This document package includes technical drawings and specifications for infrastructure upgrades at the Audie L. Murphy VA Medical Center in San Antonio, Texas. The scope of work involves upgrading data cabling and installing new telecommunications rooms throughout the facility. Drawings TN101 and TN142 provide a first floor plan showing all proposed cabling runs and the telecommunications rooms that will serve each new data outlet. Technical specifications describe requirements for routing cabling above accessible ceilings and in interstitial spaces. Offerors are advised to reuse existing backboxes and conduit where applicable. The related federal contract opportunity is a SDVOSB set-aside solicitation issued by the Department of Veterans Affairs Technology Acquisition Center Austin for the EHRM San Antonio Infrastructure Upgrades construction project requiring NAICS code 236220.
View the file
Other files for this federal contract opportunity
Show all 50
EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TN410
TN411
TN412
TN413
TN414
TN415
TN416
TN417
TN418
TN419
TR-1-5
(#G101)
TR-1-4
(#105)
TR-1-8
(#2A137)
TR-1-6
(#157)
TR-1-2
(#J104)
TR-1-1
(#S101)
TR-1-9
(#Y102.7)
TR-1-7
(#P125)
TR-1-3
(#H118.2)
TR-1-10
(#T119.2)
CAMPUS SUPPORT
CENTER (#I100.2)
ALL NEW LOW VOLTAGE CABLING IN THIS AREA
WILL ROUTE TO THE NEW TR-1-5. REFER TO THE
TN143 FOR ADDITIONAL INFORMATION.
ALL NEW LOW VOLTAGE CABLING IN THIS AREA
WILL ROUTE TO THE NEW TR-1-7. REFER TO THE
TN141 FOR ADDITIONAL INFORMATION.
ALL NEW LOW VOLTAGE CABLING IN THIS AREA
WILL ROUTE TO THE NEW TR-1-10. REFER TO THE
TN142 FOR ADDITIONAL INFORMATION.
ALL NEW LOW VOLTAGE CABLING
IN THIS AREA WILL ROUTE TO THE
NEW TR-1-3. REFER TO THE TN140
FOR ADDITIONAL INFORMATION.
ALL NEW LOW VOLTAGE CABLING IN THIS
AREA WILL ROUTE TO THE NEW TR-1-4.
REFER TO THE TN137 & TN139 FOR
ADDITIONAL INFORMATION.
ALL NEW LOW
VOLTAGE CABLING IN
THIS AREA WILL ROUTE
TO THE NEW TR-1-2.
REFER TO THE TN136
FOR ADDITIONAL
INFORMATION.
ALL NEW LOW
VOLTAGE CABLING IN
THIS AREA WILL
ROUTE TO THE NEW
TR-1-1. REFER TO
THE TN135 FOR
ADDITIONAL
INFORMATION.
ALL NEW LOW VOLTAGE
CABLING IN THIS AREA WILL
ROUTE TO THE NEW TR-1-7.
REFER TO THE TN144 FOR
ADDITIONAL INFORMATION.
ALL NEW LOW VOLTAGE CABLING IN THIS AREA WILL
ROUTE TO THE NEW TR-1-8. REFER TO THE TN146
&TN147 FOR ADDITIONAL INFORMATION.
ALL NEW LOW VOLTAGE CABLING IN THIS AREA WILL ROUTE TO
THE NEW TR-1-6. REFER TO THE TN145 FOR ADDITIONAL
INFORMATION.
TN491
1198 107 126.9
L.3
M
P.1
10.1 11.211.19.19.27.16.16.7
GA
GB
GC
GD
6.5
L
NUMBER AND ADDRESS
SUITE NO.
CITY, STATE ZIP CODE
P: 555.555.555 F: 555.555.5555 www.imegcorp.com
PROJECT #22006633.00
5 5 10
1/32"=1'-0"
FEETSCALE
P L A
N N
O R
T H
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
100%
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
B
IM
/A u d ie L
M u rp h y V
A M e d ic a l C e n te r
(S A
M
E P
T
.0
V A
-S a n A n to n io
T
X -E
H R
M
C .r v t
/2
/2
:4
:2
A
M
TN101
1ST FLOOR PLAN - TECHNOLOGY -
OVERALL
Awen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
06/09/2023
EHRM INFRASTRUCTURE
UPGRADES 1
Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229
671-22-700
KEY PLAN
ABC
D
E1 E2 F
G
H
JPT
CLC
GENERAL NOTES:
1. THIS SHEET IS SHOWN FOR CABLE ROUTING. REFER TO T601 AND
TN101.5 FOR ADDITIONAL ROUTING INFORMATION.
Revisions: Date:
Δ A, Addendum 1 08/24/2023
ClarkGarrettAIANCARB Text Box A
ClarkGarrettAIANCARB Text Box A
C -E
C -E
C -E
C -E
C -E
C -E
C3-E
C2-WAP
C -E
C3-E C3-E C4-E C4-E
C4-E C4-E
C4-E
C4-E
C2-E C4-E
C4-E
C -E
C -E
C -E
C -E
C -E
C4-E C4-E
C4-E
C4-E
C2-E
C4-E C4-E
C4-E C4-E
C4-EC4-E
C4-E
C -E
C -E
C -E
C -E
C -E
C -E
C4-E
C -E
C4-EC4-EC4-E C4-EC4-EC4-EC4-E
C -E
C -E
C4-E
C -E
C -E
C4-E
C4-EC4-EC4-E
C4-E C4-E C4-E
C2-WAP
C4-E
C -E
C -E
C -E
C4-EC4-E
C -E
C -E
C4-EC2-EC4-E
C4-E
C4-E
C4-E
C2-E
C3-E
C4-EC4-EC4-E
C2-WAP
C4-E
C4-E C4-E
C -E
C3-E
C -E
C -E
C4-E
C4-E
C -E
C2-E
C2-EC4-EC4-E
C4-E C4-E
C -E
C4-E
C4-E
C4-E
C4-E
C4-E
C -E
C4-E
C4-E
C3-E
C2-E
C2-WAP
C -E
C4-E
C -E
C -E
C4-E
C -E
C4-E
C -E
C -E
C -E
C -E
C4-E C4-E
C -E C -E
C4-E
C4-E
C4-E
C4-EC4-E
C -E
C -E
C -E
C4-E
C -E
C4-E
C -E
C -E
C4-E
C -E
C4-E
C2-E
C -E
C -E
C4-E
C -E
C2 C2 C2
C
C
C
C
C2 C2 C2
C2C2C2 C2
C2
C2
C2
C2
C2
C2
C2
READING ROOM
H117.11
MECHANICAL
ROOM
H117.12
IMAGING
SECRETARY
H117.10 TLT
H117.9
P TLT
H117.5E
CT SCAN ROOM 1
H117.5D
WORK AREA
T118.2
WALK-IN COOLER
T118.6
OFFICE
T112.5
OFFICE
T112.4
OFFICE
T112.3
GENERAL
MICROBIOLOGY
T118.3
TLT
H120.1
PIPE CHASE
XXXX
CT SCAN ROOM 3
H117.5A
READING
H117.4
P TLT
H117.5B
HALLWAY
H117.1
CORRIDOR
HXXX SERVER
I100.1A
ULTRASOUND
ROOM 3
H120
OFFICE
P119.1
WORK AREA
T107.2OFFICE
T107.3
LOUNGE
T109
STAIR 12
1S12
OFFICE
T106.2
HAC
T108
WALK-IN COOLER
XXXX
FLOUROSCOPY
T114.2
TB LAB
T114.1
CHANGING
ROOM
T115.2
AUTOCLAVE
ROOM
T114
INNER VESTIBULE
T115.1
BSL-3
LABORATORY
T115 CHANGING
ROOM
T115.4
SHOWER
T115.3
AUTOCLAVE
ROOM
T116
OFFICE
T119.5
OFFICE
T119.10
MRI ROOM 2
Z104.5
EQUIPMENT
Z109
STORAGE
Z108
HAC
Z106
CONTROL ROOM
Z104.2
DRESSING
Z104.4
READING
Z104.3
MRI SUITE
Z104
RESTROOM
Z104.1
DIGITAL RELEASE
Z102
OFFICE
T124
OFFICE
T122
CLEAN AREA
T121
OFFICE
T119.13
EQUIPMENT
ROOM
T119.11
OFFICE
TR119.12
OFFICE
T119.6
OFFICE
T119.8
STORAGE ROOM
T119.1
OFFICE
T119.14
ADMINISTRATIVE
OFFICES
T119
TR
T119.2
HAC
T124
STORAGE
T120
EQUIPMENT
ROOM
T123
SUPERVISOR'S
Z102.1
CORRIDOR
READING ROOM
H110
OFFICE
H111.1
OFFICE
H111
CONTROL
Z105.6
DRESSING
Z105.3
DRESSING
Z105.2 ELEC. ROOM
Z107
CONTROL
Z105.4
EQUIPMENT
Z110
STAIRWELL
XXX
MRI ROOM 1
Z105.5
SUPPLY
Z105
MRI SUITE
Z105
MRI / DIGITAL
RELEASE SUITE
ZXXX
SCHEDULING
Z103
TLT.
Z105.1
TLT., WOMEN
T127
TLT., MENS
T126
EXISTING IT
OPERATIONS
I100.2
IT
I100.3
OIT
I100.4
BULK STORAGE
P119.3
LAB
P119.2
STAIR 11
1S11
BLOOD BANK
T106
OFFICE
P119.6
LAB
P119.5
CORRIDOR
P1
MYCOLOGY
T116.1
EXISTING DATA
CENTER
I100.1
MICRO
-BIOLOGY
T118
STORAGE
T118.1
OFFICE
T119.4
OFFICE
T119.3OFFICE
T119.7
WORK AREA
T119.9
CONTROL ROOM
1&3
H117.5C
CT PREP
H117.5
WAITING AREA
H117
SPECIAL
CHEMISTRY LAB
T111
STAT LAB
T110
WORK AREA
T112
WORK AREA
T107
LAB RECEPTION
T107.1
SPECIMEN
DROP-OFF
T-107
1198 107 126.9
L.3
M
P.1
10.1 11.211.19.19.27.16.1 6.7
GA
GB
GC
GD
6.5 1198 107 126.9
L.3
M
P.1
10.1 11.211.19.19.27.16.1 6.7
GA
GB
GC
GD
6.5
TN419
3 TR-1-10
(#T119.2)
MDF-1-1
(#I100.1)
TR-1-3
(#H118.2)
TR-1-10
(#T119.2)
CAMPUS SUPPORT CENTER
(#I100.2)
TR-1-3
(#H118.2)
TN491
1198 107 126.9
L.3
M
P.1
10.1 11.211.19.19.27.16.1 6.7
GA
GB
GC
GD
6.5
NUMBER AND ADDRESS
SUITE NO.
CITY, STATE ZIP CODE
P: 555.555.555 F: 555.555.5555 www.imegcorp.com
PROJECT #22006633.00
5 5 10 15 20
1/8" = 1'-0"
FEETSCALE
P L A
N N
O R
T H
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
100%
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
B
IM
/A u d ie L
M u rp h y V
A M e d ic a l C e n te r
(S A
M
E P
T
.0
V A
-S a n A n to n io
T
X -E
H R
M
C .r v t
/2
/2
:4
:2
A
M
TN142
1ST FLOOR PLAN - TECHNOLOGY - AREA G
Awen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
06/09/2023
EHRM INFRASTRUCTURE
UPGRADES 1
Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229
671-22-700
KEY PLAN
G
GENERAL SHEET NOTES:
1. ALL STRUCTURED CABLING WILL BE ROUTED TO ABOVE THE
ACCESSIBLE CIELING AND EXTEND IN THE INTERSTITIAL SPACE ABOVE.
REFER TO TN101.5 FOR ADDITIONAL INFORMATION AND ROUTING
REQUIREMENTS.
2. REFER TO THE OVERALL FLOOR PLAN ON TN101 FOR ROUTING
REQUIREMENTS AND TELECOM ROOMS THAT SERVE EACH OUTLET.
3. CONTRACTOR SHALL REUSE THE EXISTING BACK BOX ROUGH-IN AND
CONDUIT WHERE APPLICABLE. REFER TO THE DEMO PLANS ON TD142
FOR ADDITIONAL INFORMATION.
4. REFER TO THE CABLING PLAN ON T000 FOR ADDITIONAL INFORMATION
AND PHASING REQUIREMENTS.
KEY NOTES:
1. ALL NEW DATA OUTLETS IN THIS AREA WILL REQUIRE NEW ROUGH-INS
AND BACKBOXES.
Revisions: Date:
Δ A, Addendum 1 08/24/2023
ClarkGarrettAIANCARB Text Box A
| Sheets |
| TN101 - 1ST FLOOR PLAN - TECHNOLOGY - OVERALL |
| TN142 - 1ST FLOOR PLAN - TECHNOLOGY - AREA G |
File details come from the government source that posted it. Updated .