S02 - Attachment 1(c) - 671-22-700 DRAWINGS Mechanical.pdf

PDF 9 MB Posted

Attached to
EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) Federal contract opportunity
Solicitation number
36C77623B0064
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This solicitation is for EHRM San Antonio Infrastructure Upgrades Construction services with a SDVOSB set-aside and NAICS code 236220. The solicitation seeks mechanical, electrical, and plumbing construction services at the Audie L Murphy VA Medical Center in San Antonio, Texas, including infrastructure upgrades, mechanical equipment replacement, and data center renovations. The period of performance is 720 calendar days from NTP. The government will issue a firm-fixed-price task order to the responsible SDVOSB offeror whose offer conforming to the solicitation will be most advantageous to the government. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas. The closing date for proposals is listed as July 15, 2023.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS), newest first.
File Type Posted
S07 - Bid Abstract Page 1_OF1419_EHRM San Antonio_6SEP2023.pdf PDF
Amendment 0005_36C77623B0064_31AUG2023.pdf PDF
S02 - Attachment 15 - STX Addendum 1 (Composite).pdf PDF
S02 - Attachment 22 - SF 25 Performance Bond Form.pdf PDF
S02 - Attachment 18 - 320523 Cement and Concrete for Exterior Improvements.pdf PDF
S02 - Attachment 16 - STX Addendum 1.pdf PDF
S02 - Attachment 23 - SF 25A Payment Bond Form.pdf PDF
S02 - Attachment 20 - Addendum 1 - Mechanical.pdf PDF
S02 - Attachment 17 - 075100 Roofing Repair.pdf PDF
Amendment 0003 Attachment Warranty RoofCAD-VA San Antonio-RFI Q100.pdf PDF
Amendment 0003_36C77623B0064_23AUG2023.pdf PDF
S02 - Attachment 6(e) - Mechanical Cut Sheets - Data Center CRAC - N 1 Operation (8000 cfm).pdf PDF
S02 - Attachment 6(a) - Mechanical Cut Sheets - 3.0 Ton Split System.pdf PDF
S02 - Attachment 6(f) - Mechanical Cut Sheets - 2.0 Ton Split System.pdf PDF
S02 - Attachment 6(b) - Mechanical Cut Sheets - Data Center CRAC - Normal Operation (6000 cfm).pdf PDF
S02 - Attachment 6(d) - Mechanical Cut Sheets - Data Center CRAC Dimensions.pdf PDF
Site Visit Attendees Sign-In Sheet_11AUG2023_EHRM San Antonio.xlsx XLSX spreadsheet
Amendment 0001_36C77623B0064_02AUG2023.pdf PDF
S02 - Attachment 8(b) - OIT-InfrastrucStdTelecomSpaces_Part 2 of 3.pdf PDF
S02 - Attachment 8(a) - OIT-InfrastrucStdTelecomSpaces_Part 1 of 3.pdf PDF
S02 - Attachment 7(b) - Technology Cut Sheets - Part 2 of 11 Corning.pdf PDF
S02 - Attachment 7(f) - Technology Cut Sheets - Part 6 of 11 Ortronics.pdf PDF
S02 - Attachment 7(j) - Technology Cut Sheets - Part 10 of 11 HID.pdf PDF
S02 - Attachment 7(e) - Technology Cut Sheets - Part 5 of 11 Leviton.pdf PDF
S02 - Attachment 7(k) - Technology Cut Sheets - Part 11 of 11 Hubbell.pdf PDF
S02 - Attachment 7(i) - Technology Cut Sheets - Part 9 of 11 Cablofil.pdf PDF
S02 - Attachment 4 - 230501 SAT_EHRM_100 percent final TechnicalReport.pdf PDF
Solicitation 36C77623B0064_28JUL2023.pdf PDF
S02 - Attachment 14(b) - Asbestos Survey Results Ground and 5th-7th Floors.pdf PDF
S02 - Attachment 13 - VA OEHRM Site Infrastructure and EUD Reqmts 2.0.pdf PDF
S02 - Attachment 10 - VA Notice Limitations on Subcontracting - Construction (JAN 2023) (DEV).docx DOCX document
S02 - Attachment 7(d) - Technology Cut Sheets - Part 4 of 11 CPI Cabinet.pdf PDF
S02 - Attachment 1(e) - 671-22-700 DRAWINGS Technology.pdf PDF
S02 - Attachment 1(d) - 671-22-700 DRAWINGS Electrical.pdf PDF
S02 - Attachment 2 - 671-22-700 100 percent final BID SPECIFICATIONS.pdf PDF
S02 - Attachment 1(f) 671-22-700 DRAWINGS Physical Security.pdf PDF
S02 - Attachment 8(c) - OIT-InfrastrucStdTelecomSpaces_Part 3 of 3.pdf PDF
S02 - Attachment 7(c) - Technology Cut Sheets - Part 3 of 11 CPI.pdf PDF
S02 - Attachment 7(g) - Technology Cut Sheets - Part 7 of 11 Panduit.pdf PDF
S02 - Attachment 1(b) - 671-22-700 DRAWINGS Architectural.pdf PDF
S02 - Attachment 6 - Mechanical Cut Sheets.pdf PDF
S02 - Attachment 7(a) - Technology Cut Sheets - Part 1 of 11 APC.pdf PDF
S02 - Attachment 3 - 671-22-700 EHRM Infrastructure Upgrades- SOW Construction.pdf PDF
S02 - Attachment 5 - Electrical Cut Sheets.pdf PDF
S02 - Attachment 14(a) - Asbestos Survey Results 1st-4th Floors.pdf PDF
S02 - Attachment 11 - Wage Determination_Bexar CountyTX_14APR2023.pdf PDF
S02 - Attachment 12 - Submittal Register ENG Form 4288-R.pdf PDF
S02 - Attachment 9 - Contractor Safety and Environmental Record Form.docx DOCX document
S02 - Attachment 7(h) - Technology Cut Sheets - Part 8 of 11 Axis.pdf PDF
S02 - Attachment 1(a) - 671-22-700 DRAWINGS General Sheets.pdf PDF
Show all 50

EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H

C

C

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.

CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR

FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO

THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS

RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN

THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES

PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE

BASIS OF DESIGN.

3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL

APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.

4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874

5. INVERT ELEVATIONS ARE FROM EXISTING DRAWINGS AND MAY NOT BE ACCURATE. VERIFY

ALL ELEVATIONS BEFORE BEGINNING WORK.

6. VERIFY UNDERGROUND PIPE SIZES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO

BEGINNING ANY WORK.

7. REFER TO THE PLUMBING ROUGH-IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO

PLUMBING FIXTURES.

8. EXISTING CONDITIONS ON DEMOLITION PLANS ARE PROVIDED TO INDICATE THE GENERAL

SCOPE OF ITEMS TO BE REMOVED. REFER TO SPECIFICATION SECTION 22 05 05 FOR

ADDITIONAL DEMOLITION INFORMATION.

9. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK

UNLESS NOTED OTHERWISE. REFER TO SPECIFICATION SECTION 22 05 05 FOR ADDITIONAL

INFORMATION.

PLUMBING GENERAL NOTES:

1. PIPE DRAIN LINES FROM EQUIPMENT TO NEAREST FLOOR DRAIN.

2. INSTALL ALL REFRIGERANT LIQUID AND SUCTION PIPING SIZED PER EQUIPMENT

MANUFACTURER RECOMMENDATIONS.

PIPING GENERAL NOTES:

1. UNLESS NOTED OTHERWISE, THE SIZE OF EACH BRANCH DUCT TO AN AIR TERMINAL SHALL

MATCH THE INLET SIZE.

2. ALIGN TEMPERATURE SENSORS WITH LIGHT SWITCHES AND WHEN IN CLOSE PROXIMITY TO

EACH OTHER.

VENTILATION GENERAL NOTES:

MECHANICAL GENERAL NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,

AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM

ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR

PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.

3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE

CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO

VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO

VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES

OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING

WITH FABRICATION OR EQUIPMENT ORDERS.

4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE

REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER

ACCESS.

5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO

COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR

EXPENSE TO OTHERS.

6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL

CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF

DESIGN.

7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY

AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING

MOUNTED DEVICES, OTHER THAN SPRINKLERS.

8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,

FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS

RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND

FINISH.

9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE

GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE

PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS

PANELS PRIOR TO BIDDING.

10. SEAL ALL PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING, AND DUCTS PENETRATE.

PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE SEALED AIRTIGHT WITH

WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER FOR OUTDOOR USE.

11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,

PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE

TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS

WITHIN ROOMS.

12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED

OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL

RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.

13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT

MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND

REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,

PIPING, DUCTWORK, ETC.

14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.

15. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL

EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT

LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,

TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.

16. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH

OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE

EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO

THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED

ELECTRICAL SPACE INCLUDING; DUCTWORK, PIPING, ETC.

17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER

NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE

CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.

MECHANICAL RENOVATION NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD

SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND

REPORT ANY CONFLICTS BEFORE PROCEEDING.

2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS

BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.

3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE

FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD

CONDITIONS.

4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF THEIR WORK AND

SHALL NOTIFY THE ARCHITECT/ENGINEER PRIOR TO BIDDING IF OTHER UTILITIES ARE

REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO THEIR AREA OF WORK.

5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF

ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.

CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.

6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF

CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL

CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO

BIDDING.

7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH

NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL

EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT

DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL

SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.

8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING

CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT

REMAIN ACTIVE.

9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY

REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW

SYSTEMS ARE INSTALLED.

10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR

TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND

CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY

DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.

11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT

THAT HAS BEEN REMOVED.

MECHANICAL PHASING NOTES:

THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED

TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE

CONTROL.

1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO

CONSTRUCTION MANAGER'S/GENERAL CONTRACTOR'S/ARCHITECT'S INSTRUCTIONS FOR

MORE DETAILS AND PHASING SCHEDULES AND FOR CONCURRENT WORK. MECHANICAL,

ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT THE INTENT OF THE FINAL DESIGN. THE

MECHANICAL, ELECTRICAL, AND TECHNOLOGY DRAWINGS DO NOT DEPICT THE MEANS AND

METHODS TO MEET THE REQUIREMENTS OF THE PHASING CRITERIA.

2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.

WITH AFFECTED ADJACENT AREAS.

3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE

ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF

PROJECT.

4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP

ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT

5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.

PLAN OR DETAIL NUMBER

PLAN OR DETAIL NAME

PLAN OR DETAIL SCALE

DETAIL REFERRED TO BY SECTION CUT

SHEET DETAIL IS LOCATED ON

NAME

VIEW NAME

1/8" = 1'-0"

M101

SIMSIM

INDICATES SIMILAR DETAIL REFERENCED

IN MULTIPLE LOCATIONS

LEVEL NAME

10'-0" HEIGHT ABOVE

PROJECT 0'-0"

1 INDICATES NOTE USED TO DESCRIBE

ADDITIONAL INFORMATION ABOUT

WORK REQUIRED, SPECIFIC TO THE

SHEET AND/OR DETAIL

VIEW KEY

LINE TYPE AND TAG KEY:

NEW WORK BY THIS CONTRACTOR (WIDE LINE)

NEW

EXISTING TO BE REMOVED (SHORT DASHED PATTERN)

NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)

EXISTING

EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)

EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)

HALFTONING DOES NOT MODIFY SCOPE.

'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING

(SEE TECHNOLOGY CALBING PLAN)

'TAG'-D TAGS WITH DASH 'D' INDICATES THE REFERENCED OBJECT IS DEMOLISHED

(SEE TECHNOLOGY CALBING PLAN)

TAG UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL

INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST

INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL

T101

THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR

SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL

MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.

ALL [FLOOR, FLOOR CEILING, AND ROOF CEILING] ASSEMBLIES SHALL BE DESIGNATED AS [1], [2], [3], [4] HOUR FIRE [/SMOKE], BARRIER(S), UNLESS NOTED OTHERWISE ON THE PLANS. RATINGS

WERE ACQUIRED FROM THE ARCHITECTURAL PLANS DATED [**/**/**].

FIRE / SMOKE BARRIER DESIGNATIONS

1 HOUR FIRE BARRIER

SMOKE BARRIER

1 HOUR FIRE/SMOKE BARRIER

OR SHAFT ENCLOSURE

2 HOUR FIRE/SMOKE BARRIER

OR SHAFT ENCLOSURE

3 HOUR FIRE/SMOKE BARRIER

4 HOUR FIRE/SMOKE BARRIER

SMOKE PARTITION

FIRE PARTITION

2 HOUR FIRE BARRIER OR WALL

3 HOUR FIRE BARRIER OR WALL

4 HOUR FIRE BARRIER OR WALL

TEMPERATURE CONTROLS CONTRACTORT.C.C.

ASBESTOS ABATEMENT CONTRACTOR

FIRE PROTECTION CONTRACTORF.P.C.

HEATING CONTRACTORH.C.

PLUMBING CONTRACTORP.C.

GENERAL CONTRACTORG.C.

MECHANICAL CONTRACTORM.C.

VENTILATION CONTRACTORV.C.

ELECTRICAL CONTRACTORE.C.

A.C.

CONTRACTOR ABBREVIATION KEY

ABBR: DESCRIPTION:

TECHNOLOGY CONTRACTORT.C.

E.O.R ENGINEER OF RECORD

C.O.R. CONTRACTING OFFICER'S REPRESENTATIVE

PLUMBING SLOPE REQUIREMENTS:

INTERIOR:

SANITARY WASTE: ≤2-1/2”ø=1/4” PER FOOT ≥3”ø = 1/8” PER FOOT ≥8”ø = 1/16” PER FOOT

CONDENSATE AND INDIRECT DRAINAGE: 1/8” PER FOOT

DOMESTIC WATER: NO SPECIFIC PITCH, PITCH TO FIXTURES

BASED ON PLUMBING CODE: IPC-2018

1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE

CONTRACTOR. CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS

REQUIRED FOR FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.

2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID

TO THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS

RESPONSIBLE FOR COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND

IN THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL

TAKES PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER IS THE

BASIS OF DESIGN.

3. CENTER SPRINKLERS IN CEILING TILES IN BOTH DIRECTIONS IN ALL AREAS. IN AREAS

WITH 2’X4’ CEILING TILES CENTERING USING A 2’X2’ CEILING PATTERN IS ACCEPTABLE.

SPRINKLER HEADS SHALL BE ALIGNED WITH OTHER SPRINKLER HEADS, LIGHTING,

DIFFUSERS, AND ANY OTHER FEATURES IN THE CEILING.

4. NEW SPRINKLERS SHALL BE QUICK RESPONSE TYPE, UNLESS OTHERWISE NOTED.

CONTRACTOR SHALL NOT MIX STANDARD RESPONSE SPRINKLERS WITH QUICK

RESPONSE SPRINKLERS IN UNPARTITIONED SPACES.

5. FIRE PROTECTION PIPE ROUTING IS SHOWN FOR GENERAL LAYOUT. DETERMINE EXACT

NUMBER OF SPRINKLERS, PIPE SIZING, AND PIPE ROUTING.

6. THE FIRE PROTECTION SYSTEM SHALL BE DESIGNED TO MEET OWNER'S INSURANCE

COMPANY STANDARDS WHERE APPLICABLE. THE MORE STRINGENT OF THE OWNER'S

INSURANCE UNDERWRITER'S DESIGN CRITERIA AND THE NFPA STANDARDS SHALL BE

USED.

7. WHERE FEASIBLE INSTALL PIPES HIGH AS POSSIBLE TO AVOID CONFLICT WITH OTHER

DISCIPLINES.

8. PROVIDE INTERMEDIATE TEMPERATURE SPRINKLER HEADS WHERE REQUIRED BY NFPA

13 UNLESS OTHERWISE NOTED.

9. FINAL HEAD LOCATION, TYPE AND FINISH SHALL BE REVIEWED AND APPROVED BY THE

ARCHITECT.

10. A GRAPHIC ANNUNCIATOR PANEL SHALL BE PROVIDED TO INCLUDE AREAS BEING

PROVIDED WITH A CLEAN AGENT SYSTEM WHICH HAS CONCEALED AREAS.

11. EXACT LOCATION OF THE ALL PANELS SHALL BE VERIFIED ON SITE AND COORDINATED

WITH THE ELECTRICAL CONTRACTOR.

12. PAINT ALL EXPOSED PIPING TO MATCH BACKGROUND OR AS DIRECTED BY THE

ARCHITECT.

13. THE OWNER MUST BE NOTIFIED PRIOR TO EACH AND EVERY DRAINING OR RECHARGING

OF THE SPRINKLER SYSTEM.

14. THE CONTRACTOR SHALL PREPARE A COORDINATED SET OF SHOP DRAWINGS AND

SHALL OBTAIN APPROVAL FROM THE AUTHORITIES HAVING JURISDICTION AND THE

LOCAL FIRE DEPARTMENT PRIOR TO ANY INSTALLATION.

15. DRAWING SHOW LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE

DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.

DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT,

ETC. AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE

INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING

CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.

16. VERIFY ALL DIMENSIONS AND CLEARANCES FROM ARCHITECTURAL, STRUCTURAL,

SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR PHYSICALLY AT SITE. REVIEW

ALL DRAWINGS. INCLUDING THOSE OF OTHER TRADES.

FIRE PROTECTION GENERAL NOTES:

OCCUPANCY SENSORO

HUMIDISTAT SENSOR

CARBON MONOXIDE SENSOR

CARBON DIOXIDE SENSOR

H HUMIDISTAT / SENSOR

TEMPERATURE SENSOR WITH WELL

T

THERMOMETER WITH WELL (DIAL TYPE)T

THERMOMETER WITH WELL (FILLED TYPE)

DIRECTION OF AIR FLOW

FLEXIBLE DUCT

MANUAL VOLUME DAMPER

RISE IN DIRECTION OF AIR FLOWR

DUCT CAP

DROP IN DIRECTION OF AIR FLOWD

DUCT DOWN

DUCT UP

SUPPLY/OUTSIDE AIR DUCT SECTION

RETURN AIR DUCT SECTION

EXHAUST/RELIEF AIR DUCT SECTION

4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION

SD-1

6/115

AIR TERMINAL PROPERTIES SYMBOL

NECK SIZE/CFM

TERMINAL AIR BOX (REFER TO SCHEDULE)###

### TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)

HUMIDIFIERH

OPPOSED BLADE DAMPER (REFER TO SCHEDULE)

PARALLEL BLADE DAMPER (REFER TO SCHEDULE)

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR/MONITORP

PRESSURE SENSOR (DUCT MOUNTED)P

THERMOSTAT/SENSORT

TEMPERATURE SENSORT

THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURET

MECHANICAL SYMBOL LIST

SYMBOL: DESCRIPTION:

AIRFLOW MEASUREMENT SYMBOL

XX - AHU SYMBOL

Y - SEQUENTIAL NUMBER

XX-Y

NOT ALL SYMBOLS MAY APPLY.

FAN POWERED TERMINAL AIR BOX w/REHEAT COIL

(REFER TO SCHEDULE)

CONTROL VALVE (TWO-WAY)

PITCH PIPE IN DIRECTION

DIELECTRIC CONNECTION

UNION/FLANGE

BALANCING VALVE (NUMBER INDICATES GPM)

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

DIRECTION OF FLOW IN PIPE

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

THROTTLING VALVE

AUTOMATIC BALANCING VALVE

MIXING VALVE

CONTROL VALVE (THREE-WAY)

SOLENOID VALVE

CHECK VALVE

SAFETY/RELIEF VALVE

PRESSURE REDUCING VALVE (LIQUID/GAS)

PRESSURE REDUCING VALVE (STEAM)

TRIPLE DUTY VALVE (ANGLE TYPE)

TRIPLE DUTY VALVE (IN-LINE TYPE)

VACUUM BREAKER

"WYE" - STRAINER

"WYE" - STRAINER W/SHUTOFF VALVE AND HOSE CONNECTION WITH CAP

BASKET STRAINER

FLEXIBLE CONNECTION

PRESSURE/TEMPERATURE TEST PLUG

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

SUCTION DIFFUSER WITH SUPPORT FOOT

AUTOMATIC AIR VENT

MANUAL AIR VENT

DRAIN VALVE WITH HOSE CONNECTION AND CAP

BOILER BLOW DOWNBD

BOILER FEED WATERBF

COMPRESSED AIRCA

HEATING/CHILLED WATER RETURNHCR

HIGH PRESSURE CLEAN STEAM (>125 TO 250 PSIG)HCS

CONDENSER WATER RETURNCR

CONDENSER WATER SUPPLYCS

CHILLED WATER RETURNCWR

CHILLED WATER SUPPLYCWS

NATURAL GASG

GLYCOL WATER RETURNGWR

GLYCOL WATER SUPPLYGWS

REFRIGERANT HOT GASHG

HIGH PRESSURE CONDENSATE (>125 TO 250 PSIG)HPC

HEATING WATER RETURNHWR

HEATING WATER SUPPLYHWS

REFRIGERANT LIQUIDLIQ

LOW PRESSURE CONDENSATE (0 TO 15 PSIG)LPC

FUEL OIL RETURNFOR

FUEL OIL SUPPLYFOS

PUMPED CONDENSATEPC

PUMPED DISCHARGEPD

REHEAT WATER RETURNRWR

REHEAT WATER SUPPLYRWS

REFRIGERANT SUCTIONSUC

SAFETY RELIEF VENTSV

HIGH PRESSURE STEAM (>125 TO 250 PSIG)HPS

LOW PRESSURE STEAM (0 TO 15 PSIG)LPS

DRAINDPP

LOW PRESSURE CLEAN STEAM (0 TO 15 PSIG) LCS

LOOP WATER RETURNLWR

LOOP WATER SUPPLYLWS

GAS REGULATOR VENTGV

LAB VACUUMVAC

MEDICAL VACUUMMV

PUMP

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P

MECHANICAL SYMBOL LIST

SYMBOL: DESCRIPTION:

NOT ALL SYMBOLS MAY APPLY.

BACKFLOW PREVENTER

CHILLED BEAM RETURNCBR

CHILLED BEAM SUPPLYCBS

RADIANT COOLING RETURNRCR

RADIANT COOLING SUPPLYRCS

MEDIUM PRESSURE CLEAN STEAM (>15 TO 125 PSIG)MCS

MEDIUM PRESSURE CONDENSATE (>15 TO 125 PSIG)MPC

MEDIUM PRESSURE STEAM (>15 TO 125 PSIG)MPS

REFRIGERANTREF

OCCUPANCY SENSORO

HUMIDISTAT SENSOR

CARBON MONOXIDE SENSOR

CARBON DIOXIDE SENSOR

HUMIDISTAT / SENSOR

TEMPERATURE SENSOR WITH WELL

THERMOMETER WITH WELL (DIAL TYPE)

THERMOMETER WITH WELL (FILLED TYPE)

DIRECTION OF AIR FLOW

FLEXIBLE DUCT

MANUAL VOLUME DAMPER

RISE IN DIRECTION OF AIR FLOWR

DUCT CAP

DROP IN DIRECTION OF AIR FLOWD

DUCT DOWN

DUCT UP

SUPPLY/OUTSIDE AIR DUCT SECTION

RETURN AIR DUCT SECTION

EXHAUST/RELIEF AIR DUCT SECTION

4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION

SD-1

6/115

AIR TERMINAL PROPERTIES SYMBOL

NECK SIZE/CFM

TERMINAL AIR BOX (REFER TO SCHEDULE)

TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)

HUMIDIFIERH

OPPOSED BLADE DAMPER (REFER TO SCHEDULE)

PARALLEL BLADE DAMPER (REFER TO SCHEDULE)

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR/MONITORP

PRESSURE SENSOR (DUCT MOUNTED)P

THERMOSTAT/SENSOR

TEMPERATURE SENSOR

THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURE

AIRFLOW MEASUREMENT SYMBOL

XX - AHU SYMBOL

Y - SEQUENTIAL NUMBER

XX-Y

NOT ALL SYMBOLS MAY APPLY.

FAN POWERED TERMINAL AIR BOX w/REHEAT COIL

(REFER TO SCHEDULE)

CONTROL VALVE (TWO-WAY)

PITCH PIPE IN DIRECTION

DIELECTRIC CONNECTION

UNION/FLANGE

BALANCING VALVE (NUMBER INDICATES GPM)

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

DIRECTION OF FLOW IN PIPE

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

THROTTLING VALVE

AUTOMATIC BALANCING VALVE

MIXING VALVE

CONTROL VALVE (THREE-WAY)

SOLENOID VALVE

CHECK VALVE

SAFETY/RELIEF VALVE

PRESSURE REDUCING VALVE (LIQUID/GAS)

PRESSURE REDUCING VALVE (STEAM)

TRIPLE DUTY VALVE (ANGLE TYPE)

TRIPLE DUTY VALVE (IN-LINE TYPE)

VACUUM BREAKER

"WYE" - STRAINER

"WYE" - STRAINER W/SHUTOFF VALVE AND HOSE CONNECTION WITH CAP

BASKET STRAINER

FLEXIBLE CONNECTION

PRESSURE/TEMPERATURE TEST PLUG

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

SUCTION DIFFUSER WITH SUPPORT FOOT

AUTOMATIC AIR VENT

MANUAL AIR VENT

DRAIN VALVE WITH HOSE CONNECTION AND CAP

BOILER BLOW DOWNBD

BOILER FEED WATERBF

COMPRESSED AIRCA

HEATING/CHILLED WATER RETURNHCR

HIGH PRESSURE CLEAN STEAM (>125 TO 250 PSIG)HCS

CONDENSER WATER RETURNCR

CONDENSER WATER SUPPLYCS

CHILLED WATER RETURNCWR

CHILLED WATER SUPPLYCWS

NATURAL GASG

GLYCOL WATER RETURNGWR

GLYCOL WATER SUPPLYGWS

REFRIGERANT HOT GASHG

HIGH PRESSURE CONDENSATE (>125 TO 250 PSIG)HPC

HEATING WATER RETURNHWR

HEATING WATER SUPPLYHWS

REFRIGERANT LIQUIDLIQ

LOW PRESSURE CONDENSATE (0 TO 15 PSIG)LPC

FUEL OIL RETURNFOR

FUEL OIL SUPPLYFOS

PUMPED CONDENSATEPC

PUMPED DISCHARGEPD

REHEAT WATER RETURNRWR

REHEAT WATER SUPPLYRWS

REFRIGERANT SUCTIONSUC

SAFETY RELIEF VENTSV

HIGH PRESSURE STEAM (>125 TO 250 PSIG)HPS

LOW PRESSURE STEAM (0 TO 15 PSIG)LPS

DRAINDPP

LOW PRESSURE CLEAN STEAM (0 TO 15 PSIG) LCS

LOOP WATER RETURNLWR

LOOP WATER SUPPLYLWS

GAS REGULATOR VENTGV

LAB VACUUMVAC

MEDICAL VACUUMMV

PUMP

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR (FURNISHED WITH BALL VALVE)

NOT ALL SYMBOLS MAY APPLY.

BACKFLOW PREVENTER

CHILLED BEAM RETURNCBR

CHILLED BEAM SUPPLYCBS

RADIANT COOLING RETURNRCR

RADIANT COOLING SUPPLYRCS

MEDIUM PRESSURE CLEAN STEAM (>15 TO 125 PSIG)MCS

MEDIUM PRESSURE CONDENSATE (>15 TO 125 PSIG)MPC

MEDIUM PRESSURE STEAM (>15 TO 125 PSIG)MPS

REFRIGERANTREF

OCCUPANCY SENSORO

HUMIDISTAT SENSOR

CARBON MONOXIDE SENSOR

CARBON DIOXIDE SENSOR

HUMIDISTAT / SENSOR

TEMPERATURE SENSOR WITH WELL

THERMOMETER WITH WELL (DIAL TYPE)

THERMOMETER WITH WELL (FILLED TYPE)

DIRECTION OF AIR FLOW

FLEXIBLE DUCT

MANUAL VOLUME DAMPER

RISE IN DIRECTION OF AIR FLOWR

DUCT CAP

DROP IN DIRECTION OF AIR FLOWD

DUCT DOWN

DUCT UP

SUPPLY/OUTSIDE AIR DUCT SECTION

RETURN AIR DUCT SECTION

EXHAUST/RELIEF AIR DUCT SECTION

4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION

SD-1

6/115

AIR TERMINAL PROPERTIES SYMBOL

NECK SIZE/CFM

TERMINAL AIR BOX (REFER TO SCHEDULE)

TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)

HUMIDIFIERH

OPPOSED BLADE DAMPER (REFER TO SCHEDULE)

PARALLEL BLADE DAMPER (REFER TO SCHEDULE)

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR/MONITORP

PRESSURE SENSOR (DUCT MOUNTED)P

THERMOSTAT/SENSOR

TEMPERATURE SENSOR

THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURE

AIRFLOW MEASUREMENT SYMBOL

XX - AHU SYMBOL

Y - SEQUENTIAL NUMBER

XX-Y

NOT ALL SYMBOLS MAY APPLY.

FAN POWERED TERMINAL AIR BOX w/REHEAT COIL

(REFER TO SCHEDULE)

CONTROL VALVE (TWO-WAY)

PITCH PIPE IN DIRECTION

DIELECTRIC CONNECTION

UNION/FLANGE

BALANCING VALVE (NUMBER INDICATES GPM)

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

DIRECTION OF FLOW IN PIPE

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

THROTTLING VALVE

AUTOMATIC BALANCING VALVE

MIXING VALVE

CONTROL VALVE (THREE-WAY)

SOLENOID VALVE

CHECK VALVE

SAFETY/RELIEF VALVE

PRESSURE REDUCING VALVE (LIQUID/GAS)

PRESSURE REDUCING VALVE (STEAM)

TRIPLE DUTY VALVE (ANGLE TYPE)

TRIPLE DUTY VALVE (IN-LINE TYPE)

VACUUM BREAKER

"WYE" - STRAINER

"WYE" - STRAINER W/SHUTOFF VALVE AND HOSE CONNECTION WITH CAP

BASKET STRAINER

FLEXIBLE CONNECTION

PRESSURE/TEMPERATURE TEST PLUG

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

SUCTION DIFFUSER WITH SUPPORT FOOT

AUTOMATIC AIR VENT

MANUAL AIR VENT

DRAIN VALVE WITH HOSE CONNECTION AND CAP

BOILER BLOW DOWNBD

BOILER FEED WATERBF

COMPRESSED AIRCA

HEATING/CHILLED WATER RETURNHCR

HIGH PRESSURE CLEAN STEAM (>125 TO 250 PSIG)HCS

CONDENSER WATER RETURNCR

CONDENSER WATER SUPPLYCS

CHILLED WATER RETURNCWR

CHILLED WATER SUPPLYCWS

NATURAL GASG

GLYCOL WATER RETURNGWR

GLYCOL WATER SUPPLYGWS

REFRIGERANT HOT GASHG

HIGH PRESSURE CONDENSATE (>125 TO 250 PSIG)HPC

HEATING WATER RETURNHWR

HEATING WATER SUPPLYHWS

REFRIGERANT LIQUIDLIQ

LOW PRESSURE CONDENSATE (0 TO 15 PSIG)LPC

FUEL OIL RETURNFOR

FUEL OIL SUPPLYFOS

PUMPED CONDENSATEPC

PUMPED DISCHARGEPD

REHEAT WATER RETURNRWR

REHEAT WATER SUPPLYRWS

REFRIGERANT SUCTIONSUC

SAFETY RELIEF VENTSV

HIGH PRESSURE STEAM (>125 TO 250 PSIG)HPS

LOW PRESSURE STEAM (0 TO 15 PSIG)LPS

DRAINDPP

LOW PRESSURE CLEAN STEAM (0 TO 15 PSIG) LCS

LOOP WATER RETURNLWR

LOOP WATER SUPPLYLWS

GAS REGULATOR VENTGV

LAB VACUUMVAC

MEDICAL VACUUMMV

PUMP

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR (FURNISHED WITH BALL VALVE)

NOT ALL SYMBOLS MAY APPLY.

BACKFLOW PREVENTER

CHILLED BEAM RETURNCBR

CHILLED BEAM SUPPLYCBS

RADIANT COOLING RETURNRCR

RADIANT COOLING SUPPLYRCS

MEDIUM PRESSURE CLEAN STEAM (>15 TO 125 PSIG)MCS

MEDIUM PRESSURE CONDENSATE (>15 TO 125 PSIG)MPC

MEDIUM PRESSURE STEAM (>15 TO 125 PSIG)MPS

REFRIGERANTREF

OCCUPANCY SENSORO

HUMIDISTAT SENSOR

CARBON MONOXIDE SENSOR

CARBON DIOXIDE SENSOR

HUMIDISTAT / SENSOR

TEMPERATURE SENSOR WITH WELL

THERMOMETER WITH WELL (DIAL TYPE)

THERMOMETER WITH WELL (FILLED TYPE)

DIRECTION OF AIR FLOW

FLEXIBLE DUCT

MANUAL VOLUME DAMPER

RISE IN DIRECTION OF AIR FLOWR

DUCT CAP

DROP IN DIRECTION OF AIR FLOWD

DUCT DOWN

DUCT UP

SUPPLY/OUTSIDE AIR DUCT SECTION

RETURN AIR DUCT SECTION

EXHAUST/RELIEF AIR DUCT SECTION

4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION

SD-1

6/115

AIR TERMINAL PROPERTIES SYMBOL

NECK SIZE/CFM

TERMINAL AIR BOX (REFER TO SCHEDULE)

TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)

HUMIDIFIERH

OPPOSED BLADE DAMPER (REFER TO SCHEDULE)

PARALLEL BLADE DAMPER (REFER TO SCHEDULE)

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR/MONITORP

PRESSURE SENSOR (DUCT MOUNTED)P

THERMOSTAT/SENSOR

TEMPERATURE SENSOR

THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURE

AIRFLOW MEASUREMENT SYMBOL

XX - AHU SYMBOL

Y - SEQUENTIAL NUMBER

XX-Y

NOT ALL SYMBOLS MAY APPLY.

FAN POWERED TERMINAL AIR BOX w/REHEAT COIL

(REFER TO SCHEDULE)

CONTROL VALVE (TWO-WAY)

PITCH PIPE IN DIRECTION

DIELECTRIC CONNECTION

UNION/FLANGE

BALANCING VALVE (NUMBER INDICATES GPM)

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

DIRECTION OF FLOW IN PIPE

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

THROTTLING VALVE

AUTOMATIC BALANCING VALVE

MIXING VALVE

CONTROL VALVE (THREE-WAY)

SOLENOID VALVE

CHECK VALVE

SAFETY/RELIEF VALVE

PRESSURE REDUCING VALVE (LIQUID/GAS)

PRESSURE REDUCING VALVE (STEAM)

TRIPLE DUTY VALVE (ANGLE TYPE)

TRIPLE DUTY VALVE (IN-LINE TYPE)

VACUUM BREAKER

"WYE" - STRAINER

"WYE" - STRAINER W/SHUTOFF VALVE AND HOSE CONNECTION WITH CAP

BASKET STRAINER

FLEXIBLE CONNECTION

PRESSURE/TEMPERATURE TEST PLUG

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

SUCTION DIFFUSER WITH SUPPORT FOOT

AUTOMATIC AIR VENT

MANUAL AIR VENT

DRAIN VALVE WITH HOSE CONNECTION AND CAP

BOILER BLOW DOWNBD

BOILER FEED WATERBF

COMPRESSED AIRCA

HEATING/CHILLED WATER RETURNHCR

HIGH PRESSURE CLEAN STEAM (>125 TO 250 PSIG)HCS

CONDENSER WATER RETURNCR

CONDENSER WATER SUPPLYCS

CHILLED WATER RETURNCWR

CHILLED WATER SUPPLYCWS

NATURAL GASG

GLYCOL WATER RETURNGWR

GLYCOL WATER SUPPLYGWS

REFRIGERANT HOT GASHG

HIGH PRESSURE CONDENSATE (>125 TO 250 PSIG)HPC

HEATING WATER RETURNHWR

HEATING WATER SUPPLYHWS

REFRIGERANT LIQUIDLIQ

LOW PRESSURE CONDENSATE (0 TO 15 PSIG)LPC

FUEL OIL RETURNFOR

FUEL OIL SUPPLYFOS

PUMPED CONDENSATEPC

PUMPED DISCHARGEPD

REHEAT WATER RETURNRWR

REHEAT WATER SUPPLYRWS

REFRIGERANT SUCTIONSUC

SAFETY RELIEF VENTSV

HIGH PRESSURE STEAM (>125 TO 250 PSIG)HPS

LOW PRESSURE STEAM (0 TO 15 PSIG)LPS

DRAINDPP

LOW PRESSURE CLEAN STEAM (0 TO 15 PSIG) LCS

LOOP WATER RETURNLWR

LOOP WATER SUPPLYLWS

GAS REGULATOR VENTGV

LAB VACUUMVAC

MEDICAL VACUUMMV

PUMP

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR (FURNISHED WITH BALL VALVE)

NOT ALL SYMBOLS MAY APPLY.

BACKFLOW PREVENTER

CHILLED BEAM RETURNCBR

CHILLED BEAM SUPPLYCBS

RADIANT COOLING RETURNRCR

RADIANT COOLING SUPPLYRCS

MEDIUM PRESSURE CLEAN STEAM (>15 TO 125 PSIG)MCS

MEDIUM PRESSURE CONDENSATE (>15 TO 125 PSIG)MPC

MEDIUM PRESSURE STEAM (>15 TO 125 PSIG)MPS

REFRIGERANTREF

OCCUPANCY SENSORO

HUMIDISTAT SENSOR

CARBON MONOXIDE SENSOR

CARBON DIOXIDE SENSOR

HUMIDISTAT / SENSOR

TEMPERATURE SENSOR WITH WELL

THERMOMETER WITH WELL (DIAL TYPE)

THERMOMETER WITH WELL (FILLED TYPE)

DIRECTION OF AIR FLOW

FLEXIBLE DUCT

MANUAL VOLUME DAMPER

RISE IN DIRECTION OF AIR FLOWR

DUCT CAP

DROP IN DIRECTION OF AIR FLOWD

DUCT DOWN

DUCT UP

SUPPLY/OUTSIDE AIR DUCT SECTION

RETURN AIR DUCT SECTION

EXHAUST/RELIEF AIR DUCT SECTION

4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION

SD-1

6/115

AIR TERMINAL PROPERTIES SYMBOL

NECK SIZE/CFM

TERMINAL AIR BOX (REFER TO SCHEDULE)

TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)

HUMIDIFIERH

OPPOSED BLADE DAMPER (REFER TO SCHEDULE)

PARALLEL BLADE DAMPER (REFER TO SCHEDULE)

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR/MONITORP

PRESSURE SENSOR (DUCT MOUNTED)P

THERMOSTAT/SENSOR

TEMPERATURE SENSOR

THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURE

AIRFLOW MEASUREMENT SYMBOL

XX - AHU SYMBOL

Y - SEQUENTIAL NUMBER

XX-Y

NOT ALL SYMBOLS MAY APPLY.

FAN POWERED TERMINAL AIR BOX w/REHEAT COIL

(REFER TO SCHEDULE)

CONTROL VALVE (TWO-WAY)

PITCH PIPE IN DIRECTION

DIELECTRIC CONNECTION

UNION/FLANGE

BALANCING VALVE (NUMBER INDICATES GPM)

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

DIRECTION OF FLOW IN PIPE

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

THROTTLING VALVE

AUTOMATIC BALANCING VALVE

MIXING VALVE

CONTROL VALVE (THREE-WAY)

SOLENOID VALVE

CHECK VALVE

SAFETY/RELIEF VALVE

PRESSURE REDUCING VALVE (LIQUID/GAS)

PRESSURE REDUCING VALVE (STEAM)

TRIPLE DUTY VALVE (ANGLE TYPE)

TRIPLE DUTY VALVE (IN-LINE TYPE)

VACUUM BREAKER

"WYE" - STRAINER

"WYE" - STRAINER W/SHUTOFF VALVE AND HOSE CONNECTION WITH CAP

BASKET STRAINER

FLEXIBLE CONNECTION

PRESSURE/TEMPERATURE TEST PLUG

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

SUCTION DIFFUSER WITH SUPPORT FOOT

AUTOMATIC AIR VENT

MANUAL AIR VENT

DRAIN VALVE WITH HOSE CONNECTION AND CAP

BOILER BLOW DOWNBD

BOILER FEED WATERBF

COMPRESSED AIRCA

HEATING/CHILLED WATER RETURNHCR

HIGH PRESSURE CLEAN STEAM (>125 TO 250 PSIG)HCS

CONDENSER WATER RETURNCR

CONDENSER WATER SUPPLYCS

CHILLED WATER RETURNCWR

CHILLED WATER SUPPLYCWS

NATURAL GASG

GLYCOL WATER RETURNGWR

GLYCOL WATER SUPPLYGWS

REFRIGERANT HOT GASHG

HIGH PRESSURE CONDENSATE (>125 TO 250 PSIG)HPC

HEATING WATER RETURNHWR

HEATING WATER SUPPLYHWS

REFRIGERANT LIQUIDLIQ

LOW PRESSURE CONDENSATE (0 TO 15 PSIG)LPC

FUEL OIL RETURNFOR

FUEL OIL SUPPLYFOS

PUMPED CONDENSATEPC

PUMPED DISCHARGEPD

REHEAT WATER RETURNRWR

REHEAT WATER SUPPLYRWS

REFRIGERANT SUCTIONSUC

SAFETY RELIEF VENTSV

HIGH PRESSURE STEAM (>125 TO 250 PSIG)HPS

LOW PRESSURE STEAM (0 TO 15 PSIG)LPS

DRAINDPP

LOW PRESSURE CLEAN STEAM (0 TO 15 PSIG) LCS

LOOP WATER RETURNLWR

LOOP WATER SUPPLYLWS

GAS REGULATOR VENTGV

LAB VACUUMVAC

MEDICAL VACUUMMV

PUMP

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR (FURNISHED WITH BALL VALVE)

NOT ALL SYMBOLS MAY APPLY.

BACKFLOW PREVENTER

CHILLED BEAM RETURNCBR

CHILLED BEAM SUPPLYCBS

RADIANT COOLING RETURNRCR

RADIANT COOLING SUPPLYRCS

MEDIUM PRESSURE CLEAN STEAM (>15 TO 125 PSIG)MCS

MEDIUM PRESSURE CONDENSATE (>15 TO 125 PSIG)MPC

MEDIUM PRESSURE STEAM (>15 TO 125 PSIG)MPS

REFRIGERANTREF

OCCUPANCY SENSORO

HUMIDISTAT SENSOR

CARBON MONOXIDE SENSOR

CARBON DIOXIDE SENSOR

HUMIDISTAT / SENSOR

TEMPERATURE SENSOR WITH WELL

THERMOMETER WITH WELL (DIAL TYPE)

THERMOMETER WITH WELL (FILLED TYPE)

DIRECTION OF AIR FLOW

FLEXIBLE DUCT

MANUAL VOLUME DAMPER

RISE IN DIRECTION OF AIR FLOWR

DUCT CAP

DROP IN DIRECTION OF AIR FLOWD

DUCT DOWN

DUCT UP

SUPPLY/OUTSIDE AIR DUCT SECTION

RETURN AIR DUCT SECTION

EXHAUST/RELIEF AIR DUCT SECTION

4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION

SD-1

6/115

AIR TERMINAL PROPERTIES SYMBOL

NECK SIZE/CFM

TERMINAL AIR BOX (REFER TO SCHEDULE)

TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)

HUMIDIFIERH

OPPOSED BLADE DAMPER (REFER TO SCHEDULE)

PARALLEL BLADE DAMPER (REFER TO SCHEDULE)

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR/MONITORP

PRESSURE SENSOR (DUCT MOUNTED)P

THERMOSTAT/SENSOR

TEMPERATURE SENSOR

THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURE

AIRFLOW MEASUREMENT SYMBOL

XX - AHU SYMBOL

Y - SEQUENTIAL NUMBER

XX-Y

NOT ALL SYMBOLS MAY APPLY.

FAN POWERED TERMINAL AIR BOX w/REHEAT COIL

(REFER TO SCHEDULE)

CONTROL VALVE (TWO-WAY)

PITCH PIPE IN DIRECTION

DIELECTRIC CONNECTION

UNION/FLANGE

BALANCING VALVE (NUMBER INDICATES GPM)

PIPE CAP

PIPE DOWN

PIPE UP OR UP/DOWN

DIRECTION OF FLOW IN PIPE

SHUTOFF VALVE NORMALLY OPEN

SHUTOFF VALVE NORMALLY CLOSED

THROTTLING VALVE

AUTOMATIC BALANCING VALVE

MIXING VALVE

CONTROL VALVE (THREE-WAY)

SOLENOID VALVE

CHECK VALVE

SAFETY/RELIEF VALVE

PRESSURE REDUCING VALVE (LIQUID/GAS)

PRESSURE REDUCING VALVE (STEAM)

TRIPLE DUTY VALVE (ANGLE TYPE)

TRIPLE DUTY VALVE (IN-LINE TYPE)

VACUUM BREAKER

"WYE" - STRAINER

"WYE" - STRAINER W/SHUTOFF VALVE AND HOSE CONNECTION WITH CAP

BASKET STRAINER

FLEXIBLE CONNECTION

PRESSURE/TEMPERATURE TEST PLUG

REDUCER - REFERENCE SPECIFICATION

FOR CONCENTRIC/ECCENTRIC AND FOT/FOB

SUCTION DIFFUSER WITH SUPPORT FOOT

AUTOMATIC AIR VENT

MANUAL AIR VENT

DRAIN VALVE WITH HOSE CONNECTION AND CAP

BOILER BLOW DOWNBD

BOILER FEED WATERBF

COMPRESSED AIRCA

HEATING/CHILLED WATER RETURNHCR

HIGH PRESSURE CLEAN STEAM (>125 TO 250 PSIG)HCS

CONDENSER WATER RETURNCR

CONDENSER WATER SUPPLYCS

CHILLED WATER RETURNCWR

CHILLED WATER SUPPLYCWS

NATURAL GASG

GLYCOL WATER RETURNGWR

GLYCOL WATER SUPPLYGWS

REFRIGERANT HOT GASHG

HIGH PRESSURE CONDENSATE (>125 TO 250 PSIG)HPC

HEATING WATER RETURNHWR

HEATING WATER SUPPLYHWS

REFRIGERANT LIQUIDLIQ

LOW PRESSURE CONDENSATE (0 TO 15 PSIG)LPC

FUEL OIL RETURNFOR

FUEL OIL SUPPLYFOS

PUMPED CONDENSATEPC

PUMPED DISCHARGEPD

REHEAT WATER RETURNRWR

REHEAT WATER SUPPLYRWS

REFRIGERANT SUCTIONSUC

SAFETY RELIEF VENTSV

HIGH PRESSURE STEAM (>125 TO 250 PSIG)HPS

LOW PRESSURE STEAM (0 TO 15 PSIG)LPS

DRAINDPP

LOW PRESSURE CLEAN STEAM (0 TO 15 PSIG) LCS

LOOP WATER RETURNLWR

LOOP WATER SUPPLYLWS

GAS REGULATOR VENTGV

LAB VACUUMVAC

MEDICAL VACUUMMV

PUMP

PRESSURE GAUGE (FURNISHED WITH BALL VALVE)

DIFFERENTIAL PRESSURE SENSOR

PRESSURE SENSOR (FURNISHED WITH BALL VALVE)

NOT ALL SYMBOLS MAY APPLY.

BACKFLOW PREVENTER

CHILLED BEAM RETURNCBR

CHILLED BEAM SUPPLYCBS

RADIANT COOLING RETURNRCR

RADIANT COOLING SUPPLYRCS

MEDIUM PRESSURE CLEAN STEAM (>15 TO 125 PSIG)MCS

MEDIUM PRESSURE CONDENSATE (>15 TO 125 PSIG)MPC

MEDIUM PRESSURE STEAM (>15 TO 125 PSIG)MPS

REFRIGERANTREF

MECHANICAL ABBREVIATION KEY

ABBR: DESCRIPTION:

DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")

DIFFERENTIAL PRESSURE SWITCHDPS

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

NOT IN CONTRACTNIC

CFSD CONTROL/FIRE/SMOKE DAMPER

EA EXHAUST/RELIEF AIR

FD FIRE DAMPER

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FSD FIRE/SMOKE DAMPER

MA MIXED AIR

OA OUTSIDE AIR

RA RETURN AIR

SA SUPPLY AIR

SD SMOKE DAMPER

TRANSFER DUCTTD

UC-1 DOOR UNDERCUT BY OTHERS (1" TYPICAL)

ECFSD EXISTING CONTROL FIRE SMOKE DAMPER

EFD EXISTING FIRE DAMPER

EFSD EXISTING FIRE SMOKE DAMPER

ESD EXISTING SMOKE DAMPER

TERMINAL AIR BOXTAB

TYPICALTYP

UON UNLESS OTHERWISE NOTES

NORMALLY CLOSEDN.C.

NORMALLY OPENN.O.

PRESSURE SWITCHPS

MIXING VALVEMV

ELECTRICAL TO PNEUMATIC VALVEEP

CO CLEANOUT

C COMMON

SCCR SHORT CIRCUIT CURRENT RATING

DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")

DIFFERENTIAL PRESSURE SWITCHDPS

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

NOT IN CONTRACTNIC

CFSD CONTROL/FIRE/SMOKE DAMPER

EA EXHAUST/RELIEF AIR

FD FIRE DAMPER

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FSD FIRE/SMOKE DAMPER

MA MIXED AIR

OA OUTSIDE AIR

RA RETURN AIR

SA SUPPLY AIR

SD SMOKE DAMPER

TRANSFER DUCTTD

UC-1 DOOR UNDERCUT BY OTHERS (1" TYPICAL)

ECFSD EXISTING CONTROL FIRE SMOKE DAMPER

EFD EXISTING FIRE DAMPER

EFSD EXISTING FIRE SMOKE DAMPER

ESD EXISTING SMOKE DAMPER

TERMINAL AIR BOXTAB

TYPICALTYP

UON UNLESS OTHERWISE NOTES

NORMALLY CLOSEDN.C.

NORMALLY OPENN.O.

PRESSURE SWITCHPS

MIXING VALVEMV

ELECTRICAL TO PNEUMATIC VALVEEP

CO CLEANOUT

C COMMON

SCCR SHORT CIRCUIT CURRENT RATING

DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")

DIFFERENTIAL PRESSURE SWITCHDPS

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

NOT IN CONTRACTNIC

CFSD CONTROL/FIRE/SMOKE DAMPER

EA EXHAUST/RELIEF AIR

FD FIRE DAMPER

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FSD FIRE/SMOKE DAMPER

MA MIXED AIR

OA OUTSIDE AIR

RA RETURN AIR

SA SUPPLY AIR

SD SMOKE DAMPER

TRANSFER DUCTTD

UC-1 DOOR UNDERCUT BY OTHERS (1" TYPICAL)

ECFSD EXISTING CONTROL FIRE SMOKE DAMPER

EFD EXISTING FIRE DAMPER

EFSD EXISTING FIRE SMOKE DAMPER

ESD EXISTING SMOKE DAMPER

TERMINAL AIR BOXTAB

TYPICALTYP

UON UNLESS OTHERWISE NOTES

NORMALLY CLOSEDN.C.

NORMALLY OPENN.O.

PRESSURE SWITCHPS

MIXING VALVEMV

ELECTRICAL TO PNEUMATIC VALVEEP

CO CLEANOUT

C COMMON

SCCR SHORT CIRCUIT CURRENT RATING

DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")

DIFFERENTIAL PRESSURE SWITCHDPS

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

NOT IN CONTRACTNIC

CFSD CONTROL/FIRE/SMOKE DAMPER

EA EXHAUST/RELIEF AIR

FD FIRE DAMPER

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FSD FIRE/SMOKE DAMPER

MA MIXED AIR

OA OUTSIDE AIR

RA RETURN AIR

SA SUPPLY AIR

SD SMOKE DAMPER

TRANSFER DUCTTD

UC-1 DOOR UNDERCUT BY OTHERS (1" TYPICAL)

ECFSD EXISTING CONTROL FIRE SMOKE DAMPER

EFD EXISTING FIRE DAMPER

EFSD EXISTING FIRE SMOKE DAMPER

ESD EXISTING SMOKE DAMPER

TERMINAL AIR BOXTAB

TYPICALTYP

UON UNLESS OTHERWISE NOTES

NORMALLY CLOSEDN.C.

NORMALLY OPENN.O.

PRESSURE SWITCHPS

MIXING VALVEMV

ELECTRICAL TO PNEUMATIC VALVEEP

CO CLEANOUT

C COMMON

SCCR SHORT CIRCUIT CURRENT RATING

DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")

DIFFERENTIAL PRESSURE SWITCHDPS

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

NOT IN CONTRACTNIC

CFSD CONTROL/FIRE/SMOKE DAMPER

EA EXHAUST/RELIEF AIR

FD FIRE DAMPER

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FSD FIRE/SMOKE DAMPER

MA MIXED AIR

OA OUTSIDE AIR

RA RETURN AIR

SA SUPPLY AIR

SD SMOKE DAMPER

TRANSFER DUCTTD

UC-1 DOOR UNDERCUT BY OTHERS (1" TYPICAL)

ECFSD EXISTING CONTROL FIRE SMOKE DAMPER

EFD EXISTING FIRE DAMPER

EFSD EXISTING FIRE SMOKE DAMPER

ESD EXISTING SMOKE DAMPER

TERMINAL AIR BOXTAB

TYPICALTYP

UON UNLESS OTHERWISE NOTES

NORMALLY CLOSEDN.C.

NORMALLY OPENN.O.

PRESSURE SWITCHPS

MIXING VALVEMV

ELECTRICAL TO PNEUMATIC VALVEEP

CO CLEANOUT

C COMMON

SCCR SHORT CIRCUIT CURRENT RATING

DIFFERENTIAL PRESSURE GAUGE (RANGE)DPG (0-2")

DIFFERENTIAL PRESSURE SWITCHDPS

AD ACCESS DOOR

ABOVE FINISHED FLOORAFF

NOT IN CONTRACTNIC

CFSD CONTROL/FIRE/SMOKE DAMPER

EA EXHAUST/RELIEF AIR

FD FIRE DAMPER

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FSD FIRE/SMOKE DAMPER

MA MIXED AIR

OA OUTSIDE AIR

RA RETURN AIR

SA SUPPLY AIR

SD SMOKE DAMPER

TRANSFER DUCTTD

UC-1 DOOR UNDERCUT BY OTHERS (1" TYPICAL)

ECFSD EXISTING CONTROL FIRE SMOKE DAMPER

EFD EXISTING FIRE DAMPER

EFSD EXISTING FIRE SMOKE DAMPER

ESD EXISTING SMOKE DAMPER

TERMINAL AIR BOXTAB

TYPICALTYP

UON UNLESS OTHERWISE NOTES

NORMALLY CLOSEDN.C.

NORMALLY OPENN.O.

PRESSURE SWITCHPS

MIXING VALVEMV

ELECTRICAL TO PNEUMATIC VALVEEP

CO CLEANOUT

C COMMON

SCCR SHORT CIRCUIT CURRENT RATING

APPLICABLE CODES AND STANDARDS:

THE DESIGN CRITERIA FOR THIS PROJECT SHALL CONSIST OF THE FOLLOWING LIST OF

DOCUMENTS:

1. PG-18-1, MASTER CONSTRUCTION SPECIFICATION INDEX

2. VHA REQUIRED DIVISION 01 SPECIFICATION SECTION LIST (SOW ATTACHMENT 01)

3. PG-18-3, DESIGN AND CONSTRUCTION PROCEDURES

4. PG-18-4, STANDARD DETAILS AND CAD STANDARDS

5. PG-18-5, EQUIPMENT GUIDE LIST

6. H-18-8 SEISMIC DESIGN HANDBOOK

7. PG-18-9, SPACE PLANNING CRITERIA

8. PG-18-10, DESIGN MANUALS (BY DISCIPLINE)

9. PG-18-12, DESIGN GUIDES (GRAPHICAL, BY FUNCTION)

10. PG-18-13, BARRIER-FREE DESIGN GUIDE

11. PG-18-14, ROOM FINISHES, DOOR, AND HARDWARE SCHEDULES

12. PG-18-15, A-E SUBMISSION REQUIREMENTS

13. PG-18-17, NEPA INTERIM GUIDANCE FOR PROJECTS

14. H-7545, VA CULTURAL RESOURCE MANAGEMENT PROCEDURES

15. OIT INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES

16. 00 VA OEHRM SITE INFRASTRUCTURE REQUIREMENTS V2.0 (SOW ATTACHMENT 02)

17. HEPF SEP (SOCAMES 6) DESIGN ALERTS 1-4 (SOW ATTACHMENT 03)

NUMBER AND ADDRESS

SUITE NO.

CITY, STATE ZIP CODE

P: 555.555.555 F: 555.555.5555 www.imegcorp.com

PROJECT #22006633.00

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

M

E P

T

.0

V A

-S a n A n to n io

T

X -E

H R

M

C .r v t

/1

/2

:1

:2

A

M

M000

MECHANICAL COVERSHEET

Awen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L Murphy VA Medical Center (San Antonio) 7400 Merton Minter, San Antonio, TX 78229

671-22-700

MECHANICAL SHEET INDEX

M000 MECHANICAL COVERSHEET

M500 MECHANICAL DETAILS

M600 MECHANICAL SCHEDULES

M700 CONTROL DIAGRAMS

MD100 GROUND LEVEL DEMOLITION PLAN - MECHANICAL - OVERALL

MD101 1ST FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL

MD102 2ND FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL

MD103 3RD FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL

MD104 4TH FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL

MD105 5TH FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL

MD106 6TH FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL

MD107 7TH FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL

MD400 1ST FLOOR - DATA CENTER - MECHANICAL - ENLARGED DEMOLITION PLANS

MN100 GROUND LEVEL PLAN - MECHANICAL - OVERALL

MN101 1ST FLOOR PLAN - MECHANICAL - OVERALL

MN102 2ND FLOOR PLAN - MECHANICAL - OVERALL

MN103 3RD FLOOR PLAN - MECHANICAL - OVERALL

MN104 4TH FLOOR PLAN - MECHANICAL - OVERALL

MN105 5TH FLOOR PLAN - MECHANICAL - OVERALL

MN106 6TH FLOOR PLAN - MECHANICAL - OVERALL

MN107 7TH FLOOR PLAN - MECHANICAL - OVERALL

MN400 GROUND LEVEL - TR C015.1 - MECHANICAL - ENLARGED PLANS

MN401 GROUND LEVEL - TR GB126.1 - MECHANICAL - ENLARGED PLANS

MN402 GROUND LEVEL - TR F004 - MECHANICAL - ENLARGED PLANS

MN403 GROUND LEVEL - TR 030 - MECHANICAL - ENLARGED PLANS

MN404 GROUND LEVEL - TR L010.2 - MECHANICAL - ENLARGED PLANS

MN405 GROUND LEVEL - TR 1A138 - MECHANICAL - ENLARGED PLANS

MN406 1ST FLOOR - TR G101 - MECHANICAL - ENLARGED PLANS

MN407 1ST FLOOR - TR 119.2 - MECHANICAL - ENLARGED PLANS

MN408 1ST FLOOR - TR H118.2 - MECHANICAL - ENLARGED PLANS

MN409 1ST FLOOR - TR P125 - MECHANICAL - ENLARGED PLANS

MN410 1ST FLOOR - TR 105 - MECHANICAL - ENLARGED PLANS

MN411 1ST FLOOR - TR J104 - MECHANICAL - ENLARGED PLANS

MN412 1ST FLOOR - TR S101R - MECHANICAL - ENLARGED PLANS

MN413 1ST FLOOR - TR 2A137 - MECHANICAL - ENLARGED PLANS

MN414 1ST FLOOR - Y102.7 - MECHANICAL - ENLARGED PLANS

MN415 2ND FLOOR - TR Z221.28A - MECHANICAL - ENLARGED PLANS

MN416 2ND FLOOR - TR A200 - MECHANICAL - ENLARGED PLANS

MN417 2ND FLOOR - TR SP238 - MECHANICAL - ENLARGED PLANS

MN418 2ND FLOOR - TR R201 - MECHANICAL - ENLARGED PLANS

MN419 3RD FLOOR - TR D320 - MECHANICAL - ENLARGED PLANS

MN420 4TH FLOOR - TR C402 - MECHANICAL - ENLARGED PLANS

MN421 5TH FLOOR - TR C511 - MECHANICAL - ENLARGED PLANS

MN422 6TH FLOOR - TR C602.1 - MECHANICAL - ENLARGED PLANS

MN423 7TH FLOOR - TR A702.1 - MECHANICAL - ENLARGED PLANS

MN424 1ST FLOOR - DATA CENTER - MECHANICAL - ENLARGED NEW WORK PLANS

GRAND TOTAL: 46

Revisions: Date:

04/28/2023

SHEET 137 of 431

6" MIN.

M

IN

8" Ø PIERS MAXIMUM

48" APART.

UNIT WIDTH +12"

CONDENSING

U N

IT

L

E N

G T

H

C O

N D

E N

S

IN

G

6x6-W2.9xW2.9 WWF

WIRE MESH

M

IN

M

IN

M

IN

M

IN

GRADE

(1) - #4

REBAR

12"

REINFORCED

CONCRETE POURED IN

PLACE & TROWELED

SMOOTH.

8" Ø PIERS MAXIMUM

48" APART.

6x6-W2.9xW2.9 WWF

WIRE MESH

GRADE

(1) - #4

REBAR

12"

8" Ø PIERS MAXIMUM

48" APART.

6x6-W2.9xW2.9 WWF

WIRE MESH

GRADE

(1) - #4

REBAR

12"

6x6-W2.9xW2.9 WWF

WIRE MESH

GRADE

(1) - #4

REBAR

12"

6x6-W2.9xW2.9 WWF

WIRE MESH

GRADE

(1) - #4

REBAR

12"

6x6-W2.9xW2.9 WWF

WIRE MESH

GRADE

(1) - #4

REBAR

12"

ELASTOFORM FLASHING

CADMIUM PLATED LAG SCREWS 12" O.C.

PIPING

COVER BOTTOM OF CURB

OPENING WITH MINIMUM 18

GAUGE SHEETMETAL.

PREFABRICATED CURB

WITH WOOD NAILER.

18 GAUGE GALVANIZED SHEETMETAL

BOX WITH SOLDERED JOINTS.

GALVANIZED SHEETMETAL CAP. CROSS

BREAK TO PROVIDE DRAINAGE. FASTEN

CAP TO BOX WITH SHEETMETAL SCREWS.

SEAL JOINT WITH SILICONE CAULKING.

PIPE SLEEVE SOLDERED

TO SHEET METAL BOX.

SEAL PIPING WATERTIGHT

BY CAULKING BETWEEN

PIPE & SHEETMETAL

SLEEVE WITH SILICONE

CAULK.

CURB HEIGHT 12"

ABOVE ROOF DECK

SINGLE MEMBRANE

ROOFING.

FRAMING, ROOF, &

ROOFING BY G.C.

10"MIN

MIN.

6"

BATT INSULATION.

PROVIDE THICKNESS

TO MATCH ROOF

INSULATION. MINIMUM

OF 6" THICK

ELASTOFORM FLASHING

CADMIUM PLATED LAG SCREWS 12" O.C.

PIPING

COVER BOTTOM OF CURB

OPENING WITH MINIMUM 18

GAUGE SHEETMETAL.

18 GAUGE GALVANIZED SHEETMETAL

BOX WITH SOLDERED JOINTS.

GALVANIZED SHEETMETAL CAP. CROSS

BREAK TO PROVIDE DRAINAGE. FASTEN

CAP TO BOX WITH SHEETMETAL SCREWS.

SEAL JOINT WITH SILICONE CAULKING.

PIPE SLEEVE SOLDERED

TO SHEET METAL BOX.

SEAL PIPING WATERTIGHT

BY CAULKING BETWEEN

PIPE & SHEETMETAL

SLEEVE WITH SILICONE

CAULK.

CURB HEIGHT 12"

ABOVE ROOF DECK

SINGLE MEMBRANE

ROOFING.

ELASTOFORM FLASHING

CADMIUM PLATED LAG SCREWS 12" O.C.

PIPING

COVER BOTTOM OF CURB

OPENING WITH MINIMUM 18

GAUGE SHEETMETAL.

18 GAUGE GALVANIZED SHEETMETAL

BOX WITH SOLDERED JOINTS.

GALVANIZED SHEETMETAL CAP. CROSS

BREAK TO PROVIDE DRAINAGE. FASTEN

CAP TO BOX WITH SHEETMETAL SCREWS.

SEAL JOINT WITH SILICONE CAULKING.

PIPE SLEEVE SOLDERED

TO SHEET METAL BOX.

SEAL PIPING WATERTIGHT

BY CAULKING BETWEEN

PIPE & SHEETMETAL

SLEEVE WITH SILICONE

CAULK.

CURB HEIGHT 12"

ABOVE ROOF DECK

SINGLE MEMBRANE

ROOFING.

ELASTOFORM FLASHING

CADMIUM PLATED LAG SCREWS 12" O.C.

PIPING

COVER BOTTOM OF CURB

OPENING WITH MINIMUM 18

GAUGE SHEETMETAL.

18 GAUGE GALVANIZED SHEETMETAL

BOX WITH SOLDERED JOINTS.

GALVANIZED SHEETMETAL CAP. CROSS

BREAK TO PROVIDE DRAINAGE. FASTEN

CAP TO BOX WITH SHEETMETAL SCREWS.

SEAL JOINT WITH SILICONE CAULKING.

PIPE SLEEVE SOLDERED

TO SHEET METAL BOX.

SEAL PIPING WATERTIGHT

BY CAULKING BETWEEN

PIPE & SHEETMETAL

SLEEVE WITH SILICONE

CAULK.

CURB HEIGHT 12"

ABOVE ROOF DECK

SINGLE MEMBRANE

ROOFING.

ELASTOFORM FLASHING

CADMIUM PLATED LAG SCREWS 12" O.C.

PIPING

COVER BOTTOM OF CURB

OPENING WITH MINIMUM 18

GAUGE SHEETMETAL.

18 GAUGE GALVANIZED SHEETMETAL

BOX WITH SOLDERED JOINTS.

GALVANIZED SHEETMETAL CAP. CROSS

BREAK TO PROVIDE DRAINAGE. FASTEN

CAP TO BOX WITH SHEETMETAL SCREWS.

SEAL JOINT WITH SILICONE CAULKING.

PIPE SLEEVE SOLDERED

TO SHEET METAL BOX.

SEAL PIPING WATERTIGHT

BY CAULKING BETWEEN

PIPE & SHEETMETAL

SLEEVE WITH SILICONE

CAULK.

CURB HEIGHT 12"

ABOVE ROOF DECK

SINGLE MEMBRANE

ROOFING.

ELASTOFORM FLASHING

CADMIUM PLATED LAG SCREWS 12" O.C.

PIPING

COVER BOTTOM OF CURB

OPENING WITH MINIMUM 18

GAUGE SHEETMETAL.

18 GAUGE GALVANIZED SHEETMETAL

BOX WITH SOLDERED JOINTS.

GALVANIZED SHEETMETAL CAP. CROSS

BREAK TO PROVIDE DRAINAGE. FASTEN

CAP TO BOX WITH SHEETMETAL SCREWS.

SEAL JOINT WITH SILICONE CAULKING.

PIPE SLEEVE SOLDERED

TO SHEET METAL BOX.

SEAL PIPING WATERTIGHT

BY CAULKING BETWEEN

PIPE & SHEETMETAL

SLEEVE WITH SILICONE

CAULK.

CURB HEIGHT 12"

ABOVE ROOF DECK

SINGLE MEMBRANE

ROOFING.

9-24 MBH AIR COOLED

CONDENSING UNIT

5/16" ZINC-PLATED LAG

SCREWS. (TYP. 4)

MOUNTING FEET (TYP.)

INSULATION AND

ROOFING

ROOF STRUCTURE

PREFABRICATED EQUIPMENT

SUPPORT CURB (TYP). VERIFY

ROOFING MATERIAL AND PROVIDE

WITH OR WITHOUT CANT AS

REQUIRED.

TOP OF CURB

CURB HEIGHT

12" ABOVE

ROOF DECK

9-24 MBH AIR COOLED

CONDENSING UNIT

5/16" ZINC-PLATED LAG

SCREWS. (TYP. 4)

MOUNTING FEET (TYP.)

9-24 MBH AIR COOLED

CONDENSING UNIT

5/16" ZINC-PLATED LAG

SCREWS. (TYP. 4)

MOUNTING FEET (TYP.)

9-24 MBH AIR COOLED

CONDENSING UNIT

5/16" ZINC-PLATED LAG

SCREWS. (TYP. 4)

MOUNTING FEET (TYP.)

NOTES:

1. VERIFY DIAMETER OF ANCHOR BOLT REQUIRED TO FIT WITHIN MOUNTING FEET ANCHOR HOLES.

9-24 MBH AIR COOLED

CONDENSING UNIT

5/16" ZINC-PLATED LAG

SCREWS. (TYP. 4)

MOUNTING FEET (TYP.)

9-24 MBH AIR COOLED

CONDENSING UNIT

5/16" ZINC-PLATED LAG

SCREWS. (TYP. 4)

MOUNTING FEET (TYP.)

OVERSIZE HANGER TO ALLOW LONGITUDINAL

PIPE EXPANSION AND PIPE INSULATION TO

PASS THROUGH UNBROKEN (TYP)

INSULATION SHIELD [AND ROLLED SUPPORT

PLATE AS REQUIRED PER SPECS]

THREADED ROD

INSULATION

CLEVIS HANGER

HIGH DENSITY INSULATION INSERT

FOR 1 1/2" PIPES AND LARGER

AS REQUIRED IN SPECIFICATIONS

INSULATION SHIELD (TYP)

BOLT (TYP)

PIPE

RISER CLAMP

PIPE SLEEVE

PLAN

BOLT (TYP)

FIRESTOPPING

MATERIAL. REFER

TO SPECS

FLOOR SLAB PIPE SLEEVE

RISER CLAMP

RISER

INSULATION

ELEVATION

FIRESTOPPING

MATERIAL. REFER

TO SPECS

FLOOR SLAB

INSULATION PIPE SLEEVE

INSULATE CLAMP AND

BOLTS WITH ELASTOMERIC

FOAM. SEAL ALL

INSULATION VAPOR TIGHTRISER

PLAN

RISER CLAMP

NEOPRENE MOUNT

BENEATH RISER CLAMP

RISER CLAMP

PIPE SLEEVE

PIPE

BOLT (TYP)

ELEVATION

INSULATED COLD PIPE RISER SUPPORTINSULATED HOT PIPE RISER SUPPORT

WELD LUG OR HUB TO PIPE

INSULATED COLD PIPE HANGER

UNI-STRUT OR EQUIVALENT

HIGH DENSITY INSULATION INSERT

FOR 1 1/2" PIPES AND LARGER

AS REQUIRED IN SPECIFICATIONS

THREADED ROD (TYP)

PIPE INSULATION (TYP)

TRAPEZE HANGER

TOP OF SUPPORT APPLICATION

BOTTOM OF SUPPORT APPLICATION

INSTALL CLAMP ON ALL

PIPES LESS THAN 4"Ø

FIRE SEALANT

FIRE SEALANT

NOTE 2

NOTE 3

PENETRATING ITEM

NOTE 4

NOTE 3

NOTE 4

PENETRATING ITEM

NOTE 2

NOTE 3

RATED WALL

(CONSTRUCTION

VARIES)

RATED FLOOR

(CONSTRUCTION

VARIES)

NOTES:

1. THIS GENERAL DETAIL APPLIES TO ALL ITEMS PENETRATING FIRE RATED WALLS OR FLOORS. THE INTENT IS TO MAINTAIN THE FIRE RATING AND TO ALLOW LONGITUDINAL MOVEMENT. REFER TO SPECIFICATION SECTION 07840 (07 84 00) (SECTION 21 05 03 - FIRE PROTECTION, SECTION 22 05 03 - PLUMBING , SECTION 23 05 03 - HVAC) FOR SELECTION OF THROUGH PENETRATION FIRE STOPPING.

2. SCHEDULE 5 PIPE SLEEVE EMBEDDED IN WALL OR FLOOR, OR SMOOTH CORE DRILL. EACH CONTRACTOR FURNISHES SLEEVE TO G.C., COORDINATES SLEEVE LOCATIONS AND DEBURS SLEEVE. G.C. BUILDS SLEEVE INTO WALL OR FLOOR ALLOWING NO GAP AROUND SLEEVE.

IF SLEEVE IS NOT PROVIDED WHEN WALL OR FLOOR IS BUILT, CONTRACTOR SHALL INSTALL SLEEVE. SLEEVE SIZE SHALL ALLOW ANNULAR

SPACE REQUIRED BY THE SELECTED FIRE STOP SYSTEM.

3. INSTALL BACKING MATERIAL, SUCH AS MINERAL WOOL SAFING, AS REQUIRED FOR FIRE STOP SYSTEM. INSTALL IN ACCORDANCE WITH FIRE STOP SYSTEM APPLICATION LISTING. SECURE TO WALL OR FLOOR TO ALLOW LONGITUDINAL MOVEMENT OF PENETRATING ITEM WITHOUT

MOVEMENT OF FIRE BARRIER.

4. WATERTIGHT WELDED 1"x1" 20 GAUGE MINIMUM GALVANIZED SHEET METAL ANGLE FRAME, BY CONTRACTOR IN EQUIPMENT ROOMS FOR WATER STOP. PLACE A BEAD OF WATERPROOF SEALANT BETWEEN FLOOR AND BOTTOM OF ANGLE FRAME. SECURE TO FLOOR WITH MASONRY ANCHORS IN CORNERS AND ON 12" MAXIMUM CENTERS. MULTIPLE PENETRATING ITEMS MAY BE ENCLOSED IN ONE FRAME.

DUCT LINER (REFER TO

SPECIFICATION SECTION

23 31 00 - DUCTWORK)

REFER TO DRAWING

FOR SIZE

FLOOR OR ROOF

CEILING

WALL

X

/2

X

6".

D1>D2

45 DEGREE

BUTT FLANGE

STRAIGHT TAP

ENTRY Θ 45°

45 DEGREE CONICAL

CLINCH LOCK

CORNER FILLER

PIECE OR USE

GASKET (TYP.)

45 DEGREE LEAD IN

DOVETAIL JOINT

LINED DUCT CONNECTION

(NO EXPOSED LINER EDGES)

DUCT LINER

FLANGED

NOTE:STRAIGHT TAP WITH BUTT

FLANGE FOR BRANCH AND TEE

CONNECTION IN RECTANGULAR DUCTS

UNDER 1" PRESSURE CLASS ONLY.

ENTRY Θ 45°

D

W

L

Θ

D

(L = 4" OR W/4; WHICHEVER IS LARGER)

NOTES:

1. DO NOT USE CONNECTIONS WITH SCOOPS.

2. FIT ALL CONNECTIONS TO AVOID VISIBLE OPENINGS AND SECURE THEM

SUITABLY FOR THE PRESSURE CLASS.

3. ADDITIONAL MECHANICAL FASTENERS ARE REQUIRED FOR 4"W.G. AND OVER.

4. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

RECTANGULAR

MITERED ELBOW

WITH VANES

TYPE RE2

RECTANGULAR

MITERED ELBOW

TYPE RE6

USE ONLY AS PART OF OFFSETS

AND TRANSITIONS PER FIGURE 4-7

TYPE 2 OR AS SHOWN ON

DRAWINGS. OFFSETS ABOVE 30°

SHALL BE TYPE RE1.

RECTANGULAR

RADIUS ELBOW

TYPE RE1

R/W = 1.0 (MINIMUM)

R/W < 1.0 SHALL BE TYPE

RE3

RECTANGULAR

RADIUS ELBOW WITH VANES

TYPE RE3

REFER TO SMACNA HVAC SYSTEMS DUCT DESIGN MANUAL,

FOURTH EDITION, SECTION 5.14 "SPLITTER VANES" AND SMACNA

HVAC DUCT CONSTRUCTION STANDARDS, THIRD EDITION,

FIGURES 4-2 AND 4-9 AND CHARTS 4-1 AND 4-1M. ELBOW SHALL

HAVE THREE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .