S07 - Bid Abstract Page 2_OF1419A_EHRM San Antonio_06SEP2023.pdf

PDF 560 KB Posted

Attached to
EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS)
Solicitation number
36C77623B0064
Issued by

About this file

This document is an abstract of offers continuation sheet for solicitation number 36C77623B0064 for EHRM infrastructure upgrades construction at the Audie L. Murphy Memorial Veterans' Hospital in San Antonio, Texas. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center Austin as a SDVOSB set-aside for NAICS code 236220, with bids from four offerors listed. Specific line items and pricing are not provided due to the document being a template, though it relates to the federal contract opportunity for EHRM San Antonio infrastructure upgrades construction.

View the file

Other files

File Type Posted
S07 - Bid Abstract Page 1_OF1419_EHRM San Antonio_6SEP2023.pdf PDF
Amendment 0005_36C77623B0064_31AUG2023.pdf PDF
S02 - Attchment 24 - EHRM San Antonio Bid Breakdown Table_31AUG2023.xlsx XLSX spreadsheet
Amendment 0004_36C77623B0064_25AUG2023.pdf PDF
S02 - Attachment 21 - Addendum 1 - Technology.pdf PDF
S02 - Attachment 19 - 02821321 Asbestos Roofing Abatement.pdf PDF
S02 - Attachment 16 - STX Addendum 1.pdf PDF
S02 - Attachment 22 - SF 25 Performance Bond Form.pdf PDF
S02 - Attachment 15 - STX Addendum 1 (Composite).pdf PDF
S02 - Attachment 18 - 320523 Cement and Concrete for Exterior Improvements.pdf PDF
S02 - Attachment 23 - SF 25A Payment Bond Form.pdf PDF
S02 - Attachment 20 - Addendum 1 - Mechanical.pdf PDF
S02 - Attachment 17 - 075100 Roofing Repair.pdf PDF
Amendment 0003 Attachment Warranty RoofCAD-VA San Antonio-RFI Q100.pdf PDF
Amendment 0003_36C77623B0064_23AUG2023.pdf PDF
S02 - Attachment 6(c) - Mechanical Cut Sheets - Clean Agent Data Sheet.pdf PDF
Amendment 0002_36C77623B0064_18AUG2023.pdf PDF
S02 - Attachment 6(e) - Mechanical Cut Sheets - Data Center CRAC - N 1 Operation (8000 cfm).pdf PDF
S02 - Attachment 6(d) - Mechanical Cut Sheets - Data Center CRAC Dimensions.pdf PDF
S02 - Attachment 6(a) - Mechanical Cut Sheets - 3.0 Ton Split System.pdf PDF
S02 - Attachment 6(b) - Mechanical Cut Sheets - Data Center CRAC - Normal Operation (6000 cfm).pdf PDF
S02 - Attachment 6(f) - Mechanical Cut Sheets - 2.0 Ton Split System.pdf PDF
Site Visit Attendees Sign-In Sheet_11AUG2023_EHRM San Antonio.xlsx XLSX spreadsheet
Pre-bid Site Visit Sign-in Sheet_11AUG2023.pdf PDF
Amendment 0001_36C77623B0064_02AUG2023.pdf PDF
S02 - Attachment 7(a) - Technology Cut Sheets - Part 1 of 11 APC.pdf PDF
S02 - Attachment 14(a) - Asbestos Survey Results 1st-4th Floors.pdf PDF
S02 - Attachment 7(g) - Technology Cut Sheets - Part 7 of 11 Panduit.pdf PDF
S02 - Attachment 5 - Electrical Cut Sheets.pdf PDF
S02 - Attachment 4 - 230501 SAT_EHRM_100 percent final TechnicalReport.pdf PDF
S02 - Attachment 7(k) - Technology Cut Sheets - Part 11 of 11 Hubbell.pdf PDF
S02 - Attachment 1(c) - 671-22-700 DRAWINGS Mechanical.pdf PDF
S02 - Attachment 11 - Wage Determination_Bexar CountyTX_14APR2023.pdf PDF
S02 - Attachment 9 - Contractor Safety and Environmental Record Form.docx DOCX document
S02 - Attachment 12 - Submittal Register ENG Form 4288-R.pdf PDF
S02 - Attachment 7(h) - Technology Cut Sheets - Part 8 of 11 Axis.pdf PDF
S02 - Attachment 13 - VA OEHRM Site Infrastructure and EUD Reqmts 2.0.pdf PDF
S02 - Attachment 1(e) - 671-22-700 DRAWINGS Technology.pdf PDF
Solicitation 36C77623B0064_28JUL2023.pdf PDF
S02 - Attachment 1(d) - 671-22-700 DRAWINGS Electrical.pdf PDF
S02 - Attachment 1(f) 671-22-700 DRAWINGS Physical Security.pdf PDF
S02 - Attachment 2 - 671-22-700 100 percent final BID SPECIFICATIONS.pdf PDF
S02 - Attachment 8(b) - OIT-InfrastrucStdTelecomSpaces_Part 2 of 3.pdf PDF
S02 - Attachment 7(d) - Technology Cut Sheets - Part 4 of 11 CPI Cabinet.pdf PDF
S02 - Attachment 7(j) - Technology Cut Sheets - Part 10 of 11 HID.pdf PDF
S02 - Attachment 7(b) - Technology Cut Sheets - Part 2 of 11 Corning.pdf PDF
S02 - Attachment 7(e) - Technology Cut Sheets - Part 5 of 11 Leviton.pdf PDF
S02 - Attachment 8(a) - OIT-InfrastrucStdTelecomSpaces_Part 1 of 3.pdf PDF
S02 - Attachment 7(i) - Technology Cut Sheets - Part 9 of 11 Cablofil.pdf PDF
S02 - Attachment 7(f) - Technology Cut Sheets - Part 6 of 11 Ortronics.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION SHEET

1. SOLICITATION NUMBER

PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)

2. PROJECT TITLE

NO.:

NO.:

NO.:

NO.:

A. OFFEROR

A. OFFEROR

A. OFFEROR

A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

A. ITEM NO.

B. ESTIMATED QUANTITY

C. UNIT

D. UNIT PRICE

E. ESTIMATED AMOUNT

E. ESTIMATED AMOUNT

D. UNIT PRICE

E. ESTIMATED AMOUNT

D. UNIT PRICE

E. ESTIMATED AMOUNT

D. UNIT PRICE

AUTHORIZED FOR LOCAL REPRODUCTION Previous edition is usable

OPTIONAL FORM 1419A (11-88)

8.2.1.3144.1.471865.466429

1. SOLICITATION NUMBER: 36C77623B0064
2. PROJECT TITLE: EHRM INFRASTRUCTURE UPGRADES AT AUDIE L. MURPHY MEMORIAL VETERANS' HOSPITAL, SAN ANTONIO, TEXAS
4B. OFFERS (Continued) BID SECURITY (Type and amount): 20%
4B. OFFERS (Continued) BID SECURITY (Type and amount):
4B. OFFERS (Continued) BID SECURITY (Type and amount):
4B. OFFERS (Continued) BID SECURITY (Type and amount):
4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: YES
4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.:
4C. OFFERORS (Continued) AMENDMENTS ACKNOWLEDGED.:
4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 1 of 13.: 1.00000000
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:
3B. ESTIMATED QUANTITY:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13.:
3C. CONTRACT ITEMS. UNIT:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 13 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 12 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 11 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 10 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 9 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 8 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 7 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 6 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 5 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 4 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 3 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 2 of 13.:
3B. ESTIMATED QUANTITY: 1.00000000
3C. CONTRACT ITEMS. UNIT: JB
4D. OFFERS (Continued) UNIT PRICE. Line 1 Of 13.: 29417000.00000000
4E. OFFERS (Continued) ESTIMATED.: 29417000.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13:
4E. OFFERS (Continued) ESTIMATED.:
PAGE OF: 2.00000000
PAGES: 2.00000000
Offeror number. Column 1 of 4.: 3
Offeror number. Column 2 of 4.:
Offeror number. Column 3 of 4.:
Offeror number. Column 4 of 4.:
A. OFFEROR: ESA SOUTH
A. OFFEROR:
A. OFFEROR:
A. OFFEROR:

File details come from the government source that posted it. Updated .