This document contains mechanical plans and specifications for data center infrastructure upgrades at the Audie L Murphy VA Medical Center in San Antonio, Texas. The plans call for installing new mechanical equipment including computer room air conditioners, fire suppression systems, and plumbing fixtures to support the data center. Specific requirements include ducting new CRAC units into an overhead return air plenum, providing nozzle coverage for a clean agent fire suppression system, connecting new chilled water lines to existing mains, and rerouting exhaust ducts. Sprinklers must be installed per NFPA 13 and 75 standards. A single butterfly valve with monitor switches will control the sprinkler piping serving the data center.

The related federal contract opportunity is solicitation number 36C77623B0064 for infrastructure upgrades at the San Antonio VA Medical Center, set aside for Service-Disabled Veteran-Owned Small Businesses. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. The required construction work includes the mechanical system upgrades described in the plans and specifications.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS), newest first.
File Type Posted
S07 - Bid Abstract Page 2_OF1419A_EHRM San Antonio_06SEP2023.pdf PDF
S02 - Attchment 24 - EHRM San Antonio Bid Breakdown Table_31AUG2023.xlsx XLSX spreadsheet
Amendment 0004_36C77623B0064_25AUG2023.pdf PDF
S02 - Attachment 21 - Addendum 1 - Technology.pdf PDF
S02 - Attachment 19 - 02821321 Asbestos Roofing Abatement.pdf PDF
S02 - Attachment 15 - STX Addendum 1 (Composite).pdf PDF
S02 - Attachment 22 - SF 25 Performance Bond Form.pdf PDF
S02 - Attachment 18 - 320523 Cement and Concrete for Exterior Improvements.pdf PDF
S02 - Attachment 23 - SF 25A Payment Bond Form.pdf PDF
S02 - Attachment 17 - 075100 Roofing Repair.pdf PDF
Amendment 0003 Attachment Warranty RoofCAD-VA San Antonio-RFI Q100.pdf PDF
Amendment 0003_36C77623B0064_23AUG2023.pdf PDF
Amendment 0002_36C77623B0064_18AUG2023.pdf PDF
S02 - Attachment 6(c) - Mechanical Cut Sheets - Clean Agent Data Sheet.pdf PDF
S02 - Attachment 6(e) - Mechanical Cut Sheets - Data Center CRAC - N 1 Operation (8000 cfm).pdf PDF
S02 - Attachment 6(a) - Mechanical Cut Sheets - 3.0 Ton Split System.pdf PDF
S02 - Attachment 6(f) - Mechanical Cut Sheets - 2.0 Ton Split System.pdf PDF
Pre-bid Site Visit Sign-in Sheet_11AUG2023.pdf PDF
Amendment 0001_36C77623B0064_02AUG2023.pdf PDF
S02 - Attachment 14(a) - Asbestos Survey Results 1st-4th Floors.pdf PDF
S02 - Attachment 11 - Wage Determination_Bexar CountyTX_14APR2023.pdf PDF
S02 - Attachment 12 - Submittal Register ENG Form 4288-R.pdf PDF
S02 - Attachment 9 - Contractor Safety and Environmental Record Form.docx DOCX document
S02 - Attachment 7(h) - Technology Cut Sheets - Part 8 of 11 Axis.pdf PDF
S02 - Attachment 1(a) - 671-22-700 DRAWINGS General Sheets.pdf PDF
S02 - Attachment 8(b) - OIT-InfrastrucStdTelecomSpaces_Part 2 of 3.pdf PDF
S02 - Attachment 8(a) - OIT-InfrastrucStdTelecomSpaces_Part 1 of 3.pdf PDF
S02 - Attachment 7(b) - Technology Cut Sheets - Part 2 of 11 Corning.pdf PDF
S02 - Attachment 7(f) - Technology Cut Sheets - Part 6 of 11 Ortronics.pdf PDF
S02 - Attachment 7(j) - Technology Cut Sheets - Part 10 of 11 HID.pdf PDF
S02 - Attachment 7(e) - Technology Cut Sheets - Part 5 of 11 Leviton.pdf PDF
S02 - Attachment 7(k) - Technology Cut Sheets - Part 11 of 11 Hubbell.pdf PDF
S02 - Attachment 7(i) - Technology Cut Sheets - Part 9 of 11 Cablofil.pdf PDF
S02 - Attachment 1(c) - 671-22-700 DRAWINGS Mechanical.pdf PDF
S02 - Attachment 4 - 230501 SAT_EHRM_100 percent final TechnicalReport.pdf PDF
S02 - Attachment 8(c) - OIT-InfrastrucStdTelecomSpaces_Part 3 of 3.pdf PDF
S02 - Attachment 7(c) - Technology Cut Sheets - Part 3 of 11 CPI.pdf PDF
S02 - Attachment 7(g) - Technology Cut Sheets - Part 7 of 11 Panduit.pdf PDF
S02 - Attachment 1(b) - 671-22-700 DRAWINGS Architectural.pdf PDF
S02 - Attachment 6 - Mechanical Cut Sheets.pdf PDF
S02 - Attachment 7(a) - Technology Cut Sheets - Part 1 of 11 APC.pdf PDF
S02 - Attachment 3 - 671-22-700 EHRM Infrastructure Upgrades- SOW Construction.pdf PDF
S02 - Attachment 5 - Electrical Cut Sheets.pdf PDF
Solicitation 36C77623B0064_28JUL2023.pdf PDF
S02 - Attachment 14(b) - Asbestos Survey Results Ground and 5th-7th Floors.pdf PDF
S02 - Attachment 13 - VA OEHRM Site Infrastructure and EUD Reqmts 2.0.pdf PDF
S02 - Attachment 10 - VA Notice Limitations on Subcontracting - Construction (JAN 2023) (DEV).docx DOCX document
S02 - Attachment 7(d) - Technology Cut Sheets - Part 4 of 11 CPI Cabinet.pdf PDF
S02 - Attachment 1(e) - 671-22-700 DRAWINGS Technology.pdf PDF
S02 - Attachment 1(d) - 671-22-700 DRAWINGS Electrical.pdf PDF
Show all 50

EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

T

T

T

T

T

T

T

EACH RACK HAS A DUCT

CONNECTION OFF THE TOP.

DUCT FROM THE

CONNECTION INTO THE

BOTTOM OF THE

OVERHEAD RETURN DUCT.

DUCT SHALL MATCH THE

RACK CONNECTION SIZE.

(TYP. ALL RACKS)

CRAC UNIT HAS A DUCT FLANGE ON

THE TOP OF THE UNIT. DUCT FROM

THE CONNECTION INTO THE BOTTOM

OF THE OVERHEAD RETURN DUCT

PLENUM. DUCT SHALL MATCH THE

CRAC CONNECTION SIZE. (TYP. 4)

CLEAN AGENT FIRE SUPPRESSION SYSTEM.

BASIS OF DESIGN CLEAN AGENT IS NOVEC 1230

WITH SYSTEM DESIGN BY ANSUL. BY PROVIDE

NOZZLE COVERAGE IN THE NEW DATA CENTER

PER NFPA 2001. REFER TO SPECIFICATION 21 22

00 FOR SYSTEM REQUIREMENTS. REFER TO

ELECTRICAL PLANS FOR MANUAL ACTIVATION

STATION LOCATION.

x

12x10 x

CD-1

6/125

CD-1

8/160

(TYP. 10)

8x8 TD

RG-1

RG-1

RG-1

x

2"CWS

2"CWR

"C

W S

"C

W R

/2 "C

W S

/2 "C

W R

2"CWR

2"CWS

"C

W S

"C

W R

2 1/2"CWR

2 1/2"CWS

3"CWR

3"CWS

CONNECT NEW CHILLED WATER

SUPPLY AND RETURN TO

EXISTING MAINS IN THIS SHAFT.

72x24 x x x

72x24

PROVIDE SPRINKLER COVERAGE IN THE DATA

CENTER PER NFPA 13 AND 75 REQUIREMENTS.

SPRINKLERS SHALL BE STANDARD RESPONSE

WITH PROTECTION GUARDS. DATA CENTER SHALL

BE CLASSIFIED AS LIGHT HAZARD.SPRINKLERS IN

THE DATA CENTER SHALL BE SERVED FROM A

SINGLE MAIN WITH A NEW BUTTERFLY VALVE AND

ASSOCIATED MONITOR SWITCH WIRED TO THE

FIRE ALARM SYSTEM. REFER TO SHEET NOTE 1

FOR BUTTERFLY VALVE REQUIREMENTS.

18x12 TD

BCU-1

x

20x16

12x10

8x10

TAB-3

TAB-4

TAB-2

TAB-1

10x8

14x10 TD

CD-1

6/160

(TYP.2)

CD-1

10/195

"C

W S

"C

W R

"C

W S

"C

W R x

REROUTE EXAUST UNDER

EXISTING LARGE EXHAUST

DUCTS.

EXHAUST DUCT UP TO

SAME BOTTOM OF DUCT

ELEVATION AS THE

ADJACENT EXISTING LARGE

EXHAUST DUCTS.

RG-1 RG-1

REUSE EXISTING

SUPPYL DUCT

PENETRATION

FD

FD

9 10

L.3

M

10.19.1

GA

GB

L

REVISE EXISTING SPRINKLER

LAYOUT AND PIPING IN THIS

AREA AS NECESSARY TO

PROVIDE SPRINKLER

COVERAGE PER NFPA 13.

NUMBER AND ADDRESS

SUITE NO.

CITY, STATE ZIP CODE

P: 555.555.555 F: 555.555.5555 www.imegcorp.com

PROJECT #22006633.00

DESIGN DEVELOPMENT SUBMISSION

N O T F O R C O N S T R U C T I O N

5 5 10 15 20

1/8" = 1'-0"

FEETSCALE

P L A

N N

O R

T H

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

M

E P

T

.0

V A

-S a n A n to n io

T

X -E

H R

M

C .r v t

/2

/2

:0

:3

P

M

MN424

1ST FLOOR - DATA CENTER - MECHANICAL -

ENLARGED NEW WORK PLANS

Awen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229

671-22-700

KEY PLAN

1/4" = 1'-0"

1ST FLOOR PLAN - DATA CENTER/IT OFFICE - MECHANICAL - ENLARGMENT

SHEET NOTES:

1. DATA CENTER SPRINKLER PIPING BUTTERFLY

VALVE SHALL BE PER THE FOLLOWING:

A. INDICATING BUTTERFLY VALVE, NORMALLY

OPEN, 175 PSI WWP, GROOVED TYPE,

DUCTILE IRON BODY WITH PROTECTIVE

COATING, ELECTROLESS NICKEL OR EPDM

COATED DUCTILE IRON DISC, STAINLESS

STEEL STEM AND SCREWS, CAST OR

DUCTILE IRON HANDWHEEL, EPDM SEAT,

INDICATOR FLAG, FACTORY MOUNTED

INTEGRAL MONITOR SWITCHES, UL/FM.

B. LUGGED OR WAFER VALVES ARE

ACCEPTABLE PROVIDED THEY HAVE THE

FEATURES LISTED ABOVE.

C. ACCEPTABLE MANUFACTURER/MODEL:

NIBCO GD-4765-8N, VICTAULIC SERIES 705,

TYCO BFV-300, KENNEDY G300, GLOBE

GLR300G, REL-BFG-300.

2. REFER TO ELECTRICAL DRAWINGS FOR EPO

BUTTON LOCATION.

04/28/2023

KEYNOTES:

1. NEW SINK SK-1:

A. EXTEND 1/2" COLD WATER, 1/2" HOT

WATER, 1 1/2" VENT, 1 1/2" SAN FROM SINK

IN THE ADJACENT ROOM PLAN EAST FROM

THIS SINK.

B. MATERIAL:

a. SINK - ACCESSIBLE, SELF-RIMMING

SINGLE COMPARTMENT WITH FAUCET

DECK AND OVERFLOW, 18 GAUGE TYPE

304 STAINLESS STEEL, 20" (SIDE-TO-

SIDE) x 16" (FRONT-TO-BACK) OVERALL SIZE, 18" x 14" x 6.5" DEEP BOWL, SOUND DEADENING ON BOTTOM OF

BASIN, 3-1/2" DIAMETER DRAIN OUTLET

LOCATION OFF-CENTERED REAR IN

BOWL, PERFORATED TYPE 304

STAINLESS STEEL GRID STRAINER.

b. SINK TRIM - SINGLE HANDLE MIXING

FAUCET, BRASS CONSTRUCTION,

CHROME-PLATED FINISH, NOMINAL 10"

HIGH-RISE SWING SPOUT, CERAMIC

CARTRIDGE, NOMINAL 8" REACH, PULL

DOWN SPRAY HOSE WITH AERATOR

STREAM / SPRAY SELECTOR, LEVER

HANDLE. MAXIMUM FLOW TO BE 2.2

GPM IN COMPLIANCE WITH ENERGY

POLICY ACT OF 2005 AND ASME/ANSI

STANDARD A112.18.1M. FAUCET SHALL

COMPLY WITH FEDERAL ACT S.3874.

PROVIDE RESTRICTIVE DEVICE AND

ESCUTCHEON PLATE AS REQUIRED.

c. ACCESSORIES - OFFSET 1-1/2" 17

GAUGE CHROME-PLATED BRASS

TAILPIECE AND P-TRAP, QUARTER-

TURN BALL VALVE TYPE 3/8" CHROME-

PLATED BRASS ANGLE SUPPLIES WITH

LOOSE KEY STOPS, CHROME-PLATED

SOFT COPPER SUPPLY LINES.

Revisions: Date:

Δ A, Addendum 1 08/24/2023

ClarkGarrettAIANCARB Text Box A

Sheets
MN424 - 1ST FLOOR - DATA CENTER - MECHANICAL - ENLARGED NEW WORK PLANS