S02 - Attachment 2 - 671-22-700 100 percent final BID SPECIFICATIONS.pdf
PDF 10 MB Posted
- Attached to
- EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) Federal contract opportunity
- Solicitation number
- 36C77623B0064
About this file
The attached document is the bid specifications for solicitation number 36C77623B0064 from the Department of Veterans Affairs Technology Acquisition Center Austin. The solicitation seeks construction services for infrastructure upgrades at the San Antonio VA Medical Center, with a NAICS code of 236220 and a SDVOSB set-aside designation. Key project details in the bid specifications include upgrades to mechanical, electrical and plumbing systems at multiple campus buildings. The response deadline is April 15, 2022, with construction to be completed within 540 calendar days of the award date. Pricing is to be provided as a firm fixed price for the base requirement and separately priced options. Work will be conducted during normal business hours with some potential overtime required.
View the file
Other files for this federal contract opportunity
Show all 50
EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EHRM INFRASTRUCTURE
UPGRADES
Final Bid Documents – 100%
Specifications
AUDIE L. MURPHY
MEMORIAL VETERANS’ HOSPITAL
7400 MERTON MINTER BOULEVARD, SAN ANTONIO TX
JUNE 9, 2023
PROJECT NO. 671-22-700
Audie L. Murphy Memorial Veterans’ Hospital EHRM Infrastructure Upgrades
Project No. 671-22-700 June 9, 2023
Consultants Directory - 00 01 03 - 1
SECTION 00 01 03
CONSULTANTS DIRECTORY
PART 1 - GENERAL
1.1 PROJECT LISTING
A. Architect / Physical Security
Awen Solutions Group
4196 Merchant Plaza Woodbridge, Virginia 22192
B. Mechanical /Electrical / Plumbing / Fire Protection Engineer
IMEG Corp
15 Sunnen Drive, Suite 104 Saint Louis, MO 63143
C. Structural Engineer
IMEG Corp
370 E Windmill Lane, Unit 100 Las Vegas NV 89118
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
Consultants Directory - 00 01 03 - 2
THIS PAGE INTENTIONALLY LEFT BLANK
Table of Contents
00 01 10-1
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES
DIVISION 00 - SPECIAL SECTIONS
00 01 03 Consultants Directory
00 01 10 Table of Contents
00 01 15 List of Drawing Sheets
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements
01 26 13 Requests for Interpretation
01 32 16.15 Project Schedules
01 33 23 Shop Drawings, Product Data, and Samples
01 35 26 Safety Requirements
01 42 19 Reference Standards
01 45 00 Quality Control
01 45 29 Testing Laboratory Services
01 45 35 Special Inspections
01 57 19 Temporary Environmental Controls
01 58 16 Temporary Interior Signage
01 74 19 Construction Waste Management
01 81 13 Sustainable Construction Requirements
01 91 00 General Commissioning Requirements
DIVISION 02 – EXISTING CONDITIONS
02 41 19 Selective Demolition
02 82 11 Traditional Asbestos Abatement
02 82 13.19 Asbestos Floor Tile and Mastic Abatement
DIVISION 03 – CONCRETE
Division Not Used
00 01 10-2
DIVISION 04 – MASONRY
DIVISION 05 – METALS
05 40 00 Cold-Formed Metal Framing
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 00 Rough Carpentry
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 81 00 Applied Fireproofing
07 84 00 Firestopping
07 92 00 Joint Sealants
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Frames and Doors
08 14 00 Interior Wood Doors
08 31 13 Access Doors and Frames
08 71 00 Door Hardware
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes
09 06 00 Schedule for Finishes
09 22 16 Non-Structural Metal Framing
09 29 00 Gypsum Board
09 51 00 Acoustical Ceilings
09 65 13 Resilient Base and Accessories
09 65 19 Resilient Tile Flooring
09 69 00 Access Flooring
09 91 00 Painting
00 01 10-3
DIVISION 10 – SPECIALTIES
10 14 00 Signage
10 26 00 Wall and Door Protection
10 44 13 Fire Extinguisher Cabinets
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural Components
DIVISION 14– CONVEYING EQUIPMENT
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression Systems
21 13 13 Wet-Pipe Sprinkler Systems
21 22 00 Clean Agent Fire Suppression Systems
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing
22 05 23 General-Duty Valves for Plumbing Piping
22 07 11 Plumbing Insulation
22 08 00 Commissioning of Plumbing Systems
22 11 00 Facility Water Distribution
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
00 01 10-4
SECTION NO. DIVISION AND SECTION TITLES
23 05 11 Common Work Results for HVAC
23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment
23 05 93 Testing, Adjusting and Balancing for HVAC
23 07 11 HVAC and Boiler Plant Insulation
23 08 00 Commissioning of HVAC Systems
23 09 23 Direct-Digital Control System for HVAC
23 23 00 Refrigerant Piping
23 31 00 HVAC Ducts and Casings
23 37 00 Air Outlets and Inlets
23 40 00 HVAC Air Cleaning Devices
23 81 00 Decentralized Unitary HVAC Equipment
23 81 23 Computer-Room Air-Conditioners
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations
26 05 19 Low-Voltage Electrical Power Conductors and Cables
26 05 26 Grounding and Bonding for Electrical Systems
26 05 33 Raceway and Boxes for Electrical Systems
26 05 73 Overcurrent Protective Device Coordination Study
26 08 00 Commissioning of Electrical Systems
26 09 23 Lighting Controls
26 24 16 Panelboards
26 26 00 Power Distribution Units for Static, Uninterruptible Power Systems
26 27 26 Wiring Devices
26 29 21 Enclosed Switches and Circuit Breakers
26 33 53 Static Uninterruptible Power Supply
26 43 13 Surge Protective Devices
26 51 00 Interior Lighting
00 01 10-5
DIVISION 27 – COMMUNICATIONS
27 05 26 Grounding and Bonding for Communications Systems
27 05 33 Conduits and Backboxes for Communications Systems
27 05 36 Cable Trays for Communications Systems
27 05 53 Identification for Communications Systems
27 10 00 Control, Communications and Signal Wiring
27 11 16 Communications Cabinets, Racks, Frames, and Enclosures
27 11 19 Communications Termination Blocks and Patch Panels
27 11 26 Communications Rack Mounted Power Protection and Power St
27 13 13 Communications Copper Backbone Cabling
271 3 13-13 Communications Copper Cable Splicing and Terminations
27 13 23 Communications Optical Fiber Backbone Cabling
27 13 23-13 Communications Optical Fiber Splicing and Terminations
27 15 13 Communications Copper Horizontal Cabling
27 16 19 Communications Patch Cords, Station Cords, and Cross Conn
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety And Security
28 05 13 Conductors and Cables for Electronic Safety and Security
28 08 00 Commissioning of Electronic Safety and Security Systems
28 13 00 Physical Access Control System
28 23 00 Video Surveillance
28 31 00
Fire Detection and Alarm
DIVISION 31 – EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
DIVISION 33 – UTILITIES
00 01 10-6
DIVISION 34 – TRANSPORTATION
DIVISION 48 – ELECTRICAL POWER GENERATION
List of Drawing Sheets 00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
DRAWING
NUMBER DRAWING TITLE
01-GENERAL
GI000 COVER SHEET
GI001 SHEET INDEX
GI003 GENERAL NOTES AND CODE REQUIREMENTS
GI004 TIL ABBREVIATION LIST (PG-18-4)
GI011 TYPICAL ADA REQUIREMENTS - INTERIOR CLEARANCES
GI005 SEQUENCING NOTES
GI100 GROUND LEVEL SEQUENCING AND DIAMOND ANALYSIS PLAN
GI101 1ST FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN
GI102 2ND FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN
GI103 3RD FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN
GI104 4TH FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN
GI105 5TH FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN
GI106 6TH FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN
GI107 7TH FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN
GC001 FIRE/SMOKE BARRIER DESCRIPTIONS
GC099 SUB-LEVEL FIRE/LIFE SAFETY PLAN
GC100 GROUND LEVEL FIRE/LIFE SAFETY PLAN
GC101 1ST FLOOR FIRE/LIFE SAFETY PLAN
GC102 2ND FLOOR FIRE/LIFE SAFETY PLAN
GC103 3RD FLOOR FIRE/LIFE SAFETY PLAN
GC104 4TH FLOOR FIRE/LIFE SAFETY PLAN
GC105 5TH FLOOR FIRE/LIFE SAFETY PLAN
GC106 6TH FLOOR FIRE/LIFE SAFETY PLAN
GC107 7TH FLOOR FIRE/LIFE SAFETY PLAN
GS101 CAMPUS SITE PLAN
08-ARCHITECTURE
AD001 GENERAL DEMOLITION NOTES
AD351 DEMOLITION BUILDING SECTIONS
AD401 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS
AD402 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS
AD403 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS
00 01 15 - 2
AD404 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS
AD405 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS
AD406 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS
AD407 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS
AD408 ENLARGED DATA CENTER DEMOLITION FLOOR PLAN
AD409 ENLARGED DATA CENTER DEMOLITION REFLECTED CEILING PLAN
AE001 ARCHITECTURAL GENERAL INFORMATION
AE100 GROUND LEVEL REFERENCE PLAN
AE100.5 GROUND-LEVEL INTERSTITIAL SPACE REFERENCE PLAN
AE101 1ST FLOOR REFERENCE PLAN
AE101.5 1ST FLOOR INTERSTITIAL SPACE REFERENCE PLAN
AE102 2ND FLOOR REFERENCE PLAN
AE102.5 2ND FLOOR INTERSTITIAL SPACE REFERENCE PLAN
AE103 3RD FLOOR REFERENCE PLAN
AE103.5 3RD FLOOR INTERSTITIAL SPACE REFERENCE PLAN
AE104 4TH FLOOR REFERENCE PLAN
AE104.5 4TH FLOOR INTERSTITIAL SPACE REFERENCE PLAN
AE105 5TH FLOOR REFERENCE PLAN
AE105.5 5TH FLOOR INTERSTITIAL SPACE REFERENCE PLAN
AE106 6TH FLOOR REFERENCE PLAN
AE106.5 6TH FLOOR INTERSTITIAL SPACE REFERENCE PLAN
AE107 7TH FLOOR REFERENCE PLAN
AE107.5 7TH FLOOR INTERSTITIAL SPACE REFERENCE PLAN
AE108 ROOF REFERENCE PLAN
AE121 GROUND LEVEL, MAIN HOSPITAL, AREA A
AE122 GROUND LEVEL, MAIN HOSPITAL, AREA B
AE123 GROUND LEVEL, MAIN HOSPITAL, AREA C
AE124 GROUND LEVEL, MAIN HOSPITAL, AREA D
AE125 GROUND LEVEL, MAIN HOSPITAL, AREA E1
AE126 GROUND LEVEL, MAIN HOSPITAL, AREA E2
AE127 GROUND LEVEL, MAIN HOSPITAL, AREA F
AE128 GROUND LEVEL, MAIN HOSPITAL, AREA G
AE129 GROUND LEVEL, MAIN HOSPITAL, AREA H
AE130 GROUND LEVEL, POLYTRAUMA
AE131 GROUND LEVEL, CLC NORTH & SOUTH
AE132 GROUND LEVEL, CLC CENTRAL
AE135 1ST FLOOR, MAIN HOSPITAL, AREA A
AE136 1ST FLOOR, MAIN HOSPITAL, AREA B
AE137 1ST FLOOR, MAIN HOSPITAL, AREA C
AE138 1ST FLOOR, MAIN HOSPITAL, AREA D
00 01 15 - 3
AE139 1ST FLOOR, MAIN HOSPITAL, AREA E1
AE140 1ST FLOOR, MAIN HOSPITAL, AREA E2
AE141 1ST FLOOR, MAIN HOSPITAL, AREA F
AE142 1ST FLOOR, MAIN HOSPITAL, AREA G
AE143 1ST FLOOR, MAIN HOSPITAL, AREA H
AE144 1ST FLOOR, MAIN HOSPITAL, AREA J
AE145 1ST FLOOR, POLYTRAUMA
AE146 1ST FLOOR, CLC NORTH & SOUTH
AE147 1ST FLOOR, CLC CENTRAL
AE152 2ND FLOOR, MAIN HOSPITAL, AREA A
AE153 2ND FLOOR, MAIN HOSPITAL, AREA B
AE154 2ND FLOOR, MAIN HOSPITAL, AREA C
AE155 2ND FLOOR, MAIN HOSPITAL, AREA D
AE156 2ND FLOOR, MAIN HOSPITAL, AREA E1
AE157 2ND FLOOR, MAIN HOSPITAL, AREA E2
AE158 2ND FLOOR, MAIN HOSPITAL, AREA F
AE159 2ND FLOOR, MAIN HOSPITAL, AREA G
AE160 2ND FLOOR, POLYTRAUMA
AE165 3RD FLOOR, MAIN HOSPITAL, AREA G
AE166 3RD FLOOR, TOWER, AREA TS
AE167 3RD FLOOR, TOWER, AREA TN
AE169 4TH FLOOR, MAIN HOSPITAL, AREA G
AE170 4TH FLOOR, TOWER, AREA TS
AE171 4TH FLOOR, TOWER, AREA TN
AE175 5TH FLOOR, TOWER, AREA TS
AE176 5TH FLOOR, TOWER, AREA TN
AE180 6TH FLOOR, TOWER, AREA TS
AE181 6TH FLOOR, TOWER, AREA TN
AE185 7TH FLOOR, TOWER, AREA TS
AE186 7TH FLOOR, TOWER, AREA TN
AE301
REFERENCE SECTION - EAST/WEST MAIN HOSPITAL - WESTERN
SECTION
AE302
REFERENCE SECTION - EAST/WEST MAIN HOSPITAL - EASTERN
SECTION
AE303 REFERENCE SECTION - G WING
AE304 REFERENCE SECTIONS
AE305 REFERENCE SECTION - CLC
AE351 ROOM SECTIONS
AE352 ROOM SECTIONS
AE353 ROOM SECTIONS
AE354 ROOM SECTIONS
00 01 15 - 4
AE401 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS
AE402 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS
AE403 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS
AE404 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS
AE405 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS
AE406 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS
AE407 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS
AE408 ENLARGED DATA CENTER FLOOR PLAN
AE409 ENLARGED DATA CENTER REFLECTED CEILING PLAN
AE410 ENLARGED MISCELLANEOUS PLANS
AE451 INTERIOR ELEVATIONS
AE452 INTERIOR ELEVATIONS
AE453 INTERIOR ELEVATIONS
AE454 INTERIOR ELEVATIONS
AE455 INTERIOR ELEVATIONS
AE501 INTERIOR FRAMING DETAILS
AE502 INTERIOR FRAMING DETAILS
AE511 DOOR DETAILS
AE521 WALL TYPES
AE522 PARTITION DETAILS
AE531 CEILING DETAILS
AE532 CEILING DETAILS
AE551 MISCELLANEOUS DETAILS
AE601 SCHEDULES
14-MECHANICAL
M000 MECHANICAL COVERSHEET
M500 MECHANICAL DETAILS
M600 MECHANICAL SCHEDULES
M700 CONTROL DIAGRAMS
MD100 GROUND LEVEL DEMOLITION PLAN - MECHANICAL - OVERALL
MD101 1ST FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL
MD102 2ND FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL
MD103 3RD FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL
MD104 4TH FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL
MD105 5TH FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL
MD106 6TH FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL
MD107 7TH FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL
MN100 GROUND LEVEL PLAN - MECHANICAL - OVERALL
MN101 1ST FLOOR PLAN - MECHANICAL - OVERALL
00 01 15 - 5
MN102 2ND FLOOR PLAN - MECHANICAL - OVERALL
MN103 3RD FLOOR PLAN - MECHANICAL - OVERALL
MN104 4TH FLOOR PLAN - MECHANICAL - OVERALL
MN105 5TH FLOOR PLAN - MECHANICAL - OVERALL
MN106 6TH FLOOR PLAN - MECHANICAL - OVERALL
MN107 7TH FLOOR PLAN - MECHANICAL - OVERALL
MD400
1ST FLOOR - DATA CENTER - MECHANICAL - ENLARGED DEMOLITION
PLANS
MN400 GROUND LEVEL - TR C015.1 - MECHANICAL - ENLARGED PLANS
MN401 GROUND LEVEL - TR GB126.1 - MECHANICAL - ENLARGED PLANS
MN402 GROUND LEVEL - TR F004 - MECHANICAL - ENLARGED PLANS
MN403 GROUND LEVEL - TR 030 - MECHANICAL - ENLARGED PLANS
MN404 GROUND LEVEL - TR L010.2 - MECHANICAL - ENLARGED PLANS
MN405 GROUND LEVEL - TR 1A138 - MECHANICAL - ENLARGED PLANS
MN406 1ST FLOOR - TR G101 - MECHANICAL - ENLARGED PLANS
MN407 1ST FLOOR - TR 119.2 - MECHANICAL - ENLARGED PLANS
MN408 1ST FLOOR - TR H118.2 - MECHANICAL - ENLARGED PLANS
MN409 1ST FLOOR - TR P125 - MECHANICAL - ENLARGED PLANS
MN410 1ST FLOOR - TR 105 - MECHANICAL - ENLARGED PLANS
MN411 1ST FLOOR - TR J104 - MECHANICAL - ENLARGED PLANS
MN412 1ST FLOOR - TR S101R - MECHANICAL - ENLARGED PLANS
MN413 1ST FLOOR - TR 2A137 - MECHANICAL - ENLARGED PLANS
MN414 1ST FLOOR - Y102.7 - MECHANICAL - ENLARGED PLANS
MN415 2ND FLOOR - TR Z221.28A - MECHANICAL - ENLARGED PLANS
MN416 2ND FLOOR - TR A200 - MECHANICAL - ENLARGED PLANS
MN417 2ND FLOOR - TR SP238 - MECHANICAL - ENLARGED PLANS
MN418 2ND FLOOR - TR R201 - MECHANICAL - ENLARGED PLANS
MN419 3RD FLOOR - TR D320 - MECHANICAL - ENLARGED PLANS
MN420 4TH FLOOR - TR C402 - MECHANICAL - ENLARGED PLANS
MN421 5TH FLOOR - TR C511 - MECHANICAL - ENLARGED PLANS
MN422 6TH FLOOR - TR C602.1 - MECHANICAL - ENLARGED PLANS
MN423 7TH FLOOR - TR A702.1 - MECHANICAL - ENLARGED PLANS
MN424
1ST FLOOR - DATA CENTER - MECHANICAL - ENLARGED NEW WORK
PLANS
15-ELECTRICAL
E000 ELECTRICAL COVERSHEET
E001 SITE PLAN - ELECTRICAL
E400 ELECTRICAL SCHEDULES
E401 ELECTRICAL SCHEDULES
E500 ELECTRICAL DETAILS
00 01 15 - 6
E501 ELECTRICAL DETAILS
ED100 GROUND FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
ED101 1ST FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
ED102 2ND FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
ED103 3RD FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
ED104 4TH FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
ED105 5TH FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
ED106 6TH FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
ED107 7TH FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
EN100 GROUND FLOOR PLAN - ELECTRICAL - OVERALL
EN100.5 GROUND FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE
EN101 1ST FLOOR PLAN - ELECTRICAL - OVERALL
EN101.5 1ST FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE
EN102 2ND FLOOR PLAN - ELECTRICAL - OVERALL
EN102.5 2ND FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE
EN103 3RD FLOOR PLAN - ELECTRICAL - OVERALL
EN103.5 3RD FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE
EN104 4TH FLOOR PLAN - ELECTRICAL - OVERALL
EN104.5 4TH FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE
EN105 5TH FLOOR PLAN - ELECTRICAL - OVERALL
EN105.5 5TH FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE
EN106 6TH FLOOR PLAN - ELECTRICAL - OVERALL
EN106.5 6TH FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE
EN107 7TH FLOOR PLAN - ELECTRICAL - OVERALL
EN107.5 7TH FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE
EN190 BLDG 4 PLAN - ELECTRICAL
EN400 GROUND FLOOR - TR L010.2 - ELECTRICAL - ENLARGED PLANS
EN401 GROUND FLOOR - TR 030 - ELECTRICAL - ENLARGED PLANS
EN402 GROUND FLOOR - TR GB126.1 - ELECTRICAL - ENLARGED PLANS
EN403 GROUND FLOOR - TR F004 - ELECTRICAL - ENLARGED PLANS
EN404 GROUND FLOOR - TR C015.1 - ELECTRICAL - ENLARGED PLANS
EN405 GROUND FLOOR - TR 020 - ELECTRICAL - ENLARGED PLANS
EN406 GROUND FLOOR - TR 1A138 - ELECTRICAL - ENLARGED PLANS
EN407 GROUND LEVEL – H031 – ELECTRICAL – ENLARGED PLANS
EN410 1ST FLOOR - TR S101R - ELECTRICAL - ENLARGED PLANS
EN411 1ST FLOOR - TR J104 - ELECTRICAL - ENLARGED PLANS
EN412 1ST FLOOR - TR H118.2 - ELECTRICAL - ENLARGED PLANS
EN413 1ST FLOOR - TR 105 - ELECTRICAL - ENLARGED PLANS
EN414 1ST FLOOR - TR G101 - ELECTRICAL - ENLARGED PLANS
EN415 1ST FLOOR - TR 157 - ELECTRICAL - ENLARGED PLANS
00 01 15 - 7
EN416 1ST FLOOR - TR P125 - ELECTRICAL - ENLARGED PLANS
EN417 1ST FLOOR - TR 2A137 - ELECTRICAL - ENLARGED PLANS
EN418 1ST FLOOR - TR Y102.7 - ELECTRICAL - ENLARGED PLANS
EN419 1ST FLOOR - TR T119.2 - ELECTRICAL - ENLARGED PLANS
EN420 2ND FLOOR - TR R201 - ELECTRICAL - ENLARGED PLANS
EN421 2ND FLOOR - TR SP238 - ELECTRICAL - ENLARGED PLANS
EN422 2ND FLOOR - TR Z221.28A - ELECTRICAL - ENLARGED PLANS
EN423 2ND FLOOR - TR E221 - ELECTRICAL - ENLARGED PLANS
EN424 2ND FLOOR - TR A200 - ELECTRICAL - ENLARGED PLANS
EN425 2ND FLOOR - TR 258 - ELECTRICAL - ENLARGED PLANS
EN430 3RD FLOOR - TR C301.1 - ELECTRICAL - ENLARGED PLANS
EN431 3RD FLOOR - TR D320 - ELECTRICAL - ENLARGED PLANS
EN440 4TH FLOOR - TR C402 - ELECTRICAL - ENLARGED PLANS
EN450 5TH FLOOR - TR C511 - ELECTRICAL - ENLARGED PLANS
EN460 6TH FLOOR - TR C602 - ELECTRICAL - ENLARGED PLANS
EN470 7TH FLOOR - TR C702.1 - ELECTRICAL - ENLARGED PLANS
EN490 ELECTRICAL - ENLARGED PLAN
EN492 1ST FLOOR - DATA CENTER - ELECTRICAL - ENLARGED PLAN
EN493 1ST FLOOR - DATA CENTER - ELECTRICAL - ENLARGED PLAN
EN497 ELECTRICAL RISER DIAGRAM
EN498 ELECTRICAL DETAILS
EN499 ELECTRICAL SCHEDULES
16-TELECOMMUNICATIONS
T000 COVERSHEET - TECHNOLOGY
T001 SITE PLAN - TECHNOLOGY
T500 DETAILS - TECHNOLOGY
T501 DETAILS - TECHNOLOGY
T600 DIAGRAMS - TECHNOLOGY
T601 DIAGRAMS - TECHNOLOGY
T602 DIAGRAMS - TECHNOLOGY
T603 DIAGRAMS - TECHNOLOGY
T605 SCHEDULES - TECHNOLOGY
TD099 SUB-LEVEL DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD100 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD101 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD102 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD103 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD104 4TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD105 5TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
00 01 15 - 8
TD106 6TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD107 7TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD121 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA A
TD122 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA B
TD123 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA C
TD124 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA D
TD125 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA E1
TD126 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA E2
TD127 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA F
TD128 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA G
TD129 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA H
TD130 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA PT
TD131
GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA CLC NORTH
& SOUTH
TD132
GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA CLC
CENTRAL
TD135 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
TD136 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
TD137 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
TD138 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D
TD139 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E1
TD140 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E2
TD141 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F
TD142 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G
TD143 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA H
TD144 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J
TD145 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA PT
TD146
1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA CLC NORTH &
SOUTH
TD147 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA CLC CENTRAL
TD152 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
TD153 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
TD154 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
TD155 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D
TD156 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E1
TD157 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E2
TD158 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F
TD159 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G
TD160 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA PT
TD165 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G
TD166 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS
00 01 15 - 9
TD167 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN
TD170 4TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS
TD171 4TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN
TD175 5TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS
TD176 5TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN
TD180 6TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS
TD181 6TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN
TD185 7TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS
TD186 7TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN
TN099 SUB-LEVEL PLAN - TECHNOLOGY - OVERALL
TN100 GROUND LEVEL PLAN - TECHNOLOGY - OVERALL
TN100.5 GROUND FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN101 1ST FLOOR PLAN - TECHNOLOGY - OVERALL
TN101.5 1ST FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN102 2ND FLOOR PLAN - TECHNOLOGY - OVERALL
TN102.5 2ND FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN103 3RD FLOOR PLAN - TECHNOLOGY - OVERALL
TN103.5 3RD FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN104 4TH FLOOR PLAN - TECHNOLOGY - OVERALL
TN104.5 4TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN105 5TH FLOOR PLAN - TECHNOLOGY - OVERALL
TN105.5 5TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN106 6TH FLOOR PLAN - TECHNOLOGY - OVERALL
TN106.5 6TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN107 7TH FLOOR PLAN - TECHNOLOGY - OVERALL
TN107.5 7TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN121 GROUND PLAN - TECHNOLOGY - AREA A
TN122 GROUND PLAN - TECHNOLOGY - AREA B
TN123 GROUND PLAN - TECHNOLOGY - AREA C
TN124 GROUND PLAN - TECHNOLOGY - AREA D
TN125 GROUND PLAN - TECHNOLOGY - AREA E1
TN126 GROUND PLAN - TECHNOLOGY - AREA E2
TN127 GROUND PLAN - TECHNOLOGY - AREA F
TN128 GROUND PLAN - TECHNOLOGY - AREA G
TN129 GROUND PLAN - TECHNOLOGY - AREA H
TN130 GROUND PLAN - TECHNOLOGY - AREA PT
TN131 GROUND PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH
TN132 GROUND PLAN - TECHNOLOGY - AREA CLC CENTRAL
TN135 1ST FLOOR PLAN - TECHNOLOGY - AREA A
TN136 1ST FLOOR PLAN - TECHNOLOGY - AREA B
00 01 15 - 10
TN137 1ST FLOOR PLAN - TECHNOLOGY - AREA C
TN138 1ST FLOOR PLAN - TECHNOLOGY - AREA D
TN139 1ST FLOOR PLAN - TECHNOLOGY - AREA E1
TN140 1ST FLOOR PLAN - TECHNOLOGY - AREA E2
TN141 1ST FLOOR PLAN - TECHNOLOGY - AREA F
TN142 1ST FLOOR PLAN - TECHNOLOGY - AREA G
TN143 1ST FLOOR PLAN - TECHNOLOGY - AREA H
TN144 1ST FLOOR PLAN - TECHNOLOGY - AREA J
TN145 1ST FLOOR PLAN - TECHNOLOGY - AREA PT
TN146 1ST FLOOR PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH
TN147 1ST FLOOR PLAN - TECHNOLOGY - AREA CLC CENTRAL
TN152 2ND FLOOR PLAN - TECHNOLOGY - AREA A
TN153 2ND FLOOR PLAN - TECHNOLOGY - AREA B
TN154 2ND FLOOR PLAN - TECHNOLOGY - AREA C
TN155 2ND FLOOR PLAN - TECHNOLOGY - AREA D
TN156 2ND FLOOR PLAN - TECHNOLOGY - AREA E1
TN157 2ND FLOOR PLAN - TECHNOLOGY - AREA E2
TN158 2ND FLOOR PLAN - TECHNOLOGY - AREA F
TN159 2ND FLOOR PLAN - TECHNOLOGY - AREA G
TN160 2ND FLOOR PLAN - TECHNOLOGY - AREA PT
TN165 3RD FLOOR PLAN - TECHNOLOGY - AREA G
TN166 3RD FLOOR PLAN - TECHNOLOGY - AREA TS
TN167 3RD FLOOR PLAN - TECHNOLOGY - AREA TN
TN170 4TH FLOOR PLAN - TECHNOLOGY - AREA TS
TN171 4TH FLOOR PLAN - TECHNOLOGY - AREA TN
TN175 5TH FLOOR PLAN - TECHNOLOGY - AREA TS
TN176 5TH FLOOR PLAN - TECHNOLOGY - AREA TN
TN180 6TH FLOOR PLAN - TECHNOLOGY - AREA TS
TN181 6TH FLOOR PLAN - TECHNOLOGY - AREA TN
TN185 7TH FLOOR PLAN - TECHNOLOGY - AREA TS
TN186 7TH FLOOR PLAN - TECHNOLOGY - AREA TN
TN190 BLDG 4 PLAN - TECHNOLOGY
TN400 GROUND LEVEL - TR L010.2 - TECHNOLOGY - ENLARGED PLANS
TN401 GROUND LEVEL - TR 030 - TECHNOLOGY - ENLARGED PLANS
TN402 GROUND LEVEL - TR GB126.1 - TECHNOLOGY - ENLARGED PLANS
TN403 GROUND LEVEL - TR F004 - TECHNOLOGY - ENLARGED PLANS
TN404 GROUND LEVEL - TR C015.1 - TECHNOLOGY - ENLARGED PLANS
TN405 GROUND LEVEL - TR 020 - TECHNOLOGY - ENLARGED PLANS
TN406 GROUND LEVEL - TR 1A138 - TECHNOLOGY - ENLARGED PLANS
TN407 GROUND LEVEL - TR H031 - TECHNOLOGY - ENLARGED PLANS
00 01 15 - 11
TN410 1ST FLOOR - TR S101 - TECHNOLOGY - ENLARGED PLANS
TN411 1ST FLOOR - TR J104 - TECHNOLOGY - ENLARGED PLANS
TN412 1ST FLOOR -TR H118.2 - TECHNOLOGY - ENLARGED PLANS
TN413 1ST FLOOR - TR 105 - TECHNOLOGY - ENLARGED PLANS
TN414 1ST FLOOR - TR G101 - TECHNOLOGY - ENLARGED PLANS
TN415 1ST FLOOR - TR 157 - TECHNOLOGY - ENLARGED PLANS
TN416 1ST FLOOR - TR P125 - TECHNOLOGY - ENLARGED PLANS
TN417 1ST FLOOR - TR 2A137 - TECHNOLOGY - ENLARGED PLANS
TN418 1ST FLOOR - TR Y102.7 - TECHNOLOGY - ENLARGED PLANS
TN419 1ST FLOOR - TR T119.2 - TECHNOLOGY - ENLARGED PLANS
TN420 2ND FLOOR - TR R201 - TECHNOLOGY - ENLARGED PLANS
TN421 2ND FLOOR - TR SP238 - TECHNOLOGY - ENLARGED PLANS
TN422 2ND FLOOR - TR Z221.28A - TECHNOLOGY - ENLARGED PLANS
TN423 2ND FLOOR - TR E221 - TECHNOLOGY - ENLARGED PLANS
TN424 2ND FLOOR - TR A200 - TECHNOLOGY - ENLARGED PLANS
TN425 2ND FLOOR - TR 258 - TECHNOLOGY - ENLARGED PLANS
TN430 3RD FLOOR - TR C301.1 - TECHNOLOGY - ENLARGED PLANS
TN431 3RD FLOOR -TR D320 - TECHNOLOGY - ENLARGED PLANS
TN440 4TH FLOOR - TR C402 - TECHNOLOGY - ENLARGED PLANS
TN450 5TH FLOOR - TR C511 - TECHNOLOGY - ENLARGED PLANS
TN460 6TH FLOOR - TR C602.1 - TECHNOLOGY - ENLARGED PLANS
TN470 7TH FLOOR - TR A702.1 - TECHNOLOGY - ENLARGED PLANS
TN480 EXISTING TRS - TECHNOLOGY - ENLARGED PLANS
TN481 EXISTING TRS - TECHNOLOGY - ENLARGED PLANS
TN490
1ST FLOOR - EXISTING CAMPUS SUPPORT CENTER - TECHNOLOGY -
ENLARGED PLANS
TN491
1ST FLOOR - CAMPUS SUPPORT CENTER - TECHNOLOGY - ENLARGED
PLANS
TN492
1ST FLOOR - CAMPUS SUPPORT CENTER - TECHNOLOGY - RACK
ELEVATIONS
TN493
1ST FLOOR - CAMPUS SUPPORT CENTER - TECHNOLOGY - RACK
ELEVATIONS
TN494 SUB-LEVEL - PBX - TECHNOLOGY - ENLARGMENTS
16.4-PHYSICAL SECURITY
TY001 SECURITY NOTES, SYMBOLS, AND ABBREVIATIONS
TY100 GROUND LEVEL SECURITY REFERENCE PLAN
TY101 1ST FLOOR SECURITY REFERENCE PLAN
TY102 2ND FLOOR SECURITY REFERENCE PLAN
TY103 3RD FLOOR SECURITY REFERENCE PLAN
TY104 4TH FLOOR SECURITY REFERENCE PLAN
00 01 15 - 12
TY105 5TH FLOOR SECURITY REFERENCE PLAN
TY106 6TH FLOOR SECURITY REFERENCE PLAN
TY107 7TH FLOOR SECURITY REFERENCE PLAN
TY401 SECURITY TR FLOOR PLANS
TY402 SECURITY TR FLOOR PLANS
TY403 SECURITY TR FLOOR PLANS
TY404 SECURITY DATA CENTER FLOOR PLAN
TY501 SECURITY DETAILS
- - - END - - -
Project No. 671-22-700 June 9, 2023
General Requirements 01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
PART 1 - GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including selective demolition in existing structures, furnish labor and materials and perform work for the
Audie L Murphy Memorial Veterans’ Hospital EHRM Upgrades as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the Medical Center
Engineering Officer.
C. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: BASE BID Work includes general construction, alterations, necessary removal of portions of existing structures and construction and certain other items.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
Project No. 671-22-700 June 9, 2023
General Requirements 01 00 00 -2
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give one week’s notice to the
Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the
Contracting Officer. Patients and staff are not to be photographed at any time.
4. VA reserves the right to close down or shut down the project site and order General
Contractor’s employees off the premises in the event of a national emergency. The
General Contractor may return to the site only with the written approval of the
Contracting Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the
Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall install temporary cores at completion of the work and turn over all permanent lock cylinders to the VA locksmith for permanent installation .
See Section 08 71 00, DOOR HARDWARE and coordinate.
D. Document Control:
Project No. 671-22-700 June 9, 2023
General Requirements 01 00 00 -3
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked
“Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project.
Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).
a) Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
b) “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical Center Facility Manager.
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on
Government premises to areas authorized or approved by the Contracting Officer. The
Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
Project No. 671-22-700 June 9, 2023
General Requirements 01 00 00 -4
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as determined by the
COR.
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.
G. Execute work so as to interfere as little as possible with normal functioning of Medical
Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient
Project No. 671-22-700 June 9, 2023
General Requirements 01 00 00 -5 for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems
(except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR . All such actions shall be coordinated with the COR or Utility Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the
Government and not the Contractor.
I. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week.
Therefore, any interruption in service must be scheduled and coordinated with the
COR to ensure that no lapses in operation occur. It is the Contractor's responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to
Medical Center Director, COR, and Contractor, as follows:
Project No. 671-22-700 June 9, 2023
General Requirements 01 00 00 -6
J. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.
K. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company
(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
L. Utilities Services: Maintain existing utility services for Medical Center at all times.
Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of
COR . Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the
Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL
INSTALLATIONS, 27 05 11 REQUIREMENTS FOR COMMUNICATIONS
Project No. 671-22-700 June 9, 2023
General Requirements 01 00 00 -7
INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR ELECTRONIC
SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical
Center . Interruption time approved by Medical Center may occur at other than
Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the
Government and not the Contractor.
M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions;
so that they are completely behind the finished surfaces.
N. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
Project No. 671-22-700 June 9, 2023
General Requirements 01 00 00 -8
O. Coordinate the work for this contract with other construction operations as directed by
COR. This includes the scheduling of traffic and the use of roadways, as specified in
Article, USE OF ROADWAYS.
1.7 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from selective demolition, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the
Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by
Contractor from Medical Center.
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government.
When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
4. PCB Transformers and Capacitors: The Contractor shall be responsible for disposal of the Polychlorinated Biphenyl (PCB) transformers and capacitors . The transformers and capacitors shall be taken out of service and handled in accordance with the procedures of the Environmental Protection Agency (EPA) and the
Department of Transportation (DOT) as outlined in Code of Federal Regulation
(CFR), Titled 40 and 49 respectively. The EPA's Toxic Substance Control Act
(TSCA) Compliance Program Policy Nos. 6-PCB-6 and 6-PCB-7 also apply. Upon removal of PCB transformers and capacitors for disposal, the "originator" copy of the
Uniform Hazardous Waste Manifest (EPA Form 8700-22), along with the Uniform
Hazardous Waste Manifest Continuation Sheet (EPA Form 8700-22A) shall be returned to the Contracting Officer who will annotate the contract file and transmit the
Manifest to the Medical Center's Chief.
Project No. 671-22-700 June 9, 2023
General Requirements 01 00 00 -9
a) Copies of the following listed CFR titles may be obtained from the Government
Printing Office:
40 CFR 261 ...............Identification and Listing of Hazardous Waste
40 CFR 262 ...............Standards Applicable to Generators of Hazardous Waste
40 CFR 263 ...............Standards Applicable to Transporters of Hazardous Waste
40 CFR 761 ...............PCB Manufacturing, Processing, Distribution in
Commerce, and use Prohibitions
49 CFR 172 ...............Hazardous Material tables and Hazardous Material
Communications Regulations
49 CFR 173 ...............Shippers - General Requirements for Shipments and
Packaging
49 CRR 173 ...............Subpart A General
49 CFR 173 ...............Subpart B Preparation of Hazardous Material for
Transportation
49 CFR 173 ...............Subpart J Other Regulated Material; Definitions and
Preparation
TSCA .........................Compliance Program Policy Nos. 6-PCB-6 and 6-PCB-7//
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged. Existing work
(walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, Project No. 671-22-700 June 9, 2023
General Requirements 01 00 00 -10 cables, etc., of utility services or of fire protection systems and communications systems
(including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE
CONDITIONS" (FAR 52.236-2).
1.11 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings.
To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.12 WARRANTY MANAGEMENT
A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction in at least 30 days before the planned pre-warranty conference, submit four of the warranty management plan. Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved.
Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project
Project No. 671-22-700 June 9, 2023
General Requirements 01 00 00 -11 acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the
Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:
1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the
Contractor, subcontractors, manufacturers or suppliers involved.
2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.
3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.
4. A list for each warranted equipment item, feature of construction or system indicating:
a. Name of item.
b. Model and serial numbers.
c. Location where installed.
d. Name and phone numbers of manufacturers and suppliers.
e. Name and phone numbers of manufacturers or suppliers.
f. Names, addresses and phone numbers of sources of spare parts.
g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.
h. Starting point and duration of warranty period.
i. Summary of maintenance procedures required to continue the warranty in force.
j. Cross-reference to specific pertinent Operation and Maintenance manuals.
k. Organizations, names and phone numbers of persons to call for warranty service.
l. Typical response time and repair time expected for various warranted equipment.
Project No. 671-22-700 June 9, 2023
General Requirements 01 00 00 -12
5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.
6. Procedure and status of tagging of all equipment covered by extended warranties.
7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.
B. Performance & Payment Bonds: The Performance & Payment…
This is the start of the file's text. The full file is on GovTribe.