Amendment 0005_36C77623B0064_31AUG2023.pdf

PDF 97 KB Posted

Attached to
EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) Federal contract opportunity
Solicitation number
36C77623B0064
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This amendment modifies a solicitation for the EHRM San Antonio Infrastructure Upgrades Construction project. The project involves upgrading infrastructure at the Audie L. Murphy Memorial Veterans' Hospital in San Antonio, Texas to support an electronic health record modernization. The amendment extends the bid due date from 1:00 pm Eastern Time to 3:00 pm Eastern Time on September 6, 2023. The bid opening is rescheduled from 1:30 pm to 4:00 pm Eastern Time that same day. Additional questions from prospective bidders are answered, including clarifying UPS specifications and confirming a battery discharge time of 20 minutes. Bidders must include a completed Attachment 24 - Bid Breakdown Table with their response to allow for a price analysis to determine fair and reasonable pricing. The solicitation is set aside for service-disabled veteran-owned small businesses and uses NAICS code 236220 for construction of other new nonresidential structures. The Department of Veterans Affairs Technology Acquisition Center in Austin is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS), newest first.
File Type Posted
S07 - Bid Abstract Page 1_OF1419_EHRM San Antonio_6SEP2023.pdf PDF
S02 - Attachment 15 - STX Addendum 1 (Composite).pdf PDF
S02 - Attachment 22 - SF 25 Performance Bond Form.pdf PDF
S02 - Attachment 18 - 320523 Cement and Concrete for Exterior Improvements.pdf PDF
S02 - Attachment 16 - STX Addendum 1.pdf PDF
S02 - Attachment 23 - SF 25A Payment Bond Form.pdf PDF
S02 - Attachment 20 - Addendum 1 - Mechanical.pdf PDF
S02 - Attachment 17 - 075100 Roofing Repair.pdf PDF
Amendment 0003 Attachment Warranty RoofCAD-VA San Antonio-RFI Q100.pdf PDF
Amendment 0003_36C77623B0064_23AUG2023.pdf PDF
S02 - Attachment 6(e) - Mechanical Cut Sheets - Data Center CRAC - N 1 Operation (8000 cfm).pdf PDF
S02 - Attachment 6(a) - Mechanical Cut Sheets - 3.0 Ton Split System.pdf PDF
S02 - Attachment 6(f) - Mechanical Cut Sheets - 2.0 Ton Split System.pdf PDF
S02 - Attachment 6(b) - Mechanical Cut Sheets - Data Center CRAC - Normal Operation (6000 cfm).pdf PDF
S02 - Attachment 6(d) - Mechanical Cut Sheets - Data Center CRAC Dimensions.pdf PDF
Site Visit Attendees Sign-In Sheet_11AUG2023_EHRM San Antonio.xlsx XLSX spreadsheet
Amendment 0001_36C77623B0064_02AUG2023.pdf PDF
S02 - Attachment 8(b) - OIT-InfrastrucStdTelecomSpaces_Part 2 of 3.pdf PDF
S02 - Attachment 8(a) - OIT-InfrastrucStdTelecomSpaces_Part 1 of 3.pdf PDF
S02 - Attachment 7(b) - Technology Cut Sheets - Part 2 of 11 Corning.pdf PDF
S02 - Attachment 7(f) - Technology Cut Sheets - Part 6 of 11 Ortronics.pdf PDF
S02 - Attachment 7(j) - Technology Cut Sheets - Part 10 of 11 HID.pdf PDF
S02 - Attachment 7(e) - Technology Cut Sheets - Part 5 of 11 Leviton.pdf PDF
S02 - Attachment 7(k) - Technology Cut Sheets - Part 11 of 11 Hubbell.pdf PDF
S02 - Attachment 7(i) - Technology Cut Sheets - Part 9 of 11 Cablofil.pdf PDF
S02 - Attachment 1(c) - 671-22-700 DRAWINGS Mechanical.pdf PDF
S02 - Attachment 4 - 230501 SAT_EHRM_100 percent final TechnicalReport.pdf PDF
Solicitation 36C77623B0064_28JUL2023.pdf PDF
S02 - Attachment 14(b) - Asbestos Survey Results Ground and 5th-7th Floors.pdf PDF
S02 - Attachment 13 - VA OEHRM Site Infrastructure and EUD Reqmts 2.0.pdf PDF
S02 - Attachment 10 - VA Notice Limitations on Subcontracting - Construction (JAN 2023) (DEV).docx DOCX document
S02 - Attachment 7(d) - Technology Cut Sheets - Part 4 of 11 CPI Cabinet.pdf PDF
S02 - Attachment 1(e) - 671-22-700 DRAWINGS Technology.pdf PDF
S02 - Attachment 1(d) - 671-22-700 DRAWINGS Electrical.pdf PDF
S02 - Attachment 2 - 671-22-700 100 percent final BID SPECIFICATIONS.pdf PDF
S02 - Attachment 1(f) 671-22-700 DRAWINGS Physical Security.pdf PDF
S02 - Attachment 8(c) - OIT-InfrastrucStdTelecomSpaces_Part 3 of 3.pdf PDF
S02 - Attachment 7(c) - Technology Cut Sheets - Part 3 of 11 CPI.pdf PDF
S02 - Attachment 7(g) - Technology Cut Sheets - Part 7 of 11 Panduit.pdf PDF
S02 - Attachment 1(b) - 671-22-700 DRAWINGS Architectural.pdf PDF
S02 - Attachment 6 - Mechanical Cut Sheets.pdf PDF
S02 - Attachment 7(a) - Technology Cut Sheets - Part 1 of 11 APC.pdf PDF
S02 - Attachment 3 - 671-22-700 EHRM Infrastructure Upgrades- SOW Construction.pdf PDF
S02 - Attachment 5 - Electrical Cut Sheets.pdf PDF
S02 - Attachment 14(a) - Asbestos Survey Results 1st-4th Floors.pdf PDF
S02 - Attachment 11 - Wage Determination_Bexar CountyTX_14APR2023.pdf PDF
S02 - Attachment 12 - Submittal Register ENG Form 4288-R.pdf PDF
S02 - Attachment 9 - Contractor Safety and Environmental Record Form.docx DOCX document
S02 - Attachment 7(h) - Technology Cut Sheets - Part 8 of 11 Axis.pdf PDF
S02 - Attachment 1(a) - 671-22-700 DRAWINGS General Sheets.pdf PDF
Show all 50

EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0005 671-22-700

36C776

Department of Veterans Affairs Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490 Independence OH 44131

36C776

Department of Veterans Affairs Program Contracting Activity Central

6100 Oak Tree Blvd, Suite 490 Independence OH 44131

To all Offerors/Bidders

36C77623B0064

08-31-2023

X

X X

3 p.m. Eastern Time on 6 Sep 2023

X 1

ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM) INFRASTRUCTURE UPGRADES, AUDIE L. MURPHY MEMORIAL VETERANS' HOSPITAL, SAN ANTONIO, TEXAS

Proceed to Page 2 of this amendment document for additional Q&As, information on Attachment 24 - Bid Breakdown Table and change of Bid Due Date Time and Bid Opening Time on 6 September 2023.

a. Prospective Bidders’ Questions and Government’s Response to The Questions are as follows:

Q131: Given that the Salt Lake City, UT EHRM bid is scheduled for 1:00 p.m. EST on the same day, with the bid opening just 30 minutes before the San Antonio EHRM bid, would it be possible to extend the bid due date by one or two hours?

A131: The Bid Due Date is extended to 3:00 p.m. Eastern Time on 6 September 2023. The Bid Opening shall now be at 4:00 p.m. Eastern Time on 6 September 2023. The Telephone Call-In Number for the Bid Opening is 205-235-3524, and the new Phone Conference ID is 322 273 263#.

Q132: Sheets TN400, TN401, TN402, TN403, TN404, TN405, TN406, TN407, TN410, TN411, TN412, TN414, TN415, TN416, TN417, TN419, TN420, TN421, TN422, TN423, TN424, TN425, TN450 and T605 have not been provided. Can you please provide them?

A132: These sheets were not intended to be included in this solicitation. They will be provided to the awardee contractor in a post-bid construction set after award is made.

Q133: The specs are calling for 150KVA, 2N redundant UPS units. The drawing states 150KVA frame, 60KW capacity. Which one is correct?

A133: The new UPS is a modular system with an expandable maximum rating 150kVA;

however, the UPS will be provided with a Day 1 capacity of 60kVA.

Q134: Please confirm UPS output voltage is 120/208V.

A134: Refer to Sheet ‘EN497’; output voltage is 208Y/120V.

Q135: Please confirm the battery discharge time to the end of voltage is 20 minutes -- not 240 minutes as stated in the specifications.

A135: 20 minutes, not 240 minutes, is the minimal required UPS time.

b. Before awarding a contract in an IFB/sealed bidding procurement, the apparent low bid must be determined fair and reasonable. Thus, in accordance with FAR 14.408-2(a), “The contracting officer shall determine that a prospective contractor is responsible and that the prices offered are reasonable before awarding the contract. The price analysis techniques in 15.404-1(b) may be used as guidelines.” Per 15.404-1(b)(2), “The Government may use various price analysis techniques and procedures to ensure a fair and reasonable price.

Examples of such techniques include, but are not limited to, the following…(viii) Analysis of data other than certified cost or pricing data (as defined at 2.101) provided by the offeror.”

Per 2.101(b)(2) Definitions, “Data Other Than Certified Cost or Pricing Data means pricing data, cost data and judgmental information necessary for the contracting officer to determine a fair and reasonable price or to determine cost realism. Such data may include the identical types of data as certified cost or pricing data, but without the certification. The data may also include, for example, sales data and any information reasonably required to explain the offeror’s estimating process, including but not limited to (1) the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data; and,

(2) the nature and amount of any contingencies included in the proposed price.”

Accordingly, prospective bidders must include in their bid package a completed Attachment 24

– Bid Breakdown Table to support your bid submitted for this EHRM project. Please submit your completed Bid Breakdown Table in Adobe Acrobat .pdf format.

End of Document