S02 - Attachment 1(e) - 671-22-700 DRAWINGS Technology.pdf

PDF 27 MB Posted

Attached to
EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) Federal contract opportunity
Solicitation number
36C77623B0064
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This document provides details for a federal contract opportunity with the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation number is 36C77623B0064 and seeks offers for EHRM San Antonio Infrastructure Upgrades Construction. This is a SDVOSB set-aside opportunity under NAICS code 236220. Offerors should provide construction services to upgrade infrastructure at the San Antonio VA location. The response deadline and award date are not specified, nor are any pricing or evaluation terms included. The file attached is a 27MB drawing related to the required construction work.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS), newest first.
File Type Posted
S07 - Bid Abstract Page 1_OF1419_EHRM San Antonio_6SEP2023.pdf PDF
Amendment 0005_36C77623B0064_31AUG2023.pdf PDF
S02 - Attachment 15 - STX Addendum 1 (Composite).pdf PDF
S02 - Attachment 22 - SF 25 Performance Bond Form.pdf PDF
S02 - Attachment 18 - 320523 Cement and Concrete for Exterior Improvements.pdf PDF
S02 - Attachment 23 - SF 25A Payment Bond Form.pdf PDF
S02 - Attachment 20 - Addendum 1 - Mechanical.pdf PDF
S02 - Attachment 17 - 075100 Roofing Repair.pdf PDF
S02 - Attachment 16 - STX Addendum 1.pdf PDF
Amendment 0003 Attachment Warranty RoofCAD-VA San Antonio-RFI Q100.pdf PDF
Amendment 0003_36C77623B0064_23AUG2023.pdf PDF
S02 - Attachment 6(e) - Mechanical Cut Sheets - Data Center CRAC - N 1 Operation (8000 cfm).pdf PDF
S02 - Attachment 6(a) - Mechanical Cut Sheets - 3.0 Ton Split System.pdf PDF
S02 - Attachment 6(f) - Mechanical Cut Sheets - 2.0 Ton Split System.pdf PDF
S02 - Attachment 6(b) - Mechanical Cut Sheets - Data Center CRAC - Normal Operation (6000 cfm).pdf PDF
S02 - Attachment 6(d) - Mechanical Cut Sheets - Data Center CRAC Dimensions.pdf PDF
Site Visit Attendees Sign-In Sheet_11AUG2023_EHRM San Antonio.xlsx XLSX spreadsheet
Amendment 0001_36C77623B0064_02AUG2023.pdf PDF
S02 - Attachment 8(b) - OIT-InfrastrucStdTelecomSpaces_Part 2 of 3.pdf PDF
S02 - Attachment 8(a) - OIT-InfrastrucStdTelecomSpaces_Part 1 of 3.pdf PDF
S02 - Attachment 7(b) - Technology Cut Sheets - Part 2 of 11 Corning.pdf PDF
S02 - Attachment 7(f) - Technology Cut Sheets - Part 6 of 11 Ortronics.pdf PDF
S02 - Attachment 7(j) - Technology Cut Sheets - Part 10 of 11 HID.pdf PDF
S02 - Attachment 7(e) - Technology Cut Sheets - Part 5 of 11 Leviton.pdf PDF
S02 - Attachment 7(k) - Technology Cut Sheets - Part 11 of 11 Hubbell.pdf PDF
S02 - Attachment 7(i) - Technology Cut Sheets - Part 9 of 11 Cablofil.pdf PDF
S02 - Attachment 1(c) - 671-22-700 DRAWINGS Mechanical.pdf PDF
S02 - Attachment 4 - 230501 SAT_EHRM_100 percent final TechnicalReport.pdf PDF
S02 - Attachment 8(c) - OIT-InfrastrucStdTelecomSpaces_Part 3 of 3.pdf PDF
S02 - Attachment 7(c) - Technology Cut Sheets - Part 3 of 11 CPI.pdf PDF
S02 - Attachment 7(g) - Technology Cut Sheets - Part 7 of 11 Panduit.pdf PDF
S02 - Attachment 1(b) - 671-22-700 DRAWINGS Architectural.pdf PDF
S02 - Attachment 6 - Mechanical Cut Sheets.pdf PDF
S02 - Attachment 7(a) - Technology Cut Sheets - Part 1 of 11 APC.pdf PDF
S02 - Attachment 3 - 671-22-700 EHRM Infrastructure Upgrades- SOW Construction.pdf PDF
S02 - Attachment 5 - Electrical Cut Sheets.pdf PDF
Solicitation 36C77623B0064_28JUL2023.pdf PDF
S02 - Attachment 14(b) - Asbestos Survey Results Ground and 5th-7th Floors.pdf PDF
S02 - Attachment 13 - VA OEHRM Site Infrastructure and EUD Reqmts 2.0.pdf PDF
S02 - Attachment 10 - VA Notice Limitations on Subcontracting - Construction (JAN 2023) (DEV).docx DOCX document
S02 - Attachment 7(d) - Technology Cut Sheets - Part 4 of 11 CPI Cabinet.pdf PDF
S02 - Attachment 1(d) - 671-22-700 DRAWINGS Electrical.pdf PDF
S02 - Attachment 2 - 671-22-700 100 percent final BID SPECIFICATIONS.pdf PDF
S02 - Attachment 1(f) 671-22-700 DRAWINGS Physical Security.pdf PDF
S02 - Attachment 14(a) - Asbestos Survey Results 1st-4th Floors.pdf PDF
S02 - Attachment 11 - Wage Determination_Bexar CountyTX_14APR2023.pdf PDF
S02 - Attachment 12 - Submittal Register ENG Form 4288-R.pdf PDF
S02 - Attachment 9 - Contractor Safety and Environmental Record Form.docx DOCX document
S02 - Attachment 7(h) - Technology Cut Sheets - Part 8 of 11 Axis.pdf PDF
S02 - Attachment 1(a) - 671-22-700 DRAWINGS General Sheets.pdf PDF
Show all 50

EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNOLOGY SYMBOL LIST

SYMBOL: DESCRIPTION: NOTE:

EQUIPMENT

LIST ABBREV.:

1.INFORMATION OUTLET (CEILING)SC-IO-C

1.INFORMATION OUTLET (WALL)SC-IO-W

1.INFORMATION OUTLET ROUGH-IN (WALL) EXISTINGN/A

C#

C#

TECHNOLOGY ABBREVIATION KEY

TELECOMMUNICATIONS ROOMTR-#

ABOVE FINISHED FLOORAFF

BELOW FINISHED CEILINGBFC

CONDUITC

SIMILARSIM

TYPICALTYP

MOUNTING HEIGHT ABOVE FINISHED FLOOR+#

JUNCTION BOXJ-BOX

ABBR: DESCRIPTION:

UNLESS OTHERWISE NOTEDUON

FIELD OF VIEWFOV

DOUBLE POLE DOUBLE THROWDPDT

PAN TILT ZOOMPTZ

POWER OVER ETHERNETPOE

ABOVE FINISHED GRADEAFG

DELAYED EGRESSDE

TELECOMMUNICATIONS ROOMTR-#

ABOVE FINISHED FLOORAFF

BELOW FINISHED CEILINGBFC

CONDUITC

SIMILARSIM

TYPICALTYP

MOUNTING HEIGHT ABOVE FINISHED FLOOR+#

JUNCTION BOXJ-BOX

UNLESS OTHERWISE NOTEDUON

FIELD OF VIEWFOV

DOUBLE POLE DOUBLE THROWDPDT

PAN TILT ZOOMPTZ

POWER OVER ETHERNETPOE

ABOVE FINISHED GRADEAFG

DELAYED EGRESSDE

TELECOMMUNICATIONS ROOMTR-#

ABOVE FINISHED FLOORAFF

BELOW FINISHED CEILINGBFC

CONDUITC

SIMILARSIM

TYPICALTYP

MOUNTING HEIGHT ABOVE FINISHED FLOOR+#

JUNCTION BOXJ-BOX

UNLESS OTHERWISE NOTEDUON

FIELD OF VIEWFOV

DOUBLE POLE DOUBLE THROWDPDT

PAN TILT ZOOMPTZ

POWER OVER ETHERNETPOE

ABOVE FINISHED GRADEAFG

DELAYED EGRESSDE

TELECOMMUNICATIONS ROOMTR-#

ABOVE FINISHED FLOORAFF

BELOW FINISHED CEILINGBFC

CONDUITC

SIMILARSIM

TYPICALTYP

MOUNTING HEIGHT ABOVE FINISHED FLOOR+#

JUNCTION BOXJ-BOX

UNLESS OTHERWISE NOTEDUON

FIELD OF VIEWFOV

DOUBLE POLE DOUBLE THROWDPDT

PAN TILT ZOOMPTZ

POWER OVER ETHERNETPOE

ABOVE FINISHED GRADEAFG

DELAYED EGRESSDE

TELECOMMUNICATIONS ROOMTR-#

ABOVE FINISHED FLOORAFF

BELOW FINISHED CEILINGBFC

CONDUITC

SIMILARSIM

TYPICALTYP

MOUNTING HEIGHT ABOVE FINISHED FLOOR+#

JUNCTION BOXJ-BOX

UNLESS OTHERWISE NOTEDUON

FIELD OF VIEWFOV

DOUBLE POLE DOUBLE THROWDPDT

PAN TILT ZOOMPTZ

POWER OVER ETHERNETPOE

ABOVE FINISHED GRADEAFG

DELAYED EGRESSDE

TELECOMMUNICATIONS ROOMTR-#

ABOVE FINISHED FLOORAFF

BELOW FINISHED CEILINGBFC

CONDUITC

SIMILARSIM

TYPICALTYP

MOUNTING HEIGHT ABOVE FINISHED FLOOR+#

JUNCTION BOXJ-BOX

UNLESS OTHERWISE NOTEDUON

FIELD OF VIEWFOV

DOUBLE POLE DOUBLE THROWDPDT

PAN TILT ZOOMPTZ

POWER OVER ETHERNETPOE

ABOVE FINISHED GRADEAFG

DELAYED EGRESSDE

TCO TELECOMMUNICATIONS OUTLET

UPS UNITERUPTABLE POWER SUPPLY

TE-# TELECOMMUNICATIONS ENCLOSURE

TECHNOLOGY GENERAL NOTES:

1. ##-###-# INDICATES TECHNOLOGY EQUIPMENT SCHEDULE ITEM LABELED AS "EQUIPMENT

LIST ABBREVIATION"

2. REFER TO TECHNOLOGY EQUIPMENT SCHEDULE AND SPECIFICATIONS FOR FULL

DESCRIPTIONS AND MANUFACTURERS OF ALL DEVICES.

3. ALL REFERENCES TO "OWNER" AND/OR "COR" HEREIN REFER TO THE CONTRACTING

OFFICER REPRESENTATIVE AND WILL BE PRIMARY POINT CONTACT FOR ALL COORDINATION

WITH THE LOCAL HOSPITAL AS THE REPRESENTATIVE OF THE BUILDING TENANTS

INCLUDING BUT NOT LIMITED TO STAFF RESPONSIBLE FOR IT AND OTHER STAFF REQUIRED

FOR COORDINATION FOR THIS PROJECT HEREIN.

TECHNOLOGY MOUNTING SUBSCRIPT KEY:

A MOUNT AT +6" TO CENTERLINE ABOVE COUNTER OR BACKSPLASH

H MOUNT ORIENTED HORIZONTALLY

L MOUNT IN CASEWORK

M MOUNT IN MODULAR FURNITURE

S MOUNT IN SURFACE RACEWAY

A SLASH IS USED BETWEEN TWO SUBSCRIPTS, E.G., A/H.

TECHNOLOGY INSTALLATION NOTES:

1. THE COMPLETE INSTALLATION SHALL BE IN ACCORDANCE WITH THE ABAAS AND VA

BARRIER FREE DESIGN GUIDE STANDARDS FOR ACCESSIBLE DESIGN. REFER TO THE ABAAS

AND VA BARRIER FREE DESIGN GUIDELINES FOR ALL CONFIGURATION DETAILS ON THIS

PAGE FOR ADDITIONAL INFORMATION.

2. CONCEAL ALL CONDUIT IN WALLS, PARTITIONS, ABOVE CEILING, IN FLOOR SLAB, ETC.

UNLESS OTHERWISE INDICATED ON THE PLANS OR IN THE SPECIFICATIONS. CONDUIT IN

MECHANICAL ROOMS AND STORAGE ROOMS WITHOUT CEILINGS MAY BE EXPOSED ON

BUILDING STRUCTURE.

3. TELECOMMUNICATIONS EQUIPMENT SHALL BE MOUNTED TO ALLOW ACCESS TO

ELECTRICAL AND MECHANICAL EQUIPMENT. ALL MOUNTING OF TELECOMMUNICATION

DEVICES ON EQUIPMENT SUPPLIED BY ANOTHER CONTRACTOR SHALL BE APPROVED IN

ADVANCE BY THE OTHER CONTRACTOR.

4. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN WALLS. ALL

OPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED CONTRACTOR AT THE

EXPENSE OF THIS CONTRACTOR. ALL CONDUITS THROUGH WALLS SHALL BE GROUTED OR

SEALED INTO OPENINGS.

5. ALL MATERIALS USED TO SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS SHALL

BE TESTED AND CERTIFIED AS A SYSTEM PER ASTM E814 STANDARDS FOR FIRE TESTS OF

THROUGH-PENETRATION FIRESTOPS.

6. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF THE CEILINGS,

CEILING TILES, AND CEILING GRID ASSOCIATED WITH THE AREAS OF WORK BY ALL

CONTRACTORS.

7. ALL WIRE BASKET AND CABLE TRAY SIZES ARE AS DEFINED ON THE DRAWINGS. REFER TO

SPECIFICATION FOR APPROVED MANUFACTURERS AND INSTALLATION REQUIREMENTS.

GENERAL NOTES:

TECHNOLOGY SYMBOL NOTES:

CABLE TRAY, CHANNEL TRAY, BASKET

TRAY

LADDER RACK

WIDTH X HEIGHT

WIDTH X HEIGHT

DIAMETERø C CONDUIT

CONDUIT DOWN

CONDUIT UP OR UP/DOWN

CONDUIT SLEEVE

CONTINUATION

1. ALL SYMBOLS AND ABBREVIATIONS LISTED MAY NOT BE APPLICABLE TO THIS PROJECT.

REFER TO THE TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE COMPLETE DESCRIPTION

AND ITEMS.

2. ALL SYMBOLS AND ABBREVIATIONS REFER TO TECHNOLOGY SHEETS ONLY AS DEFINED ON

THE SHEET INDEX. REFER TO THE GENERAL TECHNOLOGY NOTES FOR ADDITIONAL

INFORMATION.

3. ALL SYMBOLS LISTED ABOVE ARE FOR REFERENCE ONLY. REFER TO PLANS AND LINE TYPE

KEY FOR NEW, EXISTING TO REMAIN AND TO BE REMOVED ITEMS FOR ADDITIONAL

INFORMATION.

4. REFER TO DIAGRAMS ON SHEET(S): T600, T601, T602, T603, T604.

5. TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING AND TAGS WITH DASH

'D' INDICATES THE REFERENCED OBJECT IS TO BE DEMOLISHED (SEE TECHNOLOGY CALBING

PLAN)

1. "C#" INDICATES QUANTITY OF CABLES AT EACH LOCATION. REFER TO INFORMATION

OUTLET SCHEDULE ON T605 FOR ADDITIONAL INFORMATION.

C#

1.

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10'-0" HEIGHT ABOVE

PROJECT 0'-0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

(SEE TECHNOLOGY CALBING PLAN)

'TAG'-D TAGS WITH DASH 'D' INDICATES THE REFERENCED OBJECT IS DEMOLISHED

(SEE TECHNOLOGY CALBING PLAN)

TAG UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL

INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

T101

TEMPERATURE CONTROLS CONTRACTORT.C.C.

ASBESTOS ABATEMENT CONTRACTOR

FIRE PROTECTION CONTRACTORF.P.C.

HEATING CONTRACTORH.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

VENTILATION CONTRACTORV.C.

ELECTRICAL CONTRACTORE.C.

A.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

E.O.R ENGINEER OF RECORD

C.O.R. CONTRACTING OFFICER'S REPRESENTATIVE

M

A X

20" MAX.

M

A X

20"-25" MAX.

M

A X

M

IN

. 4

M

A X

M

A X

10" MAX. 10"-24" MAX.

ADA GUIDELINES - FRONT ACCESS

ADA STANDARDS FOR ACCESSIBLE DESIGN

INSTALL ABOVE COUNTER

DEVICE AT 44" ABOVE

FINISHED FLOOR.

INSTALL ABOVE COUNTER

DEVICE AT 40" ABOVE

FINISHED FLOOR.

INSTALL DEVICE AT 18"

ABOVE FINISHED FLOOR.

ADA GUIDELINES - SIDE ACCESS

INSTALL DEVICE AT 44"

ABOVE FINISHED FLOOR.

INSTALL DEVICE AT 42"

ABOVE FINISHED FLOOR.

TECHNOLOGY DEMOLITION NOTES

1. THE DRAWINGS INDICATE EXISTING ITEMS TO BE REMOVED. THE DRAWINGS ARE

INTENDED TO INDICATE THE SCOPE OF WORK REQUIRED AND DO NOT INDICATE EVERY

BOX, CONDUIT, OR WIRE THAT MUST BE REMOVED. THE CONTRACTOR SHALL VISIT THE

SITE PRIOR TO SUBMITTING A BID AND VERIFY EXISTING CONDITIONS.

2. ITEMS (i.e. SWITCHES, ETC.) REMOVED AND NOT RELOCATED REMAIN THE PROPERTY OF

THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISPOSAL OF

MATERIAL THE OWNER DOES NOT WANT TO REUSE OR RETAIN. (i.e., FOR MAINTENANCE

PURPOSES).

3. EXISTING TO REMAIN DEVICES WITHIN OR ADJACENT TO THE PATH OF CONSTRUCTION

SHALL BE PROTECTED IN PLACE. DEVICES THAT MUST BE REMOVED SHALL BE TESTED

PRIOR TO REMOVAL, PROTECTED FROM DAMAGE, AND RE-INSTALLED IN ITS ORIGINAL

LOCATION DURING THE NEW CONSTRUCTION PHASE OF THE PROJECT.

4. OBTAIN APPROVAL FROM THE OWNER BEFORE TURNING OFF THE POWER TO

EQUIPMENT, SYSTEMS, PANELS, ETC. COORDINATE ALL OUTAGES WITH OWNER.

CONDUIT CONCEALED IN WALL CONSTRUCTION MAY BE ABANDONED IN PLACE IF NOT

AFFECTED BY OTHER CONSTRUCTION.

5. ALL CONDUIT SHALL BE REMOVED WHERE WALLS ARE BEING REMOVED. WHERE

CONDUIT IS IN THE CONCRETE SLAB, CUT OFF FLUSH, PULL OUT WIRE, AND PLUG.

WHERE CONDUIT IS RUN EXPOSED, ALL ASSOCIATED CLAMPS, SUPPORTS, HANGERS,

ETC., SHALL ALSO BE REMOVED.

6. COORDINATE ALL WORK WITH OTHER CONTRACTORS AT THE JOB SITE BEFORE

REMOVING EXISTING EQUIPMENT AND INSTALLING NEW ITEMS.

7. EXISTING CONDUIT IN GOOD CONDITION, MAY BE REUSED IN PLACE. RELOCATING

EXISTING CONDUIT SHALL NOT BE ALLOWED. BONDING CONDUCTORS SHALL BE

INSTALLED IN ALL REUSED CONDUIT TO ASSURE PROPER GROUND PATH.

8. EQUIPMENT REMOVAL IN CERTAIN LOCATIONS MAY REQUIRE THE INSTALLATION OF A

JUNCTION BOX TO RECONNECT CIRCUITS THAT REMAIN IN OPERATION. EXTEND

CONDUIT AND WIRING AS REQUIRED TO MAINTAIN POWER TO REMAINING EQUIPMENT.

9. DEVICES TO BE REMOVED SHALL HAVE ALL CONNECTED WIRING REMOVED TO THE

SOURCE.

10. DEVICES NOT TO BE REMOVED SHALL BE PROTECTED FROM THE ENVIRONMENT, AND

ALL ASSOCIATED CABLE/RACEWAYS ARE TO REMAIN AND BE PROTECTED. T.C. SHALL BE

RESPONSIBLE FOR REPAIR OF ANY INTERRUPTIONS TO PROTECTED DEVICES.

11. REFER TO SPECIFICATIONS SECTION 27 05 00 FOR ADDITIONAL INFORMATION.

TECHNOLOGY CABLING PLAN

1. ALL NETWORK (DATA) CABLING ON THIS PROJECT IS INTENDED TO BE REPLACED WITH NEW

CABLING IN ALL AREAS WITHIN THE SCOPE OF WORK ON THIS PROJECT. THIS TECHNOLOGY

CABLING PLAN IS A RECOMMENDATION ON THE PHASING AND INSTALLATION. ANY CHANGES

TO THIS SCOPE WILL BE COORDINATED WITH THE LOCAL C.O.R. AND ENGINEER OF RECORD

PRIOR TO INSTALLATION.

2. PRIOR TO THE START OF ANY DEMOLITION AND INSTALLATION OF ANY CABLING AT EACH

TCO, THE CONTRACTOR SHALL COORDINATE A PLAN WITH THE LOCAL C.O.R. AND ENGINEER

OF RECORD. THIS WILL INCLUDE ANY SCHEDULED DOWNTIME REQUIRED FOR EACH

LOCATION.

3. NEW PATHWAY WILL BE INSTALLED IN THE INTERSTITIAL SPACE AND OTHER SPACES AS

DEFINED ON THE PROJECT DRAWINGS AND SPECIFICATIONS.

A. CABLING WILL BE ROUTED FROM THE SERVING ROOM AS DEFINED ON THE PROJECT

DRAWINGS.

B. ALL NEW CABLING WILL TERMINATE ON NEW COPPER PATCH PANELS.

C. ALL NEW CABLING WILL ROUTE IN CABLE TRAY OR CONDUIT AS DEFINED BY THE PATH

SHOWN ON THE DRAWINGS. ANY CHANGES TO THIS PATH WILL REQUIRE THAT THE

CONTRACTOR PROVIDE A NEW PLAN TO THE C.O.R. AND EOR TO BE APPROVED PRIOR

TO INSTALLATION.

D. CABLING INSTALLED IN THE INTERSTITIAL SPACE FROM THE TCO AND THE CABLE TRAY

CAN BE SUPPORTED BY J-HOOKS AS REQUIRED BUT WILL REQUIRE TO BE ROUTED TO

THE NEAREST CABLE TRAY.

E. NO CABLING WILL BE ROUTED THROUGH, UNDER/OVER, OR LAY ON ANY OTHER SYSTEM

CONDUIT, PIPE, DUCTWORK, ECT.

4. EXISTING DATA CABLING WILL BE REMOVED FROM THE TCO. THE FOLLOWING IS AN

OVERVIEW AND REQUIREMENT AT EACH TCO:

A. VERIFY THAT BOTH ENDS ARE DISCONNECTED FROM ACTIVE EQUIPMENT BY REMOVING

ANY PATCH CABLES/CORDS.

B. DEMO THE FACEPLATE. THE ROUGH-IN AND CONDUIT TO ABOVE THE CEILING WILL

REMAIN.

C. ONLY DATA CABLING WILL BE DEMOLISHED BACK TO THE SOURCE. COIL THE DATA

CABLING ABOVE THE TCO.

D. EXISTING VOICE CABLING WILL REMAIN. VOICE TERMINATIONS WILL REQUIRE RE

TERMINATION ON NEW JACKS COMPATIBLE WITH THE NEW FACEPLATE.

E. NEW DATA CABLING WILL BE INSTALLED AND TERMINATED ON THE NEW FACEPLATE.

F. BOTH DATA AND VOICE JACKS WILL BE TESTED AND LABELED.\

G. COORDINATE WITH THE C.O.R. ON THE RECONNECTION OF PATCH CABLES ON

COMPLETION.

5. AFTER THE ABOVE IS COMPLETED, ALL DEMOLISHED CABLING WILL BE REMOVED BACK TO

THE SOURCE. THIS INCLUDES ANY JACKS, FACEPLATES, UNUSED PATHWAY, ETC.

A. ALL ABANDON CABLING ABOVE THE CEILING IN THE SAME PATHWAY AS THE

DEMOLISHED CABLING WILL BE REMOVED. THE CONTRACTOR SHALL INCLUDE TESTING

AND VERIFICATION OF ALL CATEGORY RATED CABLING REGARDLESS OF DEMOLISHED

FROM A KNOWN OUTLET OR NOT. ONLY ACTIVE VOICE AND DATA CABLING WILL REMAIN

ABOVE ANY CEILING AND/OR INTERSTITIAL SPACES. COORDINATE WITH THE LOCAL

C.O.R. FOR ADDITIONAL REQUIREMENTS.

6. REFER TO THE SPECIFICATIONS FOR ADDITIONAL INSTALLATION AND PHASING

REQUIREMENTS.

NUMBER AND ADDRESS

SUITE NO.

CITY, STATE ZIP CODE

P: 555.555.555 F: 555.555.5555 www.imegcorp.com

PROJECT #22006633.00

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

M

E P

T

.0

V A

-S a n A n to n io

T

X -E

H R

M

C .r v t

/1

/2

:3

:0

A

M

T000

COVER SHEET - TECHNOLOGY

Awen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229

671-22-700

TELECOM ROOM SCHEDULES

TR-TAG BUILDING FLOOR AREA ROOM NUMBERS

FLOOR PLAN

REFERENCES

ENELARGEMENT

REFERENCES

TR-G-1 BUILDING 1 G AREA F L010.2 TN127 1/TN400

TR-G-2 BUILDING 1 G AREA B 030 TN122 2/TN401

TR-G-3 BUILDING 1 G AREA G GB126.1 TN128 1/TN402

TR-G-4 BUILDING 1 G AREA E1 F004 TN125 1/TN483

TR-G-5 BUILDING 1 G AREA D C015.1 TN124 1/TN404

TR-G-6 BUILDING 1 G AREA PT 020 TN130 2/TN405

TR-G-7 BUILDING 1 G AREA CLC 1A138 TN131 1/TN406

TR-G-8 BUILDING 1 G AREA A H031 TN121 1/TN408

TR-1-1 BUILDING 1 1 AREA A S101 TN135 2/TN410

TR-1-2 BUILDING 1 1 AREA B J104 TN136 2/TN411

TR-1-3 BUILDING 1 1 AREA E2 H118.2 TN140 1/TN412

TR-1-4 BUILDING 1 1 AREA E1 105 TN139 1/TN413

TR-1-5 BUILDING 1 1 AREA H G101 TN413 2/TN414

TR-1-6 BUILDING 1 1 AREA PT 157 TN145 2/TN415

TR-1-7 BUILDING 1 1 AREA F P125 TN141 1/TN416

TR-1-8 BUILDING 1 1 AREA CLC 2A137 TN146 1/TN417

TR-1-9 BUILDING 1 1 AREA J Y102.7 TN144 2/TN418

TR-1-10 BUILDING 1 1 AREA G T119.2 TN142 2/TN419

TR-2-1 BUILDING 1 2 AREA A R201 TN152 1/TN420

TR-2-2 BUILDING 1 2 AREA B SP238 TN153 2/TN421

TR-2-3 BUILDING 1 2 AREA G Z221.28A TN159 1/TN422

TR-2-4 BUILDING 1 2 AREA D E221 TN155 2/TN423

TR-2-5 BUILDING 1 2 AREA C A200 TN154 2/TN424

TR-2-6 BUILDING 1 2 AREA PT 258 TN160 2/TN425

TR-3-1 BUILDING 1 3 AREA TN C301.1 TN167 2/TN483

TR-3-2 BUILDING 1 3 AREA G D320 TN165 2/TN431

TR-4-1 BUILDING 1 4 AREA TS C402 TN170 2/TN440

TR-5-1 BUILDING 1 5 AREA TS C511 TN175 2/TN450

TR-6-1 BUILDING 1 6 AREA TS C602.1 TN180 2/TN460

TR-7-1 BUILDING 1 7 AREA TS D702.1 TN185 1/TN470

TE-P-1 BUILDING 4 G N/A N/A TN190 TN190

DATA CENTER BUILDING 1 1 AREA G I100 TN142 1/TN492

Grand total: 32

TECHNOLOGY SHEET INDEX

TN106.5 6TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE

TN107 7TH FLOOR PLAN - TECHNOLOGY - OVERALL

TN107.5 7TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE

TN121 GROUND PLAN - TECHNOLOGY - AREA A

TN122 GROUND PLAN - TECHNOLOGY - AREA B

TN123 GROUND PLAN - TECHNOLOGY - AREA C

TN124 GROUND PLAN - TECHNOLOGY - AREA D

TN125 GROUND PLAN - TECHNOLOGY - AREA E1

TN126 GROUND PLAN - TECHNOLOGY - AREA E2

TN127 GROUND PLAN - TECHNOLOGY - AREA F

TN128 GROUND PLAN - TECHNOLOGY - AREA G

TN129 GROUND PLAN - TECHNOLOGY - AREA H

TN130 GROUND PLAN - TECHNOLOGY - AREA PT

TN131 GROUND PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH

TN132 GROUND PLAN - TECHNOLOGY - AREA CLC CENTRAL

TN135 1ST FLOOR PLAN - TECHNOLOGY - AREA A

TN136 1ST FLOOR PLAN - TECHNOLOGY - AREA B

TN137 1ST FLOOR PLAN - TECHNOLOGY - AREA C

TN138 1ST FLOOR PLAN - TECHNOLOGY - AREA D

TN139 1ST FLOOR PLAN - TECHNOLOGY - AREA E1

TN140 1ST FLOOR PLAN - TECHNOLOGY - AREA E2

TN141 1ST FLOOR PLAN - TECHNOLOGY - AREA F

TN142 1ST FLOOR PLAN - TECHNOLOGY - AREA G

TN143 1ST FLOOR PLAN - TECHNOLOGY - AREA H

TN144 1ST FLOOR PLAN - TECHNOLOGY - AREA J

TN145 1ST FLOOR PLAN - TECHNOLOGY - AREA PT

TN146 1ST FLOOR PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH

TN147 1ST FLOOR PLAN - TECHNOLOGY - AREA CLC CENTRAL

TN152 2ND FLOOR PLAN - TECHNOLOGY - AREA A

TN153 2ND FLOOR PLAN - TECHNOLOGY - AREA B

TN154 2ND FLOOR PLAN - TECHNOLOGY - AREA C

TN156 2ND FLOOR PLAN - TECHNOLOGY - AREA E1

TN157 2ND FLOOR PLAN - TECHNOLOGY - AREA E2

TN158 2ND FLOOR PLAN - TECHNOLOGY - AREA F

TN159 2ND FLOOR PLAN - TECHNOLOGY - AREA G

TN160 2ND FLOOR PLAN - TECHNOLOGY - AREA PT

TN165 3RD FLOOR PLAN - TECHNOLOGY - AREA G

TN166 3RD FLOOR PLAN - TECHNOLOGY - AREA TS

TN167 3RD FLOOR PLAN - TECHNOLOGY - AREA TN

TN170 4TH FLOOR PLAN - TECHNOLOGY - AREA TS

TN171 4TH FLOOR PLAN - TECHNOLOGY - AREA TN

TN175 5TH FLOOR PLAN - TECHNOLOGY - AREA TS

TN176 5TH FLOOR PLAN - TECHNOLOGY - AREA TN

TN180 6TH FLOOR PLAN - TECHNOLOGY - AREA TS

TN181 6TH FLOOR PLAN - TECHNOLOGY - AREA TN

TN185 7TH FLOOR PLAN - TECHNOLOGY - AREA TS

TN186 7TH FLOOR PLAN - TECHNOLOGY - AREA TN

TN190 BLDG 4 PLAN - TECHNOLOGY

TN400 GROUND LEVEL - TR L010.2 - TECHNOLOGY - ENLARGED PLANS

TN401 GROUND LEVEL - TR 030 - TECHNOLOGY - ENLARGED PLANS

TN402 GROUND LEVEL - TR GB126.1 - TECHNOLOGY - ENLARGED PLANS

TN403 GROUND LEVEL - TR F004 - TECHNOLOGY - ENLARGED PLANS

TN404 GROUND LEVEL - TR C015.1 - TECHNOLOGY - ENLARGED PLANS

TN405 GROUND LEVEL - TR 020 - TECHNOLOGY - ENLARGED PLANS

TN406 GROUND LEVEL - TR 1A138 - TECHNOLOGY - ENLARGED PLANS

TN407 GROUND LEVEL - TR H031 - TECHNOLOGY - ENLARGED PLANS

TN410 1ST FLOOR - TR S101 - TECHNOLOGY - ENLARGED PLANS

TN411 1ST FLOOR - TR J104 - TECHNOLOGY - ENLARGED PLANS

TN412 1ST FLOOR -TR H118.2 - TECHNOLOGY - ENLARGED PLANS

TN413 1ST FLOOR - TR 105 - TECHNOLOGY - ENLARGED PLANS

TN414 1ST FLOOR - TR G101 - TECHNOLOGY - ENLARGED PLANS

TN415 1ST FLOOR - TR 157 - TECHNOLOGY - ENLARGED PLANS

TN416 1ST FLOOR - TR P125 - TECHNOLOGY - ENLARGED PLANS

TN417 1ST FLOOR - TR 2A137 - TECHNOLOGY - ENLARGED PLANS

TN418 1ST FLOOR - TR Y102.7 - TECHNOLOGY - ENLARGED PLANS

TN419 1ST FLOOR - TR T119.2 - TECHNOLOGY - ENLARGED PLANS

TN420 2ND FLOOR - TR R201 - TECHNOLOGY - ENLARGED PLANS

TN421 2ND FLOOR - TR SP238 - TECHNOLOGY - ENLARGED PLANS

TN422 2ND FLOOR - TR Z221.28A - TECHNOLOGY - ENLARGED PLANS

TN423 2ND FLOOR - TR E221 - TECHNOLOGY - ENLARGED PLANS

TN424 2ND FLOOR - TR A200 - TECHNOLOGY - ENLARGED PLANS

TN425 2ND FLOOR - TR 258 - TECHNOLOGY - ENLARGED PLANS

TN430 3RD FLOOR - TR C301.1 - TECHNOLOGY - ENLARGED PLANS

TN431 3RD FLOOR -TR D320 - TECHNOLOGY - ENLARGED PLANS

TN440 4TH FLOOR - TR C402 - TECHNOLOGY - ENLARGED PLANS

TN450 5TH FLOOR - TR C511 - TECHNOLOGY - ENLARGED PLANS

TN460 6TH FLOOR - TR C602.1 - TECHNOLOGY - ENLARGED PLANS

TN470 7TH FLOOR - TR A702.1 - TECHNOLOGY - ENLARGED PLANS

TN480 EXISTING TRS - TECHNOLOGY - ENLARGED PLANS

TN481 EXISTING TRS - TECHNOLOGY - ENLARGED PLANS

TN490 1ST FLOOR - EXISTING CAMPUS SUPPORT CENTER - TECHNOLOGY - ENLARGED

PLANS

TN491 1ST FLOOR - CAMPUS SUPPORT CENTER - TECHNOLOGY - ENLARGED PLANS

TN492 1ST FLOOR - CAMPUS SUPPORT CENTER - TECHNOLOGY - RACK ELEVATIONS

TN493 1ST FLOOR - CAMPUS SUPPORT CENTER - TECHNOLOGY - RACK ELEVATIONS

TN494 SUB-LEVEL - PBX - TECHNOLOGY - ENLARGMENTS

GRAND TOTAL: 163

TECHNOLOGY SHEET INDEX

T000 COVER SHEET - TECHNOLOGY

T001 SITE PLAN - TECHNOLOGY

T500 DETAILS - TECHNOLOGY

T501 DETAILS - TECHNOLOGY

T600 DIAGRAMS - TECHNOLOGY

T601 DIAGRAMS - TECHNOLOGY

T602 DIAGRAMS - TECHNOLOGY

T603 DIAGRAMS - TECHNOLOGY

T605 SCHEDULES - TECHNOLOGY

TD099 SUB-LEVEL DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD100 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD101 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD102 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD103 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD104 4TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD105 5TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD106 6TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD107 7TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD121 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA A

TD122 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA B

TD123 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA C

TD124 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA D

TD125 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA E1

TD126 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA E2

TD127 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA F

TD128 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA G

TD129 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA H

TD130 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA PT

TD131 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH

TD132 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA CLC CENTRAL

TD135 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A

TD136 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B

TD137 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C

TD138 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D

TD139 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E1

TD140 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E2

TD141 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F

TD142 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G

TD143 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA H

TD144 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J

TD145 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA PT

TD146 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH

TD147 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA CLC CENTRAL

TD152 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A

TD153 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B

TD154 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C

TD156 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E1

TD157 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E2

TD158 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F

TD159 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G

TD160 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA PT

TD165 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G

TD166 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS

TD167 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN

TD170 4TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS

TD171 4TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN

TD175 5TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS

TD176 5TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN

TD180 6TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS

TD181 6TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN

TD185 7TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS

TD186 7TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN

TN155 2ND FLOOR PLAN - TECHNOLOGY - AREA D

TD155 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D

TN099 SUB-LEVEL PLAN - TECHNOLOGY - OVERALL

TN100 GROUND LEVEL PLAN - TECHNOLOGY - OVERALL

TN100.5 GROUND FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE

TN101 1ST FLOOR PLAN - TECHNOLOGY - OVERALL

TN101.5 1ST FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE

TN102 2ND FLOOR PLAN - TECHNOLOGY - OVERALL

TN102.5 2ND FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE

TN103 3RD FLOOR PLAN - TECHNOLOGY - OVERALL

TN103.5 3RD FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE

TN104 4TH FLOOR PLAN - TECHNOLOGY - OVERALL

TN104.5 4TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE

TN105 5TH FLOOR PLAN - TECHNOLOGY - OVERALL

TN105.5 5TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE

TN106 6TH FLOOR PLAN - TECHNOLOGY - OVERALL

Revisions: Date: SHEET 255 of 431

COMMUNITY LIVING CENTER

POLYTRAUMA

MAIN HOSPITAL

CANTEENMAIN ENTRANCE

TOWER

SCI

BLDG

BLDG

MERTON MINTER

M E

R T

O N

M

IN

T E

R

VON SCHEELE RD W

U

R

ZB

A C

H R

D

W

URZBACH R

D

TN190

APPROXIMATE LOCATION OF PARKING

GARAGE IT CLOSET

SC-FDC-2

NUMBER AND ADDRESS

SUITE NO.

CITY, STATE ZIP CODE

P: 555.555.555 F: 555.555.5555 www.imegcorp.com

PROJECT #22006633.00

60 60 120

1" = 60'-0"

FEETSCALE

P L A

N N

O R

T H

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

M

E P

T

.0

V A

-S a n A n to n io

T

X -E

H R

M

C .r v t

/1

/2

:3

:1

A

M

T001

SITE PLAN - TECHNOLOGY

Awen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229

671-22-700

1" = 60'-0"

SITE PLAN - TECHNOLOGY - OVERALL

KEY PLAN

ABC

D

E1 E2 F

G

H

JPT

TN

TS

CLC

GENERAL NOTES:

1. THIS SHEET IS SHOWN FOR REFERENCE WHERE BUILDINGS THAT ARE

WITHIN THE SCOPE OF THE PROJECT ARE LOCATED.

KEYNOTES:

1. USE THE EXISTING CONDUIT THAT ROUTES FROM TR-1-9 IN BUILDING 1

TO THE EXISTING TR IN BUILDING 4.

2. PROVIDE A NEW FIBER CABINET SC-FDC-2 IN THE IT CLOSET ON THE

SECOND FLOOR OF THE PARKING STRUCTURE. FOR THE NEW FIBER

OPTIC CABLING. REFER TO T601 FOR ADDITIONAL FIBER

REQUIREMENTS. NEW FIBER CABLING WILL UTILIZE THE EXISTING

PATHWAY.

Revisions: Date: SHEET 256 of 431

B A B A

CABLE EXTENDS TO THE NEAREST

TELECOMMUNICATIONS ROOM

J-HOOK2

COILED CATEGORY

SLACKLOOP

VELCRO CABLE STRAP4

NOTES:

1. THIS DIAGRAM MAY NOT REPRESENT THE QUANTITY OF CABLES TO EACH

INFORMATION OUTLET JUNCTION BOX. REFER TO THE DRAWINGS AND THE

INFORMATION OUTLET SCHEDULE FOR ADDITIONAL INFORMATION.

2. ALL DEVICES ARE INSTALLED ABOVE THE CEILING UNLESS OTHERWISE

NOTED.

KEYNOTES:

1. 2-PORT PLENUM RATED SURFACE MOUNTED BOX, SUPPORT FROM J-HOOK.

TERMINATE CABLE ON FIELD TERMINABLE MODULAR RJ-45 PLUG. REFER TO

THE INFORMATION OUTLET SCHEDULE AND TECHNOLOGY EQUIPMENT

SCHEDULE FOR ADDITIONAL INFORMATION.

2. MOUNT A DEDICATED J-HOOK TO THE NEAREST CEILING SUBSTRUCTURE,

COLUMN, JOIST, OR WALL ABOVE THE CEILING AS SHOWN ON THE DRAWINGS.

PROVIDE THE PROPER SUPPORT WHEN HANGING FROM THE CEILING

SUBSTRUCTURE OR COLUMN WALL OR JOIST. REFER TO THE

SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

3. REFER TO THE SPECIFICATION FOR SLACKLOOP LENGTH. MAINTAIN THE

MANUFACTURERS BEND RADIUS FOR SLACKLOOP SIZE.

4. PROVIDE AND INSTALL A VELCRO CABLE STRAP ON THE SLACKLOOP

APPROXIMATELY EVERY 6" ALONG THE SLACKLOOP. FOR SLACKLOOPS

GREATER THAN 3' A MINIMUM OF (4) STRAPS WILL BE INSTALLED.

1.97"

W

IDTH

DEPTH

3.94"

118.2"

PART # DEPTH (IN) WIDTH (IN)

CAT 6A 4-PAIR

PLENUM (0.35")

CF 105/450 4 18 373

CF 150/450 6 18 536

NOTES:

1. REFER TO T605 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.

MOLDED POLYESTER -

FIBERGLASS INSULATOR

COPPER GROUND CONDUCTOR FROM

BUILDING SERVICE GROUND. REFER

TO SPECIFICATIONS FOR DETAILS

TWO HOLE

COMPRESSION LUG

NOTES:

1. REFER TO TECHNOLOGY EQUIPMENT SCHEDULE SC-GND-1 FOR WIDTH

REQUIREMENTS.

2. REFER TO 2/T501 FOR TYPICAL TELECOM ROOM BONDING FLOW DIAGRAM.

COPPER BONDING CONDUCTOR TO

EQUIPMENT RACKS, CABLE TRAYS

& METALLIC SLEEVES. REFER TO

SPECIFICATIONS FOR DETAILS

BARE COPPER GROUND BAR,

INSULATORS, BRACKETS AND

BONDING PROVIDED BY E.C.

REFER TO TECHNOLOGY

EQUIPMENT SCHEDULE SC-GND-1

5/16" Ø

(TYP)

7/16" Ø

(TYP)

18.31"

HDX1A-144 E2XHD-CMB SPLCH-12X

.1

.9

" 1

.5

.3

8.39"

.4

16.90"

.2

19.15"

.7

ANGLED PANEL COVER

e2XHD Angled Panel - 1 RU

Rear Cable Manager

16.37"

.3

.3

.3

.0

.1 e2XHD High-Density Angled Panel - Top View

1 RU Panel - Front View

19.00"

NUMBER AND ADDRESS

SUITE NO.

CITY, STATE ZIP CODE

P: 555.555.555 F: 555.555.5555 www.imegcorp.com

PROJECT #22006633.00

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

M

E P

T

.0

V A

-S a n A n to n io

T

X -E

H R

M

C .r v t

/1

/2

:3

:1

A

M

T500

DETAILS - TECHNOLOGY

Awen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229

671-22-700

NO SCALE

ABOVE CEILING INFORMATION

OUTLET MOUNTING DETAIL

12" = 1'-0"

WIRE BASKET CAPACITY

NO SCALE

BONDING BUS BAR DETAIL

4 3" = 1'-0"

FIBER DISTRIBUTION CABINET

NO SCALE

UTP PATCH PANEL

Revisions: Date:

1 1 2 3 4 5

1/2" = 1'-0"

FEETSCALE

3 3 6 9

3" = 1'-0"

INCHSCALE

SHEET 257 of 431

SC-GND-1

ELECTRICAL

PANEL

SERVING ROOM

RACK BONDING

BUSBAR (RBB)

BUILDING

STEEL

ACCESS

CONTROL

EQUIPMENT

WIRE BASKET

(CONTINUOUS

BOND)

METALLIC

CONDUITS AND

SLEEVES

RACK BONDING

BUSBAR (RBB)

RACK BONDING CONDUCTOR (6 AWG)

UNIT BONDING CONDUCTOR (6 AWG)

TOP MOUNTED RACK BONDING BUSBAR

RACK BONDING

CONDUCTOR

(6 AWG)

IRREVERSIBLE

COMPRESSION

CONNECTIONTELECOMMUNICATION

EQUIPMENT BONDING

CONDUCTOR (6 AWG)

CABLE TRAY BONDING CONDUCTOR

TYPICAL AT EACH SECTION CONNECTION POINT

TO TMGB

IRREVERSIBLE CRIMP

CONNECTOR

TELECOMMUNICATIONS

EQUIPMENT BONDING

CONDUCTOR

RACK BONDING CONDUCTOR

EXTENDED TO BOTTOM TO

ACCOMMODATE FUTURE GROWTH

INDIVIDUAL BONDING CONDUCTORS

FROM EACH PIECE OF EQUIPMENT

AND RACK TO THE RACK BONDING

CONDUCTOR

TWO HOLE COMPRESSION LUG

IRREVERSIBLE CRIMP

CONNECTOR

TO TMGB

EXAMPLE "A" EXAMPLE "B"

BASKET TRAY

NOTES:

1. REFER TO 5/T500 BONDING BUS BAR DETAIL FOR ADDITIONAL INFORMATION.

2. REFER TO 2/T500 TYPICAL TELECOM ROOM BONDING FLOW DIAGRAM FOR ADDITIONAL INFORMATION.

3. REFER TO T605 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.

KEYNOTES:

1. REFER TO 2/T500 BACK OF EQUIPMENT RACK DETAIL FOR ADDITIONAL INFORMATION.

FRONT VIEW REAR VIEW SIDE VIEW ISOMETRIC VIEW

.2

.0

.0

.0

TOP VIEW

REFER TO ARCHITECTURAL

PLANS FOR WALL CONSTRUCTION

SINGLE GANG PLASTER RING

TO COME WITHIN 1/8" OF FINAL

SURFACE

STUD

1" EMT CONDUIT UNLESS

OTHERWISE NOTED. REFER TO

DETAIL NOTES FOR ADDITIONAL

REQUIREMENTS

NYLON BUSHING

J-HOOK

NOTES:

1. 1" EMT CONDUIT SHALL STUB UP TO NEAREST ACCESSIBLE CEILING AND TERMINATE ORIENTED HORIZONTALLY AT THE HEIGHT OF THE ASSOCIATED J-HOOK ROUTE. CONDUIT RUN SHALL NOT CONTAIN MORE THAN 180 DEGREES OF BEND BETWEEN ACCESSIBLE JUNCTION BOXES OR BETWEEN JUNCTION BOX AND END OF

CONDUIT.

2. WHERE CONDUIT STUB IS LOCATED IN A ROOM WITH AN ACCESSIBLE CEILING AND IS NOT REQUIRED TO RUN TO CABLE ROUTE LOCATED OUTSIDE THE ROOM, STUB MUST TERMINATE ABOVE THE ACCESSIBLE CEILING WITH A 90-DEGREE BEND AT THE TOP ORIENTED IN TO THE ROOM AT THE HEIGHT OF THE ASSOCIATED J-HOOK ROUTE

IN THE ROOM.

3. ALL STUBS MUST BE FITTED WITH A NYLON BUSHING ON EACH END OF THE CONDUIT.

4. INSTALLING CONTRACTOR SHALL FURNISH AND INSTALL FIRESTOP MATERIALS FOR TECHNOLOGY ROUGH-INS

PER PROJECT REQUIREMENTS. REFER TO SPECIFICATIONS FOR FIRESTOP REQUIREMENTS.

VELCRO CABLE

STRAP

CABLE EXTENDS TO

THE NEAREST

TELECOMMUNICATIONS

ROOM

COILED

CATEGORY

SLACKLOOP

KEYNOTES:

1. MOUNT A DEDICATED J-HOOK TO THE NEAREST CEILING SUBSTRUCTURE, COLUMN, JOIST, OR WALL ABOVE THE CEILING AS SHOWN ON THE DRAWINGS. PROVIDE THE PROPER SUPPORT WHEN HANGING FROM THE CEILING

SUBSTRUCTURE OR COLUMN WALL OR JOIST. REFER TO THE SPECIFICATIONS FOR ADDITIONAL

REQUIREMENTS.

2. MAINTAIN A MINIMUM OF 3' COIL SLACKLOOP.

3. PROVIDE AND INSTALL A VELCRO CABLE STRAP ON THE SLACKLOOP APPROXIMATELY EVERY 6" ALONG THE

SLACKLOOP. FOR SLACKLOOPS GREATER THAN 3' A MINIMUM OF (4) STRAPS WILL BE INSTALLED.

TELECOMMUNICATIONS ROOM MC-1, TR-#, (TYP.) 1

PRIMARY/SECONDARY

BONDING BUSBAR

(PBB/SBB)

NOTES:

1. THIS FLOW DIAGRAM IS DIAGRAMMATIC AND MAY NOT SHOW ACTUAL ROUTING OR QUANTITIES OF MATERIALS. THIS FLOW DIAGRAM IS SHOWN FOR CLARIFICATION OF CONNECTION LOCATIONS AND CONDUCTOR TYPE. ALL CONNECTIONS AND SYSTEM DEVICES SHOWN ARE TYPICAL AND NOT REPRESENTATIVE OF ACTUAL PROJECT QUANTITIES. REFER TO FLOOR PLANS AND ENLARGED FLOOR PLANS FOR ACTUAL QUANTITIES AND LOCATIONS OF DEVICES AND SPECIFIC ROUTING INFORMATION. REFER TO SPECIFICATIONS FOR

ADDITIONAL REQUIREMENTS.

2. ALL CONDUCTORS IN THE TECHNOLOGY BONDING SYSTEM SHALL BE [PLENUM RATED] COPPER (GREEN OR MARKED WITH A DISTINCTIVE GREEN COLOR). REFER TO BONDING CONDUCTOR SIZING SCHEDULE FOR SIZING CRITERIA FOR CONDUCTORS. REFER

TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

3. ALL BONDING CONDUCTORS AND BONDING JUMPERS SHALL BE CONNECTED BY COMPRESSION LUGS, EXOTHERMIC WELDING, OR IRREVERSIBLE COMPRESSION CONNECTORS. SOLDER IS NOT AN ACCEPTABLE MEANS OF CONNECTION. SHEET METAL SCREWS SHALL NOT BE USED TO CONNECT COMMUNICATIONS BONDING CONDUCTORS TO EQUIPMENT. WHERE NECESSARY, REMOVE PAINT AND/OR USE PAINT-PIERCING WASHERS TO PROVIDE PROPER ELECTRICAL BOND AT ALL CONNECTIONS.

KEYNOTES:

1. REFER TO TELECOM ROOM REFERENCES SCHEDULE FOR TELECOMMUNICATIONS ROOM NUMBER AND LOCATION INFORMATION.

2. INCLUDES HORIZONTAL AND VERTICAL CONDUIT SLEEVES FOR TECHNOLOGY CABLING.

3. TELECOMMUNICATIONS BONDING BACKBONE (TBB). REFER TO TELECOMMUNICATIONS BONDING RISER DIAGRAM.

4. TELECOMMUNICATIONS BONDING CONDUCTOR (TBC), TO EXISTING ELECTRICAL ENTRANCE INTERSYSTEM BONDING TERMINATION.

REFER TO TELECOMMUNICATIONS BONDING RISER DIAGRAM FOR CONTINUATION AND ADDITIONAL INFORMATION AND REQUIREMENTS. THIS CONNECTION OCCURS IN CAMPUS SUPPORT, PBX, SERVICE ENTRANCE ROOM, AND BUILDING 4 TELECOM RACK.

5. REFER TO THE ELECTRICAL DRAWINGS FOR LOCATION.

6. REFER TO BONDING BUSBAR DETAIL FOR ADDITIONAL INFORMATION AND GROUNDING REQUIRMENTS.

NUMBER AND ADDRESS

SUITE NO.

CITY, STATE ZIP CODE

P: 555.555.555 F: 555.555.5555 www.imegcorp.com

PROJECT #22006633.00

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

M

E P

T

.0

V A

-S a n A n to n io

T

X -E

H R

M

C .r v t

/1

/2

:3

:2

A

M

T501

DETAILS - TECHNOLOGY

Awen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229

671-22-700

12" = 1'-0"

PATHWAY, RACK, BONDING CONDUCTOR JOIN REQUIREMENT

NO SCALE

TYPICAL RACK DIMENSIONS AND SPECIFICATIONS

NO SCALE

TECHNOLOGY ROUGH-IN TO J-HOOK DETAIL

Revisions: Date:

NO SCALE

TYPICAL TELECOM ROOM BONDING FLOW DIAGRAM

SHEET 258 of 431

SC-GND-1 SC-GND-1

SC-GND-1

SC-GND-1

SC-GND-1 SC-GND-1

SC-GND-1

SC-GND-1

SC-GND-1

SC-GND-1

SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1

SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1

SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1

SC-GND-1

SC-GND-1

SC-GND-1

SC-GND-1

CONDUCTOR

LENGTH IN FEET

BONDING CONDUCTOR SIZING SCHEDULE

MINIMUM ACCEPTABLE

SIZE - AWG

LESS THAN 13' 6

14' - 20' 4

21' - 26' 3

27' - 33' 2

34' - 41' 1

42' - 52' 1/0

53' - 66' 2/0

67' - 84' 3/0

GROUND

FLOOR

EXISTING ELECTRICAL

ENTRANCE INTERSYSTEM

BONDING TERMINATION

GROUNDING ELECTRODE

CONDUCTOR BY OTHERS

TELECOMMUNICATIONS

BONDING BACKBONE

(TBB) (TYP)

FIRST

FLOOR

SECOND

FLOOR

THIRD

FLOOR

FOURTH

FLOOR

FIFTH

FLOOR

TR-G-1

85' 105' 4/0

106' - 125' 250 kcmil

126' - 150' 300 kcmil

151' - 175' 350 kcmil

176' - 250' 500 kcmil

251' - 300' 600 kcmil

GREATER THAN 301' 750 kcmil

(SBB)

(SBB)

(SBB) (SBB)

(SBB)

(PBB)

(SBB) (SBB)

TR-G-2

CAMPUS SUPPORT

SYSTEM

TR-2-1

TR-3-1 TR-3-2

TR-4-1

TR-5-1

SIXTH

FLOOR

(SBB)

TR-6-1

SEVENTH

FLOOR

(SBB)

TR-7-1

(SBB)

TR-G-3

(SBB)

TR-G-4

(SBB)

TR-G-5

(SBB)

TR-G-6

(SBB)

TR-G-7

(SBB)

TR-1-1

(SBB)

TR-1-2

(SBB)

TR-1-3

(SBB)

TR-1-4

(SBB)

TR-1-5

(SBB)

TR-1-6

(SBB)

TR-1-7

(SBB)

TR-1-8

(SBB)

TR-1-9

(SBB)

TR-1-10

(SBB)

TR-2-2

(SBB)

TR-2-3

(SBB)

TR-2-4

(SBB)

TR-2-5

(SBB)

TR-2-6

PBX

(SBB)

SUB

FLOOR

LESS THAN 13' 6

14' - 20' 4

21' - 26' 3

27' - 33' 2

34' - 41' 1

42' - 52' 1/0

53' - 66' 2/0

67' - 84' 3/0

85' 105' 4/0

106' - 125' 250 kcmil

126' - 150' 300 kcmil

151' - 175' 350 kcmil

176' - 250' 500 kcmil

251' - 300' 600 kcmil

GREATER THAN 301' 750 kcmil

(SBB)

(SBB)

(SBB) (SBB)

(SBB)

(PBB)

(SBB) (SBB)

(SBB)

(SBB)

(SBB) (SBB) (SBB) (SBB) (SBB)

(SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB)

(SBB) (SBB) (SBB) (SBB) (SBB)

(SBB)

LESS THAN 13' 6

14' - 20' 4

21' - 26' 3

27' - 33' 2

34' - 41' 1

42' - 52' 1/0

53' - 66' 2/0

67' - 84' 3/0

NOTES:

1. THIS RISER IS DIAGRAMMATIC AND MAY NOT SHOW ACTUAL ROUTING OR QUANTITIES OF MATERIALS.

THIS RISER IS SHOWN FOR CLARIFICATION OF CONNECTION LOCATIONS AND CONDUCTOR TYPE.

ALL CONNECTIONS AND SYSTEM DEVICES SHOWN ARE TYPICAL AND NOT REPRESENTATIVE OF

ACTUAL PROJECT QUANTITIES. REFER TO FLOOR PLANS AND ENLARGED FLOOR PLANS FOR ACTUAL QUANTITIES AND LOCATIONS OF DEVICES AND MORE SPECIFIC ROUTING INFORMATION. REFER TO

SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

2. TELECOM BONDING BACKBONE SHALL BE PROVIDED PER BONDING CONDUCTOR SIZING SCHEDULE.

3. ALL CONDUCTORS IN THE TECHNOLOGY BONDING SYSTEM SHALL BE PLENUM RATED COPPER

(GREEN OR MARKED WITH A DISTINCTIVE GREEN COLOR). REFER TO BONDING CONDUCTOR SIZING SCHEDULE FOR SIZING CRITERIA FOR CONDUCTORS. REFER TO SPECIFICATIONS FOR ADDITIONAL

REQUIREMENTS.

4. ALL BONDING CONDUCTORS AND BONDING JUMPERS SHALL BE CONNECTED BY COMPRESSION

LUGS, EXOTHERMIC WELDING, OR IRREVERSIBLE COMPRESSION CONNECTORS. SOLDER IS NOT AN

ACCEPTABLE MEANS OF CONNECTION. SHEET METAL SCREWS SHALL NOT BE USED TO CONNECT

COMMUNICATIONS BONDING CONDUCTORS TO EQUIPMENT. WHERE NECESSARY, REMOVE PAINT

AND/OR USE PAINT-PIERCING WASHERS TO PROVIDE PROPER ELECTRICAL BOND AT ALL

CONNECTIONS.

5. SC-GND-1 IS THE PRIMARY BONDING BUSBAR (PBB) WHICH CONNECTS TO THE (TBC) AND CONNECTS

ALL SECONDARY BONDING BUSBAR (SBB) VIA THE (BBC).

6. REFER TO THE INDIVISUAL TELECOM ROOM ENLARGMETNS ON THE TN400 SERIES DRAWINGS FOR

TELECOM ROOM BONDING FLOW DIAGRAMS.

7. REFER TO TELECOM ROOM REFERENCES SCHEDULE FOR TELECOMMUNICATIONS ROOM NUMBER

AND LOCATION INFORMATION.

KEYNOTES:

1. TELECOMMUNICATIONS BONDING CONDUCTOR (TBC). TBC SHALL BE THE SAME SIZE AS THE TBB OR

LARGER. REFER TO BONDING CONDUCTOR SIZING SCHEDULE FOR SIZING REQUIREMENTS. THIS

CONNECTION OCCURS IN THE CAMPUS SUPPORT, PBX, SERVICE ENTRANCE ROOM, AND BUILDING 4

TELECOM RACK.

EXISTING ELECTRICAL

GROUNDING ELECTRODE

SYSTEM

85' 105' 4/0

106' - 125' 250 kcmil

126' - 150' 300 kcmil

151' - 175' 350 kcmil

176' - 250' 500 kcmil

251' - 300' 600 kcmil

GREATER THAN 301' 750 kcmil

(SBB)

(SBB)

(SBB) (SBB)

(SBB)

(PBB)

(SBB) (SBB)

(SBB)

(SBB)

(SBB) (SBB) (SBB) (SBB) (SBB)

(SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB)

(SBB) (SBB) (SBB) (SBB) (SBB)

(SBB)

LESS THAN 13' 6

14' - 20' 4

21' - 26' 3

27' - 33' 2

34' - 41' 1

42' - 52' 1/0

53' - 66' 2/0

67' - 84' 3/0

85' 105' 4/0

106' - 125' 250 kcmil

126' - 150' 300 kcmil

151' - 175' 350 kcmil

176' - 250' 500 kcmil

251' - 300' 600 kcmil

GREATER THAN 301' 750 kcmil

(SBB)

(SBB)

(SBB) (SBB)

(SBB)

(PBB)

(SBB) (SBB)

(SBB)

(SBB)

(SBB) (SBB) (SBB) (SBB) (SBB)

(SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB)

(SBB) (SBB) (SBB) (SBB) (SBB)

(SBB)

LESS THAN 13' 6

14' - 20' 4

21' - 26' 3

27' - 33' 2

34' - 41' 1

42' - 52' 1/0

53' - 66' 2/0

67' - 84' 3/0

85' 105' 4/0

106' - 125' 250 kcmil

126' - 150' 300 kcmil

151' - 175' 350 kcmil

176' - 250' 500 kcmil

251' - 300' 600 kcmil

GREATER THAN 301' 750 kcmil

(SBB)

(SBB)

(SBB) (SBB)

(SBB)

(PBB)

(SBB) (SBB)

(SBB)

(SBB)

(SBB) (SBB) (SBB) (SBB) (SBB)

(SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB)

(SBB) (SBB) (SBB) (SBB) (SBB)

(SBB)

LESS THAN 13' 6

14' - 20' 4

21' - 26' 3

27' - 33' 2

34' - 41' 1

42' - 52' 1/0

53' - 66' 2/0

67' - 84' 3/0

85' 105' 4/0

106' - 125' 250 kcmil

126' - 150' 300 kcmil

151' - 175' 350 kcmil

176' - 250' 500 kcmil

251' - 300' 600 kcmil

GREATER THAN 301' 750 kcmil

(SBB)

(SBB)

(SBB) (SBB)

(SBB)

(PBB)

(SBB) (SBB)

(SBB)

(SBB)

(SBB) (SBB) (SBB) (SBB) (SBB)

(SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB)

(SBB) (SBB) (SBB) (SBB) (SBB)

(SBB)

TELECOMMUNICATIONS

BONDING CONDUCTOR TBC

BUILDING 4

MAIN BUILDING

(SBB)

TE-P-1

(SBB)(SBB)(SBB)(SBB)(SBB)

SERVICE ENTRANCE

(SBB)(SBB)(SBB)(SBB)(SBB)(SBB)

EXISTING ELECTRICAL

ENTRANCE INTERSYSTEM

BONDING TERMINATION

GROUNDING ELECTRODE

CONDUCTOR BY OTHERS

EXISTING ELECTRICAL

GROUNDING ELECTRODE

SYSTEM

TELECOMMUNICATIONS

BONDING CONDUCTOR TBC

(SBB)

TR-G-8

(SBB)(SBB)(SBB)(SBB)(SBB)

NUMBER AND ADDRESS

SUITE NO.

CITY, STATE ZIP CODE

P: 555.555.555 F: 555.555.5555 www.imegcorp.com

PROJECT #22006633.00

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

M

E P

T

.0

V A

-S a n A n to n io

T

X -E

H R

M

C .r v t

/1

/2

:3

:2

A

M

T600

DIAGRAMS - TECHNOLOGY

Awen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229

671-22-700

NO SCALE

TECHNOLOGY BONDING RISER DIAGRAM

Revisions: Date: SHEET 259 of 431

SUB

LEVEL

GROUND

LEVEL

GROUND

INTERSTITIAL

ROOF

LEVEL 02

LEVEL 01

INTERSTITIAL

LEVEL 01

TR-2-1

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

LEVEL 02

INTERSTITIAL

LEVEL 03

LEVEL 03

INTERSTITIAL

LEVEL 04

LEVEL 04

INTERSTITIAL

LEVEL 05

LEVEL 05

INTERSTITIAL

LEVEL 06

LEVEL 06

INTERSTITIAL

LEVEL 07

LEVEL 07

INTERSTITIAL

TR-2-2

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-2-3

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-2-4

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-2-5

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-2-6

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-3-1

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-3-2

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-4-1

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-5-1

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-6-1

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-7-1

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-1-1

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-1-2

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-1-3

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-1-4

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-1-5

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-1-6

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

CAMPUS

SUPPORT

CENTER

MDA B FIBER

DISTRIBUTION

MDA A FIBER

DISTRIBUTION

TR-1-7

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-1-8

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-1-9

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-1-10

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-G-1

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-G-2

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-G-3

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-G-4

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-G-5

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-G-6

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-G-7

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TE-P-1

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

BUILDING 4

MAIN BUILDING

PBX

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

TR-G-8

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

24 STRAND OF OS2 24 STRAND OF OS2

IT CLOSET

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

PARKING

GARAGE

TR R201.1

B LEG

FIBER

CABINET

A LEG

FIBER

CABINET

NUMBER AND ADDRESS

SUITE NO.

CITY, STATE ZIP CODE

P: 555.555.555 F: 555.555.5555 www.imegcorp.com

PROJECT #22006633.00

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

M

E P

T

.0

V A

-S a n A n to n io

T

X -E

H R

M

C .r v t

/1

/2

:3

:2

A

M

T601

DIAGRAMS - TECHNOLOGY

Awen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229

671-22-700

NO SCALE

TECHNOLOGY BACKBONE CONNECTIVTY RISER DIAGRAM

NOTES:

1. THIS RISER IS DIAGRAMMATIC AND MAY NOT SHOW ACTUAL ROUTING OR QUANTITIES OF MATERIALS SHOWN. THIS RISER IS SHOWN FOR CLARIFICATION OF CONNECTION(S), LOCATIONS AND CABLE TYPE. REFER TO FLOOR PLANS FOR MORE

SPECIFIC ROUTING INFORMATION.

2. ALL FIBER OPTIC CABLING SHOWN ON THIS DRAWING FOR BOTH THE PRIMARY AND SECONDARY FIBER SHALL BE 24- STRANDS OF OM4 AND 12-STRANDS OF OS1 UNLESS OTHERWISE NOTED. REFER TO THE SPECIFICATIONS FOR ADDITIONAL

INFORMATION AND REQUIREMENTS.

3. ALL FIBER OPTIC CABLING SHALL FIELD TERMINATE ON MPO CONNECTORS COMPATIBLE WITH THE FIBER CASSETTES.

REFER TO THE INDIVIDUAL ROOM LAYOUTS FOR LOCATIONS OF EACH FIBER TERMINATION POINT AND SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

KEYNOTES:

1. FIBER CABINET IS INSTALLED IN THE SECOND FLOOR PARKING IT EQUIPMENT ROOM 202. REFER TO T001 FOR LOCATION OF THE CLOSET. COORDINATE WITH THE LOCAL COR FOR LOCATION OF THE FIBER CABINET INSTALLED IN THE ROOM.

2. FIBER OPTIC CABLING ROUTES TO THE EXISTING SECOND FLOOR PARKING GARAGE IT CLOSET UTILIZING THE EXISTING PATHWAY. FIELD VERIFY THE FIBER DISTANCE PRIOR TO THE PURCHASE AND INSTALLATION OF THE FIBER. ESTIMATE A

MINIMUM OF 1500 FEET FOR BIDDING PURPOSES.

3. FIBER OPTIC CABLING ROUTES TO BIO-MED ROOM ON THE SECOND FLOOR OF THE HOSPITAL. THIS IS THE ONLY SCOPE IN

THIS ROOM. REFER TO TN102 FOR ADDITIONAL INFORMATION.

LINE TYPE LEGEND

A LEG FIBER:

B LEG FIBER:

Revisions: Date: SHEET 260 of 431

SUB

LEVEL

GROUND

LEVEL

GROUND

INTERSTITIAL

LEVEL 02

LEVEL 01

INTERSTITIAL

LEVEL 01

LEVEL 02

INTERSTITIAL

LEVEL 03

LEVEL 03

INTERSTITIAL

LEVEL 04

LEVEL 04

INTERSTITIAL

LEVEL 05

LEVEL 05

INTERSTITIAL

LEVEL 06

LEVEL 06

INTERSTITIAL

LEVEL 07

LEVEL 07

INTERSTITIAL

AREA GAREA TN, AREA E2, AREA F AREA TS, AREA A, AREA BAREA E1AREA DAREA H AREA C AREA PT AREA CLC AREA J

TR-G-1 TR-G-2TR-G-3TR-G-4TR-G-5 TR-G-6 TR-G-7

TR-1-1 TR-1-2TR-1-3TR-1-4TR-1-5 TR-1-11 TR-1-6TE-1-7 TR-1-8 TR-1-9TR-1-10

TR-2-1 TR-2-2TR-2-3TR-2-4 TR-2-5 TR-2-6

TR-3-1 TR-3-2

TR-4-1

TR-5-1

TR-6-1

TR-7-1

DATA CENTER

STI PATHWAY

(TYPICAL)

PATHWAY LEGEND

A LEG FIBER:

B LEG FIBER:

WIRE BASKET

(TYPICAL)

VERTICAL CHASE

VERTICAL CHASE

VERTICAL CHASE

4 4 4

4 4 4

4 4 4

4 4

4 4

4 4

STI PATHWAY

(TYPICAL)

WIRE BASKET

(TYPICAL)

STI PATHWAY

(TYPICAL)

WIRE BASKET

(TYPICAL)

STI PATHWAY

(TYPICAL)

WIRE BASKET

(TYPICAL)

STI PATHWAY

(TYPICAL)

WIRE BASKET

(TYPICAL)

4 4

MAIN BUILDING

BUILDING 4

TE-P-1 4

FIBER PASSES THROUGH

TR-1-9 TO TE-P-1 IN BUILDING 4

PBX 4

TR-G-8 4

NUMBER AND ADDRESS

SUITE NO.

CITY, STATE ZIP CODE

P: 555.555.555 F: 555.555.5555 www.imegcorp.com

PROJECT #22006633.00

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

M

E P

T

.0

V A

-S a n A n to n io

T

X -E

H R

M

C .r v t

/1

/2

:3

:2

A

M

T602

DIAGRAMS - TECHNOLOGY

Awen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229

671-22-700

NO SCALE

FIBER ROUTING PATHWAY DIAGRAM

NOTES:

1. THIS RISER IS DIAGRAMMATIC AND REPRESENTS THE ROUTING BETWEEN FLOORS

AND AREAS AS SHOWN. THIS DIAGRAM IS SHOWN FOR CLARIFICATION OF ROUTING

AND REQUIREMENTS THAT ALL CABLING SHALL TAKE SEPARATE REDUNDANT

PATHS FROM THE SOURCE TO THE DESTINATION. REFER TO THE FLOOR PLANS

FOR ADDITIONAL ROUTING REQUIREMENTS.

2. ALL FIBER OPTIC CABLE ROUTING SHOWN ON THIS DIAGRAM ROUTES IN THE

INTERSTITIAL SPACE WHEREVER POSSIBLE. REFER TO THE FLOOR PLANS FOR

ADDITIONAL ROUTING REQUIREMENTS.

KEYNOTES:

1. REFER TO ENLARGED ROOM PLANS FOR ADDITIONAL INFORMATION.

2. REFER TO INTERSTITIAL SPACE FLOORPLANS FOR ADDITIONAL INFORMATION.

3. TR-G-6, TR-1-6, AND TR-2-6 ARE STACKED. THE A LEG FIBER PATHWAY WILL ROUTE

VERTICALLY THROUGH THE TR'S.

4. ALL FIBER OPTICAL CABLING ON THIS DIAGRAM IS FOR REFERENCE ONLY TO

REPRESENT ROUTING. REFER TO THE COPPER AND FIBER DIAGRAM ON T601 FOR

ADDITIONAL INFORMATION AND INSTALLATION REQUIREMENTS.

5. VERTICAL CHASE WILL BE LOCATED IN NEAR BY HAC CLOSETS 021, 131, AND 251.

REFER TO THE RESPECTIVE FLOORPLAN ENLARGEMENTS TN130, TN145, AND

TN160.

6. VERTICAL CHASE IS EXISTING. REFER TO THE INTERSTITIAL PLANS LOCATED ON

THE TN10X.5 DRAWINGS FOR THE EXACT LOCATIONS.

7. A AND B LEG FIBER WILL RUN ALONG THE SAME PATH THROUGH THE INTERSTITIAL

TO TR-G-7. REFER TO TN100.5 FOR ADDITIONAL INFORMATION.

Revisions: Date:

Revision 1 Date 1

SHEET 261 of 431

CABINET 1-1

(HDA A)

L M N P Q R S TKJ

B A

CABINET 1-12

(HDA B)

L1 M1 N1 P1 Q1 R1 S1 T1K1J1

D C

CABINET 2-1

(HDA A)

L2 M2 N2 P2 Q2 R2 S2 T2K2J2

H G

CABINET 2-12

(HDA B)

L3 M3 N3 P3 Q3 R3 S3 T3K3J3

F E

N

N1

P

P1

L

L1

M

M1

J

J1

K

K1

Q

Q1

R

R1

S

S1

T

T1

N2

N3

P2

P3

L2

L3

M2

M3

J2

J3

K2

K3

Q2

Q3

R2

R3

S2

S3

T2

T3

DB

CABINET 1-2 CABINET 1-3 CABINET 1-4 CABINET 1-5 CABINET 1-6 CABINET 1-7 CABINET 1-8 CABINET 1-9 CABINET 1-10 CABINET 1-11

CABINET 2-2 CABINET 2-3 CABINET 2-4 CABINET 2-5 CABINET 2-6 CABINET 2-7 CABINET 2-8 CABINET 2-9 CABINET 2-10 CABINET 2-11

CABINET 3-2

(A SIDE BACKBONE)

HF

AC

CABINET 3-7

(B SIDE BACKBONE)

EG

NUMBER AND ADDRESS

SUITE NO.

CITY, STATE ZIP CODE

P: 555.555.555 F: 555.555.5555 www.imegcorp.com

PROJECT #22006633.00

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

M

E P

T

.0

V A

-S a n A n to n io

T

X -E

H R

M

C .r v t

/1

/2

:3

:2

A

M

T603

DIAGRAMS - TECHNOLOGY

Awen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229

671-22-700

NO SCALE

CAMPUS SUPPORT CENTER CONNECTIVITY DIAGRAM

T3 CABINET 2-12 CABINET 2-11 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

S3 CABINET 2-12 CABINET 2-10 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

R3 CABINET 2-12 CABINET 2-9 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

Q3 CABINET 2-12 CABINET 2-8 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

P3 CABINET 2-12 CABINET 2-7 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

N3 CABINET 2-12 CABINET 2-6 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

M3 CABINET 2-12 CABINET 2-5 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

L3 CABINET 2-12 CABINET 2-4 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

K3 CABINET 2-12 CABINET 2-3 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

J3 CABINET 2-12 CABINET 2-2 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

T2 CABINET 2-1 CABINET 2-11 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

S2 CABINET 2-1 CABINET 2-10 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

R2 CABINET 2-1 CABINET 2-9 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

Q2 CABINET 2-1 CABINET 2-8 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

P2 CABINET 2-1 CABINET 2-7 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

N2 CABINET 2-1 CABINET 2-6 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

M2 CABINET 2-1 CABINET 2-5 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

L2 CABINET 2-1 CABINET 2-4 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

K2 CABINET 2-1 CABINET 2-3 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

J2 CABINET 2-1 CABINET 2-2 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

T1 CABINET 1-12 CABINET 1-11 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

S1 CABINET 1-12 CABINET 1-10 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

R1 CABINET 1-12 CABINET 1-9 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

Q1 CABINET 1-12 CABINET 1-8 OM4 MPO / LC (2) 12 STRAND CAT-6A 24

P1 CABINET…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .