S02 - Attachment 1(a) - 671-22-700 DRAWINGS General Sheets.pdf

PDF 10 MB Posted

Attached to
EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) Federal contract opportunity
Solicitation number
36C77623B0064
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This file is an attachment to a federal contract solicitation for infrastructure upgrades at the San Antonio VA Medical Center. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas under number 36C77623B0064. It seeks construction services for EHRM infrastructure upgrades with a NAICS code of 236220. The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses. The attachment contains general drawings but no other salient details regarding required construction work, response dates, pricing terms, or incumbent contractors are provided.

View the file

Other files for this federal contract opportunity

Other files attached to EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS), newest first.
File Type Posted
S07 - Bid Abstract Page 1_OF1419_EHRM San Antonio_6SEP2023.pdf PDF
Amendment 0005_36C77623B0064_31AUG2023.pdf PDF
S02 - Attachment 16 - STX Addendum 1.pdf PDF
S02 - Attachment 15 - STX Addendum 1 (Composite).pdf PDF
S02 - Attachment 22 - SF 25 Performance Bond Form.pdf PDF
S02 - Attachment 18 - 320523 Cement and Concrete for Exterior Improvements.pdf PDF
S02 - Attachment 23 - SF 25A Payment Bond Form.pdf PDF
S02 - Attachment 20 - Addendum 1 - Mechanical.pdf PDF
S02 - Attachment 17 - 075100 Roofing Repair.pdf PDF
Amendment 0003 Attachment Warranty RoofCAD-VA San Antonio-RFI Q100.pdf PDF
Amendment 0003_36C77623B0064_23AUG2023.pdf PDF
S02 - Attachment 6(b) - Mechanical Cut Sheets - Data Center CRAC - Normal Operation (6000 cfm).pdf PDF
S02 - Attachment 6(d) - Mechanical Cut Sheets - Data Center CRAC Dimensions.pdf PDF
S02 - Attachment 6(e) - Mechanical Cut Sheets - Data Center CRAC - N 1 Operation (8000 cfm).pdf PDF
S02 - Attachment 6(a) - Mechanical Cut Sheets - 3.0 Ton Split System.pdf PDF
S02 - Attachment 6(f) - Mechanical Cut Sheets - 2.0 Ton Split System.pdf PDF
Site Visit Attendees Sign-In Sheet_11AUG2023_EHRM San Antonio.xlsx XLSX spreadsheet
Amendment 0001_36C77623B0064_02AUG2023.pdf PDF
Solicitation 36C77623B0064_28JUL2023.pdf PDF
S02 - Attachment 14(b) - Asbestos Survey Results Ground and 5th-7th Floors.pdf PDF
S02 - Attachment 13 - VA OEHRM Site Infrastructure and EUD Reqmts 2.0.pdf PDF
S02 - Attachment 10 - VA Notice Limitations on Subcontracting - Construction (JAN 2023) (DEV).docx DOCX document
S02 - Attachment 7(d) - Technology Cut Sheets - Part 4 of 11 CPI Cabinet.pdf PDF
S02 - Attachment 1(e) - 671-22-700 DRAWINGS Technology.pdf PDF
S02 - Attachment 1(d) - 671-22-700 DRAWINGS Electrical.pdf PDF
S02 - Attachment 2 - 671-22-700 100 percent final BID SPECIFICATIONS.pdf PDF
S02 - Attachment 1(f) 671-22-700 DRAWINGS Physical Security.pdf PDF
S02 - Attachment 8(b) - OIT-InfrastrucStdTelecomSpaces_Part 2 of 3.pdf PDF
S02 - Attachment 8(a) - OIT-InfrastrucStdTelecomSpaces_Part 1 of 3.pdf PDF
S02 - Attachment 7(b) - Technology Cut Sheets - Part 2 of 11 Corning.pdf PDF
S02 - Attachment 7(f) - Technology Cut Sheets - Part 6 of 11 Ortronics.pdf PDF
S02 - Attachment 7(j) - Technology Cut Sheets - Part 10 of 11 HID.pdf PDF
S02 - Attachment 7(e) - Technology Cut Sheets - Part 5 of 11 Leviton.pdf PDF
S02 - Attachment 7(k) - Technology Cut Sheets - Part 11 of 11 Hubbell.pdf PDF
S02 - Attachment 7(i) - Technology Cut Sheets - Part 9 of 11 Cablofil.pdf PDF
S02 - Attachment 1(c) - 671-22-700 DRAWINGS Mechanical.pdf PDF
S02 - Attachment 4 - 230501 SAT_EHRM_100 percent final TechnicalReport.pdf PDF
S02 - Attachment 8(c) - OIT-InfrastrucStdTelecomSpaces_Part 3 of 3.pdf PDF
S02 - Attachment 7(c) - Technology Cut Sheets - Part 3 of 11 CPI.pdf PDF
S02 - Attachment 7(g) - Technology Cut Sheets - Part 7 of 11 Panduit.pdf PDF
S02 - Attachment 1(b) - 671-22-700 DRAWINGS Architectural.pdf PDF
S02 - Attachment 6 - Mechanical Cut Sheets.pdf PDF
S02 - Attachment 7(a) - Technology Cut Sheets - Part 1 of 11 APC.pdf PDF
S02 - Attachment 3 - 671-22-700 EHRM Infrastructure Upgrades- SOW Construction.pdf PDF
S02 - Attachment 5 - Electrical Cut Sheets.pdf PDF
S02 - Attachment 14(a) - Asbestos Survey Results 1st-4th Floors.pdf PDF
S02 - Attachment 11 - Wage Determination_Bexar CountyTX_14APR2023.pdf PDF
S02 - Attachment 12 - Submittal Register ENG Form 4288-R.pdf PDF
S02 - Attachment 9 - Contractor Safety and Environmental Record Form.docx DOCX document
S02 - Attachment 7(h) - Technology Cut Sheets - Part 8 of 11 Axis.pdf PDF
Show all 50

EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLC

POLYTRAUMA

MAIN HOSPITAL

MAIN ENTRANCE

TOWER

SCI

MERTON MINTER

M E

R T

O N

M

IN

T E

R

VON SCHEELE RD W

U

R

ZB

A C

H R

D

W

URZBACH R

D

M

ELRO

SE HO

LM

G

REE RD

MERTON M

IN

TER

P L A

N N

O R

T H

BABCOCK RD

FR

ED

ER

IC

KSBU

R

G R

D

OAK HILLS

COUNTRY CLUB

D A

T A

PO

IN

T

DR

MEDIC

AL D

R

FLOYD CURL DR

W

URZB

U

RG

R D

EW

ING

HALSEL DR

MEDICAL DR

BABCOCK RD

CALL

AGHAN R

D

HAMILTON-WOLFE RD

VA HOSPITAL SITE

7400 MERTON MINTON ST

IN

T

E R

S T

A T

E

INTERSTATE 410

LO

UIS

P

ASTEUR D

R

P L A

N N

O R

T H

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

SITE MAPDESIGN TEAM

OWNER

ARCHITECT / CONTRACT PRIME

STRUCTURAL ENGINEER

MECHANICAL / ELECTRICAL /

PLUMBING / FIRE PROTECTION

ENGINEER

South Texas Veterans Health Care System, ALMD 7400 Merton Minter Boulevard San Antonio TX 78229-4404 Contact: Reid Doty

Voice: (210) 617-5300, ext. 17646 Cell: (210) 325-4140 Justin.Doty@va.gov

EHRM INFRASTRUCTURE UPGRADES

FINAL BID DOCUMENTS - 100%

Awen Solutions Group 4196 Merchant Plaza Woodbridge VA 22192 Contact: Mike Olson molson@awensolutions.com (520)982-2670

IMEG Corp.

15 Sunnen Drive, Suite 104 Saint Louis MO 63143 Contact: David Larson, RCDD david.l.larson@imegcorp.com (765)398-4770

IMEG Corp.

370 E Windmill Lane, Unit 100 Las Vegas NV 89118 Contact: Kris Barker, PE, SE

Kris.M.Barker@imegcorp.com

(210) 957-9343

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

-2 -7

.0 .A

S T

X E

H R

M .r v t

/1

/2

:4

:0

A

M

GI001

COVER SHEET

Awen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX

671-22-700

Audie L. Murphy Memorial Veterans' Hospital

06/09/2023

7400 Merton Minter Boulevard, San Antonio TX

VICINITY MAP

Revisions: Date: SHEET 1 of 431

ClarkGarrettAIANCARB Stamp

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

-2 -7

.0 .A

S T

X E

H R

M .r v t

/1

/2

:5

:1

A

M

GI002

SHEET INDEX

Awen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX

671-22-700

DRAWING

NUMBER DRAWING TITLE

TN140 1ST FLOOR PLAN - TECHNOLOGY - AREA E2

TN141 1ST FLOOR PLAN - TECHNOLOGY - AREA F

TN142 1ST FLOOR PLAN - TECHNOLOGY - AREA G

TN143 1ST FLOOR PLAN - TECHNOLOGY - AREA H

TN144 1ST FLOOR PLAN - TECHNOLOGY - AREA J

TN145 1ST FLOOR PLAN - TECHNOLOGY - AREA PT

TN146 1ST FLOOR PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH

TN147 1ST FLOOR PLAN - TECHNOLOGY - AREA CLC CENTRAL

TN152 2ND FLOOR PLAN - TECHNOLOGY - AREA A

TN153 2ND FLOOR PLAN - TECHNOLOGY - AREA B

TN154 2ND FLOOR PLAN - TECHNOLOGY - AREA C

TN156 2ND FLOOR PLAN - TECHNOLOGY - AREA E1

TN157 2ND FLOOR PLAN - TECHNOLOGY - AREA E2

TN158 2ND FLOOR PLAN - TECHNOLOGY - AREA F

TN159 2ND FLOOR PLAN - TECHNOLOGY - AREA G

TN160 2ND FLOOR PLAN - TECHNOLOGY - AREA PT

TN165 3RD FLOOR PLAN - TECHNOLOGY - AREA G

TN166 3RD FLOOR PLAN - TECHNOLOGY - AREA TS

TN167 3RD FLOOR PLAN - TECHNOLOGY - AREA TN

TN170 4TH FLOOR PLAN - TECHNOLOGY - AREA TS

TN171 4TH FLOOR PLAN - TECHNOLOGY - AREA TN

TN175 5TH FLOOR PLAN - TECHNOLOGY - AREA TS

TN176 5TH FLOOR PLAN - TECHNOLOGY - AREA TN

TN180 6TH FLOOR PLAN - TECHNOLOGY - AREA TS

TN181 6TH FLOOR PLAN - TECHNOLOGY - AREA TN

TN185 7TH FLOOR PLAN - TECHNOLOGY - AREA TS

TN186 7TH FLOOR PLAN - TECHNOLOGY - AREA TN

TN190 BLDG 4 PLAN - TECHNOLOGY

TN400 GROUND LEVEL - TR L010.2 - TECHNOLOGY - ENLARGED PLANS

TN401 GROUND LEVEL - TR 030 - TECHNOLOGY - ENLARGED PLANS

TN402 GROUND LEVEL - TR GB126.1 - TECHNOLOGY - ENLARGED PLANS

TN403 GROUND LEVEL - TR F004 - TECHNOLOGY - ENLARGED PLANS

TN404 GROUND LEVEL - TR C015.1 - TECHNOLOGY - ENLARGED PLANS

TN405 GROUND LEVEL - TR 020 - TECHNOLOGY - ENLARGED PLANS

TN406 GROUND LEVEL - TR 1A138 - TECHNOLOGY - ENLARGED PLANS

TN407 GROUND LEVEL - TR H031 - TECHNOLOGY - ENLARGED PLANS

TN410 1ST FLOOR - TR S101 - TECHNOLOGY - ENLARGED PLANS

TN411 1ST FLOOR - TR J104 - TECHNOLOGY - ENLARGED PLANS

TN412 1ST FLOOR -TR H118.2 - TECHNOLOGY - ENLARGED PLANS

TN413 1ST FLOOR - TR 105 - TECHNOLOGY - ENLARGED PLANS

TN414 1ST FLOOR - TR G101 - TECHNOLOGY - ENLARGED PLANS

TN415 1ST FLOOR - TR 157 - TECHNOLOGY - ENLARGED PLANS

TN416 1ST FLOOR - TR P125 - TECHNOLOGY - ENLARGED PLANS

TN417 1ST FLOOR - TR 2A137 - TECHNOLOGY - ENLARGED PLANS

TN418 1ST FLOOR - TR Y102.7 - TECHNOLOGY - ENLARGED PLANS

TN419 1ST FLOOR - TR T119.2 - TECHNOLOGY - ENLARGED PLANS

TN420 2ND FLOOR - TR R201 - TECHNOLOGY - ENLARGED PLANS

TN421 2ND FLOOR - TR SP238 - TECHNOLOGY - ENLARGED PLANS

TN422 2ND FLOOR - TR Z221.28A - TECHNOLOGY - ENLARGED PLANS

TN423 2ND FLOOR - TR E221 - TECHNOLOGY - ENLARGED PLANS

TN424 2ND FLOOR - TR A200 - TECHNOLOGY - ENLARGED PLANS

TN425 2ND FLOOR - TR 258 - TECHNOLOGY - ENLARGED PLANS

TN430 3RD FLOOR - TR C301.1 - TECHNOLOGY - ENLARGED PLANS

TN431 3RD FLOOR -TR D320 - TECHNOLOGY - ENLARGED PLANS

TN440 4TH FLOOR - TR C402 - TECHNOLOGY - ENLARGED PLANS

TN450 5TH FLOOR - TR C511 - TECHNOLOGY - ENLARGED PLANS

TN460 6TH FLOOR - TR C602.1 - TECHNOLOGY - ENLARGED PLANS

TN470 7TH FLOOR - TR A702.1 - TECHNOLOGY - ENLARGED PLANS

TN480 EXISTING TRS - TECHNOLOGY - ENLARGED PLANS

TN481 EXISTING TRS - TECHNOLOGY - ENLARGED PLANS

TN490 1ST FLOOR - EXISTING CAMPUS SUPPORT CENTER - TECHNOLOGY - ENLARGED PLANS

TN491 1ST FLOOR - CAMPUS SUPPORT CENTER - TECHNOLOGY - ENLARGED PLANS

TN492 1ST FLOOR - CAMPUS SUPPORT CENTER - TECHNOLOGY - RACK ELEVATIONS

TN493 1ST FLOOR - CAMPUS SUPPORT CENTER - TECHNOLOGY - RACK ELEVATIONS

TN494 SUB-LEVEL - PBX - TECHNOLOGY - ENLARGMENTS

16.4-PHYSICAL SECURITY

TY001 SECURITY NOTES, SYMBOLS, AND ABBREVIATIONS

TY100 GROUND LEVEL SECURITY REFERENCE PLAN

TY101 1ST FLOOR SECURITY REFERENCE PLAN

TY102 2ND FLOOR SECURITY REFERENCE PLAN

TY103 3RD FLOOR SECURITY REFERENCE PLAN

TY104 4TH FLOOR SECURITY REFERENCE PLAN

TY105 5TH FLOOR SECURITY REFERENCE PLAN

TY106 6TH FLOOR SECURITY REFERENCE PLAN

TY107 7TH FLOOR SECURITY REFERENCE PLAN

TY401 SECURITY TR FLOOR PLANS

TY402 SECURITY TR FLOOR PLANS

TY403 SECURITY TR FLOOR PLANS

TY404 SECURITY DATA CENTER FLOOR PLAN

TY501 SECURITY DETAILS

TOTAL NUMBER OF SHEETS: 431

DRAWING

NUMBER DRAWING TITLE

16-TELECOMMUNICATIONS

T000 COVER SHEET - TECHNOLOGY

T001 SITE PLAN - TECHNOLOGY

T500 DETAILS - TECHNOLOGY

T501 DETAILS - TECHNOLOGY

T600 DIAGRAMS - TECHNOLOGY

T601 DIAGRAMS - TECHNOLOGY

T602 DIAGRAMS - TECHNOLOGY

T603 DIAGRAMS - TECHNOLOGY

T605 SCHEDULES - TECHNOLOGY

TD099 SUB-LEVEL DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD100 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD101 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD102 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD103 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD104 4TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD105 5TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD106 6TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD107 7TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL

TD121 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA A

TD122 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA B

TD123 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA C

TD124 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA D

TD125 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA E1

TD126 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA E2

TD127 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA F

TD128 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA G

TD129 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA H

TD130 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA PT

TD131 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH

TD132 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA CLC CENTRAL

TD135 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A

TD136 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B

TD137 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C

TD138 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D

TD139 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E1

TD140 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E2

TD141 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F

TD142 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G

TD143 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA H

TD144 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J

TD145 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA PT

TD146 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH

TD147 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA CLC CENTRAL

TD152 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A

TD153 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B

TD154 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C

TD156 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E1

TD157 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E2

TD158 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F

TD159 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G

TD160 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA PT

TD165 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G

TD166 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS

TD167 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN

TD170 4TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS

TD171 4TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN

TD175 5TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS

TD176 5TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN

TD180 6TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS

TD181 6TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN

TD185 7TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS

TD186 7TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN

TN155 2ND FLOOR PLAN - TECHNOLOGY - AREA D

TD155 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D

TN099 SUB-LEVEL PLAN - TECHNOLOGY - OVERALL

TN100 GROUND LEVEL PLAN - TECHNOLOGY - OVERALL

TN100.5 GROUND FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE

TN101 1ST FLOOR PLAN - TECHNOLOGY - OVERALL

TN101.5 1ST FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE

TN102 2ND FLOOR PLAN - TECHNOLOGY - OVERALL

TN102.5 2ND FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE

TN103 3RD FLOOR PLAN - TECHNOLOGY - OVERALL

TN103.5 3RD FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE

TN104 4TH FLOOR PLAN - TECHNOLOGY - OVERALL

TN104.5 4TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE

TN105 5TH FLOOR PLAN - TECHNOLOGY - OVERALL

TN105.5 5TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE

TN106 6TH FLOOR PLAN - TECHNOLOGY - OVERALL

TN106.5 6TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE

TN107 7TH FLOOR PLAN - TECHNOLOGY - OVERALL

TN107.5 7TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE

TN121 GROUND PLAN - TECHNOLOGY - AREA A

TN122 GROUND PLAN - TECHNOLOGY - AREA B

TN123 GROUND PLAN - TECHNOLOGY - AREA C

TN124 GROUND PLAN - TECHNOLOGY - AREA D

TN125 GROUND PLAN - TECHNOLOGY - AREA E1

TN126 GROUND PLAN - TECHNOLOGY - AREA E2

TN127 GROUND PLAN - TECHNOLOGY - AREA F

TN128 GROUND PLAN - TECHNOLOGY - AREA G

TN129 GROUND PLAN - TECHNOLOGY - AREA H

TN130 GROUND PLAN - TECHNOLOGY - AREA PT

TN131 GROUND PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH

TN132 GROUND PLAN - TECHNOLOGY - AREA CLC CENTRAL

TN135 1ST FLOOR PLAN - TECHNOLOGY - AREA A

TN136 1ST FLOOR PLAN - TECHNOLOGY - AREA B

TN137 1ST FLOOR PLAN - TECHNOLOGY - AREA C

TN138 1ST FLOOR PLAN - TECHNOLOGY - AREA D

TN139 1ST FLOOR PLAN - TECHNOLOGY - AREA E1

DRAWING

NUMBER DRAWING TITLE

15-ELECTRICAL

E000 ELECTRICAL COVERSHEET

E001 SITE PLAN - ELECTRICAL

E400 ELECTRICAL SCHEDULES

E401 ELECTRICAL SCHEDULES

E402 ELECTRICAL SCHEDULES

E500 ELECTRICAL DETAILS

E501 ELECTRICAL DETAILS

ED100 GROUND FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL

ED101 1ST FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL

ED102 2ND FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL

ED103 3RD FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL

ED104 4TH FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL

ED105 5TH FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL

ED106 6TH FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL

ED107 7TH FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL

EN100 GROUND FLOOR PLAN - ELECTRICAL - OVERALL

EN100.5 GROUND FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE

EN101 1ST FLOOR PLAN - ELECTRICAL - OVERALL

EN101.5 1ST FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE

EN102 2ND FLOOR PLAN - ELECTRICAL - OVERALL

EN102.5 2ND FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE

EN103 3RD FLOOR PLAN - ELECTRICAL - OVERALL

EN103.5 3RD FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE

EN104 4TH FLOOR PLAN - ELECTRICAL - OVERALL

EN104.5 4TH FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE

EN105 5TH FLOOR PLAN - ELECTRICAL - OVERALL

EN105.5 5TH FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE

EN106 6TH FLOOR PLAN - ELECTRICAL - OVERALL

EN106.5 6TH FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE

EN107 7TH FLOOR PLAN - ELECTRICAL - OVERALL

EN107.5 7TH FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE

EN190 BLDG 4 PLAN - ELECTRICAL

EN400 GROUND FLOOR - TR L010.2 - ELECTRICAL - ENLARGED PLANS

EN401 GROUND FLOOR - TR 030 - ELECTRICAL - ENLARGED PLANS

EN402 GROUND FLOOR - TR GB126.1 - ELECTRICAL - ENLARGED PLANS

EN403 GROUND FLOOR - TR F004 - ELECTRICAL - ENLARGED PLANS

EN404 GROUND FLOOR - TR C015.1 - ELECTRICAL - ENLARGED PLANS

EN405 GROUND FLOOR - TR 020 - ELECTRICAL - ENLARGED PLANS

EN406 GROUND FLOOR - TR 1A138 - ELECTRICAL - ENLARGED PLANS

EN407 GROUND LEVEL – H031 – ELECTRICAL – ENLARGED PLANS

EN410 1ST FLOOR - TR S101R - ELECTRICAL - ENLARGED PLANS

EN411 1ST FLOOR - TR J104 - ELECTRICAL - ENLARGED PLANS

EN412 1ST FLOOR - TR H118.2 - ELECTRICAL - ENLARGED PLANS

EN413 1ST FLOOR - TR 105 - ELECTRICAL - ENLARGED PLANS

EN414 1ST FLOOR - TR G101 - ELECTRICAL - ENLARGED PLANS

EN415 1ST FLOOR - TR 157 - ELECTRICAL - ENLARGED PLANS

EN416 1ST FLOOR - TR P125 - ELECTRICAL - ENLARGED PLANS

EN417 1ST FLOOR - TR 2A137 - ELECTRICAL - ENLARGED PLANS

EN418 1ST FLOOR - TR Y102.7 - ELECTRICAL - ENLARGED PLANS

EN419 1ST FLOOR - TR T119.2 - ELECTRICAL - ENLARGED PLANS

EN420 2ND FLOOR - TR R201 - ELECTRICAL - ENLARGED PLANS

EN421 2ND FLOOR - TR SP238 - ELECTRICAL - ENLARGED PLANS

EN422 2ND FLOOR - TR Z221.28A - ELECTRICAL - ENLARGED PLANS

EN423 2ND FLOOR - TR E221 - ELECTRICAL - ENLARGED PLANS

EN424 2ND FLOOR - TR A200 - ELECTRICAL - ENLARGED PLANS

EN425 2ND FLOOR - TR 258 - ELECTRICAL - ENLARGED PLANS

EN430 3RD FLOOR - TR C301.1 - ELECTRICAL - ENLARGED PLANS

EN431 3RD FLOOR - TR D320 - ELECTRICAL - ENLARGED PLANS

EN440 4TH FLOOR - TR C402 - ELECTRICAL - ENLARGED PLANS

EN450 5TH FLOOR - TR C511 - ELECTRICAL - ENLARGED PLANS

EN460 6TH FLOOR - TR C602 - ELECTRICAL - ENLARGED PLANS

EN470 7TH FLOOR - TR C702.1 - ELECTRICAL - ENLARGED PLANS

EN490 ELECTRICAL - ENLARGED PLAN

EN491 1ST FLOOR - IT SUITE DEMO - ELECTRICAL - ENLARGED PLAN

EN492 1ST FLOOR - DATA CENTER - ELECTRICAL - ENLARGED PLAN

EN493 1ST FLOOR - DATA CENTER - ELECTRICAL - ENLARGED PLAN

EN494 1ST FLOOR - EXISTING DATA CENTER - ELECTRICAL - EXISTING ENLARGED PLAN

EN495 1ST FLOOR - EXISTING DATA CENTER - ELECTRICAL - NEW ENLARGED PLAN

EN496 1ST FLOOR - EXISTING DATA CENTER - ELECTRICAL - NEW ENLARGED PLAN

EN497 ELECTRICAL RISER DIAGRAM

EN498 ELECTRICAL DETAILS

EN499 ELECTRICAL SCHEDULES

DRAWING

NUMBER DRAWING TITLE

AE180 6TH FLOOR, TOWER, AREA TS

AE181 6TH FLOOR, TOWER, AREA TN

AE185 7TH FLOOR, TOWER, AREA TS

AE186 7TH FLOOR, TOWER, AREA TN

AE301 REFERENCE SECTION - EAST/WEST MAIN HOSPITAL - WESTERN SECTION

AE302 REFERENCE SECTION - EAST/WEST MAIN HOSPITAL - EASTERN SECTION

AE303 REFERENCE SECTION - G WING

AE304 REFERENCE SECTIONS

AE305 REFERENCE SECTION - CLC

AE351 ROOM SECTIONS

AE352 ROOM SECTIONS

AE353 ROOM SECTIONS

AE354 ROOM SECTIONS

AE355 ROOM SECTIONS

AE361 WALL SECTIONS

AE401 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS

AE402 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS

AE403 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS

AE404 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS

AE405 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS

AE406 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS

AE407 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS

AE408 ENLARGED DATA CENTER FLOOR PLAN

AE409 ENLARGED DATA CENTER REFLECTED CEILING PLAN

AE410 ENLARGED MISCELLANEOUS PLANS

AE451 INTERIOR ELEVATIONS

AE452 INTERIOR ELEVATIONS

AE453 INTERIOR ELEVATIONS

AE454 INTERIOR ELEVATIONS

AE455 INTERIOR ELEVATIONS

AE501 INTERIOR FRAMING DETAILS

AE502 INTERIOR FRAMING DETAILS

AE511 DOOR DETAILS

AE521 WALL TYPES

AE522 PARTITION DETAILS

AE531 CEILING DETAILS

AE532 CEILING DETAILS

AE551 MISCELLANEOUS DETAILS

AE601 SCHEDULES

14-MECHANICAL

M000 MECHANICAL COVERSHEET

M500 MECHANICAL DETAILS

M600 MECHANICAL SCHEDULES

M700 CONTROL DIAGRAMS

MD100 GROUND LEVEL DEMOLITION PLAN - MECHANICAL - OVERALL

MD101 1ST FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL

MD102 2ND FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL

MD103 3RD FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL

MD104 4TH FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL

MD105 5TH FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL

MD106 6TH FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL

MD107 7TH FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL

MN100 GROUND LEVEL PLAN - MECHANICAL - OVERALL

MN101 1ST FLOOR PLAN - MECHANICAL - OVERALL

MN102 2ND FLOOR PLAN - MECHANICAL - OVERALL

MN103 3RD FLOOR PLAN - MECHANICAL - OVERALL

MN104 4TH FLOOR PLAN - MECHANICAL - OVERALL

MN105 5TH FLOOR PLAN - MECHANICAL - OVERALL

MN106 6TH FLOOR PLAN - MECHANICAL - OVERALL

MN107 7TH FLOOR PLAN - MECHANICAL - OVERALL

MD400 1ST FLOOR - DATA CENTER - MECHANICAL - ENLARGED DEMOLITION PLANS

MN400 GROUND LEVEL - TR C015.1 - MECHANICAL - ENLARGED PLANS

MN401 GROUND LEVEL - TR GB126.1 - MECHANICAL - ENLARGED PLANS

MN402 GROUND LEVEL - TR F004 - MECHANICAL - ENLARGED PLANS

MN403 GROUND LEVEL - TR 030 - MECHANICAL - ENLARGED PLANS

MN404 GROUND LEVEL - TR L010.2 - MECHANICAL - ENLARGED PLANS

MN405 GROUND LEVEL - TR 1A138 - MECHANICAL - ENLARGED PLANS

MN406 1ST FLOOR - TR G101 - MECHANICAL - ENLARGED PLANS

MN407 1ST FLOOR - TR 119.2 - MECHANICAL - ENLARGED PLANS

MN408 1ST FLOOR - TR H118.2 - MECHANICAL - ENLARGED PLANS

MN409 1ST FLOOR - TR P125 - MECHANICAL - ENLARGED PLANS

MN410 1ST FLOOR - TR 105 - MECHANICAL - ENLARGED PLANS

MN411 1ST FLOOR - TR J104 - MECHANICAL - ENLARGED PLANS

MN412 1ST FLOOR - TR S101R - MECHANICAL - ENLARGED PLANS

MN413 1ST FLOOR - TR 2A137 - MECHANICAL - ENLARGED PLANS

MN414 1ST FLOOR - Y102.7 - MECHANICAL - ENLARGED PLANS

MN415 2ND FLOOR - TR Z221.28A - MECHANICAL - ENLARGED PLANS

MN416 2ND FLOOR - TR A200 - MECHANICAL - ENLARGED PLANS

MN417 2ND FLOOR - TR SP238 - MECHANICAL - ENLARGED PLANS

MN418 2ND FLOOR - TR R201 - MECHANICAL - ENLARGED PLANS

MN419 3RD FLOOR - TR D320 - MECHANICAL - ENLARGED PLANS

MN420 4TH FLOOR - TR C402 - MECHANICAL - ENLARGED PLANS

MN421 5TH FLOOR - TR C511 - MECHANICAL - ENLARGED PLANS

MN422 6TH FLOOR - TR C602.1 - MECHANICAL - ENLARGED PLANS

MN423 7TH FLOOR - TR A702.1 - MECHANICAL - ENLARGED PLANS

MN424 1ST FLOOR - DATA CENTER - MECHANICAL - ENLARGED NEW WORK PLANS

DRAWING

NUMBER DRAWING TITLE

01-GENERAL

GI001 COVER SHEET

GI002 SHEET INDEX

GI003 GENERAL NOTES AND CODE REQUIREMENTS

GI004 TIL ABBREVIATION LIST (PG-18-4)

GI011 TYPICAL ADA REQUIREMENTS - INTERIOR CLEARANCES

GI005 SEQUENCING NOTES

GI100 GROUND LEVEL SEQUENCING AND DIAMOND ANALYSIS PLAN

GI101 1ST FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN

GI102 2ND FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN

GI103 3RD FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN

GI104 4TH FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN

GI105 5TH FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN

GI106 6TH FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN

GI107 7TH FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN

GC001 FIRE/SMOKE BARRIER DESCRIPTIONS

GC099 SUB-LEVEL FIRE/LIFE SAFETY PLAN

GC100 GROUND LEVEL FIRE/LIFE SAFETY PLAN

GC101 1ST FLOOR FIRE/LIFE SAFETY PLAN

GC102 2ND FLOOR FIRE/LIFE SAFETY PLAN

GC103 3RD FLOOR FIRE/LIFE SAFETY PLAN

GC104 4TH FLOOR FIRE/LIFE SAFETY PLAN

GC105 5TH FLOOR FIRE/LIFE SAFETY PLAN

GC106 6TH FLOOR FIRE/LIFE SAFETY PLAN

GC107 7TH FLOOR FIRE/LIFE SAFETY PLAN

GS101 CAMPUS SITE PLAN

08-ARCHITECTURE

AD001 GENERAL DEMOLITION NOTES

AD351 DEMOLITION BUILDING SECTIONS

AD361 DEMOLITION WALL SECTIONS

AD401 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS

AD402 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS

AD403 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS

AD404 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS

AD405 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS

AD406 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS

AD407 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS

AD408 ENLARGED DATA CENTER DEMOLITION FLOOR PLAN

AD409 ENLARGED DATA CENTER DEMO REFLECTED CEILING PLAN

AE001 ARCHITECTURAL GENERAL INFORMATION

AE100 GROUND LEVEL REFERENCE PLAN

AE100.5 GROUND-LEVEL INTERSTITIAL SPACE REFERENCE PLAN

AE101 1ST FLOOR REFERENCE PLAN

AE101.5 1ST FLOOR INTERSTITIAL SPACE REFERENCE PLAN

AE102 2ND FLOOR REFERENCE PLAN

AE102.5 2ND FLOOR INTERSTITIAL SPACE REFERENCE PLAN

AE103 3RD FLOOR REFERENCE PLAN

AE103.5 3RD FLOOR INTERSTITIAL SPACE REFERENCE PLAN

AE104 4TH FLOOR REFERENCE PLAN

AE104.5 4TH FLOOR INTERSTITIAL SPACE REFERENCE PLAN

AE105 5TH FLOOR REFERENCE PLAN

AE105.5 5TH FLOOR INTERSTITIAL SPACE REFERENCE PLAN

AE106 6TH FLOOR REFERENCE PLAN

AE106.5 6TH FLOOR INTERSTITIAL SPACE REFERENCE PLAN

AE107 7TH FLOOR REFERENCE PLAN

AE107.5 7TH FLOOR INTERSTITIAL SPACE REFERENCE PLAN

AE108 ROOF REFERENCE PLAN

AE121 GROUND LEVEL, MAIN HOSPITAL, AREA A

AE122 GROUND LEVEL, MAIN HOSPITAL, AREA B

AE123 GROUND LEVEL, MAIN HOSPITAL, AREA C

AE124 GROUND LEVEL, MAIN HOSPITAL, AREA D

AE125 GROUND LEVEL, MAIN HOSPITAL, AREA E1

AE126 GROUND LEVEL, MAIN HOSPITAL, AREA E2

AE127 GROUND LEVEL, MAIN HOSPITAL, AREA F

AE128 GROUND LEVEL, MAIN HOSPITAL, AREA G

AE129 GROUND LEVEL, MAIN HOSPITAL, AREA H

AE130 GROUND LEVEL, POLYTRAUMA

AE131 GROUND LEVEL, CLC NORTH & SOUTH

AE132 GROUND LEVEL, CLC CENTRAL

AE135 1ST FLOOR, MAIN HOSPITAL, AREA A

AE136 1ST FLOOR, MAIN HOSPITAL, AREA B

AE137 1ST FLOOR, MAIN HOSPITAL, AREA C

AE138 1ST FLOOR, MAIN HOSPITAL, AREA D

AE139 1ST FLOOR, MAIN HOSPITAL, AREA E1

AE140 1ST FLOOR, MAIN HOSPITAL, AREA E2

AE141 1ST FLOOR, MAIN HOSPITAL, AREA F

AE142 1ST FLOOR, MAIN HOSPITAL, AREA G

AE143 1ST FLOOR, MAIN HOSPITAL, AREA H

AE144 1ST FLOOR, MAIN HOSPITAL, AREA J

AE145 1ST FLOOR, POLYTRAUMA

AE146 1ST FLOOR, CLC NORTH & SOUTH

AE147 1ST FLOOR, CLC CENTRAL

AE152 2ND FLOOR, MAIN HOSPITAL, AREA A

AE153 2ND FLOOR, MAIN HOSPITAL, AREA B

AE154 2ND FLOOR, MAIN HOSPITAL, AREA C

AE155 2ND FLOOR, MAIN HOSPITAL, AREA D

AE156 2ND FLOOR, MAIN HOSPITAL, AREA E1

AE157 2ND FLOOR, MAIN HOSPITAL, AREA E2

AE158 2ND FLOOR, MAIN HOSPITAL, AREA F

AE159 2ND FLOOR, MAIN HOSPITAL, AREA G

AE160 2ND FLOOR, POLYTRAUMA

AE165 3RD FLOOR, MAIN HOSPITAL, AREA G

AE166 3RD FLOOR, TOWER, AREA TS

AE167 3RD FLOOR, TOWER, AREA TN

AE169 4TH FLOOR, MAIN HOSPITAL, AREA G

AE170 4TH FLOOR, TOWER, AREA TS

AE171 4TH FLOOR, TOWER, AREA TN

AE175 5TH FLOOR, TOWER, AREA TS

AE176 5TH FLOOR, TOWER, AREA TN

Revisions: Date: SHEET 2 of 431

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

-2 -7

.0 .A

S T

X E

H R

M .r v t

/1

/2

:5

:2

A

M

GI003

GENERAL NOTES AND CODE

REQUIREMENTSAwen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX

671-22-700

BUILDING CLASSIFICATION:

BASIC OCCUPANCY GROUP(S):

(NFPA 101 6.1.5)

OCCUPANCY GROUP I

CONSTRUCTION TYPE:

(EXISTING)

TYPE II 222, SPRINKLERED

BASIC ALLOWABLE AREA:

(222 FULLY SPRINKLERED)

OCCUPANCY GROUP I-2 – UNLIMITED

ACTUAL HEIGHT

8 STORY HOSPITAL + PARTIAL BASEMENT

MINIMUM FIRE RESISTIVE REQUIREMENTS:

(NFPA 222, TABLE 4.1.1)

ELEMENT RATING

BEARING WALLS, EXTERIOR 2-HOUR

BEARING WALLS, INTERIOR 2-HOUR

NON-BEARING WALLS, INTERIOR 0-HOUR

STRUCTURAL FRAME 2-HOUR

STRUCTURAL FRAME, SUPPORTING ROOF ONLY 1-HOUR

SHAFT ENCLOSURES 2-HOUR

FLOORS AND FLOOR/CEILINGS 2-HOUR

ROOFS AND ROOF/CEILINGS 1-HOUR

HORIZONTAL EXIT 2-HOUR

SMOKE BARRIER (COMPARTMENTS) 1-HOUR

HAZARDOUS AREA SEPARATIONS 1-HOUR

SOILED LINEN ROOMS 1-HOUR

STORAGE ROOMS > 100 SF 1-HOUR

CORRIDORS

(NFPA 101 CHAPTER 38.3.6.1)

EXCEPTION 3, WITHIN BUILDINGS PROTECTED THROUGHOUT

BY AN APPROVED AUTOMATIC SPRINKLER SYSTEM, 1-HOUR

FIRE RESISTANCE RATING IS NOT REQUIRED.

MAXIMUM TRAVEL DISTANCE TO EXITS

(NFPA 101, CHAPTER 39)

TRAVEL DISTANCE 200-FEET

COMMON PATH OF TRAVEL 100-FEET

DEAD-END CORRIDOR 50-FEET

FIRE SUPPRESSION

THE FACILITY WILL BE FULLY SPRINKLERED PER NFPA 13

HANDHELD FIRE SPRINKLERS WILL BE INSTALLED IN EACH IDF ROOM

OCCUPANT LOAD CALCULATIONS:

(PER NFPA 101, Table 7.3.1.2)

BUSINESS USE: 150 SF/OCC

INPATIENT TREATMENT DEPARTMENTS: 250 SF/OCC

SLEEPING DEPARTMENTS: 120 SF/OCC

AMBULATORY HEALTH CARE: 150 SF/OCC

USE 120 SF PER OCCUPANT (MOST RESTRICTIVE)

EXISTING EXIT SYSTEM CAPACITY

BASEMENT: ~49,633 SF, NO ADDED AREA

1ST FLOOR: ~67,120 SF (WINGS C, D, & E), NO ADDED AREA

2ND FLOOR: ~55,715 SF (WINGS C, D, & E), 677 ADDED AREA

EXISTING OCC LOAD: 465, ADDED OCC LOAD: 6

EXISTING STAIR CAPACITY FACTOR: 465x0.3=139.5 EXISTING DOOR CAPACITY FACTOR: 465x0.2=93.0*

EXISTING CAPACITY: 210 (STAIRS 1, 2, 3, 6, & 7) (*FROM DR WIDTH)

ADDED CAPACITY FACTOR: 6x0.2=1.2, THEREFORE OK

3RD FLOOR: ~55,678 SF (WINGS C, D, & E), 677 ADDED AREA

EXISTING OCC LOAD: 464, ADDED OCC LOAD: 6

EXISTING STAIR CAPACITY FACTOR: 464x0.3=139.2 EXISTING DOOR CAPACITY FACTOR: 464x0.2=92.8*

EXISTING CAPACITY: 210 (STAIRS 1, 2, 3, 6, & 7) (*FROM DR WIDTH)

ADDED CAPACITY FACTOR: 6x0.2=1.2, THEREFORE OK

4TH FLOOR: ~55,678 SF (WINGS C, D, & E), 677 ADDED AREA

EXISTING OCC LOAD: 464, ADDED OCC LOAD: 6

EXISTING STAIR CAPACITY FACTOR: 464x0.3=139.2 EXISTING DOOR CAPACITY FACTOR: 464x0.2=92.8*

EXISTING CAPACITY: 210 (STAIRS 1, 2, 3, 6, & 7) (*FROM DR WIDTH)

ADDED CAPACITY FACTOR: 6x0.2=1.2, THEREFORE OK

5TH FLOOR: ~30,654 SF (WINGS C, & D, 321 ADDED AREA

EXISTING OCC LOAD: 256, ADDED OCC LOAD: 3

EXISTING STAIR CAPACITY FACTOR: 256x0.3=76.8 EXISTING DOOR CAPACITY FACTOR: 465x0.2=51.2*

EXISTING CAPACITY: 126 (STAIRS 1, 2, & 3) (*FROM DR WIDTH)

ADDED CAPACITY FACTOR: 3x0.2=0.6, THEREFORE OK

6TH FLOOR: ~30,654 SF (WINGS C, & D, 321 ADDED AREA

EXISTING OCC LOAD: 256, ADDED OCC LOAD: 3

EXISTING STAIR CAPACITY FACTOR: 256x0.3=76.8 EXISTING DOOR CAPACITY FACTOR: 465x0.2=51.2*

EXISTING CAPACITY: 126 (STAIRS 1, 2, & 3) (*FROM DR WIDTH)

ADDED CAPACITY FACTOR: 3x0.2=0.6, THEREFORE OK

STAIR 1: 48" WIDE, 42" DOOR STAIR 2: 48" WIDE, 42" DOOR

STAIR 3: 48" WIDE, 42" DOOR STAIR 6: 60" WIDE, 42" DOOR

STAIR 7: 48" WIDE, 42" DOOR

EXISTING SMOKE COMPARTMENTS

2ND FLOOR

SMOKE COMPARTMENT D; 11,509 SF

SMOKE COMPARTMENT DC; 8,255 SF (INCLUDES ADDED TR)

SMOKE COMPARTMENT C; 10,766 SF

SMOKE COMPARTMENT E; 5,588 SF

3RD FLOOR

SMOKE COMPARTMENT D; 12,562 SF

SMOKE COMPARTMENT DC; 6,341 SF (INCLUDES ADDED TR)

SMOKE COMPARTMENT C; 11,752 SF

SMOKE COMPARTMENT E; 5,413 SF

4TH FLOOR

SMOKE COMPARTMENT D; 10,303 SF

SMOKE COMPARTMENT DC; 10,001 SF (INCLUDES ADDED TR)

SMOKE COMPARTMENT C; 10,203 SF

SMOKE COMPARTMENT E; 5,614 SF

5TH FLOOR

SMOKE COMPARTMENT D; 9,600 SF

SMOKE COMPARTMENT DC; 11,100 SF (INCLUDES ADDED TR)

SMOKE COMPARTMENT C; 11,273 SF

6TH FLOOR

SMOKE COMPARTMENT D; 25,408 SF (INCLUDES ADDED TR)

SMOKE COMPARTMENT C; 6,493 SF

GENERAL

1. THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS LISTED ON GI002, SHEET INDEX.

2. MATERIAL QUANTITIES EXTRACTED BY THE GC FROM THE DESIGN-INTENT MODEL SHOULD BE

USED WITH CAUTION BECAUSE A DESIGN-INTENT MODEL IS NOT CREATED FOR THIS PURPOSE.

THE GC IS OBLIGATED TO DETERMINE, AND ASSUMES ALL RISK FOR, THE SUITABILITY OF THE

DESIGN-INTENT BIM FOR MATERIAL QUANTITY TAKEOFFS.

3. THE GC IS RESPONSIBLE TO ENSURE THAT EQUIPMENT AND SYSTEMS ARE INSTALLED

ACCORDING TO THE CONSTRUCTION COORDINATED MODEL LOCATIONS, WHICH HAVE BEEN

SIGNED OFF BY VA FACILITY MANAGEMENT PERSONNEL, AND ARE REFINED FROM THE AE

DESIGN COORDINATED MODEL LOCATIONS. ANY DEVIATIONS THAT IMPINGE ON SPACE

RESERVATIONS AS NOTED IN VA BIM STANDARDS MUST BE APPROVED BY VA IN WRITING.

4. FOR GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS APPLICABLE ONLY TO THE DRAWINGS OF

ONE DISCIPLINE, REFER TO THE DRAWINGS OF THAT DISCIPLINE – SEE “SHEET INDEX”.

5. THE COMPLETE SET OF DRAWINGS CONSIST OF ALL DRAWINGS LISTED BY THE “SHEET INDEX”.

THE WORK DESCRIBED IN ONE SHEET MAY BE REFERENCED AND MAY BE AFFECTED BY WORK

DESCRIBED ON ANOTHER SHEET.

6. THE WORK DESCRIBED IN ONE DISCIPLINE MAY BE REFERENCED AND AFFECTED BY WORK OF

ANOTHER DISCIPLINE. PARTIAL SETS OF DRAWINGS ARE INCOMPLETE AND SHOULD NOT BE

REDISTRIBUTED OR UTILIZED BY THE CONTRACTOR.

7. IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF

ALL SUBCONTRACTORS, TRADES AND SUPPLIERS WITH REQUIREMENTS OF THE CONTRACT

DOCUMENTS BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT ALL PARTIES ARE

AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE REQUIREMENTS OCCUR IN THE

CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE WORK OF THAT TRADE.

8. ALL ARCHITECTURAL DRAWINGS ESTABLISH AND COORDINATE THE FINISHED APPEARANCE AND

LOCATION OF ALL EXPOSED ELEMENTS OF THE WORK, INCLUDING THAT WORK WHICH IS

ILLUSTRATED PRIMARILY ON DRAWING OF OTHER DISCIPLINES, UNLESS OTHERWISE NOTED ON

THE DRAWINGS.

9. THE ARCHITECTURAL FLOOR PLANS, REFLECTED CEILING PLANS, SECTIONS, AND ELEVATIONS

SHOW THE LOCATION OF MANY-BUT NOT ALL – EXPOSED PARTS OF THE WORK. FOR ITEMS NOT

LOCATED EXACTLY, APPLY THE RULES INDICATED BY THE DRAWING “TYPICAL MOUNTING

HEIGHTS AND CONFIGURATION DIAGRAMS” TO DETERMINE THE EXACT LOCATION OF EACH

EXPOSED PART OF THE WORK.

10. REFER TO THE STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND TELECOMMUNICATION

DRAWINGS FOR THE DETAILED DESIGN OF THE STRUCTURAL, MECHANICAL, ELECTRICAL AND

PLUMBING SYSTEMS, OF WHICH PORTIONS MAY ALSO MAY BE SHOWN ON THE ARCHITECTURAL

DRAWINGS.

11. ALL PARTS OF THE WORK – INCLUDING MATERIALS, METHODS, ASSEMBLIES, ETC – SHALL

COMPLY WITH ALL APPLICABLE GOVERNING RULES, CODES, REGULATIONS, ORDINANCES, AND

LAWS OF ALL FEDERAL, STATE DISTRICT, TERRITORIAL AND LOCAL GOVERNMENT AUTHORITIES

HAVING JURISDICTION OVER THE DESIGN, CONSTRUCTION, AND OCCUPANCY OF THE PROJECT,

WHETHER LISTED BY THE CONTRACT DOCUMENTS OR NOT.

12. NO PART OF THE CONTRACT DOCUMENTS SHALL BE CONSTRUED TO REQUIRE OR PERMIT

WORK CONTRARY TO AN APPLICABLE GOVERNING RULE, CODE, REGULATION, ORDINANCE, OR

LAW.

13. IF A CONFLICT EXISTS BETWEEN THE CONTRACT DOCUMENTS AND A REGULATORY

REQUIREMENT, THE CONTRACTOR SHALL COMPLY WITH THE ONE ESTABLISHING THE MORE

STRINGENT OR RESTRICTIVE REQUIREMENT:

• THE DRAWINGS AND SPECIFICATIONS MAY SET FORTH MORE DETAILED, MORE SPECIFIC,

AND/OR MORE RESTRICTIVE REQUIREMENTS THAN THOSE SET FORTH BY THE APPLICABLE

REGULATORY REQUIREMENTS,

• WHERE THE DRAWINGS AND SPECIFICATIONS PROVIDE MORE DETAILED, MORE SPECIFIC,

AND/OR MORE RESTRICTIVE REQUIREMENTS, THE CONTRACTOR SHALL COMPLY WITH THOSE

REQUIREMENTS. WHERE THE APPLICABLE REQUIREMENTS OF THE REFERENCED RULES,

CODES, REGULATIONS, ORDINANCES, OR LAWS ARE MORE RESTRICTIVE THAN THAT SET

FORTH BY THE DRAWINGS AND SPECIFICATION, THE CONTRACTOR SHALL COMPLY WITH ALL

SUCH MORE RESTRICTIVE REQUIREMENTS. ALTHOUGH SUCH REQUIREMENTS MAY NOT BE

ILLUSTRATED BY THE DRAWINGS AND SPECIFICATIONS.

14. APPLICABLE PORTIONS OF THE CODES, REGULATIONS, AND STANDARDS LISTED HERE ARE

INCORPORATED BY REFERENCE INTO THE REQUIREMENTS OF THIS CONTRACT AND ESTABLISH

MINIMUM REQUIREMENTS WITH WHICH THE WORK MUST COMPLY.

15. PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS “BASIS OF DESIGN”.

• ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT OR

ASSEMBLY WHILE THE SPECIFICATIONS LIST TWO OR MORE ACCEPTABLE MANUFACTURERS

AND/OR PRODUCTS, WHEN THIS OCCURS, THE PRODUCT OR ASSEMBLY ILLUSTRATED BY THE

DRAWINGS IS THE “BASIS OF DESIGN” PRODUCT OR ASSEMBLY.

• THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS OF

SPECIFIED PRODUCTS AND ASSEMBLIES OTHER THAN THE “BASIS OF DESIGN” MAY VARY

FROM THAT SHOWN BY THE DRAWINGS.

• THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR ASSEMBLY IN LIEU OF

THE “BASIS OF DESIGN” PRODUCT OR ASSEMBLY. HOWEVER, THE CONTRACTOR IS

RESPONSIBLE (AT NO ADDITIONAL EXPENSE TO THE OWNER) FOR ALL COORDINATION AND

REVISIONS TO DIMENSIONS AND/OR DETAILS NECESSARY TO ACHIEVE THE SAME FUNCTIONAL

AND AESTHETIC DESIGN INTENT AS ILLUSTRATED BY THE “BASIS OF DESIGN” SHOWN BY THE

CONTRACT DOCUMENTS.

21. CONSTRUCTION, WORKMANSHIP, AND MATERIALS SHALL CONFORM TO THE 2021 IBC AND

CURRENT VA STANDARDS.

22. THE CONTRACTOR SHALL NOTIFY THE COR AND AOR WHERE A CONFLICT OR DISCREPANCY

OCCURS BETWEEN THE CONTRACT DOCUMENT AND ANY OTHER PORTION OF THE CONTRACT

DOCUMENTS, FIELD CONDITIONS OR WHERE ANY CONDITIONS ARISE NOT COVERED BY THESE

DOCUMENTS WHEREIN WORK WILL NOT COMPLY WITH THE REQUIREMENTS OF THE IBC.

23. THESE DRAWINGS INDICATE IN GENERAL THE PROJECT IN TERMS OF ARCHITECTURAL

DESIGN INTENT, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS

AND TYPE OF STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS. THE DRAWINGS DO

NOT NECESSARILY INDICATE OR DESCRIBE ALL WORK REQUIRED FOR FULL PERFORMANCE

AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. AS INDICATED OR

DESCRIBED, THE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER

EXECUTION AND COMPLETION OF THE WORK.

24. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND TELECOMMUNICATIONS DRAWINGS

AND SPECIFICATIONS FOR ARCHITECTURAL ROUTING OF CONDUIT, PIPING, DUCTWORK ETC.

AT UNDERSIDE OF CONCRETE SLABS. ROUTING SHALL BE ORTHOGONAL, AND LIKE ITEMS TO

BE GANGED AND TO RUN PARALLEL WITH EVEN SPACING TYPICAL. EXACT ROUTING SHALL BE

DETERMINED BY THE CONTRACTOR, AND LAYOUT SHOP DRAWINGS SUBMITTED FOR

ARCHITECTURAL REVIEW AND APPROVAL PRIOR TO INSTALLATION. CONTRACTOR SHALL

VERIFY SIZES AND LOCATIONS OF ALL MECHANICAL EQUIPMENT PADS AND BASES AS WELL AS

POWER AND WATER OR DRAIN INSTALLATIONS WITH EQUIPMENT MANUFACTURERS BEFORE

PROCEEDING WITH THE WORK. CHANGES TO ACCOMMODATE FIELD CONDITIONS OR

SUBSTITUTIONS SHALL BE MADE AT NO ADDITIONAL COST.

25. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED TO BE

CONSTRUCTION STANDARDS. IF THE CONTRACTOR HAS QUESTIONS REGARDING SAME, OR

THEIR EXACT MEANING, THE ARCHITECT SHALL BE NOTIFIED FOR CLARIFICATION.

26. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR/WALL SLEEVES AND SHAFTS

IN CONCRETE SLABS/WALLS WITH MECHANICAL, PLUMBING, FIRE PROTECTION, ELECTRICAL,

STRUCTURAL AND ARCHITECTURAL DRAWINGS AND DISCREPANCIES, IF ANY, TO BE BROUGHT

TO NOTICE OF THE ENGINEER PRIOR TO EXECUTION OF WORK.

27. COORDINATE WORK WITH COR, INCLUDING SCHEDULING TIME AND LOCATIONS FOR

DELIVERIES, BUILDING ACCESS, USE OF BUILDING SERVICES AND FACILITIES, AND USE OF

ELEVATORS. MINIMIZE DISTURBANCE OF BUILDING FUNCTIONS AND OCCUPANTS.

28. ALL EXISTING OR PROPOSED ELEVATIONS (LEVELS) AND DIMENSIONS, ON SITE AND ON

DRAWINGS MUST BE CHECKED AND VERIFIED BY THE CONTRACTOR BEFORE THE

PREPARATION OF SHOP DRAWINGS OR COMMENCEMENT OF ANY ITEM OF WORK ON THE SITE.

29. ARCHITECTURAL DRAWINGS MUST ALWAYS BE READ IN CONJUNCTION WITH ALL OTHER

RELEVANT SERVICES DRAWINGS AND CONTRACT DOCUMENTS. ANY DISCREPANCY BETWEEN

THESE DRAWINGS AND DOCUMENTS SHOULD BE REPORTED TO THE COR AND ARCHITECT FOR

CLARIFICATION AND VERIFICATION.

30. CONTRACTOR SHALL LOCATE AND INSTALL ALL ACCESS PANEL IN THE GYPSUM BOARD

CEILING AND WALLS FOR SERVICES ACCESS.

31. FOR AREAS WITHOUT SUSPENDED CEILING HAVING EXPOSED SLAB AND BEAMS, WALL FINISH

MATERIAL SHALL BE FROM FLOOR LEVEL TO BOTTOM OF SLAB LEVEL. (UNLESS NOTED

OTHERWISE)

32. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT SYSTEMS AND MATERIALS ARE

TO BE REVIEWED, COORDINATED AND ARE TO BE APPLIED TO ALL RELATED DRAWINGS AND

DETAILS.

FIRE PROTECTION

1. ALL OPENINGS IN SLABS AT MECHANICAL ROOMS (INCLUDING SPACES LEFTOVER IN THE

SHAFTS AFTER INSTALLATION OF DUCTS) MUST BE SEALED OFF WITH NON-COMBUSTIBLE

MATERIALS TO MAINTAIN THE REQUIRED FIRE-RATING CONTINUITY OF THE FLOOR

CONSTRUCTION. CONTRACTOR SHALL SUBMIT SHOP-DRAWINGS FOR APPROVAL FOR ALL

SUCH CASES.

2. ALL OPENINGS AT SLABS, WALLS SHALL BE SEALED OFF (FILLED) WITH NON-COMBUSTIBLE

MATERIALS TO MAINTAIN THE REQUIRED FIRE RATING CONTINUITY OF THE FLOOR, WALL

CONSTRUCTION. ALL HOLES, INCLUDING THOSE FOR MECHANICAL, AND ELECTRICAL

FACILITIES WHICH ARE LOCATED ON FLOOR SLAB, PARTITIONS AND WALLS MUST BE FILLED

WITH NON-COMBUSTIBLE MATERIALS TO PROVIDE REQUIRED FIRE RATING AND SHALL BE

SEALED AGAINST PASSAGE OF SMOKE AND FLAME.

3. A FINISH OR FIRE RATING INDICATION ON A WALL SHALL MEAN THE ENTIRE LENGTH OF WALL

IS TO BE FINISHED OR FIRE RATED.

4. FIRE RATED ASSEMBLIES SHALL BE PER TABLE 721.1(1), GENERIC ASSEMBLIES OF GYPSUM

HANDBOOK, OR HAVE ICC APPROVAL.

5. PENETRATIONS OF FIRE RESISTANCE-RATED HORIZONTAL ASSEMBLIES AND FIRE

RESISTANCE RATED WALLS SHALL COMPLY WITH SECTION 714 OF THE IBC, INCLUDING FIRE

DAMPERS AND SMOKE DAMPERS WHERE REQUIRED.

6. MEMBRANE PENETRATIONS BY LISTED ELECTRICAL OUTLET BOXES ARE PERMITTED

PROVIDED SUCH BOXES HAVE BEEN TESTED FOR USE IN FIRE-RESISTANCE-RATED

ASSEMBLIES AND THE BOX DOES NOT EXCEED 1/8" UNLESS LISTED OTHERWISE.

METAL WORKS

1. ALL MILD STEEL WORKS SHOWN ON THE CONTRACT DRAWINGS/DETAILS SHALL BE PRIMED

AND SHALL BE PAINTED WITH TWO COATS OF EPOXY PAINT.

2. STEEL ELEMENTS NOT SHOWN IN THE CONTRACT DRAWINGS BUT ARE DEEMED NECESSARY

FOR THE SATISFACTORY COMPLETION OF THE WORKS SHALL BE GALVANIZED STEEL PRIMED

& PAINTED WITH TWO COATS OF EPOXY PAINT FOR ALL INTERIOR SITUATIONS AND STAINLESS

STEEL (#316) FOR ALL EXTERIOR SITUATIONS.

3. ALL WELDED STEEL JOINTS SHALL BE GRINDED SMOOTH, PRIMED & PAINTED.

4. ALL WELDING SHALL BE OF SUITABLE TYPE TO STEEL WORKS.

ABATEMENT SCHEDULE

Level

ROOM

MATERIAL DISCRIPTION

NUMBER NAME

FLR 1 J104 TR APPROXIMATELY 40 SF OF DRYWALL JOINT COMPOUND

FLR 1 S101 TR APPROXIMATELY 100 SF OF BLACK MASTIC UNDER TAN FLOOR TILE

CODE ANALYSISPROJECT GENERAL NOTES

THE ELECTRONIC HEALTHCARE RECORDS MODERNIZATION (EHRM) INFRASTRUCTURE UPGRADES

PROJECT AT THE AUDIE L. MURPHY MEMORIAL VETERANS HOSPITAL (ALMMVH) IN SAN ANTONIO, TEXAS, ADDRESSES NECESSARY INFORMATION TECHNOLOGY (IT) UPGRADES TO MODERNIZE

EXISTING INFRASTRUCTURE AND SUPPORT IMPLEMENTING A NEW EHRM SYSTEM IN ACCORDANCE

WITH THE FOLLOWING REQUIREMENTS ESTABLISHED BY THE FOLLOWING VA OFFICE OF INFORMATION AND TECHNOLOGY (OIT) AND VA OFFICE OF ELECTRONIC HEALTH RECORDS MODERNIZATION (OEHRM)

STANDARDS:

• OEHRM SITE INFRASTRUCTURE AND END USER DEVICE (EUD) REQUIREMENTS, VERSION 2.0, DATED

APRIL 15, 2021

• OIT INFRASTRUCTURE STANDARDS FOR TELECOMMUNICATION SPACES, V3.1, DATED 1 JULY 2021

• HEPF SEP (SOCAMES) DESIGN ALERTS 1-8

THE PROJECT INCLUDES, BUT IS NOT LIMITED TO:

1. ELECTRICAL (ELECTRICAL PANEL UPGRADE POWER (NORMAL, EMERGENCY), BONDING, UPS)

2. BUILDING MANAGEMENT SYSTEM INTERFACES

3. NEW AND UPGRADING EXISTING HVAC

4. RECONFIGURATION, EXPANSION, AND RENOVATION OF EXISTING SPACES, INCLUDING DEMO, NEW

CONSTRUCTION, AND FINISHES)

5. DATA CENTER (SERVER ROOMS) WORK (HVAC, UPS, POWER DISTRIBUTION, CABLE MANAGEMENT)

6. COMMUNICATION INFRASTRUCTURE (NEW DATA OUTLETS, PATCH PANELS, UPGRADE TO CAT 6A

CABLE) IN BUILDINGS AS INDICATED

7. PHYSICAL SECURITY UPGRADES

8. UPGRADE FIBER INFRASTRUCTURE BACKBONE CAMPUS WIDE WITHIN BUILDINGS AND BETWEEN

BUILDINGS

9. HAZARDOUS MATERIAL ABATEMENT

10. REMOVAL OF ALL SUSPENDED ACOUSTICAL TILE CEILINGS IN TRs TO REMAIN.

11. REMOVAL OF EXISTING FLOORING IN TRs TO REMAIN AND INSTALLATION OF SDT STATIC

DISSIPATIVE TILE FLOORING GROUNDED TO THE BUSS BAR IN THE TR.

CONSTRUCTION PROJECT TO UPGRADE THE FACILITY INFRASTRUCTURE TO SUPPORT THE

NEW ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM) SYSTEM IN ACCORDANCE WITH VA

OEHRM SITE INFRASTRUCTURE REQUIREMENTS. THE PROJECT INCLUDES, BUT IS NOT LIMITED TO:

1. ELECTRICAL (ELECTRICAL PANEL UPGRADE POWER (NORMAL, EMERGENCY))

2. BONDING

3. UPS

4. BUILDING MANAGEMENT SYSTEM INTERFACES

5. NEW AND UPGRADES TO EXISTING HVAC

6. RECONFIGURATION, EXPANSION AND RENOVATION OF EXISTING SPACE (DEMO, NEW

CONSTRUCTION, FINISHES)

7. DATA CENTER (SERVER ROOMS) WORK (HVAC, UPS, POWER DISTRIBUTION, CABLE MANAGEMENT)

8. COMMUNICATION INFRASTRUCTURE (NEW DATA OUTLETS, PATCH PANELS, UPGRADE TO CAT 6A

CABLE) IN BUILDINGS AS INDICATED

9. UPGRADE FIBER INFRASTRUCTURE BACKBONE CAMPUS WIDE WITHIN BUILDINGS AND BETWEEN

BUILDINGS

10. HAZARDOUS MATERIAL ABATEMENT

PROJECT BUILDING LOCATIONS INCLUDE:

1. BUILDING 1 (MAIN HOSPITAL BUILDING, INCLUDING TOWER AND SCI, COMMUNITY LIVING CENTER

BUILDING, POLYTRAUMA BUILDING)

2. BUILDING 4

THE FOLLOWING TRS WILL REMAIN IN PLACE WITH ARCHITECTURAL FINISH AND MEPT UPGRADES AS

INDICATED.

1. 020 C5/AE402

2. F004 F1/AE401

3. H031 B7/AE401

4. L010.2 C7/AE402

5. 157 F5/AE405

6. C132 C3/AE403

7. Y102.7 C5/AE405

8. 105 F7/AE403

9. E221 C5/AE406

10. 258 C3/AE406

11. C301.1 C7/AE407

12. 4101.1 F3/AE407

THE FOLLOWING TRS WILL BE EXPANDED WITH ARCHITECTURAL FINISH AND MEPT UPGRADES AS

INDICATED:

1. 030 F7/AE401

2. G101 F7/AE405

3. J104 D7/AE404

4. T119.2 C7/AE405

5. S101 C5/AE403

6. A200 F7/AE406

7. R201 F1/AE405

8. (SP)238 C7/AE406

9. D320 F1/AE406

10. C402 F7/AE407

11. C511 C5/AE407

12. C602.1 F1/AE407

THE FOLLOWING TRS WILL BE CONSTRUCTED WITH ARCHITECTURAL FINISH AND MEPT UPGRADES AS

INDICATED:

1. 1A138 C1/AE402

2. C015.1 C1/AE401

3. GB126.1 F7/AE402

4. 2A137 F1/AE402

5. H118.2 F5/AE403

6. P125 F1/AE404

7. Z221.28A F5/AE406

8. A702.1 F5/AE407

THE FOLLOWING TRS WILL BE DECOMMISSIONED:

1. 1A139 C1/AE402

2. C013 F5/AE401

3. D016 F5/AE402

4. GB101 C5/AE401

5. 2A138 F1/AE402

6. H120A C7/AE403

7. P127 F5/AE404

8. X102 D5/AE404

9. W220 F3/AE406

10. Z221.1 C3/AE406

11. D703 C3/AE407

THE DATA CENTER WILL BE RELOCATED

1. I100.2 AE408 & AE409

SCOPE OF WORK

Revisions: Date:

1. VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A

MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR

IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA

DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT

VA FOLLOWS ON ITS PROJECTS:

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD

APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)

(WWW.CFM.VA.GOV/TIL/).

• INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN

DOCUMENTS, SEE NOTES BELOW)

• NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)

• NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• NATIONAL ELECTRICAL CODE (NEC)

• INTERNATIONAL PLUMBING CODE (IPC)

• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL

ENGINEERS (ASME) A 17.1.

• ASME BOILER AND PRESSURE VESSEL CODE

• ASME CODE FOR PRESSURE PIPING

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA

SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)

• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE

INSTITUTE AND COMMENTARY (ACI 318)

• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN

SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL

CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL,

COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE

RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM

OF UNDERSTANDING (MOU)

• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND

TRANSPORTATION MANAGEMENT.

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL

• REQUIREMENTS SECTION 01010 OF THE VA MASTER CONSTRUCTION SPECIFICATION.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2004.

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2007.

16. THE CONTRACTOR SHALL NOT SCALE DRAWINGS, THE CONTRACTOR SHALL VERIFY ALL

DIMENSIONS AND EXISTING CONDITIONS PRIOR TO THE START OF WORK AND SHALL NOTIFY THE

OWNER’S REPRESENTATIVE OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK.

17. PER VA POLICY, THE NEW CAMPUS DATA CENTER MUST MEET THE REQUIREMENTS OF NFPA 75.

THE REQUIREMENTS OF NFPA 75 APPLICABLE TO THE DATA CENTER, INCLUDE:

• PROVISION OF CLEAN AGENT EXTINGUISHING SYSTEM IN THE DATA CENTER;

• DETECTION FOR EARLY DETECTION AND SYSTEM DISCHARGE;

• 1-HOUR SEPARATION OF THE DATA CENTER;

• PROVISION OF FIRE DAMPERS AND/OR COMBINATION FIRE/SMOKE DAMPERS IN DUCT

PENETRATIONS OF THE DATA CENTER BOUNDARIES;

• PROVISION OF EMERGENCY LIGHTING;

• PROVISION OF EMERGENCY POWER OFF SWITCH(ES) FOR ELECTRICAL POWER;

• EMERGENCY OFF SWITCHES FOR HVAC.

18. ALL WORK PERFORMED SHALL COMPLY WITH THE CONTRACT DOCUMENTS, DRAWINGS, AND

PROJECT MANUAL, INCLUDING THESE GENERAL NOTES. THE CONTRACTOR SHALL COORDINATE

THE INTENT OF THE GENERAL NOTES WITH ALL TRADES. ALL WORK PERFORMED SHALL COMPLY

WITH CODES, LAWS, ORDINANCES, RULES, AND REGULATIONS OF PUBLIC AUTHORITIES

GOVERNING THE WORK.

19. THE PROJECT MANUAL, BOUND SEPARATELY, IS A PART OF THE CONTRACT DOCUMENTS.

20. THE ORGANIZATION OF THE DRAWINGS AND PROJECT MANUAL SHALL NOT CONTROL THE

CONTRACTOR IN DIVIDING THE WORK AMONG SUBCONTRACTORS OR IN ESTABLISHING THE

EXTENT OF WORK TO BE PERFORMED BY ANY TRADE.

CODES AND STANDARDS

2. LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL

IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS,

INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ)

AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH

ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT

PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES

NOT PAY FOR REVIEW OR INSPECTION FEES.

3. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY

CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS

REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF

THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE

LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT

ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE

REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN

THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF

THE IBC REQUIREMENTS ARE DIFFERENT).

4. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA

REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED

NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE

ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY

HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

SHEET 3 of 431

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FINAL BID DOCUMENTS

100%

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMP

321 4 5 6 7 8 9 10

B

IM

/A u d ie L

M u rp h y V

A M e d ic a l C e n te r

(S A

-2 -7

.0 .A

S T

X E

H R

M .r v t

/1

/2

:5

:3

A

M

GI004

TIL ABBREVIATION LIST (PG-18-4)

Awen Solutions Group

4196 Merchant Plaza, Suite 711

Woodbridge, VA 22192

06/09/2023

EHRM INFRASTRUCTURE

UPGRADES 1

Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX

671-22-700

ARCHITECTURAL ABBREVIATIONS U.O.N.

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAMA AMERICAN ARCHITECTURAL

MANUFACTURERS ASSOCIATION

AB ANCHOR BOLT

ABAN ABANDONED

ABC AGGREGATE BASE COURSE

AC ASBESTOS CEMENT OR ASPHALTIC

CONCRETE

ACI AMERICAN CONCRETE INSTITUTE

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

ADB AUTOMATIC DOOR BOTTOM

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGA AMERICAN GAS ASSOCIATION

AGC ASSOCIATED GENERAL

CONTRACTORS

AGGR AGGREGATE

AHJ AUTHORITY HAVING JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF

ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZE

ANSI AMERICAN NATIONAL STANDARDS

INSTITUTE

ANT ANTENNA

APA AMERICAN PLYWOOD

ASSOCIATION

APPD APPROVED

APPROX APPROXIMATE

APT APARTMENT

AR AS REQUIRED

ARCH ARCHITECT

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL

INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ASTM AMERICAN SOCIETY FOR TESTING

AND MATERIALS

ATCH ATTACHMENT

ATM AUTOMATIC TELLER MACHINE

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVE AVENUE

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL WOODWORKING

INSTITUTE

AWPA AMERICAN WOOD PRESERVERS'

ASSOCIATION

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B LABEL CLASS B DOOR

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BD FT BOARD FEET (FOOT)

BEV BEVEL

BHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATION

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKT BLANKET

BLVD BOULEVARD

BM BEAM OR BENCHMARK

BOT BOTTOM

BR BEDROOM

BRCG BRACING

BRDG BRIDGING

BRDG JST BRIDGING JOIST

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BU BUSHEL

BUR BUILT-UP ROOFING

C CELSIUS CHANNEL

C CHANNEL CELSIUS

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

C TO C CENTER TO CENTER

CAB CABINET

CAC CEILING ATTENUATION CLASS

CB CATCH BASIN OR CORNER BEAD

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CD CONSTRUCTION DOCUMENTS OR

CONTRACT DOCUMENTS

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED /

CONTRACTOR INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER

INSTALLED

CFLG COUNTERFLASHING

C…

This is the start of the file's text. The full file is on GovTribe.