S02 - Attachment 6(b) - Mechanical Cut Sheets - Data Center CRAC - Normal Operation (6000 cfm).pdf

PDF 194 KB Posted

Attached to
EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) Federal contract opportunity
Solicitation number
36C77623B0064
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document contains submittal data sheets for mechanical cooling units to be provided under the EHRM San Antonio Infrastructure Upgrades Construction solicitation. The solicitation is issued by the Department of Veterans Affairs Technology Acquisition Center Austin for chilled water air handling units to support infrastructure upgrades at the San Antonio VA facility. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses and has a NAICS code of 236220 for commercial and institutional building construction. The submittal data sheets provide specifications for above-air mission critical mechanical cooling units, including performance data, dimensions, construction details, control features, options, and warranties. Relevant details include unit models, total airflow rates, fan and motor specifications, coil configurations and capacities, control types, standard and optional features, and a one-year parts warranty.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS), newest first.
File Type Posted
S07 - Bid Abstract Page 2_OF1419A_EHRM San Antonio_06SEP2023.pdf PDF
S07 - Bid Abstract Page 1_OF1419_EHRM San Antonio_6SEP2023.pdf PDF
S02 - Attchment 24 - EHRM San Antonio Bid Breakdown Table_31AUG2023.xlsx XLSX spreadsheet
Amendment 0005_36C77623B0064_31AUG2023.pdf PDF
S02 - Attachment 15 - STX Addendum 1 (Composite).pdf PDF
S02 - Attachment 22 - SF 25 Performance Bond Form.pdf PDF
S02 - Attachment 18 - 320523 Cement and Concrete for Exterior Improvements.pdf PDF
Amendment 0004_36C77623B0064_25AUG2023.pdf PDF
S02 - Attachment 21 - Addendum 1 - Technology.pdf PDF
S02 - Attachment 19 - 02821321 Asbestos Roofing Abatement.pdf PDF
S02 - Attachment 16 - STX Addendum 1.pdf PDF
Amendment 0003_36C77623B0064_23AUG2023.pdf PDF
S02 - Attachment 6(e) - Mechanical Cut Sheets - Data Center CRAC - N 1 Operation (8000 cfm).pdf PDF
S02 - Attachment 6(a) - Mechanical Cut Sheets - 3.0 Ton Split System.pdf PDF
S02 - Attachment 6(f) - Mechanical Cut Sheets - 2.0 Ton Split System.pdf PDF
Amendment 0002_36C77623B0064_18AUG2023.pdf PDF
S02 - Attachment 6(c) - Mechanical Cut Sheets - Clean Agent Data Sheet.pdf PDF
S02 - Attachment 6(d) - Mechanical Cut Sheets - Data Center CRAC Dimensions.pdf PDF
Pre-bid Site Visit Sign-in Sheet_11AUG2023.pdf PDF
Site Visit Attendees Sign-In Sheet_11AUG2023_EHRM San Antonio.xlsx XLSX spreadsheet
S02 - Attachment 8(b) - OIT-InfrastrucStdTelecomSpaces_Part 2 of 3.pdf PDF
S02 - Attachment 8(a) - OIT-InfrastrucStdTelecomSpaces_Part 1 of 3.pdf PDF
S02 - Attachment 7(b) - Technology Cut Sheets - Part 2 of 11 Corning.pdf PDF
S02 - Attachment 7(f) - Technology Cut Sheets - Part 6 of 11 Ortronics.pdf PDF
S02 - Attachment 7(j) - Technology Cut Sheets - Part 10 of 11 HID.pdf PDF
S02 - Attachment 7(e) - Technology Cut Sheets - Part 5 of 11 Leviton.pdf PDF
S02 - Attachment 7(k) - Technology Cut Sheets - Part 11 of 11 Hubbell.pdf PDF
S02 - Attachment 7(i) - Technology Cut Sheets - Part 9 of 11 Cablofil.pdf PDF
S02 - Attachment 1(c) - 671-22-700 DRAWINGS Mechanical.pdf PDF
S02 - Attachment 4 - 230501 SAT_EHRM_100 percent final TechnicalReport.pdf PDF
S02 - Attachment 14(a) - Asbestos Survey Results 1st-4th Floors.pdf PDF
S02 - Attachment 11 - Wage Determination_Bexar CountyTX_14APR2023.pdf PDF
S02 - Attachment 12 - Submittal Register ENG Form 4288-R.pdf PDF
S02 - Attachment 9 - Contractor Safety and Environmental Record Form.docx DOCX document
S02 - Attachment 7(h) - Technology Cut Sheets - Part 8 of 11 Axis.pdf PDF
S02 - Attachment 1(a) - 671-22-700 DRAWINGS General Sheets.pdf PDF
Solicitation 36C77623B0064_28JUL2023.pdf PDF
S02 - Attachment 14(b) - Asbestos Survey Results Ground and 5th-7th Floors.pdf PDF
S02 - Attachment 13 - VA OEHRM Site Infrastructure and EUD Reqmts 2.0.pdf PDF
S02 - Attachment 10 - VA Notice Limitations on Subcontracting - Construction (JAN 2023) (DEV).docx DOCX document
S02 - Attachment 7(d) - Technology Cut Sheets - Part 4 of 11 CPI Cabinet.pdf PDF
S02 - Attachment 1(e) - 671-22-700 DRAWINGS Technology.pdf PDF
S02 - Attachment 1(d) - 671-22-700 DRAWINGS Electrical.pdf PDF
S02 - Attachment 2 - 671-22-700 100 percent final BID SPECIFICATIONS.pdf PDF
S02 - Attachment 1(f) 671-22-700 DRAWINGS Physical Security.pdf PDF
S02 - Attachment 8(c) - OIT-InfrastrucStdTelecomSpaces_Part 3 of 3.pdf PDF
S02 - Attachment 7(c) - Technology Cut Sheets - Part 3 of 11 CPI.pdf PDF
S02 - Attachment 7(g) - Technology Cut Sheets - Part 7 of 11 Panduit.pdf PDF
S02 - Attachment 1(b) - 671-22-700 DRAWINGS Architectural.pdf PDF
S02 - Attachment 6 - Mechanical Cut Sheets.pdf PDF
Show all 50

EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal Data Sheet

MC™ MissionCritical AC Equipment

4/21/2023 Rev 4

Unit Tag AHU-1 Project VA EHRM - San Antonio Evap Model, Qty (4) MCC-053X-4-00000-EC-00-DFB-2B Engineer Engineer

Contractor Contractor Unit Type AboveAir Rep TAS (Wes Weissgarber)

Date 21-Apr-23

Electrical Data Humidification Data Unit Power 460-480/3/60 Type N/A Unit Nameplate 11.8 FLA | 14.8 MCA | 25 MOP Steam Capacity / FLA N/A

Operation N/A Design Ambient Conditions Summer 95.0°F DB / 78.0°F WB Unit Configuration & Airflow Patterns Winter 0.0°F DB ● Downflow: Free or Ducted Top Return/Bottom Discharge

● Top Piping Connections Design Space/Return Conditions ● No Plenum Box Cooling 94.0°F DB / 61.0°F WB ● 24" High (Adj. 23.2"-26") Field Installed Floor Stand Heating 75.0°F DB ● Field Installed Turning Vanes

Supply Air Fan Data Connection Data Total Airflow Rate 6,000 cfm Condensate Drain 1/2" ESP / TSP 0.30 in w.g. / 0.63 in w.g. Chilled Water 1-5/8" OD IN/OUT Fan Type, Qty (2) EC DD Backward-Inclined Impeller Humidifier Supply N/A Motor kW / FLA 4.5 kW / 5.9 FLA Hot Water or Steam N/A Fan Speed Control Constant Speed

Air Filtration Data Cooling Coil Data Filter Gross Capacity 131.3 TMBh / 131.3 SMBh Net Capacity 128.3 TMBh / 128.3 SMBh Net Capacity 37.6 Tot kW / 37.6 Sens kW Mixed EAT 94.0°F DB / 61.0°F WB Coil LAT 73.5°F DB / 52.9°F WB Condensate Flow 0.0 lb/hr Physical Data Face Area / Rows / FPI 19.6 ft² / 2 / 10 Dimensions See attached cut sheet Construction Aluminum Finned, Copper Tube Unit Weight 1545 lb

EWT / LWT 39.0°F / 52.3°F

GPM @ Ft Hd 19.8 @ 1.3 FT WG System Notes Fluid Water *Performance requires custom 2 row coil Control Valve 2-Way, Modulating (300 psig) Valve Size (Cv) TBD Valve Mounting Factory Mounted

Unit Mounted Heat Data Type N/A Capacity / FLA N/A Operation N/A

EAT / LAT N/A

EWT / LWT N/A

GPM @ Ft Hd N/A Fluid N/A Control Valve N/A Control Valve Cv N/A

Qty (1) 20x20x4 &

Qty (2) 20x25x4 &

Qty (1) 16x20x4 &

Qty (2) 16x25x4 (4" MERV 8)

53 kW/15.0 Ton Nom. MC Chilled

Water Air Handling Unit www.aboveair.com sales@aboveair.com AboveAir Technologies

5179 Mountville Road

Frederick, Maryland 21703 USA

Ph: 301-874-1130

Fax: 301-874-1131

Submittal Data Sheet

MC™ MissionCritical AC Equipment

4/21/2023 Rev 4

Select Standard Design Features Control Type

● Heavy Duty Galvanized Steel Construction

● Powder-Coat Painted Cabinet

● Stainless Steel Drain Pan with Overflow Safety Switch Control Sequence

● Intertek (ETL) UL STD 1995 Listed/Labeled

● Factory installed and tested controls

● Each unit factory tested per UL 1995 Requirements

Sensors & Displays Coil Coatings

Chilled Water Options BMS Connection

Power Options Multi-Unit Sequencing

Condensate Management Options

Life Safety Options Options

Factory Warranties (Labor Not Included)

Extra Filters

● Voltage/Phase Monitor: Not Included

● Condensate Pump: Included, Factory Installed

● Water Detector:

Not Provided/by Others

Not Provided/by Others

● Standard Terms: 1-Year Limited Parts

● Supply Air Coils: No Coatings

● Spare Sets: Not Included

Not Provided

Not Provided/by Others

● Smoke Detector:

● Firestat:

Unit Mounted Standard Connections● Power Connection:

● Disconnect:

● Flexible Hose Kit:

● Not Included

● MC-6000S RT Std CHW Temperature Only Control

● MC-Series Advanced Microprocessor w/ Alarms

● Display:

● Select (BACnet MSTP / BACnet IP / Modbus)

Standard Unit Mounted HMI

● Wall Mtd Sensor:

Temperature www.aboveair.com sales@aboveair.com AboveAir Technologies

5179 Mountville Road

Frederick, Maryland 21703 USA

Ph: 301-874-1130

Fax: 301-874-1131