S02 - Attachment 1(a) - 671-22-700 DRAWINGS General Sheets.pdf
PDF 10 MB Posted
- Attached to
- EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) Federal contract opportunity
- Solicitation number
- 36C77623B0064
About this file
This file is an attachment to a federal contract solicitation for infrastructure upgrades at the San Antonio VA Medical Center. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas under number 36C77623B0064. It seeks construction services for EHRM infrastructure upgrades with a NAICS code of 236220. The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses. The attachment contains general drawings but no other salient details regarding required construction work, response dates, pricing terms, or incumbent contractors are provided.
View the file
Other files for this federal contract opportunity
Show all 50
EHRM San Antonio Infrastructure Upgrades Construction (SDVOSB Set-Aside and 236220 NAICS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLC
POLYTRAUMA
MAIN HOSPITAL
MAIN ENTRANCE
TOWER
SCI
MERTON MINTER
M E
R T
O N
M
IN
T E
R
VON SCHEELE RD W
U
R
ZB
A C
H R
D
W
URZBACH R
D
M
ELRO
SE HO
LM
G
REE RD
MERTON M
IN
TER
P L A
N N
O R
T H
BABCOCK RD
FR
ED
ER
IC
KSBU
R
G R
D
OAK HILLS
COUNTRY CLUB
D A
T A
PO
IN
T
DR
MEDIC
AL D
R
FLOYD CURL DR
W
URZB
U
RG
R D
EW
ING
HALSEL DR
MEDICAL DR
BABCOCK RD
CALL
AGHAN R
D
HAMILTON-WOLFE RD
VA HOSPITAL SITE
7400 MERTON MINTON ST
IN
T
E R
S T
A T
E
INTERSTATE 410
LO
UIS
P
ASTEUR D
R
P L A
N N
O R
T H
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
100%
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
SITE MAPDESIGN TEAM
OWNER
ARCHITECT / CONTRACT PRIME
STRUCTURAL ENGINEER
MECHANICAL / ELECTRICAL /
PLUMBING / FIRE PROTECTION
ENGINEER
South Texas Veterans Health Care System, ALMD 7400 Merton Minter Boulevard San Antonio TX 78229-4404 Contact: Reid Doty
Voice: (210) 617-5300, ext. 17646 Cell: (210) 325-4140 Justin.Doty@va.gov
EHRM INFRASTRUCTURE UPGRADES
FINAL BID DOCUMENTS - 100%
Awen Solutions Group 4196 Merchant Plaza Woodbridge VA 22192 Contact: Mike Olson molson@awensolutions.com (520)982-2670
IMEG Corp.
15 Sunnen Drive, Suite 104 Saint Louis MO 63143 Contact: David Larson, RCDD david.l.larson@imegcorp.com (765)398-4770
IMEG Corp.
370 E Windmill Lane, Unit 100 Las Vegas NV 89118 Contact: Kris Barker, PE, SE
Kris.M.Barker@imegcorp.com
(210) 957-9343
B
IM
/A u d ie L
M u rp h y V
A M e d ic a l C e n te r
(S A
-2 -7
.0 .A
S T
X E
H R
M .r v t
/1
/2
:4
:0
A
M
GI001
COVER SHEET
Awen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
06/09/2023
EHRM INFRASTRUCTURE
UPGRADES 1
Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX
671-22-700
Audie L. Murphy Memorial Veterans' Hospital
06/09/2023
7400 Merton Minter Boulevard, San Antonio TX
VICINITY MAP
Revisions: Date: SHEET 1 of 431
ClarkGarrettAIANCARB Stamp
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
100%
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
B
IM
/A u d ie L
M u rp h y V
A M e d ic a l C e n te r
(S A
-2 -7
.0 .A
S T
X E
H R
M .r v t
/1
/2
:5
:1
A
M
GI002
SHEET INDEX
Awen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
06/09/2023
EHRM INFRASTRUCTURE
UPGRADES 1
Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX
671-22-700
DRAWING
NUMBER DRAWING TITLE
TN140 1ST FLOOR PLAN - TECHNOLOGY - AREA E2
TN141 1ST FLOOR PLAN - TECHNOLOGY - AREA F
TN142 1ST FLOOR PLAN - TECHNOLOGY - AREA G
TN143 1ST FLOOR PLAN - TECHNOLOGY - AREA H
TN144 1ST FLOOR PLAN - TECHNOLOGY - AREA J
TN145 1ST FLOOR PLAN - TECHNOLOGY - AREA PT
TN146 1ST FLOOR PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH
TN147 1ST FLOOR PLAN - TECHNOLOGY - AREA CLC CENTRAL
TN152 2ND FLOOR PLAN - TECHNOLOGY - AREA A
TN153 2ND FLOOR PLAN - TECHNOLOGY - AREA B
TN154 2ND FLOOR PLAN - TECHNOLOGY - AREA C
TN156 2ND FLOOR PLAN - TECHNOLOGY - AREA E1
TN157 2ND FLOOR PLAN - TECHNOLOGY - AREA E2
TN158 2ND FLOOR PLAN - TECHNOLOGY - AREA F
TN159 2ND FLOOR PLAN - TECHNOLOGY - AREA G
TN160 2ND FLOOR PLAN - TECHNOLOGY - AREA PT
TN165 3RD FLOOR PLAN - TECHNOLOGY - AREA G
TN166 3RD FLOOR PLAN - TECHNOLOGY - AREA TS
TN167 3RD FLOOR PLAN - TECHNOLOGY - AREA TN
TN170 4TH FLOOR PLAN - TECHNOLOGY - AREA TS
TN171 4TH FLOOR PLAN - TECHNOLOGY - AREA TN
TN175 5TH FLOOR PLAN - TECHNOLOGY - AREA TS
TN176 5TH FLOOR PLAN - TECHNOLOGY - AREA TN
TN180 6TH FLOOR PLAN - TECHNOLOGY - AREA TS
TN181 6TH FLOOR PLAN - TECHNOLOGY - AREA TN
TN185 7TH FLOOR PLAN - TECHNOLOGY - AREA TS
TN186 7TH FLOOR PLAN - TECHNOLOGY - AREA TN
TN190 BLDG 4 PLAN - TECHNOLOGY
TN400 GROUND LEVEL - TR L010.2 - TECHNOLOGY - ENLARGED PLANS
TN401 GROUND LEVEL - TR 030 - TECHNOLOGY - ENLARGED PLANS
TN402 GROUND LEVEL - TR GB126.1 - TECHNOLOGY - ENLARGED PLANS
TN403 GROUND LEVEL - TR F004 - TECHNOLOGY - ENLARGED PLANS
TN404 GROUND LEVEL - TR C015.1 - TECHNOLOGY - ENLARGED PLANS
TN405 GROUND LEVEL - TR 020 - TECHNOLOGY - ENLARGED PLANS
TN406 GROUND LEVEL - TR 1A138 - TECHNOLOGY - ENLARGED PLANS
TN407 GROUND LEVEL - TR H031 - TECHNOLOGY - ENLARGED PLANS
TN410 1ST FLOOR - TR S101 - TECHNOLOGY - ENLARGED PLANS
TN411 1ST FLOOR - TR J104 - TECHNOLOGY - ENLARGED PLANS
TN412 1ST FLOOR -TR H118.2 - TECHNOLOGY - ENLARGED PLANS
TN413 1ST FLOOR - TR 105 - TECHNOLOGY - ENLARGED PLANS
TN414 1ST FLOOR - TR G101 - TECHNOLOGY - ENLARGED PLANS
TN415 1ST FLOOR - TR 157 - TECHNOLOGY - ENLARGED PLANS
TN416 1ST FLOOR - TR P125 - TECHNOLOGY - ENLARGED PLANS
TN417 1ST FLOOR - TR 2A137 - TECHNOLOGY - ENLARGED PLANS
TN418 1ST FLOOR - TR Y102.7 - TECHNOLOGY - ENLARGED PLANS
TN419 1ST FLOOR - TR T119.2 - TECHNOLOGY - ENLARGED PLANS
TN420 2ND FLOOR - TR R201 - TECHNOLOGY - ENLARGED PLANS
TN421 2ND FLOOR - TR SP238 - TECHNOLOGY - ENLARGED PLANS
TN422 2ND FLOOR - TR Z221.28A - TECHNOLOGY - ENLARGED PLANS
TN423 2ND FLOOR - TR E221 - TECHNOLOGY - ENLARGED PLANS
TN424 2ND FLOOR - TR A200 - TECHNOLOGY - ENLARGED PLANS
TN425 2ND FLOOR - TR 258 - TECHNOLOGY - ENLARGED PLANS
TN430 3RD FLOOR - TR C301.1 - TECHNOLOGY - ENLARGED PLANS
TN431 3RD FLOOR -TR D320 - TECHNOLOGY - ENLARGED PLANS
TN440 4TH FLOOR - TR C402 - TECHNOLOGY - ENLARGED PLANS
TN450 5TH FLOOR - TR C511 - TECHNOLOGY - ENLARGED PLANS
TN460 6TH FLOOR - TR C602.1 - TECHNOLOGY - ENLARGED PLANS
TN470 7TH FLOOR - TR A702.1 - TECHNOLOGY - ENLARGED PLANS
TN480 EXISTING TRS - TECHNOLOGY - ENLARGED PLANS
TN481 EXISTING TRS - TECHNOLOGY - ENLARGED PLANS
TN490 1ST FLOOR - EXISTING CAMPUS SUPPORT CENTER - TECHNOLOGY - ENLARGED PLANS
TN491 1ST FLOOR - CAMPUS SUPPORT CENTER - TECHNOLOGY - ENLARGED PLANS
TN492 1ST FLOOR - CAMPUS SUPPORT CENTER - TECHNOLOGY - RACK ELEVATIONS
TN493 1ST FLOOR - CAMPUS SUPPORT CENTER - TECHNOLOGY - RACK ELEVATIONS
TN494 SUB-LEVEL - PBX - TECHNOLOGY - ENLARGMENTS
16.4-PHYSICAL SECURITY
TY001 SECURITY NOTES, SYMBOLS, AND ABBREVIATIONS
TY100 GROUND LEVEL SECURITY REFERENCE PLAN
TY101 1ST FLOOR SECURITY REFERENCE PLAN
TY102 2ND FLOOR SECURITY REFERENCE PLAN
TY103 3RD FLOOR SECURITY REFERENCE PLAN
TY104 4TH FLOOR SECURITY REFERENCE PLAN
TY105 5TH FLOOR SECURITY REFERENCE PLAN
TY106 6TH FLOOR SECURITY REFERENCE PLAN
TY107 7TH FLOOR SECURITY REFERENCE PLAN
TY401 SECURITY TR FLOOR PLANS
TY402 SECURITY TR FLOOR PLANS
TY403 SECURITY TR FLOOR PLANS
TY404 SECURITY DATA CENTER FLOOR PLAN
TY501 SECURITY DETAILS
TOTAL NUMBER OF SHEETS: 431
DRAWING
NUMBER DRAWING TITLE
16-TELECOMMUNICATIONS
T000 COVER SHEET - TECHNOLOGY
T001 SITE PLAN - TECHNOLOGY
T500 DETAILS - TECHNOLOGY
T501 DETAILS - TECHNOLOGY
T600 DIAGRAMS - TECHNOLOGY
T601 DIAGRAMS - TECHNOLOGY
T602 DIAGRAMS - TECHNOLOGY
T603 DIAGRAMS - TECHNOLOGY
T605 SCHEDULES - TECHNOLOGY
TD099 SUB-LEVEL DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD100 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD101 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD102 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD103 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD104 4TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD105 5TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD106 6TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD107 7TH FLOOR DEMOLITION PLAN - TECHNOLOGY - OVERALL
TD121 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA A
TD122 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA B
TD123 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA C
TD124 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA D
TD125 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA E1
TD126 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA E2
TD127 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA F
TD128 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA G
TD129 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA H
TD130 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA PT
TD131 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH
TD132 GROUND LEVEL DEMOLITION PLAN - TECHNOLOGY - AREA CLC CENTRAL
TD135 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
TD136 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
TD137 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
TD138 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D
TD139 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E1
TD140 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E2
TD141 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F
TD142 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G
TD143 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA H
TD144 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA J
TD145 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA PT
TD146 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH
TD147 1ST FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA CLC CENTRAL
TD152 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA A
TD153 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA B
TD154 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA C
TD156 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E1
TD157 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA E2
TD158 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA F
TD159 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G
TD160 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA PT
TD165 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA G
TD166 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS
TD167 3RD FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN
TD170 4TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS
TD171 4TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN
TD175 5TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS
TD176 5TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN
TD180 6TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS
TD181 6TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN
TD185 7TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TS
TD186 7TH FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA TN
TN155 2ND FLOOR PLAN - TECHNOLOGY - AREA D
TD155 2ND FLOOR DEMOLITION PLAN - TECHNOLOGY - AREA D
TN099 SUB-LEVEL PLAN - TECHNOLOGY - OVERALL
TN100 GROUND LEVEL PLAN - TECHNOLOGY - OVERALL
TN100.5 GROUND FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN101 1ST FLOOR PLAN - TECHNOLOGY - OVERALL
TN101.5 1ST FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN102 2ND FLOOR PLAN - TECHNOLOGY - OVERALL
TN102.5 2ND FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN103 3RD FLOOR PLAN - TECHNOLOGY - OVERALL
TN103.5 3RD FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN104 4TH FLOOR PLAN - TECHNOLOGY - OVERALL
TN104.5 4TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN105 5TH FLOOR PLAN - TECHNOLOGY - OVERALL
TN105.5 5TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN106 6TH FLOOR PLAN - TECHNOLOGY - OVERALL
TN106.5 6TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN107 7TH FLOOR PLAN - TECHNOLOGY - OVERALL
TN107.5 7TH FLOOR PLAN - TECHNOLOGY - INTERSTITIAL SPACE
TN121 GROUND PLAN - TECHNOLOGY - AREA A
TN122 GROUND PLAN - TECHNOLOGY - AREA B
TN123 GROUND PLAN - TECHNOLOGY - AREA C
TN124 GROUND PLAN - TECHNOLOGY - AREA D
TN125 GROUND PLAN - TECHNOLOGY - AREA E1
TN126 GROUND PLAN - TECHNOLOGY - AREA E2
TN127 GROUND PLAN - TECHNOLOGY - AREA F
TN128 GROUND PLAN - TECHNOLOGY - AREA G
TN129 GROUND PLAN - TECHNOLOGY - AREA H
TN130 GROUND PLAN - TECHNOLOGY - AREA PT
TN131 GROUND PLAN - TECHNOLOGY - AREA CLC NORTH & SOUTH
TN132 GROUND PLAN - TECHNOLOGY - AREA CLC CENTRAL
TN135 1ST FLOOR PLAN - TECHNOLOGY - AREA A
TN136 1ST FLOOR PLAN - TECHNOLOGY - AREA B
TN137 1ST FLOOR PLAN - TECHNOLOGY - AREA C
TN138 1ST FLOOR PLAN - TECHNOLOGY - AREA D
TN139 1ST FLOOR PLAN - TECHNOLOGY - AREA E1
DRAWING
NUMBER DRAWING TITLE
15-ELECTRICAL
E000 ELECTRICAL COVERSHEET
E001 SITE PLAN - ELECTRICAL
E400 ELECTRICAL SCHEDULES
E401 ELECTRICAL SCHEDULES
E402 ELECTRICAL SCHEDULES
E500 ELECTRICAL DETAILS
E501 ELECTRICAL DETAILS
ED100 GROUND FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
ED101 1ST FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
ED102 2ND FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
ED103 3RD FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
ED104 4TH FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
ED105 5TH FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
ED106 6TH FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
ED107 7TH FLOOR DEMOLITION PLAN - ELECTRICAL - OVERALL
EN100 GROUND FLOOR PLAN - ELECTRICAL - OVERALL
EN100.5 GROUND FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE
EN101 1ST FLOOR PLAN - ELECTRICAL - OVERALL
EN101.5 1ST FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE
EN102 2ND FLOOR PLAN - ELECTRICAL - OVERALL
EN102.5 2ND FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE
EN103 3RD FLOOR PLAN - ELECTRICAL - OVERALL
EN103.5 3RD FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE
EN104 4TH FLOOR PLAN - ELECTRICAL - OVERALL
EN104.5 4TH FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE
EN105 5TH FLOOR PLAN - ELECTRICAL - OVERALL
EN105.5 5TH FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE
EN106 6TH FLOOR PLAN - ELECTRICAL - OVERALL
EN106.5 6TH FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE
EN107 7TH FLOOR PLAN - ELECTRICAL - OVERALL
EN107.5 7TH FLOOR PLAN - ELECTRICAL - INTERSTITIAL SPACE
EN190 BLDG 4 PLAN - ELECTRICAL
EN400 GROUND FLOOR - TR L010.2 - ELECTRICAL - ENLARGED PLANS
EN401 GROUND FLOOR - TR 030 - ELECTRICAL - ENLARGED PLANS
EN402 GROUND FLOOR - TR GB126.1 - ELECTRICAL - ENLARGED PLANS
EN403 GROUND FLOOR - TR F004 - ELECTRICAL - ENLARGED PLANS
EN404 GROUND FLOOR - TR C015.1 - ELECTRICAL - ENLARGED PLANS
EN405 GROUND FLOOR - TR 020 - ELECTRICAL - ENLARGED PLANS
EN406 GROUND FLOOR - TR 1A138 - ELECTRICAL - ENLARGED PLANS
EN407 GROUND LEVEL – H031 – ELECTRICAL – ENLARGED PLANS
EN410 1ST FLOOR - TR S101R - ELECTRICAL - ENLARGED PLANS
EN411 1ST FLOOR - TR J104 - ELECTRICAL - ENLARGED PLANS
EN412 1ST FLOOR - TR H118.2 - ELECTRICAL - ENLARGED PLANS
EN413 1ST FLOOR - TR 105 - ELECTRICAL - ENLARGED PLANS
EN414 1ST FLOOR - TR G101 - ELECTRICAL - ENLARGED PLANS
EN415 1ST FLOOR - TR 157 - ELECTRICAL - ENLARGED PLANS
EN416 1ST FLOOR - TR P125 - ELECTRICAL - ENLARGED PLANS
EN417 1ST FLOOR - TR 2A137 - ELECTRICAL - ENLARGED PLANS
EN418 1ST FLOOR - TR Y102.7 - ELECTRICAL - ENLARGED PLANS
EN419 1ST FLOOR - TR T119.2 - ELECTRICAL - ENLARGED PLANS
EN420 2ND FLOOR - TR R201 - ELECTRICAL - ENLARGED PLANS
EN421 2ND FLOOR - TR SP238 - ELECTRICAL - ENLARGED PLANS
EN422 2ND FLOOR - TR Z221.28A - ELECTRICAL - ENLARGED PLANS
EN423 2ND FLOOR - TR E221 - ELECTRICAL - ENLARGED PLANS
EN424 2ND FLOOR - TR A200 - ELECTRICAL - ENLARGED PLANS
EN425 2ND FLOOR - TR 258 - ELECTRICAL - ENLARGED PLANS
EN430 3RD FLOOR - TR C301.1 - ELECTRICAL - ENLARGED PLANS
EN431 3RD FLOOR - TR D320 - ELECTRICAL - ENLARGED PLANS
EN440 4TH FLOOR - TR C402 - ELECTRICAL - ENLARGED PLANS
EN450 5TH FLOOR - TR C511 - ELECTRICAL - ENLARGED PLANS
EN460 6TH FLOOR - TR C602 - ELECTRICAL - ENLARGED PLANS
EN470 7TH FLOOR - TR C702.1 - ELECTRICAL - ENLARGED PLANS
EN490 ELECTRICAL - ENLARGED PLAN
EN491 1ST FLOOR - IT SUITE DEMO - ELECTRICAL - ENLARGED PLAN
EN492 1ST FLOOR - DATA CENTER - ELECTRICAL - ENLARGED PLAN
EN493 1ST FLOOR - DATA CENTER - ELECTRICAL - ENLARGED PLAN
EN494 1ST FLOOR - EXISTING DATA CENTER - ELECTRICAL - EXISTING ENLARGED PLAN
EN495 1ST FLOOR - EXISTING DATA CENTER - ELECTRICAL - NEW ENLARGED PLAN
EN496 1ST FLOOR - EXISTING DATA CENTER - ELECTRICAL - NEW ENLARGED PLAN
EN497 ELECTRICAL RISER DIAGRAM
EN498 ELECTRICAL DETAILS
EN499 ELECTRICAL SCHEDULES
DRAWING
NUMBER DRAWING TITLE
AE180 6TH FLOOR, TOWER, AREA TS
AE181 6TH FLOOR, TOWER, AREA TN
AE185 7TH FLOOR, TOWER, AREA TS
AE186 7TH FLOOR, TOWER, AREA TN
AE301 REFERENCE SECTION - EAST/WEST MAIN HOSPITAL - WESTERN SECTION
AE302 REFERENCE SECTION - EAST/WEST MAIN HOSPITAL - EASTERN SECTION
AE303 REFERENCE SECTION - G WING
AE304 REFERENCE SECTIONS
AE305 REFERENCE SECTION - CLC
AE351 ROOM SECTIONS
AE352 ROOM SECTIONS
AE353 ROOM SECTIONS
AE354 ROOM SECTIONS
AE355 ROOM SECTIONS
AE361 WALL SECTIONS
AE401 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS
AE402 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS
AE403 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS
AE404 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS
AE405 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS
AE406 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS
AE407 ENLARGED TR FLOOR AND REFLECTED CEILING (RC) PLANS
AE408 ENLARGED DATA CENTER FLOOR PLAN
AE409 ENLARGED DATA CENTER REFLECTED CEILING PLAN
AE410 ENLARGED MISCELLANEOUS PLANS
AE451 INTERIOR ELEVATIONS
AE452 INTERIOR ELEVATIONS
AE453 INTERIOR ELEVATIONS
AE454 INTERIOR ELEVATIONS
AE455 INTERIOR ELEVATIONS
AE501 INTERIOR FRAMING DETAILS
AE502 INTERIOR FRAMING DETAILS
AE511 DOOR DETAILS
AE521 WALL TYPES
AE522 PARTITION DETAILS
AE531 CEILING DETAILS
AE532 CEILING DETAILS
AE551 MISCELLANEOUS DETAILS
AE601 SCHEDULES
14-MECHANICAL
M000 MECHANICAL COVERSHEET
M500 MECHANICAL DETAILS
M600 MECHANICAL SCHEDULES
M700 CONTROL DIAGRAMS
MD100 GROUND LEVEL DEMOLITION PLAN - MECHANICAL - OVERALL
MD101 1ST FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL
MD102 2ND FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL
MD103 3RD FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL
MD104 4TH FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL
MD105 5TH FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL
MD106 6TH FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL
MD107 7TH FLOOR DEMOLITION PLAN - MECHANICAL - OVERALL
MN100 GROUND LEVEL PLAN - MECHANICAL - OVERALL
MN101 1ST FLOOR PLAN - MECHANICAL - OVERALL
MN102 2ND FLOOR PLAN - MECHANICAL - OVERALL
MN103 3RD FLOOR PLAN - MECHANICAL - OVERALL
MN104 4TH FLOOR PLAN - MECHANICAL - OVERALL
MN105 5TH FLOOR PLAN - MECHANICAL - OVERALL
MN106 6TH FLOOR PLAN - MECHANICAL - OVERALL
MN107 7TH FLOOR PLAN - MECHANICAL - OVERALL
MD400 1ST FLOOR - DATA CENTER - MECHANICAL - ENLARGED DEMOLITION PLANS
MN400 GROUND LEVEL - TR C015.1 - MECHANICAL - ENLARGED PLANS
MN401 GROUND LEVEL - TR GB126.1 - MECHANICAL - ENLARGED PLANS
MN402 GROUND LEVEL - TR F004 - MECHANICAL - ENLARGED PLANS
MN403 GROUND LEVEL - TR 030 - MECHANICAL - ENLARGED PLANS
MN404 GROUND LEVEL - TR L010.2 - MECHANICAL - ENLARGED PLANS
MN405 GROUND LEVEL - TR 1A138 - MECHANICAL - ENLARGED PLANS
MN406 1ST FLOOR - TR G101 - MECHANICAL - ENLARGED PLANS
MN407 1ST FLOOR - TR 119.2 - MECHANICAL - ENLARGED PLANS
MN408 1ST FLOOR - TR H118.2 - MECHANICAL - ENLARGED PLANS
MN409 1ST FLOOR - TR P125 - MECHANICAL - ENLARGED PLANS
MN410 1ST FLOOR - TR 105 - MECHANICAL - ENLARGED PLANS
MN411 1ST FLOOR - TR J104 - MECHANICAL - ENLARGED PLANS
MN412 1ST FLOOR - TR S101R - MECHANICAL - ENLARGED PLANS
MN413 1ST FLOOR - TR 2A137 - MECHANICAL - ENLARGED PLANS
MN414 1ST FLOOR - Y102.7 - MECHANICAL - ENLARGED PLANS
MN415 2ND FLOOR - TR Z221.28A - MECHANICAL - ENLARGED PLANS
MN416 2ND FLOOR - TR A200 - MECHANICAL - ENLARGED PLANS
MN417 2ND FLOOR - TR SP238 - MECHANICAL - ENLARGED PLANS
MN418 2ND FLOOR - TR R201 - MECHANICAL - ENLARGED PLANS
MN419 3RD FLOOR - TR D320 - MECHANICAL - ENLARGED PLANS
MN420 4TH FLOOR - TR C402 - MECHANICAL - ENLARGED PLANS
MN421 5TH FLOOR - TR C511 - MECHANICAL - ENLARGED PLANS
MN422 6TH FLOOR - TR C602.1 - MECHANICAL - ENLARGED PLANS
MN423 7TH FLOOR - TR A702.1 - MECHANICAL - ENLARGED PLANS
MN424 1ST FLOOR - DATA CENTER - MECHANICAL - ENLARGED NEW WORK PLANS
DRAWING
NUMBER DRAWING TITLE
01-GENERAL
GI001 COVER SHEET
GI002 SHEET INDEX
GI003 GENERAL NOTES AND CODE REQUIREMENTS
GI004 TIL ABBREVIATION LIST (PG-18-4)
GI011 TYPICAL ADA REQUIREMENTS - INTERIOR CLEARANCES
GI005 SEQUENCING NOTES
GI100 GROUND LEVEL SEQUENCING AND DIAMOND ANALYSIS PLAN
GI101 1ST FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN
GI102 2ND FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN
GI103 3RD FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN
GI104 4TH FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN
GI105 5TH FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN
GI106 6TH FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN
GI107 7TH FLOOR SEQUENCING AND DIAMOND ANALYSIS PLAN
GC001 FIRE/SMOKE BARRIER DESCRIPTIONS
GC099 SUB-LEVEL FIRE/LIFE SAFETY PLAN
GC100 GROUND LEVEL FIRE/LIFE SAFETY PLAN
GC101 1ST FLOOR FIRE/LIFE SAFETY PLAN
GC102 2ND FLOOR FIRE/LIFE SAFETY PLAN
GC103 3RD FLOOR FIRE/LIFE SAFETY PLAN
GC104 4TH FLOOR FIRE/LIFE SAFETY PLAN
GC105 5TH FLOOR FIRE/LIFE SAFETY PLAN
GC106 6TH FLOOR FIRE/LIFE SAFETY PLAN
GC107 7TH FLOOR FIRE/LIFE SAFETY PLAN
GS101 CAMPUS SITE PLAN
08-ARCHITECTURE
AD001 GENERAL DEMOLITION NOTES
AD351 DEMOLITION BUILDING SECTIONS
AD361 DEMOLITION WALL SECTIONS
AD401 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS
AD402 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS
AD403 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS
AD404 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS
AD405 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS
AD406 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS
AD407 DEMOLITION TR FLOOR AND REFLECTED CEILING (RC) PLANS
AD408 ENLARGED DATA CENTER DEMOLITION FLOOR PLAN
AD409 ENLARGED DATA CENTER DEMO REFLECTED CEILING PLAN
AE001 ARCHITECTURAL GENERAL INFORMATION
AE100 GROUND LEVEL REFERENCE PLAN
AE100.5 GROUND-LEVEL INTERSTITIAL SPACE REFERENCE PLAN
AE101 1ST FLOOR REFERENCE PLAN
AE101.5 1ST FLOOR INTERSTITIAL SPACE REFERENCE PLAN
AE102 2ND FLOOR REFERENCE PLAN
AE102.5 2ND FLOOR INTERSTITIAL SPACE REFERENCE PLAN
AE103 3RD FLOOR REFERENCE PLAN
AE103.5 3RD FLOOR INTERSTITIAL SPACE REFERENCE PLAN
AE104 4TH FLOOR REFERENCE PLAN
AE104.5 4TH FLOOR INTERSTITIAL SPACE REFERENCE PLAN
AE105 5TH FLOOR REFERENCE PLAN
AE105.5 5TH FLOOR INTERSTITIAL SPACE REFERENCE PLAN
AE106 6TH FLOOR REFERENCE PLAN
AE106.5 6TH FLOOR INTERSTITIAL SPACE REFERENCE PLAN
AE107 7TH FLOOR REFERENCE PLAN
AE107.5 7TH FLOOR INTERSTITIAL SPACE REFERENCE PLAN
AE108 ROOF REFERENCE PLAN
AE121 GROUND LEVEL, MAIN HOSPITAL, AREA A
AE122 GROUND LEVEL, MAIN HOSPITAL, AREA B
AE123 GROUND LEVEL, MAIN HOSPITAL, AREA C
AE124 GROUND LEVEL, MAIN HOSPITAL, AREA D
AE125 GROUND LEVEL, MAIN HOSPITAL, AREA E1
AE126 GROUND LEVEL, MAIN HOSPITAL, AREA E2
AE127 GROUND LEVEL, MAIN HOSPITAL, AREA F
AE128 GROUND LEVEL, MAIN HOSPITAL, AREA G
AE129 GROUND LEVEL, MAIN HOSPITAL, AREA H
AE130 GROUND LEVEL, POLYTRAUMA
AE131 GROUND LEVEL, CLC NORTH & SOUTH
AE132 GROUND LEVEL, CLC CENTRAL
AE135 1ST FLOOR, MAIN HOSPITAL, AREA A
AE136 1ST FLOOR, MAIN HOSPITAL, AREA B
AE137 1ST FLOOR, MAIN HOSPITAL, AREA C
AE138 1ST FLOOR, MAIN HOSPITAL, AREA D
AE139 1ST FLOOR, MAIN HOSPITAL, AREA E1
AE140 1ST FLOOR, MAIN HOSPITAL, AREA E2
AE141 1ST FLOOR, MAIN HOSPITAL, AREA F
AE142 1ST FLOOR, MAIN HOSPITAL, AREA G
AE143 1ST FLOOR, MAIN HOSPITAL, AREA H
AE144 1ST FLOOR, MAIN HOSPITAL, AREA J
AE145 1ST FLOOR, POLYTRAUMA
AE146 1ST FLOOR, CLC NORTH & SOUTH
AE147 1ST FLOOR, CLC CENTRAL
AE152 2ND FLOOR, MAIN HOSPITAL, AREA A
AE153 2ND FLOOR, MAIN HOSPITAL, AREA B
AE154 2ND FLOOR, MAIN HOSPITAL, AREA C
AE155 2ND FLOOR, MAIN HOSPITAL, AREA D
AE156 2ND FLOOR, MAIN HOSPITAL, AREA E1
AE157 2ND FLOOR, MAIN HOSPITAL, AREA E2
AE158 2ND FLOOR, MAIN HOSPITAL, AREA F
AE159 2ND FLOOR, MAIN HOSPITAL, AREA G
AE160 2ND FLOOR, POLYTRAUMA
AE165 3RD FLOOR, MAIN HOSPITAL, AREA G
AE166 3RD FLOOR, TOWER, AREA TS
AE167 3RD FLOOR, TOWER, AREA TN
AE169 4TH FLOOR, MAIN HOSPITAL, AREA G
AE170 4TH FLOOR, TOWER, AREA TS
AE171 4TH FLOOR, TOWER, AREA TN
AE175 5TH FLOOR, TOWER, AREA TS
AE176 5TH FLOOR, TOWER, AREA TN
Revisions: Date: SHEET 2 of 431
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
100%
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
B
IM
/A u d ie L
M u rp h y V
A M e d ic a l C e n te r
(S A
-2 -7
.0 .A
S T
X E
H R
M .r v t
/1
/2
:5
:2
A
M
GI003
GENERAL NOTES AND CODE
REQUIREMENTSAwen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
06/09/2023
EHRM INFRASTRUCTURE
UPGRADES 1
Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX
671-22-700
BUILDING CLASSIFICATION:
BASIC OCCUPANCY GROUP(S):
(NFPA 101 6.1.5)
OCCUPANCY GROUP I
CONSTRUCTION TYPE:
(EXISTING)
TYPE II 222, SPRINKLERED
BASIC ALLOWABLE AREA:
(222 FULLY SPRINKLERED)
OCCUPANCY GROUP I-2 – UNLIMITED
ACTUAL HEIGHT
8 STORY HOSPITAL + PARTIAL BASEMENT
MINIMUM FIRE RESISTIVE REQUIREMENTS:
(NFPA 222, TABLE 4.1.1)
ELEMENT RATING
BEARING WALLS, EXTERIOR 2-HOUR
BEARING WALLS, INTERIOR 2-HOUR
NON-BEARING WALLS, INTERIOR 0-HOUR
STRUCTURAL FRAME 2-HOUR
STRUCTURAL FRAME, SUPPORTING ROOF ONLY 1-HOUR
SHAFT ENCLOSURES 2-HOUR
FLOORS AND FLOOR/CEILINGS 2-HOUR
ROOFS AND ROOF/CEILINGS 1-HOUR
HORIZONTAL EXIT 2-HOUR
SMOKE BARRIER (COMPARTMENTS) 1-HOUR
HAZARDOUS AREA SEPARATIONS 1-HOUR
SOILED LINEN ROOMS 1-HOUR
STORAGE ROOMS > 100 SF 1-HOUR
CORRIDORS
(NFPA 101 CHAPTER 38.3.6.1)
EXCEPTION 3, WITHIN BUILDINGS PROTECTED THROUGHOUT
BY AN APPROVED AUTOMATIC SPRINKLER SYSTEM, 1-HOUR
FIRE RESISTANCE RATING IS NOT REQUIRED.
MAXIMUM TRAVEL DISTANCE TO EXITS
(NFPA 101, CHAPTER 39)
TRAVEL DISTANCE 200-FEET
COMMON PATH OF TRAVEL 100-FEET
DEAD-END CORRIDOR 50-FEET
FIRE SUPPRESSION
THE FACILITY WILL BE FULLY SPRINKLERED PER NFPA 13
HANDHELD FIRE SPRINKLERS WILL BE INSTALLED IN EACH IDF ROOM
OCCUPANT LOAD CALCULATIONS:
(PER NFPA 101, Table 7.3.1.2)
BUSINESS USE: 150 SF/OCC
INPATIENT TREATMENT DEPARTMENTS: 250 SF/OCC
SLEEPING DEPARTMENTS: 120 SF/OCC
AMBULATORY HEALTH CARE: 150 SF/OCC
USE 120 SF PER OCCUPANT (MOST RESTRICTIVE)
EXISTING EXIT SYSTEM CAPACITY
BASEMENT: ~49,633 SF, NO ADDED AREA
1ST FLOOR: ~67,120 SF (WINGS C, D, & E), NO ADDED AREA
2ND FLOOR: ~55,715 SF (WINGS C, D, & E), 677 ADDED AREA
EXISTING OCC LOAD: 465, ADDED OCC LOAD: 6
EXISTING STAIR CAPACITY FACTOR: 465x0.3=139.5 EXISTING DOOR CAPACITY FACTOR: 465x0.2=93.0*
EXISTING CAPACITY: 210 (STAIRS 1, 2, 3, 6, & 7) (*FROM DR WIDTH)
ADDED CAPACITY FACTOR: 6x0.2=1.2, THEREFORE OK
3RD FLOOR: ~55,678 SF (WINGS C, D, & E), 677 ADDED AREA
EXISTING OCC LOAD: 464, ADDED OCC LOAD: 6
EXISTING STAIR CAPACITY FACTOR: 464x0.3=139.2 EXISTING DOOR CAPACITY FACTOR: 464x0.2=92.8*
EXISTING CAPACITY: 210 (STAIRS 1, 2, 3, 6, & 7) (*FROM DR WIDTH)
ADDED CAPACITY FACTOR: 6x0.2=1.2, THEREFORE OK
4TH FLOOR: ~55,678 SF (WINGS C, D, & E), 677 ADDED AREA
EXISTING OCC LOAD: 464, ADDED OCC LOAD: 6
EXISTING STAIR CAPACITY FACTOR: 464x0.3=139.2 EXISTING DOOR CAPACITY FACTOR: 464x0.2=92.8*
EXISTING CAPACITY: 210 (STAIRS 1, 2, 3, 6, & 7) (*FROM DR WIDTH)
ADDED CAPACITY FACTOR: 6x0.2=1.2, THEREFORE OK
5TH FLOOR: ~30,654 SF (WINGS C, & D, 321 ADDED AREA
EXISTING OCC LOAD: 256, ADDED OCC LOAD: 3
EXISTING STAIR CAPACITY FACTOR: 256x0.3=76.8 EXISTING DOOR CAPACITY FACTOR: 465x0.2=51.2*
EXISTING CAPACITY: 126 (STAIRS 1, 2, & 3) (*FROM DR WIDTH)
ADDED CAPACITY FACTOR: 3x0.2=0.6, THEREFORE OK
6TH FLOOR: ~30,654 SF (WINGS C, & D, 321 ADDED AREA
EXISTING OCC LOAD: 256, ADDED OCC LOAD: 3
EXISTING STAIR CAPACITY FACTOR: 256x0.3=76.8 EXISTING DOOR CAPACITY FACTOR: 465x0.2=51.2*
EXISTING CAPACITY: 126 (STAIRS 1, 2, & 3) (*FROM DR WIDTH)
ADDED CAPACITY FACTOR: 3x0.2=0.6, THEREFORE OK
STAIR 1: 48" WIDE, 42" DOOR STAIR 2: 48" WIDE, 42" DOOR
STAIR 3: 48" WIDE, 42" DOOR STAIR 6: 60" WIDE, 42" DOOR
STAIR 7: 48" WIDE, 42" DOOR
EXISTING SMOKE COMPARTMENTS
2ND FLOOR
SMOKE COMPARTMENT D; 11,509 SF
SMOKE COMPARTMENT DC; 8,255 SF (INCLUDES ADDED TR)
SMOKE COMPARTMENT C; 10,766 SF
SMOKE COMPARTMENT E; 5,588 SF
3RD FLOOR
SMOKE COMPARTMENT D; 12,562 SF
SMOKE COMPARTMENT DC; 6,341 SF (INCLUDES ADDED TR)
SMOKE COMPARTMENT C; 11,752 SF
SMOKE COMPARTMENT E; 5,413 SF
4TH FLOOR
SMOKE COMPARTMENT D; 10,303 SF
SMOKE COMPARTMENT DC; 10,001 SF (INCLUDES ADDED TR)
SMOKE COMPARTMENT C; 10,203 SF
SMOKE COMPARTMENT E; 5,614 SF
5TH FLOOR
SMOKE COMPARTMENT D; 9,600 SF
SMOKE COMPARTMENT DC; 11,100 SF (INCLUDES ADDED TR)
SMOKE COMPARTMENT C; 11,273 SF
6TH FLOOR
SMOKE COMPARTMENT D; 25,408 SF (INCLUDES ADDED TR)
SMOKE COMPARTMENT C; 6,493 SF
GENERAL
1. THE FOLLOWING GENERAL NOTES APPLY TO THE ENTIRE SET OF DRAWINGS LISTED ON GI002, SHEET INDEX.
2. MATERIAL QUANTITIES EXTRACTED BY THE GC FROM THE DESIGN-INTENT MODEL SHOULD BE
USED WITH CAUTION BECAUSE A DESIGN-INTENT MODEL IS NOT CREATED FOR THIS PURPOSE.
THE GC IS OBLIGATED TO DETERMINE, AND ASSUMES ALL RISK FOR, THE SUITABILITY OF THE
DESIGN-INTENT BIM FOR MATERIAL QUANTITY TAKEOFFS.
3. THE GC IS RESPONSIBLE TO ENSURE THAT EQUIPMENT AND SYSTEMS ARE INSTALLED
ACCORDING TO THE CONSTRUCTION COORDINATED MODEL LOCATIONS, WHICH HAVE BEEN
SIGNED OFF BY VA FACILITY MANAGEMENT PERSONNEL, AND ARE REFINED FROM THE AE
DESIGN COORDINATED MODEL LOCATIONS. ANY DEVIATIONS THAT IMPINGE ON SPACE
RESERVATIONS AS NOTED IN VA BIM STANDARDS MUST BE APPROVED BY VA IN WRITING.
4. FOR GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS APPLICABLE ONLY TO THE DRAWINGS OF
ONE DISCIPLINE, REFER TO THE DRAWINGS OF THAT DISCIPLINE – SEE “SHEET INDEX”.
5. THE COMPLETE SET OF DRAWINGS CONSIST OF ALL DRAWINGS LISTED BY THE “SHEET INDEX”.
THE WORK DESCRIBED IN ONE SHEET MAY BE REFERENCED AND MAY BE AFFECTED BY WORK
DESCRIBED ON ANOTHER SHEET.
6. THE WORK DESCRIBED IN ONE DISCIPLINE MAY BE REFERENCED AND AFFECTED BY WORK OF
ANOTHER DISCIPLINE. PARTIAL SETS OF DRAWINGS ARE INCOMPLETE AND SHOULD NOT BE
REDISTRIBUTED OR UTILIZED BY THE CONTRACTOR.
7. IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO REVIEW AND COORDINATE THE WORK OF
ALL SUBCONTRACTORS, TRADES AND SUPPLIERS WITH REQUIREMENTS OF THE CONTRACT
DOCUMENTS BEFORE COMMENCING CONSTRUCTION, AND TO ASSURE THAT ALL PARTIES ARE
AWARE OF ALL REQUIREMENTS, REGARDLESS OF WHERE THE REQUIREMENTS OCCUR IN THE
CONTRACT DOCUMENTS, WHICH MIGHT AFFECT THE WORK OF THAT TRADE.
8. ALL ARCHITECTURAL DRAWINGS ESTABLISH AND COORDINATE THE FINISHED APPEARANCE AND
LOCATION OF ALL EXPOSED ELEMENTS OF THE WORK, INCLUDING THAT WORK WHICH IS
ILLUSTRATED PRIMARILY ON DRAWING OF OTHER DISCIPLINES, UNLESS OTHERWISE NOTED ON
THE DRAWINGS.
9. THE ARCHITECTURAL FLOOR PLANS, REFLECTED CEILING PLANS, SECTIONS, AND ELEVATIONS
SHOW THE LOCATION OF MANY-BUT NOT ALL – EXPOSED PARTS OF THE WORK. FOR ITEMS NOT
LOCATED EXACTLY, APPLY THE RULES INDICATED BY THE DRAWING “TYPICAL MOUNTING
HEIGHTS AND CONFIGURATION DIAGRAMS” TO DETERMINE THE EXACT LOCATION OF EACH
EXPOSED PART OF THE WORK.
10. REFER TO THE STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AND TELECOMMUNICATION
DRAWINGS FOR THE DETAILED DESIGN OF THE STRUCTURAL, MECHANICAL, ELECTRICAL AND
PLUMBING SYSTEMS, OF WHICH PORTIONS MAY ALSO MAY BE SHOWN ON THE ARCHITECTURAL
DRAWINGS.
11. ALL PARTS OF THE WORK – INCLUDING MATERIALS, METHODS, ASSEMBLIES, ETC – SHALL
COMPLY WITH ALL APPLICABLE GOVERNING RULES, CODES, REGULATIONS, ORDINANCES, AND
LAWS OF ALL FEDERAL, STATE DISTRICT, TERRITORIAL AND LOCAL GOVERNMENT AUTHORITIES
HAVING JURISDICTION OVER THE DESIGN, CONSTRUCTION, AND OCCUPANCY OF THE PROJECT,
WHETHER LISTED BY THE CONTRACT DOCUMENTS OR NOT.
12. NO PART OF THE CONTRACT DOCUMENTS SHALL BE CONSTRUED TO REQUIRE OR PERMIT
WORK CONTRARY TO AN APPLICABLE GOVERNING RULE, CODE, REGULATION, ORDINANCE, OR
LAW.
13. IF A CONFLICT EXISTS BETWEEN THE CONTRACT DOCUMENTS AND A REGULATORY
REQUIREMENT, THE CONTRACTOR SHALL COMPLY WITH THE ONE ESTABLISHING THE MORE
STRINGENT OR RESTRICTIVE REQUIREMENT:
• THE DRAWINGS AND SPECIFICATIONS MAY SET FORTH MORE DETAILED, MORE SPECIFIC,
AND/OR MORE RESTRICTIVE REQUIREMENTS THAN THOSE SET FORTH BY THE APPLICABLE
REGULATORY REQUIREMENTS,
• WHERE THE DRAWINGS AND SPECIFICATIONS PROVIDE MORE DETAILED, MORE SPECIFIC,
AND/OR MORE RESTRICTIVE REQUIREMENTS, THE CONTRACTOR SHALL COMPLY WITH THOSE
REQUIREMENTS. WHERE THE APPLICABLE REQUIREMENTS OF THE REFERENCED RULES,
CODES, REGULATIONS, ORDINANCES, OR LAWS ARE MORE RESTRICTIVE THAN THAT SET
FORTH BY THE DRAWINGS AND SPECIFICATION, THE CONTRACTOR SHALL COMPLY WITH ALL
SUCH MORE RESTRICTIVE REQUIREMENTS. ALTHOUGH SUCH REQUIREMENTS MAY NOT BE
ILLUSTRATED BY THE DRAWINGS AND SPECIFICATIONS.
14. APPLICABLE PORTIONS OF THE CODES, REGULATIONS, AND STANDARDS LISTED HERE ARE
INCORPORATED BY REFERENCE INTO THE REQUIREMENTS OF THIS CONTRACT AND ESTABLISH
MINIMUM REQUIREMENTS WITH WHICH THE WORK MUST COMPLY.
15. PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS “BASIS OF DESIGN”.
• ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT OR
ASSEMBLY WHILE THE SPECIFICATIONS LIST TWO OR MORE ACCEPTABLE MANUFACTURERS
AND/OR PRODUCTS, WHEN THIS OCCURS, THE PRODUCT OR ASSEMBLY ILLUSTRATED BY THE
DRAWINGS IS THE “BASIS OF DESIGN” PRODUCT OR ASSEMBLY.
• THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS OF
SPECIFIED PRODUCTS AND ASSEMBLIES OTHER THAN THE “BASIS OF DESIGN” MAY VARY
FROM THAT SHOWN BY THE DRAWINGS.
• THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR ASSEMBLY IN LIEU OF
THE “BASIS OF DESIGN” PRODUCT OR ASSEMBLY. HOWEVER, THE CONTRACTOR IS
RESPONSIBLE (AT NO ADDITIONAL EXPENSE TO THE OWNER) FOR ALL COORDINATION AND
REVISIONS TO DIMENSIONS AND/OR DETAILS NECESSARY TO ACHIEVE THE SAME FUNCTIONAL
AND AESTHETIC DESIGN INTENT AS ILLUSTRATED BY THE “BASIS OF DESIGN” SHOWN BY THE
CONTRACT DOCUMENTS.
21. CONSTRUCTION, WORKMANSHIP, AND MATERIALS SHALL CONFORM TO THE 2021 IBC AND
CURRENT VA STANDARDS.
22. THE CONTRACTOR SHALL NOTIFY THE COR AND AOR WHERE A CONFLICT OR DISCREPANCY
OCCURS BETWEEN THE CONTRACT DOCUMENT AND ANY OTHER PORTION OF THE CONTRACT
DOCUMENTS, FIELD CONDITIONS OR WHERE ANY CONDITIONS ARISE NOT COVERED BY THESE
DOCUMENTS WHEREIN WORK WILL NOT COMPLY WITH THE REQUIREMENTS OF THE IBC.
23. THESE DRAWINGS INDICATE IN GENERAL THE PROJECT IN TERMS OF ARCHITECTURAL
DESIGN INTENT, THE DIMENSIONS OF THE BUILDING, THE MAJOR ARCHITECTURAL ELEMENTS
AND TYPE OF STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS. THE DRAWINGS DO
NOT NECESSARILY INDICATE OR DESCRIBE ALL WORK REQUIRED FOR FULL PERFORMANCE
AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. AS INDICATED OR
DESCRIBED, THE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR THE PROPER
EXECUTION AND COMPLETION OF THE WORK.
24. REFER TO MECHANICAL, PLUMBING, ELECTRICAL AND TELECOMMUNICATIONS DRAWINGS
AND SPECIFICATIONS FOR ARCHITECTURAL ROUTING OF CONDUIT, PIPING, DUCTWORK ETC.
AT UNDERSIDE OF CONCRETE SLABS. ROUTING SHALL BE ORTHOGONAL, AND LIKE ITEMS TO
BE GANGED AND TO RUN PARALLEL WITH EVEN SPACING TYPICAL. EXACT ROUTING SHALL BE
DETERMINED BY THE CONTRACTOR, AND LAYOUT SHOP DRAWINGS SUBMITTED FOR
ARCHITECTURAL REVIEW AND APPROVAL PRIOR TO INSTALLATION. CONTRACTOR SHALL
VERIFY SIZES AND LOCATIONS OF ALL MECHANICAL EQUIPMENT PADS AND BASES AS WELL AS
POWER AND WATER OR DRAIN INSTALLATIONS WITH EQUIPMENT MANUFACTURERS BEFORE
PROCEEDING WITH THE WORK. CHANGES TO ACCOMMODATE FIELD CONDITIONS OR
SUBSTITUTIONS SHALL BE MADE AT NO ADDITIONAL COST.
25. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED TO BE
CONSTRUCTION STANDARDS. IF THE CONTRACTOR HAS QUESTIONS REGARDING SAME, OR
THEIR EXACT MEANING, THE ARCHITECT SHALL BE NOTIFIED FOR CLARIFICATION.
26. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL FLOOR/WALL SLEEVES AND SHAFTS
IN CONCRETE SLABS/WALLS WITH MECHANICAL, PLUMBING, FIRE PROTECTION, ELECTRICAL,
STRUCTURAL AND ARCHITECTURAL DRAWINGS AND DISCREPANCIES, IF ANY, TO BE BROUGHT
TO NOTICE OF THE ENGINEER PRIOR TO EXECUTION OF WORK.
27. COORDINATE WORK WITH COR, INCLUDING SCHEDULING TIME AND LOCATIONS FOR
DELIVERIES, BUILDING ACCESS, USE OF BUILDING SERVICES AND FACILITIES, AND USE OF
ELEVATORS. MINIMIZE DISTURBANCE OF BUILDING FUNCTIONS AND OCCUPANTS.
28. ALL EXISTING OR PROPOSED ELEVATIONS (LEVELS) AND DIMENSIONS, ON SITE AND ON
DRAWINGS MUST BE CHECKED AND VERIFIED BY THE CONTRACTOR BEFORE THE
PREPARATION OF SHOP DRAWINGS OR COMMENCEMENT OF ANY ITEM OF WORK ON THE SITE.
29. ARCHITECTURAL DRAWINGS MUST ALWAYS BE READ IN CONJUNCTION WITH ALL OTHER
RELEVANT SERVICES DRAWINGS AND CONTRACT DOCUMENTS. ANY DISCREPANCY BETWEEN
THESE DRAWINGS AND DOCUMENTS SHOULD BE REPORTED TO THE COR AND ARCHITECT FOR
CLARIFICATION AND VERIFICATION.
30. CONTRACTOR SHALL LOCATE AND INSTALL ALL ACCESS PANEL IN THE GYPSUM BOARD
CEILING AND WALLS FOR SERVICES ACCESS.
31. FOR AREAS WITHOUT SUSPENDED CEILING HAVING EXPOSED SLAB AND BEAMS, WALL FINISH
MATERIAL SHALL BE FROM FLOOR LEVEL TO BOTTOM OF SLAB LEVEL. (UNLESS NOTED
OTHERWISE)
32. NOTES APPEARING ON VARIOUS DRAWINGS FOR DIFFERENT SYSTEMS AND MATERIALS ARE
TO BE REVIEWED, COORDINATED AND ARE TO BE APPLIED TO ALL RELATED DRAWINGS AND
DETAILS.
FIRE PROTECTION
1. ALL OPENINGS IN SLABS AT MECHANICAL ROOMS (INCLUDING SPACES LEFTOVER IN THE
SHAFTS AFTER INSTALLATION OF DUCTS) MUST BE SEALED OFF WITH NON-COMBUSTIBLE
MATERIALS TO MAINTAIN THE REQUIRED FIRE-RATING CONTINUITY OF THE FLOOR
CONSTRUCTION. CONTRACTOR SHALL SUBMIT SHOP-DRAWINGS FOR APPROVAL FOR ALL
SUCH CASES.
2. ALL OPENINGS AT SLABS, WALLS SHALL BE SEALED OFF (FILLED) WITH NON-COMBUSTIBLE
MATERIALS TO MAINTAIN THE REQUIRED FIRE RATING CONTINUITY OF THE FLOOR, WALL
CONSTRUCTION. ALL HOLES, INCLUDING THOSE FOR MECHANICAL, AND ELECTRICAL
FACILITIES WHICH ARE LOCATED ON FLOOR SLAB, PARTITIONS AND WALLS MUST BE FILLED
WITH NON-COMBUSTIBLE MATERIALS TO PROVIDE REQUIRED FIRE RATING AND SHALL BE
SEALED AGAINST PASSAGE OF SMOKE AND FLAME.
3. A FINISH OR FIRE RATING INDICATION ON A WALL SHALL MEAN THE ENTIRE LENGTH OF WALL
IS TO BE FINISHED OR FIRE RATED.
4. FIRE RATED ASSEMBLIES SHALL BE PER TABLE 721.1(1), GENERIC ASSEMBLIES OF GYPSUM
HANDBOOK, OR HAVE ICC APPROVAL.
5. PENETRATIONS OF FIRE RESISTANCE-RATED HORIZONTAL ASSEMBLIES AND FIRE
RESISTANCE RATED WALLS SHALL COMPLY WITH SECTION 714 OF THE IBC, INCLUDING FIRE
DAMPERS AND SMOKE DAMPERS WHERE REQUIRED.
6. MEMBRANE PENETRATIONS BY LISTED ELECTRICAL OUTLET BOXES ARE PERMITTED
PROVIDED SUCH BOXES HAVE BEEN TESTED FOR USE IN FIRE-RESISTANCE-RATED
ASSEMBLIES AND THE BOX DOES NOT EXCEED 1/8" UNLESS LISTED OTHERWISE.
METAL WORKS
1. ALL MILD STEEL WORKS SHOWN ON THE CONTRACT DRAWINGS/DETAILS SHALL BE PRIMED
AND SHALL BE PAINTED WITH TWO COATS OF EPOXY PAINT.
2. STEEL ELEMENTS NOT SHOWN IN THE CONTRACT DRAWINGS BUT ARE DEEMED NECESSARY
FOR THE SATISFACTORY COMPLETION OF THE WORKS SHALL BE GALVANIZED STEEL PRIMED
& PAINTED WITH TWO COATS OF EPOXY PAINT FOR ALL INTERIOR SITUATIONS AND STAINLESS
STEEL (#316) FOR ALL EXTERIOR SITUATIONS.
3. ALL WELDED STEEL JOINTS SHALL BE GRINDED SMOOTH, PRIMED & PAINTED.
4. ALL WELDING SHALL BE OF SUITABLE TYPE TO STEEL WORKS.
ABATEMENT SCHEDULE
Level
ROOM
MATERIAL DISCRIPTION
NUMBER NAME
FLR 1 J104 TR APPROXIMATELY 40 SF OF DRYWALL JOINT COMPOUND
FLR 1 S101 TR APPROXIMATELY 100 SF OF BLACK MASTIC UNDER TAN FLOOR TILE
CODE ANALYSISPROJECT GENERAL NOTES
THE ELECTRONIC HEALTHCARE RECORDS MODERNIZATION (EHRM) INFRASTRUCTURE UPGRADES
PROJECT AT THE AUDIE L. MURPHY MEMORIAL VETERANS HOSPITAL (ALMMVH) IN SAN ANTONIO, TEXAS, ADDRESSES NECESSARY INFORMATION TECHNOLOGY (IT) UPGRADES TO MODERNIZE
EXISTING INFRASTRUCTURE AND SUPPORT IMPLEMENTING A NEW EHRM SYSTEM IN ACCORDANCE
WITH THE FOLLOWING REQUIREMENTS ESTABLISHED BY THE FOLLOWING VA OFFICE OF INFORMATION AND TECHNOLOGY (OIT) AND VA OFFICE OF ELECTRONIC HEALTH RECORDS MODERNIZATION (OEHRM)
STANDARDS:
• OEHRM SITE INFRASTRUCTURE AND END USER DEVICE (EUD) REQUIREMENTS, VERSION 2.0, DATED
APRIL 15, 2021
• OIT INFRASTRUCTURE STANDARDS FOR TELECOMMUNICATION SPACES, V3.1, DATED 1 JULY 2021
• HEPF SEP (SOCAMES) DESIGN ALERTS 1-8
THE PROJECT INCLUDES, BUT IS NOT LIMITED TO:
1. ELECTRICAL (ELECTRICAL PANEL UPGRADE POWER (NORMAL, EMERGENCY), BONDING, UPS)
2. BUILDING MANAGEMENT SYSTEM INTERFACES
3. NEW AND UPGRADING EXISTING HVAC
4. RECONFIGURATION, EXPANSION, AND RENOVATION OF EXISTING SPACES, INCLUDING DEMO, NEW
CONSTRUCTION, AND FINISHES)
5. DATA CENTER (SERVER ROOMS) WORK (HVAC, UPS, POWER DISTRIBUTION, CABLE MANAGEMENT)
6. COMMUNICATION INFRASTRUCTURE (NEW DATA OUTLETS, PATCH PANELS, UPGRADE TO CAT 6A
CABLE) IN BUILDINGS AS INDICATED
7. PHYSICAL SECURITY UPGRADES
8. UPGRADE FIBER INFRASTRUCTURE BACKBONE CAMPUS WIDE WITHIN BUILDINGS AND BETWEEN
BUILDINGS
9. HAZARDOUS MATERIAL ABATEMENT
10. REMOVAL OF ALL SUSPENDED ACOUSTICAL TILE CEILINGS IN TRs TO REMAIN.
11. REMOVAL OF EXISTING FLOORING IN TRs TO REMAIN AND INSTALLATION OF SDT STATIC
DISSIPATIVE TILE FLOORING GROUNDED TO THE BUSS BAR IN THE TR.
CONSTRUCTION PROJECT TO UPGRADE THE FACILITY INFRASTRUCTURE TO SUPPORT THE
NEW ELECTRONIC HEALTH RECORD MODERNIZATION (EHRM) SYSTEM IN ACCORDANCE WITH VA
OEHRM SITE INFRASTRUCTURE REQUIREMENTS. THE PROJECT INCLUDES, BUT IS NOT LIMITED TO:
1. ELECTRICAL (ELECTRICAL PANEL UPGRADE POWER (NORMAL, EMERGENCY))
2. BONDING
3. UPS
4. BUILDING MANAGEMENT SYSTEM INTERFACES
5. NEW AND UPGRADES TO EXISTING HVAC
6. RECONFIGURATION, EXPANSION AND RENOVATION OF EXISTING SPACE (DEMO, NEW
CONSTRUCTION, FINISHES)
7. DATA CENTER (SERVER ROOMS) WORK (HVAC, UPS, POWER DISTRIBUTION, CABLE MANAGEMENT)
8. COMMUNICATION INFRASTRUCTURE (NEW DATA OUTLETS, PATCH PANELS, UPGRADE TO CAT 6A
CABLE) IN BUILDINGS AS INDICATED
9. UPGRADE FIBER INFRASTRUCTURE BACKBONE CAMPUS WIDE WITHIN BUILDINGS AND BETWEEN
BUILDINGS
10. HAZARDOUS MATERIAL ABATEMENT
PROJECT BUILDING LOCATIONS INCLUDE:
1. BUILDING 1 (MAIN HOSPITAL BUILDING, INCLUDING TOWER AND SCI, COMMUNITY LIVING CENTER
BUILDING, POLYTRAUMA BUILDING)
2. BUILDING 4
THE FOLLOWING TRS WILL REMAIN IN PLACE WITH ARCHITECTURAL FINISH AND MEPT UPGRADES AS
INDICATED.
1. 020 C5/AE402
2. F004 F1/AE401
3. H031 B7/AE401
4. L010.2 C7/AE402
5. 157 F5/AE405
6. C132 C3/AE403
7. Y102.7 C5/AE405
8. 105 F7/AE403
9. E221 C5/AE406
10. 258 C3/AE406
11. C301.1 C7/AE407
12. 4101.1 F3/AE407
THE FOLLOWING TRS WILL BE EXPANDED WITH ARCHITECTURAL FINISH AND MEPT UPGRADES AS
INDICATED:
1. 030 F7/AE401
2. G101 F7/AE405
3. J104 D7/AE404
4. T119.2 C7/AE405
5. S101 C5/AE403
6. A200 F7/AE406
7. R201 F1/AE405
8. (SP)238 C7/AE406
9. D320 F1/AE406
10. C402 F7/AE407
11. C511 C5/AE407
12. C602.1 F1/AE407
THE FOLLOWING TRS WILL BE CONSTRUCTED WITH ARCHITECTURAL FINISH AND MEPT UPGRADES AS
INDICATED:
1. 1A138 C1/AE402
2. C015.1 C1/AE401
3. GB126.1 F7/AE402
4. 2A137 F1/AE402
5. H118.2 F5/AE403
6. P125 F1/AE404
7. Z221.28A F5/AE406
8. A702.1 F5/AE407
THE FOLLOWING TRS WILL BE DECOMMISSIONED:
1. 1A139 C1/AE402
2. C013 F5/AE401
3. D016 F5/AE402
4. GB101 C5/AE401
5. 2A138 F1/AE402
6. H120A C7/AE403
7. P127 F5/AE404
8. X102 D5/AE404
9. W220 F3/AE406
10. Z221.1 C3/AE406
11. D703 C3/AE407
THE DATA CENTER WILL BE RELOCATED
1. I100.2 AE408 & AE409
SCOPE OF WORK
Revisions: Date:
1. VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A
MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR
IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA
DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT
VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD
APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
(WWW.CFM.VA.GOV/TIL/).
• INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN
DOCUMENTS, SEE NOTES BELOW)
• NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)
• NFPA NATIONAL FIRE CODES, WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• NATIONAL ELECTRICAL CODE (NEC)
• INTERNATIONAL PLUMBING CODE (IPC)
• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL
ENGINEERS (ASME) A 17.1.
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA
SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE
INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN
SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL
CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL,
COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE
RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM
OF UNDERSTANDING (MOU)
• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND
TRANSPORTATION MANAGEMENT.
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL
• REQUIREMENTS SECTION 01010 OF THE VA MASTER CONSTRUCTION SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2004.
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2007.
16. THE CONTRACTOR SHALL NOT SCALE DRAWINGS, THE CONTRACTOR SHALL VERIFY ALL
DIMENSIONS AND EXISTING CONDITIONS PRIOR TO THE START OF WORK AND SHALL NOTIFY THE
OWNER’S REPRESENTATIVE OF ANY DISCREPANCIES PRIOR TO PROCEEDING WITH THE WORK.
17. PER VA POLICY, THE NEW CAMPUS DATA CENTER MUST MEET THE REQUIREMENTS OF NFPA 75.
THE REQUIREMENTS OF NFPA 75 APPLICABLE TO THE DATA CENTER, INCLUDE:
• PROVISION OF CLEAN AGENT EXTINGUISHING SYSTEM IN THE DATA CENTER;
• DETECTION FOR EARLY DETECTION AND SYSTEM DISCHARGE;
• 1-HOUR SEPARATION OF THE DATA CENTER;
• PROVISION OF FIRE DAMPERS AND/OR COMBINATION FIRE/SMOKE DAMPERS IN DUCT
PENETRATIONS OF THE DATA CENTER BOUNDARIES;
• PROVISION OF EMERGENCY LIGHTING;
• PROVISION OF EMERGENCY POWER OFF SWITCH(ES) FOR ELECTRICAL POWER;
• EMERGENCY OFF SWITCHES FOR HVAC.
18. ALL WORK PERFORMED SHALL COMPLY WITH THE CONTRACT DOCUMENTS, DRAWINGS, AND
PROJECT MANUAL, INCLUDING THESE GENERAL NOTES. THE CONTRACTOR SHALL COORDINATE
THE INTENT OF THE GENERAL NOTES WITH ALL TRADES. ALL WORK PERFORMED SHALL COMPLY
WITH CODES, LAWS, ORDINANCES, RULES, AND REGULATIONS OF PUBLIC AUTHORITIES
GOVERNING THE WORK.
19. THE PROJECT MANUAL, BOUND SEPARATELY, IS A PART OF THE CONTRACT DOCUMENTS.
20. THE ORGANIZATION OF THE DRAWINGS AND PROJECT MANUAL SHALL NOT CONTROL THE
CONTRACTOR IN DIVIDING THE WORK AMONG SUBCONTRACTORS OR IN ESTABLISHING THE
EXTENT OF WORK TO BE PERFORMED BY ANY TRADE.
CODES AND STANDARDS
2. LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL
IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS,
INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ)
AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH
ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT
PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES
NOT PAY FOR REVIEW OR INSPECTION FEES.
3. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY
CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS
REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF
THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE
LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT
ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE
REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN
THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF
THE IBC REQUIREMENTS ARE DIFFERENT).
4. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA
REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED
NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE
ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY
HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
SHEET 3 of 431
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
100%
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMP
321 4 5 6 7 8 9 10
B
IM
/A u d ie L
M u rp h y V
A M e d ic a l C e n te r
(S A
-2 -7
.0 .A
S T
X E
H R
M .r v t
/1
/2
:5
:3
A
M
GI004
TIL ABBREVIATION LIST (PG-18-4)
Awen Solutions Group
4196 Merchant Plaza, Suite 711
Woodbridge, VA 22192
06/09/2023
EHRM INFRASTRUCTURE
UPGRADES 1
Audie L. Murphy Memorial Veterans' Hospital 7400 Merton Minter Boulevard, San Antonio TX
671-22-700
ARCHITECTURAL ABBREVIATIONS U.O.N.
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AAMA AMERICAN ARCHITECTURAL
MANUFACTURERS ASSOCIATION
AB ANCHOR BOLT
ABAN ABANDONED
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR ASPHALTIC
CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
ADB AUTOMATIC DOOR BOTTOM
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGA AMERICAN GAS ASSOCIATION
AGC ASSOCIATED GENERAL
CONTRACTORS
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL
CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS
INSTITUTE
ANT ANTENNA
APA AMERICAN PLYWOOD
ASSOCIATION
APPD APPROVED
APPROX APPROXIMATE
APT APARTMENT
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL
INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ASTM AMERICAN SOCIETY FOR TESTING
AND MATERIALS
ATCH ATTACHMENT
ATM AUTOMATIC TELLER MACHINE
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVE AVENUE
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING
INSTITUTE
AWPA AMERICAN WOOD PRESERVERS'
ASSOCIATION
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B LABEL CLASS B DOOR
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BD FT BOARD FEET (FOOT)
BEV BEVEL
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKT BLANKET
BLVD BOULEVARD
BM BEAM OR BENCHMARK
BOT BOTTOM
BR BEDROOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BU BUSHEL
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL
C CHANNEL CELSIUS
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
C TO C CENTER TO CENTER
CAB CABINET
CAC CEILING ATTENUATION CLASS
CB CATCH BASIN OR CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS OR
CONTRACT DOCUMENTS
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED /
CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER
INSTALLED
CFLG COUNTERFLASHING
C…