S02 - Attachment 1(e) - 671-22-700 DRAWINGS Technology.pdf
PDF 27 MB Posted
- Attached to
- EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) Federal contract opportunity
- Solicitation number
- 36C77623B0064
About this file
This document provides details for a federal contract opportunity with the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation number is 36C77623B0064 and seeks offers for EHRM San Antonio Infrastructure Upgrades Construction. This is a SDVOSB set-aside opportunity under NAICS code 236220. Offerors should provide construction services to upgrade infrastructure at the San Antonio VA location. The response deadline and award date are not specified, nor are any pricing or evaluation terms included. The file attached is a 27MB drawing related to the required construction work.
View the file
Other files for this federal contract opportunity
Show all 50
EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNOLOGY SYMBOL LIST
SYMBOL: DESCRIPTION: NOTE:
EQUIPMENT
LIST ABBREV.:
1.INFORMATION OUTLET (CEILING)SC-IO-C
1.INFORMATION OUTLET (WALL)SC-IO-W
1.INFORMATION OUTLET ROUGH-IN (WALL) EXISTINGN/A
C#
C#
TECHNOLOGY ABBREVIATION KEY
TELECOMMUNICATIONS ROOMTR-#
ABOVE FINISHED FLOORAFF
BELOW FINISHED CEILINGBFC
CONDUITC
SIMILARSIM
TYPICALTYP
MOUNTING HEIGHT ABOVE FINISHED FLOOR+#
JUNCTION BOXJ-BOX
ABBR: DESCRIPTION:
UNLESS OTHERWISE NOTEDUON
FIELD OF VIEWFOV
DOUBLE POLE DOUBLE THROWDPDT
PAN TILT ZOOMPTZ
POWER OVER ETHERNETPOE
ABOVE FINISHED GRADEAFG
DELAYED EGRESSDE
TELECOMMUNICATIONS ROOMTR-#
ABOVE FINISHED FLOORAFF
BELOW FINISHED CEILINGBFC
CONDUITC
SIMILARSIM
TYPICALTYP
MOUNTING HEIGHT ABOVE FINISHED FLOOR+#
JUNCTION BOXJ-BOX
UNLESS OTHERWISE NOTEDUON
FIELD OF VIEWFOV
DOUBLE POLE DOUBLE THROWDPDT
PAN TILT ZOOMPTZ
POWER OVER ETHERNETPOE
ABOVE FINISHED GRADEAFG
DELAYED EGRESSDE
TELECOMMUNICATIONS ROOMTR-#
ABOVE FINISHED FLOORAFF
BELOW FINISHED CEILINGBFC
CONDUITC
SIMILARSIM
TYPICALTYP
MOUNTING HEIGHT ABOVE FINISHED FLOOR+#
JUNCTION BOXJ-BOX
UNLESS OTHERWISE NOTEDUON
FIELD OF VIEWFOV
DOUBLE POLE DOUBLE THROWDPDT
PAN TILT ZOOMPTZ
POWER OVER ETHERNETPOE
ABOVE FINISHED GRADEAFG
DELAYED EGRESSDE
TELECOMMUNICATIONS ROOMTR-#
ABOVE FINISHED FLOORAFF
BELOW FINISHED CEILINGBFC
CONDUITC
SIMILARSIM
TYPICALTYP
MOUNTING HEIGHT ABOVE FINISHED FLOOR+#
JUNCTION BOXJ-BOX
UNLESS OTHERWISE NOTEDUON
FIELD OF VIEWFOV
DOUBLE POLE DOUBLE THROWDPDT
PAN TILT ZOOMPTZ
POWER OVER ETHERNETPOE
ABOVE FINISHED GRADEAFG
DELAYED EGRESSDE
TELECOMMUNICATIONS ROOMTR-#
ABOVE FINISHED FLOORAFF
BELOW FINISHED CEILINGBFC
CONDUITC
SIMILARSIM
TYPICALTYP
MOUNTING HEIGHT ABOVE FINISHED FLOOR+#
JUNCTION BOXJ-BOX
UNLESS OTHERWISE NOTEDUON
FIELD OF VIEWFOV
DOUBLE POLE DOUBLE THROWDPDT
PAN TILT ZOOMPTZ
POWER OVER ETHERNETPOE
ABOVE FINISHED GRADEAFG
DELAYED EGRESSDE
TELECOMMUNICATIONS ROOMTR-#
ABOVE FINISHED FLOORAFF
BELOW FINISHED CEILINGBFC
CONDUITC
SIMILARSIM
TYPICALTYP
MOUNTING HEIGHT ABOVE FINISHED FLOOR+#
JUNCTION BOXJ-BOX
UNLESS OTHERWISE NOTEDUON
FIELD OF VIEWFOV
DOUBLE POLE DOUBLE THROWDPDT
PAN TILT ZOOMPTZ
POWER OVER ETHERNETPOE
ABOVE FINISHED GRADEAFG
DELAYED EGRESSDE
TCO TELECOMMUNICATIONS OUTLET
UPS UNITERUPTABLE POWER SUPPLY
TE-# TELECOMMUNICATIONS ENCLOSURE
TECHNOLOGY GENERAL NOTES:
1. ##-###-# INDICATES TECHNOLOGY EQUIPMENT SCHEDULE ITEM LABELED AS "EQUIPMENT
LIST ABBREVIATION"
2. REFER TO TECHNOLOGY EQUIPMENT SCHEDULE AND SPECIFICATIONS FOR FULL
DESCRIPTIONS AND MANUFACTURERS OF ALL DEVICES.
3. ALL REFERENCES TO "OWNER" AND/OR "COR" HEREIN REFER TO THE CONTRACTING
OFFICER REPRESENTATIVE AND WILL BE PRIMARY POINT CONTACT FOR ALL COORDINATION
WITH THE LOCAL HOSPITAL AS THE REPRESENTATIVE OF THE BUILDING TENANTS
INCLUDING BUT NOT LIMITED TO STAFF RESPONSIBLE FOR IT AND OTHER STAFF REQUIRED
FOR COORDINATION FOR THIS PROJECT HEREIN.
TECHNOLOGY MOUNTING SUBSCRIPT KEY:
A MOUNT AT +6" TO CENTERLINE ABOVE COUNTER OR BACKSPLASH
H MOUNT ORIENTED HORIZONTALLY
L MOUNT IN CASEWORK
M MOUNT IN MODULAR FURNITURE
S MOUNT IN SURFACE RACEWAY
A SLASH IS USED BETWEEN TWO SUBSCRIPTS, E.G., A/H.
TECHNOLOGY INSTALLATION NOTES:
1. THE COMPLETE INSTALLATION SHALL BE IN ACCORDANCE WITH THE ABAAS AND VA
BARRIER FREE DESIGN GUIDE STANDARDS FOR ACCESSIBLE DESIGN. REFER TO THE ABAAS
AND VA BARRIER FREE DESIGN GUIDELINES FOR ALL CONFIGURATION DETAILS ON THIS
PAGE FOR ADDITIONAL INFORMATION.
2. CONCEAL ALL CONDUIT IN WALLS, PARTITIONS, ABOVE CEILING, IN FLOOR SLAB, ETC.
UNLESS OTHERWISE INDICATED ON THE PLANS OR IN THE SPECIFICATIONS. CONDUIT IN
MECHANICAL ROOMS AND STORAGE ROOMS WITHOUT CEILINGS MAY BE EXPOSED ON
BUILDING STRUCTURE.
3. TELECOMMUNICATIONS EQUIPMENT SHALL BE MOUNTED TO ALLOW ACCESS TO
ELECTRICAL AND MECHANICAL EQUIPMENT. ALL MOUNTING OF TELECOMMUNICATION
DEVICES ON EQUIPMENT SUPPLIED BY ANOTHER CONTRACTOR SHALL BE APPROVED IN
ADVANCE BY THE OTHER CONTRACTOR.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OPENINGS REQUIRED IN WALLS. ALL
OPENINGS SHALL BE REPAIRED TO MATCH EXISTING BY A QUALIFIED CONTRACTOR AT THE
EXPENSE OF THIS CONTRACTOR. ALL CONDUITS THROUGH WALLS SHALL BE GROUTED OR
SEALED INTO OPENINGS.
5. ALL MATERIALS USED TO SEAL PENETRATIONS OF FIRE RATED WALLS AND FLOORS SHALL
BE TESTED AND CERTIFIED AS A SYSTEM PER ASTM E814 STANDARDS FOR FIRE TESTS OF
THROUGH-PENETRATION FIRESTOPS.
6. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF THE CEILINGS,
CEILING TILES, AND CEILING GRID ASSOCIATED WITH THE AREAS OF WORK BY ALL
CONTRACTORS.
7. ALL WIRE BASKET AND CABLE TRAY SIZES ARE AS DEFINED ON THE DRAWINGS. REFER TO
SPECIFICATION FOR APPROVED MANUFACTURERS AND INSTALLATION REQUIREMENTS.
GENERAL NOTES:
TECHNOLOGY SYMBOL NOTES:
CABLE TRAY, CHANNEL TRAY, BASKET
TRAY
LADDER RACK
WIDTH X HEIGHT
WIDTH X HEIGHT
DIAMETERø C CONDUIT
CONDUIT DOWN
CONDUIT UP OR UP/DOWN
CONDUIT SLEEVE
CONTINUATION
1. ALL SYMBOLS AND ABBREVIATIONS LISTED MAY NOT BE APPLICABLE TO THIS PROJECT.
REFER TO THE TECHNOLOGY EQUIPMENT SCHEDULE FOR MORE COMPLETE DESCRIPTION
AND ITEMS.
2. ALL SYMBOLS AND ABBREVIATIONS REFER TO TECHNOLOGY SHEETS ONLY AS DEFINED ON
THE SHEET INDEX. REFER TO THE GENERAL TECHNOLOGY NOTES FOR ADDITIONAL
INFORMATION.
3. ALL SYMBOLS LISTED ABOVE ARE FOR REFERENCE ONLY. REFER TO PLANS AND LINE TYPE
KEY FOR NEW, EXISTING TO REMAIN AND TO BE REMOVED ITEMS FOR ADDITIONAL
INFORMATION.
4. REFER TO DIAGRAMS ON SHEET(S): T600, T601, T602, T603, T604.
5. TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING AND TAGS WITH DASH
'D' INDICATES THE REFERENCED OBJECT IS TO BE DEMOLISHED (SEE TECHNOLOGY CALBING
PLAN)
1. "C#" INDICATES QUANTITY OF CABLES AT EACH LOCATION. REFER TO INFORMATION
OUTLET SCHEDULE ON T605 FOR ADDITIONAL INFORMATION.
C#
1.
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10'-0" HEIGHT ABOVE
PROJECT 0'-0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
(SEE TECHNOLOGY CALBING PLAN)
'TAG'-D TAGS WITH DASH 'D' INDICATES THE REFERENCED OBJECT IS DEMOLISHED
(SEE TECHNOLOGY CALBING PLAN)
TAG UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
TEMPERATURE CONTROLS CONTRACTORT.C.C.
ASBESTOS ABATEMENT CONTRACTOR
FIRE PROTECTION CONTRACTORF.P.C.
HEATING CONTRACTORH.C.
PLUMBING CONTRACTORP.C.
GENERAL CONTRACTORG.C.
MECHANICAL CONTRACTORM.C.
VENTILATION CONTRACTORV.C.
ELECTRICAL CONTRACTORE.C.
A.C.
CONTRACTOR ABBREVIATION KEY
ABBR: DESCRIPTION:
TECHNOLOGY CONTRACTORT.C.
E.O.R ENGINEER OF RECORD
C.O.R. CONTRACTING OFFICER'S REPRESENTATIVE
M
A X
20" MAX.
M
A X
20"-25" MAX.
M
A X
M
IN
. 4
M
A X
M
A X
10" MAX. 10"-24" MAX.
ADA GUIDELINES - FRONT ACCESS
ADA STANDARDS FOR ACCESSIBLE DESIGN
INSTALL ABOVE COUNTER
DEVICE AT 44" ABOVE
FINISHED FLOOR.
INSTALL ABOVE COUNTER
DEVICE AT 40" ABOVE
FINISHED FLOOR.
INSTALL DEVICE AT 18"
ABOVE FINISHED FLOOR.
ADA GUIDELINES - SIDE ACCESS
INSTALL DEVICE AT 44"
ABOVE FINISHED FLOOR.
INSTALL DEVICE AT 42"
ABOVE FINISHED FLOOR.
TECHNOLOGY DEMOLITION NOTES
1. THE DRAWINGS INDICATE EXISTING ITEMS TO BE REMOVED. THE DRAWINGS ARE
INTENDED TO INDICATE THE SCOPE OF WORK REQUIRED AND DO NOT INDICATE EVERY
BOX, CONDUIT, OR WIRE THAT MUST BE REMOVED. THE CONTRACTOR SHALL VISIT THE
SITE PRIOR TO SUBMITTING A BID AND VERIFY EXISTING CONDITIONS.
2. ITEMS (i.e. SWITCHES, ETC.) REMOVED AND NOT RELOCATED REMAIN THE PROPERTY OF
THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISPOSAL OF
MATERIAL THE OWNER DOES NOT WANT TO REUSE OR RETAIN. (i.e., FOR MAINTENANCE
PURPOSES).
3. EXISTING TO REMAIN DEVICES WITHIN OR ADJACENT TO THE PATH OF CONSTRUCTION
SHALL BE PROTECTED IN PLACE. DEVICES THAT MUST BE REMOVED SHALL BE TESTED
PRIOR TO REMOVAL, PROTECTED FROM DAMAGE, AND RE-INSTALLED IN ITS ORIGINAL
LOCATION DURING THE NEW CONSTRUCTION PHASE OF THE PROJECT.
4. OBTAIN APPROVAL FROM THE OWNER BEFORE TURNING OFF THE POWER TO
EQUIPMENT, SYSTEMS, PANELS, ETC. COORDINATE ALL OUTAGES WITH OWNER.
CONDUIT CONCEALED IN WALL CONSTRUCTION MAY BE ABANDONED IN PLACE IF NOT
AFFECTED BY OTHER CONSTRUCTION.
5. ALL CONDUIT SHALL BE REMOVED WHERE WALLS ARE BEING REMOVED. WHERE
CONDUIT IS IN THE CONCRETE SLAB, CUT OFF FLUSH, PULL OUT WIRE, AND PLUG.
WHERE CONDUIT IS RUN EXPOSED, ALL ASSOCIATED CLAMPS, SUPPORTS, HANGERS,
ETC., SHALL ALSO BE REMOVED.
6. COORDINATE ALL WORK WITH OTHER CONTRACTORS AT THE JOB SITE BEFORE
REMOVING EXISTING EQUIPMENT AND INSTALLING NEW ITEMS.
7. EXISTING CONDUIT IN GOOD CONDITION, MAY BE REUSED IN PLACE. RELOCATING
EXISTING CONDUIT SHALL NOT BE ALLOWED. BONDING CONDUCTORS SHALL BE
INSTALLED IN ALL REUSED CONDUIT TO ASSURE PROPER GROUND PATH.
8. EQUIPMENT REMOVAL IN CERTAIN LOCATIONS MAY REQUIRE THE INSTALLATION OF A
JUNCTION BOX TO RECONNECT CIRCUITS THAT REMAIN IN OPERATION. EXTEND
CONDUIT AND WIRING AS REQUIRED TO MAINTAIN POWER TO REMAINING EQUIPMENT.
9. DEVICES TO BE REMOVED SHALL HAVE ALL CONNECTED WIRING REMOVED TO THE
SOURCE.
10. DEVICES NOT TO BE REMOVED SHALL BE PROTECTED FROM THE ENVIRONMENT, AND
ALL ASSOCIATED CABLE/RACEWAYS ARE TO REMAIN AND BE PROTECTED. T.C. SHALL BE
RESPONSIBLE FOR REPAIR OF ANY INTERRUPTIONS TO PROTECTED DEVICES.
11. REFER TO SPECIFICATIONS SECTION 27 05 00 FOR ADDITIONAL INFORMATION.
TECHNOLOGY CABLING PLAN
1. ALL NETWORK (DATA) CABLING ON THIS PROJECT IS INTENDED TO BE REPLACED WITH NEW
CABLING IN ALL AREAS WITHIN THE SCOPE OF WORK ON THIS PROJECT. THIS TECHNOLOGY
CABLING PLAN IS A RECOMMENDATION ON THE PHASING AND INSTALLATION. ANY CHANGES
TO THIS SCOPE WILL BE COORDINATED WITH THE LOCAL C.O.R. AND ENGINEER OF RECORD
PRIOR TO INSTALLATION.
2. PRIOR TO THE START OF ANY DEMOLITION AND INSTALLATION OF ANY CABLING AT EACH
TCO, THE CONTRACTOR SHALL COORDINATE A PLAN WITH THE LOCAL C.O.R. AND ENGINEER
OF RECORD. THIS WILL INCLUDE ANY SCHEDULED DOWNTIME REQUIRED FOR EACH
LOCATION.
3. NEW PATHWAY WILL BE INSTALLED IN THE INTERSTITIAL SPACE AND OTHER SPACES AS
DEFINED ON THE PROJECT DRAWINGS AND SPECIFICATIONS.
A. CABLING WILL BE ROUTED FROM THE SERVING ROOM AS DEFINED ON THE PROJECT
DRAWINGS.
B. ALL NEW CABLING WILL TERMINATE ON NEW COPPER PATCH PANELS.
C. ALL NEW CABLING WILL ROUTE IN CABLE TRAY OR CONDUIT AS DEFINED BY THE PATH
SHOWN ON THE DRAWINGS. ANY CHANGES TO THIS PATH WILL REQUIRE THAT THE
CONTRACTOR PROVIDE A NEW PLAN TO THE C.O.R. AND EOR TO BE APPROVED PRIOR
TO INSTALLATION.
D. CABLING INSTALLED IN THE INTERSTITIAL SPACE FROM THE TCO AND THE CABLE TRAY
CAN BE SUPPORTED BY J-HOOKS AS REQUIRED BUT WILL REQUIRE TO BE ROUTED TO
THE NEAREST CABLE TRAY.
E. NO CABLING WILL BE ROUTED THROUGH, UNDER/OVER, OR LAY ON ANY OTHER SYSTEM
CONDUIT, PIPE, DUCTWORK, ECT.
4. EXISTING DATA CABLING WILL BE REMOVED FROM THE TCO. THE FOLLOWING IS AN
OVERVIEW AND REQUIREMENT AT EACH TCO:
A. VERIFY THAT BOTH ENDS ARE DISCONNECTED FROM ACTIVE EQUIPMENT BY REMOVING
ANY PATCH CABLES/CORDS.
B. DEMO THE FACEPLATE. THE ROUGH-IN AND CONDUIT TO ABOVE THE CEILING WILL
REMAIN.
C. ONLY DATA CABLING WILL BE DEMOLISHED BACK TO THE SOURCE. COIL THE DATA
CABLING ABOVE THE TCO.
D. EXISTING VOICE CABLING WILL REMAIN. VOICE TERMINATIONS WILL REQUIRE RE
TERMINATION ON NEW JACKS COMPATIBLE WITH THE NEW FACEPLATE.
E. NEW DATA CABLING WILL BE INSTALLED AND TERMINATED ON THE NEW FACEPLATE.
F. BOTH DATA AND VOICE JACKS WILL BE TESTED AND LABELED.\
G. COORDINATE WITH THE C.O.R. ON THE RECONNECTION OF PATCH CABLES ON
COMPLETION.
5. AFTER THE ABOVE IS COMPLETED, ALL DEMOLISHED CABLING WILL BE REMOVED BACK TO
THE SOURCE. THIS INCLUDES ANY JACKS, FACEPLATES, UNUSED PATHWAY, ETC.
A. ALL ABANDON CABLING ABOVE THE CEILING IN THE SAME PATHWAY AS THE
DEMOLISHED CABLING WILL BE REMOVED. THE CONTRACTOR SHALL INCLUDE TESTING
AND VERIFICATION OF ALL CATEGORY RATED CABLING REGARDLESS OF DEMOLISHED
FROM A KNOWN OUTLET OR NOT. ONLY ACTIVE VOICE AND DATA CABLING WILL REMAIN
ABOVE ANY CEILING AND/OR INTERSTITIAL SPACES. COORDINATE WITH THE LOCAL
C.O.R. FOR ADDITIONAL REQUIREMENTS.
6. REFER TO THE SPECIFICATIONS FOR ADDITIONAL INSTALLATION AND PHASING
REQUIREMENTS.
NUMBER AND ADDRESS
SUITE NO.
CITY, STATE ZIP CODE
P: 555.555.555 F: 555.555.5555 www.imegcorp.com
PROJECT #22006633.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
100%
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
B
IM
/A u d ie L
M u rp h y V
A M e d ic a l C e n te r
(S A
M
E P
T
.0
V A
-S a n A n to n io
T
X -E
H R
M
C .r v t
/1
/2
:3
:0
A
M
T000
COVER SHEET - TECHNOLOGY
Awen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
06/09/2023
EHRM INFRASTRUCTURE
UPGRADES 1
Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229
671-22-700
TELECOM ROOM SCHEDULES
TR-TAG BUILDING FLOOR AREA ROOM NUMBERS
FLOOR PLAN
REFERENCES
ENELARGEMENT
REFERENCES
TR-G-1 BUILDING 1 G AREA F L010.2 TN127 1/TN400
TR-G-2 BUILDING 1 G AREA B 030 TN122 2/TN401
TR-G-3 BUILDING 1 G AREA G GB126.1 TN128 1/TN402
TR-G-4 BUILDING 1 G AREA E1 F004 TN125 1/TN483
TR-G-5 BUILDING 1 G AREA D C015.1 TN124 1/TN404
TR-G-6 BUILDING 1 G AREA PT 020 TN130 2/TN405
TR-G-7 BUILDING 1 G AREA CLC 1A138 TN131 1/TN406
TR-G-8 BUILDING 1 G AREA A H031 TN121 1/TN408
TR-1-1 BUILDING 1 1 AREA A S101 TN135 2/TN410
TR-1-2 BUILDING 1 1 AREA B J104 TN136 2/TN411
TR-1-3 BUILDING 1 1 AREA E2 H118.2 TN140 1/TN412
TR-1-4 BUILDING 1 1 AREA E1 105 TN139 1/TN413
TR-1-5 BUILDING 1 1 AREA H G101 TN413 2/TN414
TR-1-6 BUILDING 1 1 AREA PT 157 TN145 2/TN415
TR-1-7 BUILDING 1 1 AREA F P125 TN141 1/TN416
TR-1-8 BUILDING 1 1 AREA CLC 2A137 TN146 1/TN417
TR-1-9 BUILDING 1 1 AREA J Y102.7 TN144 2/TN418
TR-1-10 BUILDING 1 1 AREA G T119.2 TN142 2/TN419
TR-2-1 BUILDING 1 2 AREA A R201 TN152 1/TN420
TR-2-2 BUILDING 1 2 AREA B SP238 TN153 2/TN421
TR-2-3 BUILDING 1 2 AREA G Z221.28A TN159 1/TN422
TR-2-4 BUILDING 1 2 AREA D E221 TN155 2/TN423
TR-2-5 BUILDING 1 2 AREA C A200 TN154 2/TN424
TR-2-6 BUILDING 1 2 AREA PT 258 TN160 2/TN425
TR-3-1 BUILDING 1 3 AREA TN C301.1 TN167 2/TN483
TR-3-2 BUILDING 1 3 AREA G D320 TN165 2/TN431
TR-4-1 BUILDING 1 4 AREA TS C402 TN170 2/TN440
TR-5-1 BUILDING 1 5 AREA TS C511 TN175 2/TN450
TR-6-1 BUILDING 1 6 AREA TS C602.1 TN180 2/TN460
TR-7-1 BUILDING 1 7 AREA TS D702.1 TN185 1/TN470
TE-P-1 BUILDING 4 G N/A N/A TN190 TN190
DATA CENTER BUILDING 1 1 AREA G I100 TN142 1/TN492
Grand total: 32
TECHNOLOGY SHEET INDEX
TN106.5 6TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN107 7TH FLOOR PLAN - TECHNOLOGY - OVERALL
TN107.5 7TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN121 GROUND PLAN - TECHNOLOGY - AREA A
TN122 GROUND PLAN - TECHNOLOGY - AREA B
TN123 GROUND PLAN - TECHNOLOGY - AREA C
TN124 GROUND PLAN - TECHNOLOGY - AREA D
TN125 GROUND PLAN - TECHNOLOGY - AREA E1
TN126 GROUND PLAN - TECHNOLOGY - AREA E2
TN127 GROUND PLAN - TECHNOLOGY - AREA F
TN128 GROUND PLAN - TECHNOLOGY - AREA G
TN129 GROUND PLAN - TECHNOLOGY - AREA H
TN130 GROUND PLAN - TECHNOLOGY - AREA PT
TN131 GROUND PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH
TN132 GROUND PLAN - TECHNOLOGY - AREA CLC CENTRAL
TN135 1ST FLOOR PLAN - TECHNOLOGY - AREA A
TN136 1ST FLOOR PLAN - TECHNOLOGY - AREA B
TN137 1ST FLOOR PLAN - TECHNOLOGY - AREA C
TN138 1ST FLOOR PLAN - TECHNOLOGY - AREA D
TN139 1ST FLOOR PLAN - TECHNOLOGY - AREA E1
TN140 1ST FLOOR PLAN - TECHNOLOGY - AREA E2
TN141 1ST FLOOR PLAN - TECHNOLOGY - AREA F
TN142 1ST FLOOR PLAN - TECHNOLOGY - AREA G
TN143 1ST FLOOR PLAN - TECHNOLOGY - AREA H
TN144 1ST FLOOR PLAN - TECHNOLOGY - AREA J
TN145 1ST FLOOR PLAN - TECHNOLOGY - AREA PT
TN146 1ST FLOOR PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH
TN147 1ST FLOOR PLAN - TECHNOLOGY - AREA CLC CENTRAL
TN152 2ND FLOOR PLAN - TECHNOLOGY - AREA A
TN153 2ND FLOOR PLAN - TECHNOLOGY - AREA B
TN154 2ND FLOOR PLAN - TECHNOLOGY - AREA C
TN156 2ND FLOOR PLAN - TECHNOLOGY - AREA E1
TN157 2ND FLOOR PLAN - TECHNOLOGY - AREA E2
TN158 2ND FLOOR PLAN - TECHNOLOGY - AREA F
TN159 2ND FLOOR PLAN - TECHNOLOGY - AREA G
TN160 2ND FLOOR PLAN - TECHNOLOGY - AREA PT
TN165 3RD FLOOR PLAN - TECHNOLOGY - AREA G
TN166 3RD FLOOR PLAN - TECHNOLOGY - AREA TS
TN167 3RD FLOOR PLAN - TECHNOLOGY - AREA TN
TN170 4TH FLOOR PLAN - TECHNOLOGY - AREA TS
TN171 4TH FLOOR PLAN - TECHNOLOGY - AREA TN
TN175 5TH FLOOR PLAN - TECHNOLOGY - AREA TS
TN176 5TH FLOOR PLAN - TECHNOLOGY - AREA TN
TN180 6TH FLOOR PLAN - TECHNOLOGY - AREA TS
TN181 6TH FLOOR PLAN - TECHNOLOGY - AREA TN
TN185 7TH FLOOR PLAN - TECHNOLOGY - AREA TS
TN186 7TH FLOOR PLAN - TECHNOLOGY - AREA TN
TN190 BLDG 4 PLAN - TECHNOLOGY
TN400 GROUND LEVEL - TR L010.2 - TECHNOLOGY - ENLARGED PLANS
TN401 GROUND LEVEL - TR 030 - TECHNOLOGY - ENLARGED PLANS
TN402 GROUND LEVEL - TR GB126.1 - TECHNOLOGY - ENLARGED PLANS
TN403 GROUND LEVEL - TR F004 - TECHNOLOGY - ENLARGED PLANS
TN404 GROUND LEVEL - TR C015.1 - TECHNOLOGY - ENLARGED PLANS
TN405 GROUND LEVEL - TR 020 - TECHNOLOGY - ENLARGED PLANS
TN406 GROUND LEVEL - TR 1A138 - TECHNOLOGY - ENLARGED PLANS
TN407 GROUND LEVEL - TR H031 - TECHNOLOGY - ENLARGED PLANS
TN410 1ST FLOOR - TR S101 - TECHNOLOGY - ENLARGED PLANS
TN411 1ST FLOOR - TR J104 - TECHNOLOGY - ENLARGED PLANS
TN412 1ST FLOOR -TR H118.2 - TECHNOLOGY - ENLARGED PLANS
TN413 1ST FLOOR - TR 105 - TECHNOLOGY - ENLARGED PLANS
TN414 1ST FLOOR - TR G101 - TECHNOLOGY - ENLARGED PLANS
TN415 1ST FLOOR - TR 157 - TECHNOLOGY - ENLARGED PLANS
TN416 1ST FLOOR - TR P125 - TECHNOLOGY - ENLARGED PLANS
TN417 1ST FLOOR - TR 2A137 - TECHNOLOGY - ENLARGED PLANS
TN418 1ST FLOOR - TR Y102.7 - TECHNOLOGY - ENLARGED PLANS
TN419 1ST FLOOR - TR T119.2 - TECHNOLOGY - ENLARGED PLANS
TN420 2ND FLOOR - TR R201 - TECHNOLOGY - ENLARGED PLANS
TN421 2ND FLOOR - TR SP238 - TECHNOLOGY - ENLARGED PLANS
TN422 2ND FLOOR - TR Z221.28A - TECHNOLOGY - ENLARGED PLANS
TN423 2ND FLOOR - TR E221 - TECHNOLOGY - ENLARGED PLANS
TN424 2ND FLOOR - TR A200 - TECHNOLOGY - ENLARGED PLANS
TN425 2ND FLOOR - TR 258 - TECHNOLOGY - ENLARGED PLANS
TN430 3RD FLOOR - TR C301.1 - TECHNOLOGY - ENLARGED PLANS
TN431 3RD FLOOR -TR D320 - TECHNOLOGY - ENLARGED PLANS
TN440 4TH FLOOR - TR C402 - TECHNOLOGY - ENLARGED PLANS
TN450 5TH FLOOR - TR C511 - TECHNOLOGY - ENLARGED PLANS
TN460 6TH FLOOR - TR C602.1 - TECHNOLOGY - ENLARGED PLANS
TN470 7TH FLOOR - TR A702.1 - TECHNOLOGY - ENLARGED PLANS
TN480 EXISTING TRS - TECHNOLOGY - ENLARGED PLANS
TN481 EXISTING TRS - TECHNOLOGY - ENLARGED PLANS
TN490 1ST FLOOR - EXISTING CAMPUS SUPPORT CENTER - TECHNOLOGY - ENLARGED
PLANS
TN491 1ST FLOOR - CAMPUS SUPPORT CENTER - TECHNOLOGY - ENLARGED PLANS
TN492 1ST FLOOR - CAMPUS SUPPORT CENTER - TECHNOLOGY - RACK ELEVATIONS
TN493 1ST FLOOR - CAMPUS SUPPORT CENTER - TECHNOLOGY - RACK ELEVATIONS
TN494 SUB-LEVEL - PBX - TECHNOLOGY - ENLARGMENTS
GRAND TOTAL: 163
TECHNOLOGY SHEET INDEX
T000 COVER SHEET - TECHNOLOGY
T001 SITE PLAN - TECHNOLOGY
T500 DETAILS - TECHNOLOGY
T501 DETAILS - TECHNOLOGY
T600 DIAGRAMS - TECHNOLOGY
T601 DIAGRAMS - TECHNOLOGY
T602 DIAGRAMS - TECHNOLOGY
T603 DIAGRAMS - TECHNOLOGY
T605 SCHEDULES - TECHNOLOGY
TD099 SUB-LEVEL DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD100 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD101 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD102 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD103 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD104 4TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD105 5TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD106 6TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD107 7TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD121 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA A
TD122 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA B
TD123 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA C
TD124 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA D
TD125 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA E1
TD126 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA E2
TD127 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA F
TD128 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA G
TD129 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA H
TD130 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA PT
TD131 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH
TD132 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA CLC CENTRAL
TD135 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
TD136 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
TD137 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
TD138 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D
TD139 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E1
TD140 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E2
TD141 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F
TD142 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G
TD143 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA H
TD144 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J
TD145 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA PT
TD146 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH
TD147 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA CLC CENTRAL
TD152 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
TD153 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
TD154 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
TD156 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E1
TD157 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E2
TD158 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F
TD159 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G
TD160 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA PT
TD165 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G
TD166 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS
TD167 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN
TD170 4TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS
TD171 4TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN
TD175 5TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS
TD176 5TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN
TD180 6TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS
TD181 6TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN
TD185 7TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS
TD186 7TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN
TN155 2ND FLOOR PLAN - TECHNOLOGY - AREA D
TD155 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D
TN099 SUB-LEVEL PLAN - TECHNOLOGY - OVERALL
TN100 GROUND LEVEL PLAN - TECHNOLOGY - OVERALL
TN100.5 GROUND FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN101 1ST FLOOR PLAN - TECHNOLOGY - OVERALL
TN101.5 1ST FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN102 2ND FLOOR PLAN - TECHNOLOGY - OVERALL
TN102.5 2ND FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN103 3RD FLOOR PLAN - TECHNOLOGY - OVERALL
TN103.5 3RD FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN104 4TH FLOOR PLAN - TECHNOLOGY - OVERALL
TN104.5 4TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN105 5TH FLOOR PLAN - TECHNOLOGY - OVERALL
TN105.5 5TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN106 6TH FLOOR PLAN - TECHNOLOGY - OVERALL
Revisions: Date: SHEET 255 of 431
COMMUNITY LIVING CENTER
POLYTRAUMA
MAIN HOSPITAL
CANTEENMAIN ENTRANCE
TOWER
SCI
BLDG
BLDG
MERTON MINTER
M E
R T
O N
M
IN
T E
R
VON SCHEELE RD W
U
R
ZB
A C
H R
D
W
URZBACH R
D
TN190
APPROXIMATE LOCATION OF PARKING
GARAGE IT CLOSET
SC-FDC-2
NUMBER AND ADDRESS
SUITE NO.
CITY, STATE ZIP CODE
P: 555.555.555 F: 555.555.5555 www.imegcorp.com
PROJECT #22006633.00
60 60 120
1" = 60'-0"
FEETSCALE
P L A
N N
O R
T H
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
100%
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
B
IM
/A u d ie L
M u rp h y V
A M e d ic a l C e n te r
(S A
M
E P
T
.0
V A
-S a n A n to n io
T
X -E
H R
M
C .r v t
/1
/2
:3
:1
A
M
T001
SITE PLAN - TECHNOLOGY
Awen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
06/09/2023
EHRM INFRASTRUCTURE
UPGRADES 1
Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229
671-22-700
1" = 60'-0"
SITE PLAN - TECHNOLOGY - OVERALL
KEY PLAN
ABC
D
E1 E2 F
G
H
JPT
TN
TS
CLC
GENERAL NOTES:
1. THIS SHEET IS SHOWN FOR REFERENCE WHERE BUILDINGS THAT ARE
WITHIN THE SCOPE OF THE PROJECT ARE LOCATED.
KEYNOTES:
1. USE THE EXISTING CONDUIT THAT ROUTES FROM TR-1-9 IN BUILDING 1
TO THE EXISTING TR IN BUILDING 4.
2. PROVIDE A NEW FIBER CABINET SC-FDC-2 IN THE IT CLOSET ON THE
SECOND FLOOR OF THE PARKING STRUCTURE. FOR THE NEW FIBER
OPTIC CABLING. REFER TO T601 FOR ADDITIONAL FIBER
REQUIREMENTS. NEW FIBER CABLING WILL UTILIZE THE EXISTING
PATHWAY.
Revisions: Date: SHEET 256 of 431
B A B A
CABLE EXTENDS TO THE NEAREST
TELECOMMUNICATIONS ROOM
J-HOOK2
COILED CATEGORY
SLACKLOOP
VELCRO CABLE STRAP4
NOTES:
1. THIS DIAGRAM MAY NOT REPRESENT THE QUANTITY OF CABLES TO EACH
INFORMATION OUTLET JUNCTION BOX. REFER TO THE DRAWINGS AND THE
INFORMATION OUTLET SCHEDULE FOR ADDITIONAL INFORMATION.
2. ALL DEVICES ARE INSTALLED ABOVE THE CEILING UNLESS OTHERWISE
NOTED.
KEYNOTES:
1. 2-PORT PLENUM RATED SURFACE MOUNTED BOX, SUPPORT FROM J-HOOK.
TERMINATE CABLE ON FIELD TERMINABLE MODULAR RJ-45 PLUG. REFER TO
THE INFORMATION OUTLET SCHEDULE AND TECHNOLOGY EQUIPMENT
SCHEDULE FOR ADDITIONAL INFORMATION.
2. MOUNT A DEDICATED J-HOOK TO THE NEAREST CEILING SUBSTRUCTURE,
COLUMN, JOIST, OR WALL ABOVE THE CEILING AS SHOWN ON THE DRAWINGS.
PROVIDE THE PROPER SUPPORT WHEN HANGING FROM THE CEILING
SUBSTRUCTURE OR COLUMN WALL OR JOIST. REFER TO THE
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
3. REFER TO THE SPECIFICATION FOR SLACKLOOP LENGTH. MAINTAIN THE
MANUFACTURERS BEND RADIUS FOR SLACKLOOP SIZE.
4. PROVIDE AND INSTALL A VELCRO CABLE STRAP ON THE SLACKLOOP
APPROXIMATELY EVERY 6" ALONG THE SLACKLOOP. FOR SLACKLOOPS
GREATER THAN 3' A MINIMUM OF (4) STRAPS WILL BE INSTALLED.
1.97"
W
IDTH
DEPTH
3.94"
118.2"
PART # DEPTH (IN) WIDTH (IN)
CAT 6A 4-PAIR
PLENUM (0.35")
CF 105/450 4 18 373
CF 150/450 6 18 536
NOTES:
1. REFER TO T605 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
MOLDED POLYESTER -
FIBERGLASS INSULATOR
COPPER GROUND CONDUCTOR FROM
BUILDING SERVICE GROUND. REFER
TO SPECIFICATIONS FOR DETAILS
TWO HOLE
COMPRESSION LUG
NOTES:
1. REFER TO TECHNOLOGY EQUIPMENT SCHEDULE SC-GND-1 FOR WIDTH
REQUIREMENTS.
2. REFER TO 2/T501 FOR TYPICAL TELECOM ROOM BONDING FLOW DIAGRAM.
COPPER BONDING CONDUCTOR TO
EQUIPMENT RACKS, CABLE TRAYS
& METALLIC SLEEVES. REFER TO
SPECIFICATIONS FOR DETAILS
BARE COPPER GROUND BAR,
INSULATORS, BRACKETS AND
BONDING PROVIDED BY E.C.
REFER TO TECHNOLOGY
EQUIPMENT SCHEDULE SC-GND-1
5/16" Ø
(TYP)
7/16" Ø
(TYP)
18.31"
HDX1A-144 E2XHD-CMB SPLCH-12X
.1
.9
" 1
.5
.3
8.39"
.4
16.90"
.2
19.15"
.7
ANGLED PANEL COVER
e2XHD Angled Panel - 1 RU
Rear Cable Manager
16.37"
.3
.3
.3
.0
.1 e2XHD High-Density Angled Panel - Top View
1 RU Panel - Front View
19.00"
NUMBER AND ADDRESS
SUITE NO.
CITY, STATE ZIP CODE
P: 555.555.555 F: 555.555.5555 www.imegcorp.com
PROJECT #22006633.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
100%
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
B
IM
/A u d ie L
M u rp h y V
A M e d ic a l C e n te r
(S A
M
E P
T
.0
V A
-S a n A n to n io
T
X -E
H R
M
C .r v t
/1
/2
:3
:1
A
M
T500
DETAILS - TECHNOLOGY
Awen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
06/09/2023
EHRM INFRASTRUCTURE
UPGRADES 1
Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229
671-22-700
NO SCALE
ABOVE CEILING INFORMATION
OUTLET MOUNTING DETAIL
12" = 1'-0"
WIRE BASKET CAPACITY
NO SCALE
BONDING BUS BAR DETAIL
4 3" = 1'-0"
FIBER DISTRIBUTION CABINET
NO SCALE
UTP PATCH PANEL
Revisions: Date:
1 1 2 3 4 5
1/2" = 1'-0"
FEETSCALE
3 3 6 9
3" = 1'-0"
INCHSCALE
SHEET 257 of 431
SC-GND-1
ELECTRICAL
PANEL
SERVING ROOM
RACK BONDING
BUSBAR (RBB)
BUILDING
STEEL
ACCESS
CONTROL
EQUIPMENT
WIRE BASKET
(CONTINUOUS
BOND)
METALLIC
CONDUITS AND
SLEEVES
RACK BONDING
BUSBAR (RBB)
RACK BONDING CONDUCTOR (6 AWG)
UNIT BONDING CONDUCTOR (6 AWG)
TOP MOUNTED RACK BONDING BUSBAR
RACK BONDING
CONDUCTOR
(6 AWG)
IRREVERSIBLE
COMPRESSION
CONNECTIONTELECOMMUNICATION
EQUIPMENT BONDING
CONDUCTOR (6 AWG)
CABLE TRAY BONDING CONDUCTOR
TYPICAL AT EACH SECTION CONNECTION POINT
TO TMGB
IRREVERSIBLE CRIMP
CONNECTOR
TELECOMMUNICATIONS
EQUIPMENT BONDING
CONDUCTOR
RACK BONDING CONDUCTOR
EXTENDED TO BOTTOM TO
ACCOMMODATE FUTURE GROWTH
INDIVIDUAL BONDING CONDUCTORS
FROM EACH PIECE OF EQUIPMENT
AND RACK TO THE RACK BONDING
CONDUCTOR
TWO HOLE COMPRESSION LUG
IRREVERSIBLE CRIMP
CONNECTOR
TO TMGB
EXAMPLE "A" EXAMPLE "B"
BASKET TRAY
NOTES:
1. REFER TO 5/T500 BONDING BUS BAR DETAIL FOR ADDITIONAL INFORMATION.
2. REFER TO 2/T500 TYPICAL TELECOM ROOM BONDING FLOW DIAGRAM FOR ADDITIONAL INFORMATION.
3. REFER TO T605 FOR GENERAL TECHNOLOGY EQUIPMENT SCHEDULE.
KEYNOTES:
1. REFER TO 2/T500 BACK OF EQUIPMENT RACK DETAIL FOR ADDITIONAL INFORMATION.
FRONT VIEW REAR VIEW SIDE VIEW ISOMETRIC VIEW
.2
.0
.0
.0
TOP VIEW
REFER TO ARCHITECTURAL
PLANS FOR WALL CONSTRUCTION
SINGLE GANG PLASTER RING
TO COME WITHIN 1/8" OF FINAL
SURFACE
STUD
1" EMT CONDUIT UNLESS
OTHERWISE NOTED. REFER TO
DETAIL NOTES FOR ADDITIONAL
REQUIREMENTS
NYLON BUSHING
J-HOOK
NOTES:
1. 1" EMT CONDUIT SHALL STUB UP TO NEAREST ACCESSIBLE CEILING AND TERMINATE ORIENTED HORIZONTALLY AT THE HEIGHT OF THE ASSOCIATED J-HOOK ROUTE. CONDUIT RUN SHALL NOT CONTAIN MORE THAN 180 DEGREES OF BEND BETWEEN ACCESSIBLE JUNCTION BOXES OR BETWEEN JUNCTION BOX AND END OF
CONDUIT.
2. WHERE CONDUIT STUB IS LOCATED IN A ROOM WITH AN ACCESSIBLE CEILING AND IS NOT REQUIRED TO RUN TO CABLE ROUTE LOCATED OUTSIDE THE ROOM, STUB MUST TERMINATE ABOVE THE ACCESSIBLE CEILING WITH A 90-DEGREE BEND AT THE TOP ORIENTED IN TO THE ROOM AT THE HEIGHT OF THE ASSOCIATED J-HOOK ROUTE
IN THE ROOM.
3. ALL STUBS MUST BE FITTED WITH A NYLON BUSHING ON EACH END OF THE CONDUIT.
4. INSTALLING CONTRACTOR SHALL FURNISH AND INSTALL FIRESTOP MATERIALS FOR TECHNOLOGY ROUGH-INS
PER PROJECT REQUIREMENTS. REFER TO SPECIFICATIONS FOR FIRESTOP REQUIREMENTS.
VELCRO CABLE
STRAP
CABLE EXTENDS TO
THE NEAREST
TELECOMMUNICATIONS
ROOM
COILED
CATEGORY
SLACKLOOP
KEYNOTES:
1. MOUNT A DEDICATED J-HOOK TO THE NEAREST CEILING SUBSTRUCTURE, COLUMN, JOIST, OR WALL ABOVE THE CEILING AS SHOWN ON THE DRAWINGS. PROVIDE THE PROPER SUPPORT WHEN HANGING FROM THE CEILING
SUBSTRUCTURE OR COLUMN WALL OR JOIST. REFER TO THE SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS.
2. MAINTAIN A MINIMUM OF 3' COIL SLACKLOOP.
3. PROVIDE AND INSTALL A VELCRO CABLE STRAP ON THE SLACKLOOP APPROXIMATELY EVERY 6" ALONG THE
SLACKLOOP. FOR SLACKLOOPS GREATER THAN 3' A MINIMUM OF (4) STRAPS WILL BE INSTALLED.
TELECOMMUNICATIONS ROOM MC-1, TR-#, (TYP.) 1
PRIMARY/SECONDARY
BONDING BUSBAR
(PBB/SBB)
NOTES:
1. THIS FLOW DIAGRAM IS DIAGRAMMATIC AND MAY NOT SHOW ACTUAL ROUTING OR QUANTITIES OF MATERIALS. THIS FLOW DIAGRAM IS SHOWN FOR CLARIFICATION OF CONNECTION LOCATIONS AND CONDUCTOR TYPE. ALL CONNECTIONS AND SYSTEM DEVICES SHOWN ARE TYPICAL AND NOT REPRESENTATIVE OF ACTUAL PROJECT QUANTITIES. REFER TO FLOOR PLANS AND ENLARGED FLOOR PLANS FOR ACTUAL QUANTITIES AND LOCATIONS OF DEVICES AND SPECIFIC ROUTING INFORMATION. REFER TO SPECIFICATIONS FOR
ADDITIONAL REQUIREMENTS.
2. ALL CONDUCTORS IN THE TECHNOLOGY BONDING SYSTEM SHALL BE [PLENUM RATED] COPPER (GREEN OR MARKED WITH A DISTINCTIVE GREEN COLOR). REFER TO BONDING CONDUCTOR SIZING SCHEDULE FOR SIZING CRITERIA FOR CONDUCTORS. REFER
TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
3. ALL BONDING CONDUCTORS AND BONDING JUMPERS SHALL BE CONNECTED BY COMPRESSION LUGS, EXOTHERMIC WELDING, OR IRREVERSIBLE COMPRESSION CONNECTORS. SOLDER IS NOT AN ACCEPTABLE MEANS OF CONNECTION. SHEET METAL SCREWS SHALL NOT BE USED TO CONNECT COMMUNICATIONS BONDING CONDUCTORS TO EQUIPMENT. WHERE NECESSARY, REMOVE PAINT AND/OR USE PAINT-PIERCING WASHERS TO PROVIDE PROPER ELECTRICAL BOND AT ALL CONNECTIONS.
KEYNOTES:
1. REFER TO TELECOM ROOM REFERENCES SCHEDULE FOR TELECOMMUNICATIONS ROOM NUMBER AND LOCATION INFORMATION.
2. INCLUDES HORIZONTAL AND VERTICAL CONDUIT SLEEVES FOR TECHNOLOGY CABLING.
3. TELECOMMUNICATIONS BONDING BACKBONE (TBB). REFER TO TELECOMMUNICATIONS BONDING RISER DIAGRAM.
4. TELECOMMUNICATIONS BONDING CONDUCTOR (TBC), TO EXISTING ELECTRICAL ENTRANCE INTERSYSTEM BONDING TERMINATION.
REFER TO TELECOMMUNICATIONS BONDING RISER DIAGRAM FOR CONTINUATION AND ADDITIONAL INFORMATION AND REQUIREMENTS. THIS CONNECTION OCCURS IN CAMPUS SUPPORT, PBX, SERVICE ENTRANCE ROOM, AND BUILDING 4 TELECOM RACK.
5. REFER TO THE ELECTRICAL DRAWINGS FOR LOCATION.
6. REFER TO BONDING BUSBAR DETAIL FOR ADDITIONAL INFORMATION AND GROUNDING REQUIRMENTS.
NUMBER AND ADDRESS
SUITE NO.
CITY, STATE ZIP CODE
P: 555.555.555 F: 555.555.5555 www.imegcorp.com
PROJECT #22006633.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
100%
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
B
IM
/A u d ie L
M u rp h y V
A M e d ic a l C e n te r
(S A
M
E P
T
.0
V A
-S a n A n to n io
T
X -E
H R
M
C .r v t
/1
/2
:3
:2
A
M
T501
DETAILS - TECHNOLOGY
Awen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
06/09/2023
EHRM INFRASTRUCTURE
UPGRADES 1
Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229
671-22-700
12" = 1'-0"
PATHWAY, RACK, BONDING CONDUCTOR JOIN REQUIREMENT
NO SCALE
TYPICAL RACK DIMENSIONS AND SPECIFICATIONS
NO SCALE
TECHNOLOGY ROUGH-IN TO J-HOOK DETAIL
Revisions: Date:
NO SCALE
TYPICAL TELECOM ROOM BONDING FLOW DIAGRAM
SHEET 258 of 431
SC-GND-1 SC-GND-1
SC-GND-1
SC-GND-1
SC-GND-1 SC-GND-1
SC-GND-1
SC-GND-1
SC-GND-1
SC-GND-1
SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1
SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1
SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1 SC-GND-1
SC-GND-1
SC-GND-1
SC-GND-1
SC-GND-1
CONDUCTOR
LENGTH IN FEET
BONDING CONDUCTOR SIZING SCHEDULE
MINIMUM ACCEPTABLE
SIZE - AWG
LESS THAN 13' 6
14' - 20' 4
21' - 26' 3
27' - 33' 2
34' - 41' 1
42' - 52' 1/0
53' - 66' 2/0
67' - 84' 3/0
GROUND
FLOOR
EXISTING ELECTRICAL
ENTRANCE INTERSYSTEM
BONDING TERMINATION
GROUNDING ELECTRODE
CONDUCTOR BY OTHERS
TELECOMMUNICATIONS
BONDING BACKBONE
(TBB) (TYP)
FIRST
FLOOR
SECOND
FLOOR
THIRD
FLOOR
FOURTH
FLOOR
FIFTH
FLOOR
TR-G-1
85' 105' 4/0
106' - 125' 250 kcmil
126' - 150' 300 kcmil
151' - 175' 350 kcmil
176' - 250' 500 kcmil
251' - 300' 600 kcmil
GREATER THAN 301' 750 kcmil
(SBB)
(SBB)
(SBB) (SBB)
(SBB)
(PBB)
(SBB) (SBB)
TR-G-2
CAMPUS SUPPORT
SYSTEM
TR-2-1
TR-3-1 TR-3-2
TR-4-1
TR-5-1
SIXTH
FLOOR
(SBB)
TR-6-1
SEVENTH
FLOOR
(SBB)
TR-7-1
(SBB)
TR-G-3
(SBB)
TR-G-4
(SBB)
TR-G-5
(SBB)
TR-G-6
(SBB)
TR-G-7
(SBB)
TR-1-1
(SBB)
TR-1-2
(SBB)
TR-1-3
(SBB)
TR-1-4
(SBB)
TR-1-5
(SBB)
TR-1-6
(SBB)
TR-1-7
(SBB)
TR-1-8
(SBB)
TR-1-9
(SBB)
TR-1-10
(SBB)
TR-2-2
(SBB)
TR-2-3
(SBB)
TR-2-4
(SBB)
TR-2-5
(SBB)
TR-2-6
PBX
(SBB)
SUB
FLOOR
LESS THAN 13' 6
14' - 20' 4
21' - 26' 3
27' - 33' 2
34' - 41' 1
42' - 52' 1/0
53' - 66' 2/0
67' - 84' 3/0
85' 105' 4/0
106' - 125' 250 kcmil
126' - 150' 300 kcmil
151' - 175' 350 kcmil
176' - 250' 500 kcmil
251' - 300' 600 kcmil
GREATER THAN 301' 750 kcmil
(SBB)
(SBB)
(SBB) (SBB)
(SBB)
(PBB)
(SBB) (SBB)
(SBB)
(SBB)
(SBB) (SBB) (SBB) (SBB) (SBB)
(SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB)
(SBB) (SBB) (SBB) (SBB) (SBB)
(SBB)
LESS THAN 13' 6
14' - 20' 4
21' - 26' 3
27' - 33' 2
34' - 41' 1
42' - 52' 1/0
53' - 66' 2/0
67' - 84' 3/0
NOTES:
1. THIS RISER IS DIAGRAMMATIC AND MAY NOT SHOW ACTUAL ROUTING OR QUANTITIES OF MATERIALS.
THIS RISER IS SHOWN FOR CLARIFICATION OF CONNECTION LOCATIONS AND CONDUCTOR TYPE.
ALL CONNECTIONS AND SYSTEM DEVICES SHOWN ARE TYPICAL AND NOT REPRESENTATIVE OF
ACTUAL PROJECT QUANTITIES. REFER TO FLOOR PLANS AND ENLARGED FLOOR PLANS FOR ACTUAL QUANTITIES AND LOCATIONS OF DEVICES AND MORE SPECIFIC ROUTING INFORMATION. REFER TO
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
2. TELECOM BONDING BACKBONE SHALL BE PROVIDED PER BONDING CONDUCTOR SIZING SCHEDULE.
3. ALL CONDUCTORS IN THE TECHNOLOGY BONDING SYSTEM SHALL BE PLENUM RATED COPPER
(GREEN OR MARKED WITH A DISTINCTIVE GREEN COLOR). REFER TO BONDING CONDUCTOR SIZING SCHEDULE FOR SIZING CRITERIA FOR CONDUCTORS. REFER TO SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS.
4. ALL BONDING CONDUCTORS AND BONDING JUMPERS SHALL BE CONNECTED BY COMPRESSION
LUGS, EXOTHERMIC WELDING, OR IRREVERSIBLE COMPRESSION CONNECTORS. SOLDER IS NOT AN
ACCEPTABLE MEANS OF CONNECTION. SHEET METAL SCREWS SHALL NOT BE USED TO CONNECT
COMMUNICATIONS BONDING CONDUCTORS TO EQUIPMENT. WHERE NECESSARY, REMOVE PAINT
AND/OR USE PAINT-PIERCING WASHERS TO PROVIDE PROPER ELECTRICAL BOND AT ALL
CONNECTIONS.
5. SC-GND-1 IS THE PRIMARY BONDING BUSBAR (PBB) WHICH CONNECTS TO THE (TBC) AND CONNECTS
ALL SECONDARY BONDING BUSBAR (SBB) VIA THE (BBC).
6. REFER TO THE INDIVISUAL TELECOM ROOM ENLARGMETNS ON THE TN400 SERIES DRAWINGS FOR
TELECOM ROOM BONDING FLOW DIAGRAMS.
7. REFER TO TELECOM ROOM REFERENCES SCHEDULE FOR TELECOMMUNICATIONS ROOM NUMBER
AND LOCATION INFORMATION.
KEYNOTES:
1. TELECOMMUNICATIONS BONDING CONDUCTOR (TBC). TBC SHALL BE THE SAME SIZE AS THE TBB OR
LARGER. REFER TO BONDING CONDUCTOR SIZING SCHEDULE FOR SIZING REQUIREMENTS. THIS
CONNECTION OCCURS IN THE CAMPUS SUPPORT, PBX, SERVICE ENTRANCE ROOM, AND BUILDING 4
TELECOM RACK.
EXISTING ELECTRICAL
GROUNDING ELECTRODE
SYSTEM
85' 105' 4/0
106' - 125' 250 kcmil
126' - 150' 300 kcmil
151' - 175' 350 kcmil
176' - 250' 500 kcmil
251' - 300' 600 kcmil
GREATER THAN 301' 750 kcmil
(SBB)
(SBB)
(SBB) (SBB)
(SBB)
(PBB)
(SBB) (SBB)
(SBB)
(SBB)
(SBB) (SBB) (SBB) (SBB) (SBB)
(SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB)
(SBB) (SBB) (SBB) (SBB) (SBB)
(SBB)
LESS THAN 13' 6
14' - 20' 4
21' - 26' 3
27' - 33' 2
34' - 41' 1
42' - 52' 1/0
53' - 66' 2/0
67' - 84' 3/0
85' 105' 4/0
106' - 125' 250 kcmil
126' - 150' 300 kcmil
151' - 175' 350 kcmil
176' - 250' 500 kcmil
251' - 300' 600 kcmil
GREATER THAN 301' 750 kcmil
(SBB)
(SBB)
(SBB) (SBB)
(SBB)
(PBB)
(SBB) (SBB)
(SBB)
(SBB)
(SBB) (SBB) (SBB) (SBB) (SBB)
(SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB)
(SBB) (SBB) (SBB) (SBB) (SBB)
(SBB)
LESS THAN 13' 6
14' - 20' 4
21' - 26' 3
27' - 33' 2
34' - 41' 1
42' - 52' 1/0
53' - 66' 2/0
67' - 84' 3/0
85' 105' 4/0
106' - 125' 250 kcmil
126' - 150' 300 kcmil
151' - 175' 350 kcmil
176' - 250' 500 kcmil
251' - 300' 600 kcmil
GREATER THAN 301' 750 kcmil
(SBB)
(SBB)
(SBB) (SBB)
(SBB)
(PBB)
(SBB) (SBB)
(SBB)
(SBB)
(SBB) (SBB) (SBB) (SBB) (SBB)
(SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB)
(SBB) (SBB) (SBB) (SBB) (SBB)
(SBB)
LESS THAN 13' 6
14' - 20' 4
21' - 26' 3
27' - 33' 2
34' - 41' 1
42' - 52' 1/0
53' - 66' 2/0
67' - 84' 3/0
85' 105' 4/0
106' - 125' 250 kcmil
126' - 150' 300 kcmil
151' - 175' 350 kcmil
176' - 250' 500 kcmil
251' - 300' 600 kcmil
GREATER THAN 301' 750 kcmil
(SBB)
(SBB)
(SBB) (SBB)
(SBB)
(PBB)
(SBB) (SBB)
(SBB)
(SBB)
(SBB) (SBB) (SBB) (SBB) (SBB)
(SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB) (SBB)
(SBB) (SBB) (SBB) (SBB) (SBB)
(SBB)
TELECOMMUNICATIONS
BONDING CONDUCTOR TBC
BUILDING 4
MAIN BUILDING
(SBB)
TE-P-1
(SBB)(SBB)(SBB)(SBB)(SBB)
SERVICE ENTRANCE
(SBB)(SBB)(SBB)(SBB)(SBB)(SBB)
EXISTING ELECTRICAL
ENTRANCE INTERSYSTEM
BONDING TERMINATION
GROUNDING ELECTRODE
CONDUCTOR BY OTHERS
EXISTING ELECTRICAL
GROUNDING ELECTRODE
SYSTEM
TELECOMMUNICATIONS
BONDING CONDUCTOR TBC
(SBB)
TR-G-8
(SBB)(SBB)(SBB)(SBB)(SBB)
NUMBER AND ADDRESS
SUITE NO.
CITY, STATE ZIP CODE
P: 555.555.555 F: 555.555.5555 www.imegcorp.com
PROJECT #22006633.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
100%
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
B
IM
/A u d ie L
M u rp h y V
A M e d ic a l C e n te r
(S A
M
E P
T
.0
V A
-S a n A n to n io
T
X -E
H R
M
C .r v t
/1
/2
:3
:2
A
M
T600
DIAGRAMS - TECHNOLOGY
Awen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
06/09/2023
EHRM INFRASTRUCTURE
UPGRADES 1
Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229
671-22-700
NO SCALE
TECHNOLOGY BONDING RISER DIAGRAM
Revisions: Date: SHEET 259 of 431
SUB
LEVEL
GROUND
LEVEL
GROUND
INTERSTITIAL
ROOF
LEVEL 02
LEVEL 01
INTERSTITIAL
LEVEL 01
TR-2-1
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
LEVEL 02
INTERSTITIAL
LEVEL 03
LEVEL 03
INTERSTITIAL
LEVEL 04
LEVEL 04
INTERSTITIAL
LEVEL 05
LEVEL 05
INTERSTITIAL
LEVEL 06
LEVEL 06
INTERSTITIAL
LEVEL 07
LEVEL 07
INTERSTITIAL
TR-2-2
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-2-3
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-2-4
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-2-5
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-2-6
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-3-1
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-3-2
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-4-1
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-5-1
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-6-1
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-7-1
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-1-1
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-1-2
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-1-3
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-1-4
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-1-5
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-1-6
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
CAMPUS
SUPPORT
CENTER
MDA B FIBER
DISTRIBUTION
MDA A FIBER
DISTRIBUTION
TR-1-7
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-1-8
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-1-9
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-1-10
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-G-1
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-G-2
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-G-3
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-G-4
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-G-5
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-G-6
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-G-7
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TE-P-1
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
BUILDING 4
MAIN BUILDING
PBX
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
TR-G-8
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
24 STRAND OF OS2 24 STRAND OF OS2
IT CLOSET
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
PARKING
GARAGE
TR R201.1
B LEG
FIBER
CABINET
A LEG
FIBER
CABINET
NUMBER AND ADDRESS
SUITE NO.
CITY, STATE ZIP CODE
P: 555.555.555 F: 555.555.5555 www.imegcorp.com
PROJECT #22006633.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
100%
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
B
IM
/A u d ie L
M u rp h y V
A M e d ic a l C e n te r
(S A
M
E P
T
.0
V A
-S a n A n to n io
T
X -E
H R
M
C .r v t
/1
/2
:3
:2
A
M
T601
DIAGRAMS - TECHNOLOGY
Awen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
06/09/2023
EHRM INFRASTRUCTURE
UPGRADES 1
Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229
671-22-700
NO SCALE
TECHNOLOGY BACKBONE CONNECTIVTY RISER DIAGRAM
NOTES:
1. THIS RISER IS DIAGRAMMATIC AND MAY NOT SHOW ACTUAL ROUTING OR QUANTITIES OF MATERIALS SHOWN. THIS RISER IS SHOWN FOR CLARIFICATION OF CONNECTION(S), LOCATIONS AND CABLE TYPE. REFER TO FLOOR PLANS FOR MORE
SPECIFIC ROUTING INFORMATION.
2. ALL FIBER OPTIC CABLING SHOWN ON THIS DRAWING FOR BOTH THE PRIMARY AND SECONDARY FIBER SHALL BE 24- STRANDS OF OM4 AND 12-STRANDS OF OS1 UNLESS OTHERWISE NOTED. REFER TO THE SPECIFICATIONS FOR ADDITIONAL
INFORMATION AND REQUIREMENTS.
3. ALL FIBER OPTIC CABLING SHALL FIELD TERMINATE ON MPO CONNECTORS COMPATIBLE WITH THE FIBER CASSETTES.
REFER TO THE INDIVIDUAL ROOM LAYOUTS FOR LOCATIONS OF EACH FIBER TERMINATION POINT AND SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
KEYNOTES:
1. FIBER CABINET IS INSTALLED IN THE SECOND FLOOR PARKING IT EQUIPMENT ROOM 202. REFER TO T001 FOR LOCATION OF THE CLOSET. COORDINATE WITH THE LOCAL COR FOR LOCATION OF THE FIBER CABINET INSTALLED IN THE ROOM.
2. FIBER OPTIC CABLING ROUTES TO THE EXISTING SECOND FLOOR PARKING GARAGE IT CLOSET UTILIZING THE EXISTING PATHWAY. FIELD VERIFY THE FIBER DISTANCE PRIOR TO THE PURCHASE AND INSTALLATION OF THE FIBER. ESTIMATE A
MINIMUM OF 1500 FEET FOR BIDDING PURPOSES.
3. FIBER OPTIC CABLING ROUTES TO BIO-MED ROOM ON THE SECOND FLOOR OF THE HOSPITAL. THIS IS THE ONLY SCOPE IN
THIS ROOM. REFER TO TN102 FOR ADDITIONAL INFORMATION.
LINE TYPE LEGEND
A LEG FIBER:
B LEG FIBER:
Revisions: Date: SHEET 260 of 431
SUB
LEVEL
GROUND
LEVEL
GROUND
INTERSTITIAL
LEVEL 02
LEVEL 01
INTERSTITIAL
LEVEL 01
LEVEL 02
INTERSTITIAL
LEVEL 03
LEVEL 03
INTERSTITIAL
LEVEL 04
LEVEL 04
INTERSTITIAL
LEVEL 05
LEVEL 05
INTERSTITIAL
LEVEL 06
LEVEL 06
INTERSTITIAL
LEVEL 07
LEVEL 07
INTERSTITIAL
AREA GAREA TN, AREA E2, AREA F AREA TS, AREA A, AREA BAREA E1AREA DAREA H AREA C AREA PT AREA CLC AREA J
TR-G-1 TR-G-2TR-G-3TR-G-4TR-G-5 TR-G-6 TR-G-7
TR-1-1 TR-1-2TR-1-3TR-1-4TR-1-5 TR-1-11 TR-1-6TE-1-7 TR-1-8 TR-1-9TR-1-10
TR-2-1 TR-2-2TR-2-3TR-2-4 TR-2-5 TR-2-6
TR-3-1 TR-3-2
TR-4-1
TR-5-1
TR-6-1
TR-7-1
DATA CENTER
STI PATHWAY
(TYPICAL)
PATHWAY LEGEND
A LEG FIBER:
B LEG FIBER:
WIRE BASKET
(TYPICAL)
VERTICAL CHASE
VERTICAL CHASE
VERTICAL CHASE
4 4 4
4 4 4
4 4 4
4 4
4 4
4 4
STI PATHWAY
(TYPICAL)
WIRE BASKET
(TYPICAL)
STI PATHWAY
(TYPICAL)
WIRE BASKET
(TYPICAL)
STI PATHWAY
(TYPICAL)
WIRE BASKET
(TYPICAL)
STI PATHWAY
(TYPICAL)
WIRE BASKET
(TYPICAL)
4 4
MAIN BUILDING
BUILDING 4
TE-P-1 4
FIBER PASSES THROUGH
TR-1-9 TO TE-P-1 IN BUILDING 4
PBX 4
TR-G-8 4
NUMBER AND ADDRESS
SUITE NO.
CITY, STATE ZIP CODE
P: 555.555.555 F: 555.555.5555 www.imegcorp.com
PROJECT #22006633.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
100%
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
B
IM
/A u d ie L
M u rp h y V
A M e d ic a l C e n te r
(S A
M
E P
T
.0
V A
-S a n A n to n io
T
X -E
H R
M
C .r v t
/1
/2
:3
:2
A
M
T602
DIAGRAMS - TECHNOLOGY
Awen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
06/09/2023
EHRM INFRASTRUCTURE
UPGRADES 1
Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229
671-22-700
NO SCALE
FIBER ROUTING PATHWAY DIAGRAM
NOTES:
1. THIS RISER IS DIAGRAMMATIC AND REPRESENTS THE ROUTING BETWEEN FLOORS
AND AREAS AS SHOWN. THIS DIAGRAM IS SHOWN FOR CLARIFICATION OF ROUTING
AND REQUIREMENTS THAT ALL CABLING SHALL TAKE SEPARATE REDUNDANT
PATHS FROM THE SOURCE TO THE DESTINATION. REFER TO THE FLOOR PLANS
FOR ADDITIONAL ROUTING REQUIREMENTS.
2. ALL FIBER OPTIC CABLE ROUTING SHOWN ON THIS DIAGRAM ROUTES IN THE
INTERSTITIAL SPACE WHEREVER POSSIBLE. REFER TO THE FLOOR PLANS FOR
ADDITIONAL ROUTING REQUIREMENTS.
KEYNOTES:
1. REFER TO ENLARGED ROOM PLANS FOR ADDITIONAL INFORMATION.
2. REFER TO INTERSTITIAL SPACE FLOORPLANS FOR ADDITIONAL INFORMATION.
3. TR-G-6, TR-1-6, AND TR-2-6 ARE STACKED. THE A LEG FIBER PATHWAY WILL ROUTE
VERTICALLY THROUGH THE TR'S.
4. ALL FIBER OPTICAL CABLING ON THIS DIAGRAM IS FOR REFERENCE ONLY TO
REPRESENT ROUTING. REFER TO THE COPPER AND FIBER DIAGRAM ON T601 FOR
ADDITIONAL INFORMATION AND INSTALLATION REQUIREMENTS.
5. VERTICAL CHASE WILL BE LOCATED IN NEAR BY HAC CLOSETS 021, 131, AND 251.
REFER TO THE RESPECTIVE FLOORPLAN ENLARGEMENTS TN130, TN145, AND
TN160.
6. VERTICAL CHASE IS EXISTING. REFER TO THE INTERSTITIAL PLANS LOCATED ON
THE TN10X.5 DRAWINGS FOR THE EXACT LOCATIONS.
7. A AND B LEG FIBER WILL RUN ALONG THE SAME PATH THROUGH THE INTERSTITIAL
TO TR-G-7. REFER TO TN100.5 FOR ADDITIONAL INFORMATION.
Revisions: Date:
Revision 1 Date 1
SHEET 261 of 431
CABINET 1-1
(HDA A)
L M N P Q R S TKJ
B A
CABINET 1-12
(HDA B)
L1 M1 N1 P1 Q1 R1 S1 T1K1J1
D C
CABINET 2-1
(HDA A)
L2 M2 N2 P2 Q2 R2 S2 T2K2J2
H G
CABINET 2-12
(HDA B)
L3 M3 N3 P3 Q3 R3 S3 T3K3J3
F E
N
N1
P
P1
L
L1
M
M1
J
J1
K
K1
Q
Q1
R
R1
S
S1
T
T1
N2
N3
P2
P3
L2
L3
M2
M3
J2
J3
K2
K3
Q2
Q3
R2
R3
S2
S3
T2
T3
DB
CABINET 1-2 CABINET 1-3 CABINET 1-4 CABINET 1-5 CABINET 1-6 CABINET 1-7 CABINET 1-8 CABINET 1-9 CABINET 1-10 CABINET 1-11
CABINET 2-2 CABINET 2-3 CABINET 2-4 CABINET 2-5 CABINET 2-6 CABINET 2-7 CABINET 2-8 CABINET 2-9 CABINET 2-10 CABINET 2-11
CABINET 3-2
(A SIDE BACKBONE)
HF
AC
CABINET 3-7
(B SIDE BACKBONE)
EG
NUMBER AND ADDRESS
SUITE NO.
CITY, STATE ZIP CODE
P: 555.555.555 F: 555.555.5555 www.imegcorp.com
PROJECT #22006633.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
100%
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
B
IM
/A u d ie L
M u rp h y V
A M e d ic a l C e n te r
(S A
M
E P
T
.0
V A
-S a n A n to n io
T
X -E
H R
M
C .r v t
/1
/2
:3
:2
A
M
T603
DIAGRAMS - TECHNOLOGY
Awen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
06/09/2023
EHRM INFRASTRUCTURE
UPGRADES 1
Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229
671-22-700
NO SCALE
CAMPUS SUPPORT CENTER CONNECTIVITY DIAGRAM
T3 CABINET 2-12 CABINET 2-11 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
S3 CABINET 2-12 CABINET 2-10 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
R3 CABINET 2-12 CABINET 2-9 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
Q3 CABINET 2-12 CABINET 2-8 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
P3 CABINET 2-12 CABINET 2-7 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
N3 CABINET 2-12 CABINET 2-6 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
M3 CABINET 2-12 CABINET 2-5 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
L3 CABINET 2-12 CABINET 2-4 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
K3 CABINET 2-12 CABINET 2-3 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
J3 CABINET 2-12 CABINET 2-2 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
T2 CABINET 2-1 CABINET 2-11 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
S2 CABINET 2-1 CABINET 2-10 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
R2 CABINET 2-1 CABINET 2-9 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
Q2 CABINET 2-1 CABINET 2-8 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
P2 CABINET 2-1 CABINET 2-7 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
N2 CABINET 2-1 CABINET 2-6 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
M2 CABINET 2-1 CABINET 2-5 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
L2 CABINET 2-1 CABINET 2-4 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
K2 CABINET 2-1 CABINET 2-3 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
J2 CABINET 2-1 CABINET 2-2 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
T1 CABINET 1-12 CABINET 1-11 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
S1 CABINET 1-12 CABINET 1-10 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
R1 CABINET 1-12 CABINET 1-9 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
Q1 CABINET 1-12 CABINET 1-8 OM4 MPO / LC (2) 12 STRAND CAT-6A 24
P1 CABINET…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .