS DO NOT INDICATE ALL MINOR AREAS AFFECTED BY SELECTIVE DEMOLITION, THE

CONTRACTOR SHALL BE RESPONSIBLE FOR QUANTIFYING THE MATERIAL AND LABOR COSTS TO

DEMOLISH, PATCH, REPAIR ADJACENT AREAS AFFECTED BY THE CONSTRUCTION INDICATED TO A

"LIKE NEW" CONDITION.

2. COORDINATE WITH FIRE PROTECTION, MECHANICAL, ELECTRICAL, PLUMBING, TELECOMMUNICATIONS, AND SECURITY PLANS FOR ADDITIONAL SELECTIVE DEMOLITION REQUIREMENTS NOT SHOWN ON THIS

DRAWING.

3. SOME SHEET KEYNOTES LISTED BELOW MAY NOT APPLY TO THIS SHEET.

4. DIMENSIONS PRECEDED BY A TILDE (~) ARE APPROXIMATE, SUBJECT TO FIELD VERIFICATION.

CONSTRUCTION TO REMAIN

IN PLACE (SHOWN SOLID)

CONSTRUCTION TO BE

DEMOLISHED (SHOWN DASHED)

DEMOLITION LEGEND

TEMPORARY CONSTRUCTION

BARRIER (F5/AE523)

DEMOLITION BOUNDARY, IN ADDITION TO KEYNOTED ITEMS, PERFORM THE

DISMANTLING OF CONSTRUCTION IN A MANNER THAT WILL NOT DAMAGE

ADJACENT REMAINING CONSTRUCTION.

PATH OF EGRESS

OUT OF SCOPE AREAS, COORDINATE WITH FIRE PROTECTION, MECHANICAL,

ELECTRICAL, PLUMBING, TELECOMMUNICATIONS, AND SECURITY PLANS FOR

ADDITIONAL REQUIREMENTS WITHIN THIS AREA

REMOVE CEILING AND ASSOCIATED SUPPORT AND SEISMIC BRACING,

FIXTURES, AND ACCESSORIES, TYPICAL WITHIN DEMOLITION BOUNDARY.

PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT

SURFACES FOR CONSTRUCTION INDICATED

REMOVE GYPSUM BOARD CEILING AND ASSOCIATED

SUPPORT/SUSPENSION SYSTEM, FIXTURES, AND ACCESSORIES

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

P L A

N N

O R

T H

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

-2 -7

.0 .A

S T

X E

H R

M .r v t

/1

/2

:3

:4

A

M

AD404

DEMOLITION TR FLOOR AND

REFLECTED CEILING (RC) PLANSAwen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX

671-22-700

1/4" = 1'-0" REF FROM: - / AE136

D1 TR J104 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE141

F5 TR P125 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE141

F1 TR P125 FLOOR AND RC PLAN

B01 ACOUSTICAL CEILING UNITS ON EXPOSED GRID SUSPENSION SYSTEM TO REMAIN

B02 GYPSUM WALLBOARD OR PLASTER CEILING TO REMAIN

B05 RESILIENT FLOORING TO REMAIN

B19 CARPET TO REMAIN

B28 DROPPED SOFFIT TO REMAIN

D02 REMOVE WALL IN ITS ENTIRETY

D03 REMOVE DOOR AND FRAME, SALVAGE ALL DOOR HARDWARE AND TURN OVER TO VA, VERIFY

FRAMING AND PROVIDE MODIFICATIONS NECESSARY IF DOOR INCREASES IN SIZE, PATCH

ADJACENT FINISHES TO MATCH EXISTING, PAINT AFFECTED WALL TO CLOSEST CORNER

D04 REMOVE ACOUSTICAL CEILING AND ASSOCIATED SUPPORT AND SEISMIC BRACING, FIXTURES, AND

ACCESSORIES, PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT SURFACES FOR

CONSTRUCTION INDICATED

D05 REMOVE PORTION OF WALL TO FACILITATE INSTALLATION OF DOOR

D13 REMOVE LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS

D14 TELECOM RACK(S) TO BE REMOVED, PREP ADJACENT SURFACES FOR NEW CONSTRUCTION, SEE

TELECOM DRAWINGS

D21 REMOVE FINISH FLOOR MATERIAL, PREP FLOOR TO RECEIVE FLOOR FINISH SPECIFIED

D28 REMOVE WALL TO 6-INCHES BELOW CEILING

E07 LIGHT FIXTURE TO REMAIN

E08 REMOVE LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS

T08 DECOMMISSIONED TR, SEE TELECOMMUNICATIONS DRAWINGS

SHEET KEYNOTES

FLOOR PLAN

REFLECTED CEILING PLAN

REFLECTED CEILING PLANFLOOR PLANREFLECTED CEILING PLANFLOOR PLAN

Revisions: Date: SHEET 32 of 431

GD

AUTOCLAVE

T116

TR

T119.2

ADMINISTRATIVE

OFFICES

T119

CORRIDOR

B562

D02

D03

D03

D21

D01

D14

MAS

BACK OFFICE

G100.10

TR

G101

TLT

G102

OFFICE

G146

WAITING AREA A

G100.8 B05

D21

D29

D21

D03

D02D14

TR

Y102.7

STAIR 16

1S16

PATRIOT STORE

Y102

D01

D14

COFFEE VENDOR

TR

CORRIDOR

D01

D14

D

0'

/4

D20

CORRIDOR

V235

CORRIDOR

B1051

ANIMAL

PROTOCOLS

Q200

OFFICE

Q201

RESEARCH ADMIN

OFFICES

Q202

OFFICE

Q202.2

BIO-MED

SERVERS

R201.1

TR

R201

BONE MARROW

LAB

B715

B23

B22

D03

B26

B05

B05

D14

D

D04

D13

D13

D11

B01

OFFICE

Q201

OFFICE

Q202.2

RESEARCH ADMIN

OFFICES

Q202

BIO-MED

SERVERS

R201.1

ANIMAL

PROTOCOLS

Q200

CORRIDOR

V235

TR

R201

SCI3.8

D13

D04 B01

B02

TR

G101

TLT

G102

OFFICE

G146

MAS

BACK OFFICE

G100.10

WAITING AREA A

G100.8

E07E07

A43

TR

COFFEE VENDOR

CORRIDOR

WORK AREA

TR

Y102.7

STAIR 16

1S16

PATRIOT STORE

Y102

A43

E07

GD

D04

D04

D13

D13

ADMINISTRATIVE

OFFICES

T119

CORRIDOR

B562

AUTOCLAVE

T116

TR

T119.2

1. THESE DOCUMENTS DO NOT INDICATE ALL MINOR AREAS AFFECTED BY SELECTIVE DEMOLITION, THE

CONTRACTOR SHALL BE RESPONSIBLE FOR QUANTIFYING THE MATERIAL AND LABOR COSTS TO

DEMOLISH, PATCH, REPAIR ADJACENT AREAS AFFECTED BY THE CONSTRUCTION INDICATED TO A

"LIKE NEW" CONDITION.

2. COORDINATE WITH FIRE PROTECTION, MECHANICAL, ELECTRICAL, PLUMBING, TELECOMMUNICATIONS, AND SECURITY PLANS FOR ADDITIONAL SELECTIVE DEMOLITION REQUIREMENTS NOT SHOWN ON THIS

DRAWING.

3. SOME SHEET KEYNOTES LISTED BELOW MAY NOT APPLY TO THIS SHEET.

4. DIMENSIONS PRECEDED BY A TILDE (~) ARE APPROXIMATE, SUBJECT TO FIELD VERIFICATION.

CONSTRUCTION TO REMAIN

IN PLACE (SHOWN SOLID)

CONSTRUCTION TO BE

DEMOLISHED (SHOWN DASHED)

DEMOLITION LEGEND

TEMPORARY CONSTRUCTION

BARRIER (F5/AE523)

DEMOLITION BOUNDARY, IN ADDITION TO KEYNOTED ITEMS, PERFORM THE

DISMANTLING OF CONSTRUCTION IN A MANNER THAT WILL NOT DAMAGE

ADJACENT REMAINING CONSTRUCTION.

PATH OF EGRESS

OUT OF SCOPE AREAS, COORDINATE WITH FIRE PROTECTION, MECHANICAL,

ELECTRICAL, PLUMBING, TELECOMMUNICATIONS, AND SECURITY PLANS FOR

ADDITIONAL REQUIREMENTS WITHIN THIS AREA

REMOVE CEILING AND ASSOCIATED SUPPORT AND SEISMIC BRACING,

FIXTURES, AND ACCESSORIES, TYPICAL WITHIN DEMOLITION BOUNDARY.

PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT

SURFACES FOR CONSTRUCTION INDICATED

REMOVE GYPSUM BOARD CEILING AND ASSOCIATED

SUPPORT/SUSPENSION SYSTEM, FIXTURES, AND ACCESSORIES

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

P L A

N N

O R

T H

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

-2 -7

.0 .A

S T

X E

H R

M .r v t

/1

/2

:3

:5

A

M

AD405

DEMOLITION TR FLOOR AND

REFLECTED CEILING (RC) PLANSAwen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX

671-22-700

1/4" = 1'-0" REF FROM: - / AE142

C7 TR T119.2 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE143

F7 TR G101 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE144

C5 TR Y102.7 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE145

F5 TR 157 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE152

F1 TR 201 FLOOR AND RC PLAN

A43 OPEN TO STUCTURE ABOVE

B01 ACOUSTICAL CEILING UNITS ON EXPOSED GRID SUSPENSION SYSTEM TO REMAIN

B02 GYPSUM WALLBOARD OR PLASTER CEILING TO REMAIN

B05 RESILIENT FLOORING TO REMAIN

B22 ACCESS FLOORING TO REMAIN

B23 ACCESS FLOOR RAMP DOWN TO REMAIN

B26 CONCRETE FLOOR TO REMAIN, PREP FLOOR TO RECEIVE FLOOR FINISH SPECIFIED

D01 REMOVE FINISH FLOOR MATERIAL EXCEPT FLOORING DIRECTLY UNDER RACK(S) INDICATED TO

REMAIN AND PREP FLOOR TO RECEIVE FLOOR FINISH SPECIFIED

D02 REMOVE WALL IN ITS ENTIRETY

D03 REMOVE DOOR AND FRAME, SALVAGE ALL DOOR HARDWARE AND TURN OVER TO VA, VERIFY

FRAMING AND PROVIDE MODIFICATIONS NECESSARY IF DOOR INCREASES IN SIZE, PATCH

ADJACENT FINISHES TO MATCH EXISTING, PAINT AFFECTED WALL TO CLOSEST CORNER

D04 REMOVE ACOUSTICAL CEILING AND ASSOCIATED SUPPORT AND SEISMIC BRACING, FIXTURES, AND

ACCESSORIES, PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT SURFACES FOR

CONSTRUCTION INDICATED

D11 REMOVE GYPSUM BOARD CEILING, ASSOCIATED SUPPORT/SUSPENSION SYSTEM, FIXTURES, AND

ACCESSORIES, PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT SURFACES FOR

CONSTRUCTION INDICATED

D13 REMOVE LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS

D14 TELECOM RACK(S) TO BE REMOVED, PREP ADJACENT SURFACES FOR NEW CONSTRUCTION, SEE

TELECOM DRAWINGS

D20 REMOVE ACCESS FLOORING, ASSOCIATED SUPPORTS, AND SEISMIC BRACING

D21 REMOVE FINISH FLOOR MATERIAL, PREP FLOOR TO RECEIVE FLOOR FINISH SPECIFIED

D29 REMOVE PONY WALL IN ITS ENTIRETY

E07 LIGHT FIXTURE TO REMAIN

SHEET KEYNOTES

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLANFLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLAN

Revisions: Date: SHEET 33 of 431

C

D03

STAIR 2

B712

TR

WAITING

M201

TLT

M201.1

D01

D21 B05

~ 3' - 9"

D14

D14

TR

A200

STORAGE

NURSE

STATION

A201

CORRIDOR

A200

CORRIDOR

200.0

NURSE

MANAGER

A249

D01 D03

D01

B05

D02

D30

D14

L

D01

D03

TR

E221

CORRIDOR

E200

NURSE MANAGER

D221

CORRIDOR

B462

CONFERENCE

Z221.28

0'

D05

D21

B19

T08

B05

IDF

Z221.1

D14

B05

T08

CONFERENCE

W200

COLD ROOM

W216

BREAKROOM

W215

TR

W220

D14

D01

SERVICE ELEV

LOBBY

CR2-208

TR

TLT

CORRIDOR

CR2-207

D14

GC

STR

D319

TRAINING RM 1A

D317.1A

TR

D320

LAN / WAN

MANAGER

E301.15

CORRIDOR

D300

WEB

MANAGER

E301.14

D01

D02

D14

C

TR

STAIR 2

B712

TLT

M201.1

WAITING

M201

B02 D04 B01

L

B02

E07 E07

CORRIDOR

E200

TR

E221

CORRIDOR

B462

NURSE MANAGER

D221

B01

E07 E07

IDF

Z221.1

E07E07

A43

TR

TLT

SERVICE ELEV

LOBBY

CR2-208

CORRIDOR

CR2-207

D11

D11

E08 E08 E08

E08 B02

STORAGE

NURSE

MANAGER

A249

NURSE

STATION

A201

CORRIDOR

A200

CORRIDOR

200.0

TR

A200

B01

D04

TR

Z221.28A

TR

W220

COLD ROOM

W216

BREAKROOM

W215

CONFERENCE

W200

E07

B02

GC

D04

D04

TR

D320

1. THESE DOCUMENTS DO NOT INDICATE ALL MINOR AREAS AFFECTED BY SELECTIVE DEMOLITION, THE

CONTRACTOR SHALL BE RESPONSIBLE FOR QUANTIFYING THE MATERIAL AND LABOR COSTS TO

DEMOLISH, PATCH, REPAIR ADJACENT AREAS AFFECTED BY THE CONSTRUCTION INDICATED TO A

"LIKE NEW" CONDITION.

2. COORDINATE WITH FIRE PROTECTION, MECHANICAL, ELECTRICAL, PLUMBING, TELECOMMUNICATIONS, AND SECURITY PLANS FOR ADDITIONAL SELECTIVE DEMOLITION REQUIREMENTS NOT SHOWN ON THIS

DRAWING.

3. SOME SHEET KEYNOTES LISTED BELOW MAY NOT APPLY TO THIS SHEET.

4. DIMENSIONS PRECEDED BY A TILDE (~) ARE APPROXIMATE, SUBJECT TO FIELD VERIFICATION.

CONSTRUCTION TO REMAIN

IN PLACE (SHOWN SOLID)

CONSTRUCTION TO BE

DEMOLISHED (SHOWN DASHED)

DEMOLITION LEGEND

TEMPORARY CONSTRUCTION

BARRIER (F5/AE523)

DEMOLITION BOUNDARY, IN ADDITION TO KEYNOTED ITEMS, PERFORM THE

DISMANTLING OF CONSTRUCTION IN A MANNER THAT WILL NOT DAMAGE

ADJACENT REMAINING CONSTRUCTION.

PATH OF EGRESS

OUT OF SCOPE AREAS, COORDINATE WITH FIRE PROTECTION, MECHANICAL,

ELECTRICAL, PLUMBING, TELECOMMUNICATIONS, AND SECURITY PLANS FOR

ADDITIONAL REQUIREMENTS WITHIN THIS AREA

REMOVE CEILING AND ASSOCIATED SUPPORT AND SEISMIC BRACING,

FIXTURES, AND ACCESSORIES, TYPICAL WITHIN DEMOLITION BOUNDARY.

PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT

SURFACES FOR CONSTRUCTION INDICATED

REMOVE GYPSUM BOARD CEILING AND ASSOCIATED

SUPPORT/SUSPENSION SYSTEM, FIXTURES, AND ACCESSORIES

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

P L A

N N

O R

T H

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

-2 -7

.0 .A

S T

X E

H R

M .r v t

/1

/2

:3

:5

A

M

AD406

DEMOLITION TR FLOOR AND

REFLECTED CEILING (RC) PLANSAwen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX

671-22-700

1/4" = 1'-0" REF FROM: - / AE153

C7 TR 238 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE154

F7 TR A200 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE155

C5 TR E221 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE159

F5 TR Z221.28 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE159

C3 TR Z221.1 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE159

F3 TR W220 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE160

C1 TR 258 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE165

F1 TR D320 FLOOR AND RC PLAN

A43 OPEN TO STUCTURE ABOVE

B01 ACOUSTICAL CEILING UNITS ON EXPOSED GRID SUSPENSION SYSTEM TO REMAIN

B02 GYPSUM WALLBOARD OR PLASTER CEILING TO REMAIN

B05 RESILIENT FLOORING TO REMAIN

B19 CARPET TO REMAIN

D01 REMOVE FINISH FLOOR MATERIAL EXCEPT FLOORING DIRECTLY UNDER RACK(S) INDICATED TO

REMAIN AND PREP FLOOR TO RECEIVE FLOOR FINISH SPECIFIED

D02 REMOVE WALL IN ITS ENTIRETY

D03 REMOVE DOOR AND FRAME, SALVAGE ALL DOOR HARDWARE AND TURN OVER TO VA, VERIFY

FRAMING AND PROVIDE MODIFICATIONS NECESSARY IF DOOR INCREASES IN SIZE, PATCH

ADJACENT FINISHES TO MATCH EXISTING, PAINT AFFECTED WALL TO CLOSEST CORNER

D04 REMOVE ACOUSTICAL CEILING AND ASSOCIATED SUPPORT AND SEISMIC BRACING, FIXTURES, AND

ACCESSORIES, PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT SURFACES FOR

CONSTRUCTION INDICATED

D05 REMOVE PORTION OF WALL TO FACILITATE INSTALLATION OF DOOR

D11 REMOVE GYPSUM BOARD CEILING, ASSOCIATED SUPPORT/SUSPENSION SYSTEM, FIXTURES, AND

ACCESSORIES, PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT SURFACES FOR

CONSTRUCTION INDICATED

D14 TELECOM RACK(S) TO BE REMOVED, PREP ADJACENT SURFACES FOR NEW CONSTRUCTION, SEE

TELECOM DRAWINGS

D21 REMOVE FINISH FLOOR MATERIAL, PREP FLOOR TO RECEIVE FLOOR FINISH SPECIFIED

D30 ALIGN DEMOLITION TO FACE OF COLUMN

E07 LIGHT FIXTURE TO REMAIN

E08 REMOVE LIGHT FIXTURE, SEE ELECTRICAL DRAWINGS

T08 DECOMMISSIONED TR, SEE TELECOMMUNICATIONS DRAWINGS

SHEET KEYNOTES

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLAN

FLOOR PLAN

REFLECTED CEILING PLAN

Revisions: Date: SHEET 34 of 431

D01

D03

CORRIDOR

C300

TR

C301.1

NURSING

EDUCATION

C303

OFFICE

C301.2

OFFICE

C303.1

D D01

D02

D01

D03

DIALYSIS WAITING

C403

WAITING

B402

TR

C402

TLT

C401

SERVICE

ELEVATOR LOBBY

C400.2

D14

D14

D

D21

D01 D02 D03

DIETITIANS

C512

TRAINING

STORAGE

A502

PATIENT

TRANSPORT

C510

SERVICE

ELEVATOR LOBBY

C500.2

D21

D02

TR

C511

D14

D ~

1/

2"

D02

D02

D02

D02

D03

D03

D21

D21

D03

OFFICE

C603.1

ACM PROJECT

C603

WAITING ROOM

B603

OFFICE

B606

OFFICE

B605

TLT

C601

TLT

C600

D14

OFFICE

C603.1

TR

C602.1

D

D03

D21

B05

CONFERENCE

ROOM

A702

SERVICE

ELEVATOR LOBBY

700.1

OFFICE

E702

OFFICE

E703.3

Room

C600.24

TR

A702.1

D

B05

TLT

B702

SERVICE

ELEVATOR LOBBY

700.1

CORRIDOR

C600.63

RESEARCH

PHARMACY

D705

TR

D703

T08D14

B02

B17

B03

TR

C301.1

OFFICE

C301.2

CORRIDOR

C300

NURSING

EDUCATION

C303

D

D11

D04

D04

3/

4"

TR

C511

D

B02

E07

TR

D703

TLT

B702

RESEARCH

PHARMACY

D705

SERVICE

ELEVATOR LOBBY

700.1

CORRIDOR

C600.63

D

D04

B02

DIALYSIS WAITING

C403

TR

C402

SERVICE

ELEVATOR LOBBY

C400.2

TLT

C401

WAITING

B402

D

D04

E06 E07

E07

B01

E08

TR

A702.1

D

D04 D04

D11

D13 D13

OFFICE

C603.1

Room

D022.100

ACM PROJECT

C603

WAITING ROOM

B603

OFFICE

B606

OFFICE

B605

OFFICE

C603.1

D02

D02

D03

B01

A42

B03

M21

1. THESE DOCUMENTS DO NOT INDICATE ALL MINOR AREAS AFFECTED BY SELECTIVE DEMOLITION, THE

CONTRACTOR SHALL BE RESPONSIBLE FOR QUANTIFYING THE MATERIAL AND LABOR COSTS TO

DEMOLISH, PATCH, REPAIR ADJACENT AREAS AFFECTED BY THE CONSTRUCTION INDICATED TO A

"LIKE NEW" CONDITION.

2. COORDINATE WITH FIRE PROTECTION, MECHANICAL, ELECTRICAL, PLUMBING, TELECOMMUNICATIONS, AND SECURITY PLANS FOR ADDITIONAL SELECTIVE DEMOLITION REQUIREMENTS NOT SHOWN ON THIS

DRAWING.

3. SOME SHEET KEYNOTES LISTED BELOW MAY NOT APPLY TO THIS SHEET.

4. DIMENSIONS PRECEDED BY A TILDE (~) ARE APPROXIMATE, SUBJECT TO FIELD VERIFICATION.

CONSTRUCTION TO REMAIN

IN PLACE (SHOWN SOLID)

CONSTRUCTION TO BE

DEMOLISHED (SHOWN DASHED)

DEMOLITION LEGEND

TEMPORARY CONSTRUCTION

BARRIER (F5/AE523)

DEMOLITION BOUNDARY, IN ADDITION TO KEYNOTED ITEMS, PERFORM THE

DISMANTLING OF CONSTRUCTION IN A MANNER THAT WILL NOT DAMAGE

ADJACENT REMAINING CONSTRUCTION.

PATH OF EGRESS

OUT OF SCOPE AREAS, COORDINATE WITH FIRE PROTECTION, MECHANICAL,

ELECTRICAL, PLUMBING, TELECOMMUNICATIONS, AND SECURITY PLANS FOR

ADDITIONAL REQUIREMENTS WITHIN THIS AREA

REMOVE CEILING AND ASSOCIATED SUPPORT AND SEISMIC BRACING,

FIXTURES, AND ACCESSORIES, TYPICAL WITHIN DEMOLITION BOUNDARY.

PROTECT ADJACENT SURFACES AND EQUIPMENT. PREP ADJACENT

SURFACES FOR CONSTRUCTION INDICATED

REMOVE GYPSUM BOARD CEILING AND ASSOCIATED

SUPPORT/SUSPENSION SYSTEM, FIXTURES, AND ACCESSORIES

2 2 4 6 8 10

1/4" = 1'-0"

FEETSCALE

P L A

N N

O R

T H

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SHEET NOTES:

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

-2 -7

.0 .A

S T

X E

H R

M .r v t

/1

/2

:4

:0

A

M

AD407

DEMOLITION TR FLOOR AND

REFLECTED CEILING (RC) PLANSAwen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX

671-22-700

SHEET KEYNOTES

1/4" = 1'-0" REF FROM: - / AE166

C7 TR C301.1 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE170

F7 TR C402 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE175

C5 TR C511 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE180

F1 TR C602.1 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE185

F5 TR A702.1 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: - / AE185

C3 TR D703 FLOOR AND RC PLAN

1/4" = 1'-0" REF FROM: F1 / AE410

F3 TR 4101.1 FLOOR AND RC PLAN

A42 ACOUSTICAL CEILING UNITS ON EXPOSED GRID SUSPENSION SYSTEM, MATCH EXISTING

B01 ACOUSTICAL CEILING UNITS ON EXPOSED GRID SUSPENSION SYSTEM TO REMAIN

B02 GYPSUM WALLBOARD OR PLASTER CEILING TO REMAIN

B03 LIGHT FIXTURE TO REMAIN

B05 RESILIENT FLOORING TO REMAIN

B17…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .