- Adams County, Asotin County, Benton County, Chelan County, Clallam County, Clark County, Columbia County, Cowlitz County, Douglas County, Ferry County, Franklin County, Garfield County, Grant County, Grays Harbor County, Island County, Jefferson County, King County, Kitsap County, Kittitas County, Klickitat County, Lewis County, Lincoln County, Mason County, Okanogan County, Pacific County, Pend Oreille County, Pierce County, San Juan County, Skagit County, Skamania County, Snohomish County, Spokane County, Stevens County, Thurston County, Wahkiakum County, Walla Walla County, Whatcom County, Whitman County, Yakima County, Asotin City, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Benton City, Chelan City, Chelan Falls CDP, Clallam Bay CDP, Lewisville CDP, Rock Island City, Pacific Beach CDP, Whidbey Island Station CDP, Mercer Island City, Pacific City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Kittitas City, Klickitat CDP, Okanogan City, Anderson Island CDP, Fort Lewis CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, North Fort Lewis CDP, Raft Island CDP, Stevenson City, Hat Island CDP, Lake Stevens City, Snohomish City, Spokane City, Spokane Valley City, Puget Island CDP, Garfield Town, Yakima City, Washington
About this file
This Request for Proposals (RFP-2026-0911) is issued by the Washington State Department of Transportation (WSDOT) seeking qualified bidders to design, develop, implement, operate, and maintain Roadway Toll Systems (RTS) throughout Washington State. WSDOT will award two independent contracts through this single RFP: an Open Road Tolling (ORT) RTS Contract and a Side-Fire RTS Contract, which may be awarded to the same or different bidders. The ORT RTS Contract encompasses a mix of replacement and new projects including the SR 520 Toll Facility replacement, SR 167 East of I-5 Toll Facility installation, SR 99 Toll Facility replacement, and I-405 Bellevue to Lynnwood Express Toll Lane facility replacement, plus shared-host and program-level work. The Side-Fire RTS Contract includes an initial Proof of Concept scope with potential for future standalone facilities. A mandatory bidders meeting is scheduled for October 8, 2026, with proposals due December 9, 2026 at noon. Bidder interviews are estimated for February 8-11, 2027, and the Apparent Successful Bidder is expected to be identified by February 22, 2027, with contract execution estimated for March 25, 2027. The ORT RTS Contract term commences upon the last contract signature date and terminates ten years after System Acceptance by WSDOT on the last System Statement of Work issued under the contract, with ten years of Operations and Maintenance included for each system. The Side-Fire RTS Contract term is five years from the Effective Date if no System Statements of Work are issued, or ten years after System Acceptance on the last System Statement of Work if such statements are issued.
WSDOT reserves the right to add or modify Roadway Toll Systems to either contract no later than ten years from the Effective Date. Bidders must demonstrate minimum qualifications including at least one RTS solution with two or more adjacent lanes implemented and in revenue operation within the last five years, and for the Side-Fire contract, preferred experience includes cloud-based Host implementation, Application Programming Interface integration, and replacement of existing operational toll collection systems. Proposals must address technical requirements spanning design, installation, testing, operations, and maintenance across multiple locations and facility types, including both Greenfield and Brownfield projects. Bidders are required to comply with prevailing wage requirements under Chapter 39.12 RCW, provide wage theft prevention and workers' rights certifications, and disclose organizational conflicts of interest. The RFP does not obligate WSDOT to award any contract, and any awarded contract is contingent upon funding availability. Bidders must submit separate proposals for each contract type if applying to both, with specific page limits and organizational requirements, and must attend the mandatory bidders meeting to be eligible for proposal submission. Cost proposals will be evaluated separately from technical proposals, with WSDOT retaining the option to request Best and Final Offers before determining the best value proposal.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposals
RFP-2026-0911
Washington State
Roadway Toll Systems
Modernization Programs
Offered by
Washington State Department of
Transportation
Roadway Toll Systems Project Request for Proposals RFP-2026-0911 i State of Washington Department of Transportation
Table of Contents
1. REQUEST FOR PROPOSALS AVAILABILITY
1.1 Electronic Availability
1.2 Alternative Formats
2. DEFINITIONS
3. INTRODUCTION
3.1 Authorization
3.2 Contract Terms
3.3 No Obligation
3.4 RFP Materials Summary
4. ORT AND SIDE-FIRE PROGRAM DESCRIPTIONS
5. OVERALL PROGRAM GOALS
6. PROCUREMENT PROCESS
6.1 RFP Schedule
6.2 Selection Process
7. CONTACT INFORMATION AND TERMS AND CONDITIONS
7.1 WSDOT Procurement Coordinator
7.2 Communications
7.3 WSDOT Consultant/Technical Support
7.4 Complaint Process
7.5 Organizational Conflicts of Interest
7.6 Equal Employment Opportunity
7.7 Wage Theft Prevention Certification
7.8 Workers’ Rights Certification
7.9 Prevailing Wages
7.10 Client References
8. LETTER OF INTENT
9. MANDATORY BIDDERS MEETING AND REGISTRATION
10. QUESTIONS AND ANSWERS
11. PROPOSAL SUBMITTAL INSTRUCTIONS AND FORMAT
11.1 Time and Manner of Submission
11.2 Bidder’s Acknowledgement
11.3 Bidder Expenses
11.4 Proprietary Information and Public Disclosure
11.5 Irregularities or Defects
11.6 Rejection of Proposals/Cancellation of RFP
11.7 Proposal Organization and Format
12. PROPOSAL DOCUMENT
12.1 Page Limits
12.2 Proposal Section 1: Letter of Submittal
12.3 Proposal Section 2: Table of Contents
ii State of Washington Department of Transportation
12.4 Proposal Section 3: Executive Summary
12.5 Proposal Section 4: Proposal Narrative ORT RTS Contract:
12.6 Proposal Section 4: Proposal Narrative Side-Fire RTS Contract:
12.7 Proposal Section 5: Technical Requirements Compliance Matrix
12.8 Proposal Section 6: Key Personnel Resumes
12.9 Proposal Section 7: Cost Proposal
12.10 Proposal Section 8: Required Documents and Documentation
12.11 Proposal Section 9: Corporate Financial Information
12.12 Proposal Section 10: Bidder's Contract Issues List
13. PROPOSAL EVALUATION AND SELECTION
13.1 Overview
13.2 Pass/Fail Screening Criteria
13.3 Minimum Qualifications Pass/Fail Screening Criteria
13.4 Technical Proposal Scoring
13.5 Interviews
13.6 Technical Scoring Update
13.7 Cost Proposal Scoring
13.8 Total Score Determination
13.9 BAFO (at WSDOT’s option)
13.10 Best Value Proposal Determination
13.11 Financial Stability Assessment
13.12 Selection of Apparent Successful Bidder
13.13 Contract Negotiations
14. NOTIFICATIONS AND DEBRIEFING
14.1 Notification of Successful Bidder
14.2 Notification to Unsuccessful Bidders
14.3 Debriefing of Unsuccessful Bidders
15. PROTESTS
15.1 Grounds for Protest
15.2 Protest Bond Requirement
15.3 Procedure for Protest
15.4 Protest Review Process
TABLES
Table 6-1. RFP Procurement Schedule Table 12-1. Proposal Page Limits Table 12-2. ORT RTS Contract Key Personnel Qualifications Table 12-3. Side-Fire RTS Contract: Key Personnel Qualifications Table 12-4. Performance Measures Table 13-1. ORT RTS Proposal Scoring Table Table 13-2. Side-Fire RTS Proposal Scoring Table Table 13-3. Pass/Fail Criteria Table 13-4. ORT RTS Contract Minimum Qualifications Pass/Fail Criteria iii State of Washington Department of Transportation
EXHIBIT LIST
• Exhibit 1: Bidders Certification
• Exhibit 2: Compliance Matrix
• Exhibit 3A: ORT RTS Contract Cost Proposal
• Exhibit 3B: Side-Fire RTS Contract Cost Proposal
• Exhibit 4: Bidder's Contract Issues List
• Exhibit 5: Subcontractor Inclusion Plan
• Exhibit 6A: ORT RTS Contract Proposer Checklist
• Exhibit 6B: Side-Fire RTS Contract Proposer Checklist
• Exhibit 7: Key Personnel Resume Template
• Exhibit 8: Washington State Prevailing Wage Rates
• Exhibit 9: Organizational Conflicts of Interest Certification, Disclosure and
Avoidance/Neutralization Plan (OCOI)
• Exhibit 10A: ORT RTS Contract
• Exhibit 10B: Side-Fire RTS Contract
APPENDIX LIST
• Appendix 1: Definitions
• Appendix 2A: ORT RTS Project Overview
• Appendix 2B: Side-Fire RTS Project Overview
• Appendix 3: Design, Installation, and Testing
• Appendix 4: Toll Technical Requirements
• Appendix 5: Operations and Maintenance
• Appendix 6: List of Mandatory Standards
• Appendix 7: Lane Side Operations Business Rules
• Appendix 8: Roadside ICD
• Appendix 9: Information Technology Security
• Appendix 10: Plate Type Reference Guide
• Appendix 11: Supplemental Manuals From WSDOT
• Appendix 12: Toll Sign Display File ICD
State of Washington Department of Transportation
1. REQUEST FOR PROPOSALS AVAILABILITY
1.1 Electronic Availability
The contents of this Request for Proposals (RFP), and any RFP Amendments and written answers to questions, will be available on Washington’s Electronic Business Solution (WEBS) website at https://pr-webs-vendor.des.wa.gov/.
Bidders are solely responsible for:
• Properly registering with WEBS at https://fortress.wa.gov/ga/webs/ and maintaining an accurate Bidder profile in WEBS.
• Downloading the RFP packet, consisting of the RFP, all Exhibits and Appendices, and incorporated documents related to the RFP for which the Bidder is interested in submitting.
• Downloading all current and subsequent RFP Amendments to ensure receipt of all
RFP documents.
Notification of RFP Amendments will only be generated by the WEBS system and will be provided only to those Bidders who have registered with WEBS and have downloaded the
RFP from WEBS. Failure to register and download the RFP from WEBS may result in a Bidder having incomplete, inaccurate, or otherwise missing information and RFP documents. RFP
Amendments and requests for Best and Final Offers (BAFO) that occur after Proposals are submitted will be emailed directly to the designated point of contact for all remaining Bidders.
1.2 Alternative Formats
Persons with disabilities may request information contained within this RFP and subsequent
RFP Amendments to be prepared and supplied in alternative formats by contacting the
WSDOT Procurement Coordinator.
2. DEFINITIONS
All capitalized terms used in this RFP, but not expressly defined herein, have the respective meanings set forth in Appendix 1.
3. INTRODUCTION
The Washington State Department of Transportation (WSDOT) is soliciting Proposals from interested Bidders to design, develop, implement, operate, and maintain four or more Roadway
Toll Systems (RTS) in Washington State. WSDOT will be awarding two contracts through this single RFP. The Contracts have distinct scopes, as discussed in Exhibit 10A, Open Road
Tolling (ORT) RTS Contract and Exhibit 10B, Side-Fire RTS Contract of this RFP.
https://pr-webs-vendor.des.wa.gov/ https://fortress.wa.gov/ga/webs/
State of Washington Department of Transportation
ORT RTS Contract includes a mix of replacement and new projects that are both Single-Point and Express Toll Lane (ETL) Open Road Tolling facilities. The four toll facilities included, in addition to shared-host and program-level work, are:
• RTS Program and Host (ORT RTS Contract, Exhibit A)
• Replacement of the existing SR 520 Toll Facility (ORT RTS Contract, Exhibit B)
• Installation of the new SR 167 East of I-5 Toll Facility (ORT RTS Contract, Exhibit
C)
• Replacement of the existing SR 99 Toll Facility (ORT RTS Contract, Exhibit D)
• Replacement of the existing I-405 Bellevue to Lynnwood ETL Facility (ORT RTS
Contract, Exhibit E)
Side-Fire RTS Contract includes an initial scope for a Side-Fire Only RTS project Proof of
Concept (POC). The distinct POC Statement of Work (SOW) is discussed in Side-Fire RTS
Contract, Exhibit A. At WSDOT’s discretion, standalone facilities may be added to the Side-Fire
RTS Contract in future Statements of Work.
ORT RTS Contract will be eligible to be awarded future projects statewide, while Side-Fire RTS
Contract will only be eligible for future work based on the results of the POC. The intent is to empower WSDOT to select either or both of the ORT RTS Contract Response or the Side-Fire
RTS Contract Response for future projects (beyond the four initial facilities included in ORT
RTS Contract).
Each contract will be awarded and evaluated independently. The ORT RTS Contract and the
Side-Fire RTS Contract may be awarded to the same or different Bidders. Bidders may propose overlapping key personnel team members in their ORT RTS Contract and Side-Fire RTS
Contract.
Future projects that may potentially be added include the following (further described in ORT
RTS Contract Exhibit H and Side-Fire RTS Contract Exhibit C, Hypothetical Future Systems):
• ORT RTS Contract Hypothetical Systems:
− System 1: Single Point 3 lanes, 2 Toll Zones
− System 2: Single Point 2 lanes, 2 Toll Zones
− System 3: Single Point 1 lane, 4 Toll Zones
− System 4: ETL Single lane, 20 Toll Points
− System 5: ETL Dual lane, 20 Toll Points
• Side-Fire RTS Contract Hypothetical Systems:
− System 1: Side-Fire Program
− System 2: Single Point 2 lanes, 2 Toll Zones
State of Washington Department of Transportation
− System 3: Single point 1 lane, 4 Toll Zones
− System 4: ETL Single lane, 20 Toll Points
− System 5: ETL Dual lane, 20 Toll Points
The RTS projects may also be referred to in this RFP as the “RTS Program.”
Bidders shall satisfy all requirements specified in this RFP. Failure of the Bidder to meet these requirements may result in rejection of the Proposal. By submitting a Proposal, Bidders agree to be bound by the requirements outlined in this RFP.
3.1 Authorization
The Washington State Department of Enterprise Services (DES) has authority over goods and services under Chapter 39.26 RCW and sets processes for procuring information technology based on the policies and standards set by the Washington State Technology Services Board
(TSB). Chapter 43.105 RCW as amended establishes the TSB. While the TSB does not purchase for agencies, it establishes policies and standards addressing the way State agencies may acquire information technology equipment, software, and services. Chapter
39.26 RCW and Chapter 43.105 RCW WSDOT issues this RFP acting under the delegated authority of DES and consistent with the policies and standards of Washington Technology
Solutions (WaTech).
3.2 Contract Terms
The term of the ORT RTS Contract shall commence upon the last Contract signature date
(Effective Date) and terminate 10 years after System Acceptance by WSDOT on the last
System SOW issued under this Contract, unless terminated early as provided elsewhere in the Contract. The Work for each System will include 10 years of Operations and Maintenance, unless specifically modified by an applicable SOW. This term may be further extended upon the mutual written agreement of the parties.
The term of the Side-Fire RTS Contract shall commence upon the last Contract signature date
(Effective Date) and terminate five years after the POC Decommissioning milestone approval date unless a System SOW is issued within that five-year term. In the event one or more
System SOWs are issued, the Contract shall terminate 10 years after System Acceptance by
WSDOT on the last System SOW issued under this Contract, unless terminated early as provided elsewhere in the Contract. The Work for each System will include 10 years of
Operations and Maintenance (commencing upon System Acceptance), unless specifically modified by an applicable SOW. This term may be further extended upon the mutual written agreement of the parties.
WSDOT may later add or modify Roadway Toll Systems to the Project. WSDOT may add a
Roadway Toll System to the Project no later than 10 years from the Effective Date of the respective Contract. This term may be further extended upon the mutual written agreement of the parties.
State of Washington Department of Transportation
3.3 No Obligation
This RFP does not obligate WSDOT to award a Contract to any Bidder. WSDOT reserves the right to amend, modify, cancel, or reissue this RFP, in whole or in part, without prior notice, at any time, and at its sole discretion.
WSDOT reserves the right to modify the scope and requirements of the Program, including adding and/or deleting functionality, throughout the procurement process.
Any Contract awarded as a result of this RFP is contingent upon the availability of funding.
3.4 RFP Materials Summary
As this RFP will procure two contracts there are some materials that apply to both and some that apply only to one or the other. Unless otherwise noted, Appendices and Exhibits apply to both contracts. Appendices and Exhibits appended with “A” pertain to the ORT RTS Contract only. Appendices and Exhibits appended with “B” pertain to the Side-Fire RTS Contract only.
Please review the lists below to ensure you have downloaded all of the relevant materials for the respective contract(s) of interest.
RFP Exhibits:
• Exhibit 1: Bidders Certification
• Exhibit 2: Compliance Matrix
• Exhibit 3A: ORT RTS Contract Cost Proposal
• Exhibit 3B: Side-Fire RTS Contract Cost Proposal
• Exhibit 4: Bidder's Contract Issues List
• Exhibit 5: Subcontractor Inclusion Plan
• Exhibit 6A: ORT RTS Contract Proposer Checklist
• Exhibit 6B: Side-Fire RTS Contract Proposer Checklist
• Exhibit 7: Key Personnel Resume Template
• Exhibit 8: Washington State Prevailing Wage Rates
• Exhibit 9: Organizational Conflicts of Interest Certification, Disclosure and
Avoidance/Neutralization Plan (OCOI)
• Exhibit 10A: ORT RTS Contract
• ORT RTS Exhibit A: RTS SOW #1 RTS Program and Host
• ORT RTS Exhibit B: RTS SOW #2 SR 520 Replacement
• ORT RTS Exhibit C: RTS SOW #3 Gateway SR 167 East of I-5
State of Washington Department of Transportation
• ORT RTS Exhibit D: RTS SOW #4 SR 99 Replacement
• ORT RTS Exhibit E: RTS SOW #5 I-405 Bellevue to Lynnwood Replacement
• ORT RTS Exhibit F: Labor Rates
• ORT RTS Exhibit H: RTS Hypothetical Facilities
• ORT RTS Exhibit I: Minor System Enhancements and Facility Repairs
• ORT RTS Exhibit J: Performance Measures/KPIs
• ORT RTS Exhibit K: Bond Templates
• ORT RTS Exhibit L: Software License (for Vendor Proprietary Software)
• ORT RTS Exhibit M: Software Escrow Agreement
• Exhibit 10B: Side-Fire RTS Contract
• Side-Fire RTS Exhibit A: Side Fire SOW #1 Proof of Concept
• Side-Fire RTS Exhibit B: Preliminary Coordination for Additional Systems
• Side-Fire RTS Exhibit C: Side Fire Hypothetical Facilities
• Side-Fire RTS Exhibit D: Minor System Enhancements and Facility Repairs
• Side-Fire RTS Exhibit E: Performance Measures/KPIs
• Side-Fire RTS Exhibit F: Bond Templates
• Side-Fire RTS Exhibit G: Labor Rates
• Side-Fire RTS Exhibit H: Software License (for Vendor Proprietary Software)
• Side-Fire RTS Exhibit I: Software Escrow Agreement
Appendices:
• Appendix 1: Definitions
• Appendix 2A: ORT RTS Project Overview
• Appendix 2B: Side-Fire RTS Project Overview
• Appendix 3: Design, Installation, and Testing
• Appendix 4: Toll Technical Requirements
• Appendix 5: Operations and Maintenance
• Appendix 6: List of Mandatory Standards
• Appendix 7: Lane Side Operations Business Rules
• *Appendix 8: Roadside ICD
• Appendix 9: Information Technology Security
• *Appendix 10: Plate Type Reference Guide
State of Washington Department of Transportation
• *Appendix 11: Supplemental Manuals From WSDOT
• *Appendix 12: Toll Sign Display File ICD
*Documents not provided via WEBS and will be provided separately on an as-needed basis to Bidders who submit Letters of Intent.
4. ORT AND SIDE-FIRE PROGRAM DESCRIPTIONS
The RTS Program comprises the design, installation, integration, testing, operation, and maintenance of Single-Point Toll and ETL systems that will be a mix of Brownfield Projects and
Greenfield Projects. The scope of work for the Program comprises multiple facilities and systems that will be executed in separate SOWs.
The plan for both Programs consists of the following components:
• Design, supply, install, field test, commission, operate, and maintain RTS.
• Coordinate with WSDOT Groups and Subject Matter Experts (SMEs) as required to design, plan, and execute field work throughout the life of the Program.
• Coordinate with WSDOT’s separately contracted Design Builder teams (on
Greenfield Projects) responsible for delivering toll facility infrastructure, including toll signs, striping, toll gantries, roadside cabinets, and required power and communication connections.
• For Brownfield Projects, coordinate with WSDOT and WSDOT’s legacy Toll Vendor to effectively and efficiently plan transition and execute conversion of existing systems within the Replacement Projects.
• Support succession plans and decommissioning activities at end of life.
The RTS Program will include electronic equipment for Transponder (optional for Side-Fire
RTS) and Image-based Tolling. The RTS will also include a Digital Video Audit System (DVAS) to provide camera monitoring of the Toll Zones. The purpose of the RTS is to detect, identify, and classify (as required) vehicles passing through toll zones to allow accurate transaction creation and to support revenue collection on the WSDOT Tolling System.
WSDOT provides and operates Toll Rate Signs on all WSDOT tolling facilities announcing current toll rates. WSDOT generates Toll Sign Display Files (TSDF) that capture effective toll rates and other WSDOT-posted messages on Toll Rate Signs on ETL facilities. TSDF files are transmitted to the Bidder for correct rate assignment during the Trip-building process. Single-point toll facilities employ a variable time-of-day toll rate schedule that is determined by
WSDOT.
WSDOT provides a Back Office System (BOS) for back-office functions but does not complete
Trip building. The Bidder will be responsible for building complete Trips for all WSDOT facilities and providing all Trip data associated with each vehicle passage in accordance with the BOS
Interface Control Document (ICD).
State of Washington Department of Transportation
No manual image review is explicitly required under the Contract; however, the Bidder may choose to perform image review for certain Transactions in order to meet Key Performance
Indicators (KPIs).
More detailed project descriptions are described in the Contract Exhibits.
The main business requirements for the Program are contained within the following Appendices:
• Appendix 3, Design, Installation, and Testing Requirements
• Appendix 4, Toll Technical Requirements
• Appendix 5, Operations and Maintenance Requirements
The Work for this Program includes all services, labor, material, and equipment necessary to design, develop, implement, operate, and maintain the RTS Projects in accordance with the
Contracts.
5. OVERALL PROGRAM GOALS
• Goal 1: Safe and Smooth Transition:
− Execute a safe and smooth transition to the RTS that minimizes impacts to operations and customers. This goal will be met, in part, through a combination of each of the subsequent goals. Where roadside facilities are replaced, the
Bidder should leverage technology options and transition approaches to maintain business continuity and aid in revenue loss prevention. Transitions will be deployed with the customer in mind so they are not unduly burdened.
Ensure safety for all staff and the traveling public.
• Goal 2: Leverage Technology:
− Utilize innovation, advanced technology and industry best practices to deliver schedule and cost savings while achieving high performance. Solutions should require less roadside infrastructure than previous generations and have less equipment in or over the roadway to install and maintain. Solutions should be faster to deploy and provide efficiencies over previous generations. Solutions should mitigate future cost risk by providing scalability and building in flexibility to leverage improvements or efficiencies due to new technologies, processes, or systems as they become available.
• Goal 3: System Resiliency and Transparency:
− Provide resilient, flexible, and adaptable solutions to streamline implementation and operations while providing a high degree of transparency into current conditions and performance data. Systems will minimize downtime due to failures and environmental conditions and they will store, transmit, and back up data appropriately for business needs moving forward. Solutions will be flexible and adaptable to encompass both full roadway and express toll lane applications, and will be expandable depending on volume and new
State of Washington Department of Transportation deployments, as well as any new functionality desired by WSDOT, such as interoperability. Solutions will provide thorough and timely reporting of system performance data and will remove barriers to communication and understanding, improving time to resolution and supporting clear auditability.
• Goal 4: Partnership and Delivery:
− Strong partnership between WSDOT and the Bidder, supported by rigorous
Project management, accountability, and transparency. Work hand-in-hand with WSDOT to collaboratively plan work, resolve issues, and foster regular and transparent communications. Provide efficient project delivery through flexible resource planning and partner fairly with WSDOT if flexibility is needed to navigate enhancements or potential unknowns.
• Goal 5: Maximize Value and Efficiency:
− Minimize implementation cost, operational cost, and potential lost revenue while optimizing business value through programmatic efficiencies and improvements that provide benefit to customers and across toll division.
Leverage economies of scale and seek efficiencies to reduce operational costs as volumes grow. Help mitigate risks of rising infrastructure costs. Enact a partnering approach to change and change management.
6. PROCUREMENT PROCESS
6.1 RFP Schedule
All Bidders shall adhere to the schedule of activities set forth in Table 6-1. WSDOT reserves the right to modify dates and times related to this solicitation. Changes will be posted on WEBS as RFP Amendments and sent electronically to all users of WEBS who downloaded this RFP.
RFP Amendments and requests for BAFOs that occur after Proposals are submitted will be emailed directly to the designated point of contact for all remaining Bidders. Late Proposals will not be accepted, nor will time extensions be granted.
Table 6-1. RFP Procurement Schedule
Activity Due Date Time
(Pacific)
Official Release of the RFP September 11, 2026 4:00 p.m.
Mandatory Bidders Meeting Registration September 25, 2026 Noon
Mandatory Bidders Meeting October 8, 2026 12:30 p.m.
Letter of Intent October 16, 2026 Noon
Bidder Written Questions Due October 16, 2026 Noon
WSDOT Written Answers to Written Questions (estimated)
October 30, 2026 Noon
Deadline for Bidder Submittal of Complaints November 6, 2026 Noon
Proposals Due December 9, 2026 Noon
Invitation to Bidder Interviews (estimated) January 22, 2027 Noon
State of Washington Department of Transportation
Activity Due Date Time
(Pacific)
Bidder Interviews February 8, 2027 – February 11, 2027 Varies
Request for BAFO (at WSDOT’s option) If requested, would follow Interviews Varies
BAFO Submittals, If Required Request for BAFO + 4 weeks Noon
Determine Best Value Proposal (if no BAFO) February 12, 2027 Internal
Financial Stability Assessment February 16, 2027 – February 22, 2027 Internal
Identify The Apparent Successful Bidder (ASB) February 22, 2027 4:00 p.m.
Bidder Request for Optional Debriefing Due Debrief must be requested no later than 3 Business Days after the ASB is announced
4:00 p.m.
Bidder Debriefing (if any) No later than 5 Business Days after debriefing request
Varies
Protests Due No later than 5 Business Days after debriefing conference
2:00 p.m.
Begin Contract Negotiations (if any) March 3, 2027 Internal
Estimated Contract Execution March 25, 2027 Internal
6.2 Selection Process
WSDOT will use the following multi-step evaluation process to select a Bidder to deliver the
Project:
• Step 1: Pass/Fail. WSDOT evaluates the Proposals against the Pass/Fail screening criteria in accordance with Section 13.2 herein.
• Step 2: Minimum Qualifications. Those Bidders that pass Step 1 will advance to the second step in which the Minimum Qualifications Pass/Fail criteria will be evaluated in accordance with Section 13.3 herein.
• Step 3: Technical Proposal Scoring. Those Bidders that pass Step 2 will advance to the third step in which the Proposals are evaluated and scored on the technical sections of the Proposal in accordance with Section 13.4 herein.
• Step 4: Interviews. Following the completion of Step 3, WSDOT will conduct in-person interviews with the Bidders, with the top scoring Proposals, or, at WSDOT’s sole discretion, all remaining Bidders, in accordance with Section 13.5 herein.
• Step 5: Technical Proposal Scoring Update. Following completion of Step 4, WSDOT will score the interview and update the technical score for each interviewed
Bidder based upon the interview responses in accordance with Section 13.6 herein.
• Step 6: Cost Proposal Scoring. Following completion of Step 5 or in parallel with the technical reviews, WSDOT will open and evaluate the Cost Proposals in accordance with Section 13.7 herein.
State of Washington Department of Transportation
• Step 7: Total Score Determination. The technical score and price score will be combined to establish the total score for each remaining Bidder in accordance with
Section 13.8 herein. Upon calculation of the total score, WSDOT may, at its sole discretion, implement Step 9, Step 10, or Step 11.
• Step 8: Best and Final Offers (optional). Following the completion of Step 7, WSDOT may, at its sole discretion, issue a notice for a BAFO to the top scoring Step
7 Bidders, or at WSDOT’s sole discretion, all remaining Bidders, in accordance with
Section 13.9 herein.
• Step 9: Best Value Determination. Following the completion of Step 6, Step 7, or
Step 8, if implemented, WSDOT will determine the Best Value Proposal in accordance with Section 13.10 herein.
• Step 10: Financial Stability Assessment. Following the completion of Step 9, WSDOT will perform a Financial Stability Assessment of the Bidder with the Best
Value Proposal in accordance with Section 13.11 herein.
• Step 11: Apparent Successful Bidder. Following the successful completion of Step
10, WSDOT will identify the Apparent Successful Bidder in accordance with Section
13.12 herein.
• Step 12: Contract Negotiations. Following the successful completion of Step 11, WSDOT will enter into contract negotiations with the Apparent Successful Bidder in accordance with Section 13.13 herein.
The steps of the evaluation process are summarized in the following sections and described in detail in Section 13.
7. CONTACT INFORMATION AND TERMS AND CONDITIONS
7.1 WSDOT Procurement Coordinator
The WSDOT Procurement Coordinator is the sole point of contact in WSDOT for this RFP.
Upon issuance of this RFP and until WSDOT and the Apparent Successful Bidder have executed the Contract, all communication between Bidders and WSDOT shall be with the
WSDOT Procurement Coordinator, as follows:
Tariq Ohab, WSDOT Procurement Coordinator
Phone: (360) 972-5245
Email: ACOAcquisitionSubmittal@wsdot.wa.gov and
Cc to: Tariq.Ohab@wsdot.wa.gov
Persons with a hearing or speech disability may contact the Procurement Coordinator by dialing 711 to connect with a Telecommunications Relay Services operator for assistance.
mailto:ACOAcquisitionSubmittal@wsdot.wa.gov mailto:Tariq.Ohab@wsdot.wa.gov
State of Washington Department of Transportation
7.2 Communications
Upon receipt of this RFP and until WSDOT has executed the Contract, the Bidders may not approach any WSDOT employee or consultant other than the WSDOT Procurement
Coordinator regarding this procurement. All RFP-specific inquiries and other correspondence concerning this RFP shall be addressed to the WSDOT Procurement Coordinator.
Communication regarding this RFP with any other WSDOT or State employee or consultant will be considered unofficial and non-binding to WSDOT. Bidders are expected to conduct themselves with professional integrity and to refrain from lobbying activities. Solicitation to WSDOT employees or consultants is prohibited in any form.
Any verified allegation of an attempt to unduly influence the selection or communication by a
Bidder or its employees, agents, Subcontractors, or consultants directed to parties other than the WSDOT Procurement Coordinator may result in disqualification of the Bidder, all at the sole discretion of WSDOT.
Verbal responses to questions will be considered unofficial and non-binding. Only written responses posted to WEBS will be considered official and binding.
Bidders must use email for any communication required in this RFP. Bidders must submit protests in writing via email to the email address indicated in Section 7.1 herein.
7.3 WSDOT Consultant/Technical Support
WSDOT has retained the consulting firms of Jacobs Engineering, WSP USA, and Silicon
Transportation Consultants to assist in developing the RFP. Each of these firms is prohibited from joining or otherwise assisting any Bidder in connection with the procurement process.
7.4 Complaint Process
7.4.1 GENERAL
The complaint process occurs during the solicitation portion of the procurement process prior to submitting a Proposal to a competitive solicitation. Complaints are designed to improve and clarify the competitive solicitation process. The purpose of a complaint process is to settle unresolved Bidder issues or concerns that either were not or could not be resolved during the question-and-answer period or the pre-proposal conference. The complaint process allows Bidders to focus on the solicitation requirements and the evaluation process and raise issues early enough in the process to allow WSDOT to correct a problem before bids are submitted and time is expended on evaluations. The compliant process helps mitigate the need for protests.
Bidders are expected to raise any questions they have concerning the RFP early in the RFP process. If a Bidder believes the RFP unnecessarily restricts competition, contains inadequate or insufficient requirements, or utilizes an evaluation process that
State of Washington Department of Transportation is unfair or flawed, the Bidder may submit a formal written complaint to the WSDOT
Procurement Coordinator identified in this RFP.
7.4.2 DEADLINE FOR FILING COMPLAINTS
The deadline for filing complaints regarding this solicitation is by the date and time specified in Section 6.1 herein.
Bidders may submit a complaint based only on the following:
• The solicitation unnecessarily restricts competition;
• The solicitation evaluation or scoring process is unfair or flawed; or
• The solicitation requirements are inadequate or insufficient to prepare a
Proposal.
7.4.3 FORM OF BIDDER COMPLAINTS
• The complaint must be in writing;
• The complaint must be sent via email to the WSDOT Procurement Coordinator, by the due date set forth in Section 6.1 herein;
• The complaint must clearly articulate the basis for the complaint; and
• The complaint must include a proposed remedy.
The WSDOT Procurement Coordinator will review and evaluate the complaint and provide a written response. WSDOT reserves the right to modify the RFP if it is determined, at WSDOT’s sole discretion, that the complaint is valid or the recommended change is in the best interest of WSDOT. WSDOT’s decision is final, and no appeal process will be available to the Bidder once a decision has been made.
WSDOT’s response to the complaint, including any resulting changes to the RFP, will be posted on WEBS. The Washington State Secretary of Transportation will be notified of the complaint and provided with a copy of WSDOT’s response.
7.5 Organizational Conflicts of Interest
Organizational conflict of interest means that because of other activities or relationships with other people or entities, a person or entity:
• Is unable or potentially unable to render impartial assistance or advice to WSDOT; or
• Is or might be otherwise impaired in its objectivity in performing the Contract work; or
• Has an unfair competitive advantage.
Attention is directed to the requirement for disclosure of organizational conflicts of interest set forth in 23 CFR Section 636.116(a)(2) (applicable to federal aid procurements), WSDOT
State of Washington Department of Transportation
Secretary’s Executive Order E-1059.00, and WSDOT Organizational Conflicts of Interest
Manual (M 3043).
Bidders are required to disclose all relevant facts concerning any past, present, or currently planned interests, activities, or relationships that may present an organizational conflict of interest. Bidders shall state how their interests, activities, or relationships, or those of the chief executives, directors, Key Personnel, or any proposed consultant, sub-consultant at any tier, Contractor, or Subcontractor at any tier may result or could be viewed as an organizational conflict of interest, in accordance with Secretary’s Executive Order E-1059.00 and WSDOT
Organizational Conflicts of Interest Manual (M 3043). Bidders shall submit the Organizational
Conflicts of Interest Certification and Organizational Conflicts of Interest Disclosure and
Avoidance/Neutralization Plans (forms contained in Exhibit 9) as described elsewhere in this
RFP.
If an Organizational Conflict of Interest is determined to exist, WSDOT may, at its sole discretion: offer the Bidder the opportunity to avoid or neutralize the Organizational Conflict of
Interest; disqualify the Bidder from further participation in the RFP; or cancel this RFP.
WSDOT will take steps to ensure that individuals that are involved in the procurement package and evaluation of Proposals are not influenced by organizational conflicts of interest, and that no Bidder is given an unfair competitive advantage over another.
7.6 Equal Employment Opportunity
Discrimination in all phases of contracted employment, consultant activities, contracting activities, and training is prohibited by Title VI of the Civil Rights Act, 42 U.S.C. § 2000d et seq.; Title 49 CFR, Subt. A, Part 21, Nondiscrimination in Federally Assisted Programs of the
Department of Transportation - Effectuation of Title VI of the Civil Rights Act; Title VII of the
Civil Rights Act, 42 U.S.C. § 2000e et seq.; Americans with Disabilities Act, 42 U.S.C. § 12101 et seq.; Washington Law Against Discrimination, Chapter 49.60 RCW; and other Laws and
Regulations. The referenced legal citations establish the minimum requirements for affirmative action efforts and define the basic nondiscrimination provisions as further detailed in the Contract.
7.7 Wage Theft Prevention Certification
Bidder must represent and warrant that neither it nor its principals or affiliates have, within the three-year period prior to the date of this solicitation, been determined, by a final order of the
Washington Department of Labor and Industries or a court of competent jurisdiction, to be in willful violation of state wage laws. Said certification shall be made in Exhibit 1, Bidders
Certification.
State of Washington Department of Transportation
7.8 Workers’ Rights Certification
Pursuant to the Washington State Governor’s Executive Order 18-03, Supporting Workers’
Rights to Effectively Address Workplace Violations (dated June 12, 2018), to the extent permissible under state and federal law, WSDOT is seeking to contract with qualified entities and business owners who certify that their employees are not, as a condition of employment, subject to mandatory individual arbitration clauses and class or collective action waivers. Said certification shall be made in Exhibit 1, Bidders Certification. All Bidders that certify that their employees are not required, as a condition of employment, to sign or agree to mandatory individual arbitration clauses or class or collective action waivers will be given preference over
Bidders that do not make that certification in the event of a tie score.
7.9 Prevailing Wages
Bidder shall ensure that it is familiar with, and complies with, the requirements of Chapter
39.12 RCW and that the Prevailing Wage is paid to workers under the Contract (including by any Subcontractors) where such payment is required by Washington law.
7.10 Client References
Bidder shall submit three references listed in Exhibit 1, Bidders Certification. WSDOT will contact the references directly. Bidders are encouraged to confirm the submitted references are willing and able to provide a reference. WSDOT may request additional references from
Bidders if any of their original references are unresponsive or unable to provide a reference.
WSDOT may follow up with questions relative to the references during the Bidder interviews.
8. LETTER OF INTENT
A letter indicating the Bidder's intent to propose in response to this RFP is requested to be transmitted to the WSDOT Procurement Coordinator at the email address specified in Section
7.1 herein no later than the date and time listed in Section 6.1 herein. The Bidder shall submit the Letter of Intent by email. The WSDOT Procurement Coordinator will confirm by email receipt of Bidder’s Letter of Intent.
A Letter of Intent to Propose does not obligate the Bidder to submit a Proposal.
Only Bidders who have submitted a Letter of Intent will be eligible to receive subsequent limited appendices or materials issued as part of this RFP. These materials should be treated as and considered confidential and not to be further disseminated.
Each Bidder must include the following information in the Letter of Intent:
• Bidder name;
State of Washington Department of Transportation
• Statement that the Bidder intends to submit a proposal to RFP-2026-0911 and for which contracts the Bidder intends to submit (i.e., ORT RTS Contract, Side-Fire
RTS Contract, or both); and
• Bidder’s authorized representative for this RFP (Bidder Representative), who will be available as the primary contact throughout the RFP process, with contact information as follows:
− Name of Bidder Representative
− Title of Bidder Representative
− Address
− Telephone number
− E-mail address
9. MANDATORY BIDDERS MEETING AND REGISTRATION
WSDOT will conduct a mandatory pre-proposal Bidders Meeting on the date indicated herein in
Section 6.1, Table 6-1: RFP Procurement Schedule. Only those that attend the mandatory
Bidders Meeting will be eligible to submit proposals. The Bidders Meeting will allow for both in person and remote attendees. In person attendance will be held at the following location:
2901 3rd Avenue
Suite 500
Seattle, WA 98121
Rainier Room
In person attendance will be limited to two individuals per organization.
Virtual attendance will be conducted via MS Teams. A link to the virtual attendance will be provided to those upon registration with the WSDOT Procurement Coordinator.
Each Bidder shall confirm it will participate in the mandatory pre-proposal Bidders Meeting by registering with the WSDOT Procurement Coordinator via email at the email address specified in Section 7.1 herein by the date and time shown in Section 6.1 herein. The WSDOT
Procurement Coordinator will confirm by email receipt of Bidder’s registration. All conversations that take place during the pre-proposal Bidders Meeting are considered informal and are not contractually binding. Bidders desiring a formal response to their questions shall submit questions in writing to the WSDOT Procurement Coordinator as described in Section 7 herein.
10. QUESTIONS AND ANSWERS
WSDOT must receive all written inquiries from Bidders by the date and time shown in Section
6.1 herein. Questions may be submitted in advance of the questions deadline. Any inquiries, suggestions, or requests concerning interpretation, clarification, or additional information shall
State of Washington Department of Transportation be made in writing and delivered to the WSDOT Procurement Coordinator via email at the email address as specified in Section 7.1 herein. WSDOT will not respond to Bidder questions submitted or received after said date and time. WSDOT will provide written answers by the date shown in Section 6.1 herein.
It is incumbent upon each Bidder to carefully examine the RFP requirements, terms, and conditions. Should any Bidder find discrepancies, omissions, or ambiguities in this RFP, the
Bidder shall at once request, via email at the email address as specified in Section 7.1 herein, an interpretation from the WSDOT Procurement Coordinator.
Written answers to Bidder questions and amendments, if any, will be posted on WEBS.
The Bidder that submitted the question(s) will not be identified in the answer. Verbal responses to questions will be considered unofficial and non-binding. Only written answers and amendments to the RFP, if any, posted to WEBS will be considered official and binding.
11. PROPOSAL SUBMITTAL INSTRUCTIONS AND FORMAT
11.1 Time and Manner of Submission
The Bidder’s electronic bid must be emailed to the Procurement Coordinator at the following email address: acoacquisitionsubmittal@wsdot.wa.gov and tariq.ohab@wsdot.wa.gov.
Separate emails with complete bid materials shall be provided for the ORT RTS Contract and the Side-Fire RTS Contract, in the event a Bidder is proposing on both contracts.
Note: Bidder emails (including attachments) CANNOT exceed 30 MB in size (emails that exceed 30 MB in size will not be delivered). Accordingly, Bidders are cautioned to keep email sizes to less than 25 MB to ease delivery. Zipped files cannot be accepted. WSDOT will send an acknowledgement email of bid receipt. Acknowledgement of bid receipt is not a determination on the bid’s responsiveness. If the Bidder does not receive an acknowledgement within a reasonable time, it is the responsibility of the Bidder to contact
WSDOT for acknowledgement of bid receipt. Bidders shall submit proposals electronically no later than the date indicated in Section 6.1 herein.
Bidders shall submit their Proposals in the format set forth in Section 11.7 herein.
Any Proposal received after the prescribed deadline will be marked as “Late” and will not be considered.
Bidders will not be allowed to make changes to their Proposal after the Proposal submission deadline unless they receive a request for a BAFO from WSDOT.
mailto:acoacquisitionsubmittal@wsdot.wa.gov mailto:tariq.ohab@wsdot.wa.gov
State of Washington Department of Transportation
11.2 Bidder’s Acknowledgement
By submitting a Proposal in response to this RFP, each Bidder unequivocally acknowledges that the Bidder has read and fully understands this RFP and any amendments hereto, and that the Bidder has asked questions and received answers from WSDOT regarding any provisions of this RFP with regard to the Bidder’s desired clarification.
11.3 Bidder Expenses
WSDOT will not assume any expense incurred by the Bidder for, or related to, responding to this RFP. Bidders are solely responsible for their own expenses in preparing, delivering, and/or presenting a Proposal, including but not limited to expenses incurred to attend and participate in the pre-proposal Bidders Meeting, Bidder Interview, Bidder Discussions, and the
Contract negotiations.
11.4 Proprietary Information and Public Disclosure
Materials submitted in response to this RFP shall be deemed public records as defined by
Chapter 42.56 RCW. All Proposals and accompanying documentation shall become the property of WSDOT upon receipt and will not be returned. Additionally, pursuant to RCW
39.26.030, materials submitted in response to this RFP along with any evaluation materials are exempt from disclosure until WSDOT announces the Apparent Successful Bidder.
In the event a Bidder desires to claim portions of its Proposal as exempt from public disclosure, the Bidder shall identify those portions in the Letter of Submittal and provide the legal basis for the exemption. In addition, each sentence, paragraph, table, graphic, or similar individual element of the Proposal claimed to be exempt shall be clearly identified as “PROPRIETARY.”
Bidder’s marking of the entire Proposal or entire sections of the Proposal as proprietary will not be accepted nor honored. WSDOT will not accept Proposals in which pricing is marked PROPRIETARY, and the Proposal will be rejected. While total implementation and operations pricing cannot be treated as proprietary, the milestone detail and annual operations pricing will be treated as confidential.
To the extent consistent with Chapter 42.56 RCW, the Public Records Act, WSDOT shall maintain the confidentiality of Bidder’s information marked PROPRIETARY. If a request is made to view the portions of the Proposal a Bidder has marked as PROPRIETARY, WSDOT will notify the Bidder of the request and of the date that the records will be released to the requester unless the Bidder obtains a court order enjoining that disclosure. If the Bidder fails to obtain the court order enjoining disclosure, WSDOT will release the requested information on the date specified.
WSDOT’s sole responsibility shall be limited to maintaining the Bidder’s identified information in a secure area and to notify the Bidder of any request(s) for disclosure for as long as WSDOT retains the Bidder’s information in WSDOT records. Failure to so label such materials or failure
State of Washington Department of Transportation to timely respond after notice of request for public disclosure has been given shall be deemed a waiver by the Bidder of any claim that such materials are exempt from disclosure.
11.5 Irregularities or Defects
WSDOT may, at its sole discretion, waive minor irregularities or defects in a Proposal, or accept or reject any item or combination of items, when to do so would be to the advantage of the State. WSDOT reserves the right to seek clarification of a Bidder’s Proposal from the
Bidder or verification of information contained in a Bidder’s Proposal from any other source.
11.6 Rejection of Proposals/Cancellation of RFP
WSDOT reserves the right to reject any or all Proposals. It is also within the right of WSDOT to reject Proposals that do not contain all elements and information requested in this RFP or
RFP Amendments. WSDOT reserves the right to cancel this RFP at any time for any reason.
11.7 Proposal Organization and Format
This Section contains and describes the specific information that is to be provided in a
Proposal in order to be considered by WSDOT. The Proposal shall contain all required information and address all requirements specified within this RFP. Failure to respond or provide required information may result in a determination by WSDOT, in its sole discretion, that a Proposal is non-responsive and may be disqualified from further consideration.
Proposals shall be organized into the Proposal sections and subsections set forth in
Section 12 herein. The section and subsection numbers and titles must be restated in the
Bidder’s Proposal Narrative Section 4 in the order specified. Proposal Narrative files shall be in a searchable, unlocked PDF format. The proposal narrative shall use no smaller than 11-point font for general text and no smaller than 8-point font for proposal tables and graphics, headers, footers, and footnotes. Proposal content may be in portrait or landscape format, or a mixture of the two. If the Bidder elects to include technical or equipment performance data, that should be organized within the technical solution portion of its proposal.
Resumes shall use no smaller than 10-point font. Any signatures required in the submitted files may be digital signatures.
The response should be submitted in two separate electronic files. The separation of the documentation protects the integrity of the State’s evaluation process. No mention of the cost response/Cost Proposal may be made in File 1. Separate emails with separate File 1 and
File 2 materials shall be provided for the ORT RTS Contract and the Side-Fire RTS Contract respectively, in the event a Bidder is proposing on both contracts.
State of Washington Department of Transportation
11.7.1 ELECTRONIC FILE 1
1. Letter of Submittal (with a copy in File 2)
2. Proposal Document
3. Exhibit 2, Compliance Matrix
4. Exhibit 7, Key Personnel Resume Template
5. Exhibit 9, Organizational Conflicts of Interest Certification, Disclosure and
Avoidance/Neutralization Plan (OCOI)
11.7.2 ELECTRONIC FILE 2
1. Letter of Submittal (Copy)
2. Exhibit 1, Bidders Certification: This Exhibit gathers essential details about potential Bidders, including their legal business information, tax identification numbers, and registration details. The references identified in this Exhibit will be contacted.
3. Exhibit 3A (ORT RTS Contract) or Exhibit 3B (Side-Fire RTS Contract) –
Cost Proposal
4. Exhibit 4, Bidder's Contract Issues List: This Exhibit outlines the Bidder’s issues, if any, and proposed resolution for Bidders who have business concerns with the form of the Contract. Note, however, that WSDOT reserves the right not to modify the Contract and to award the Contract based on a Bidder’s willingness to agree to the Contract.
− Redlined documents will NOT be reviewed.
− Do not provide a copy of Bidder's standard contract.
− WSDOT cannot and will not accept a bid or enter a Contract that substantially changes the material terms and conditions set forth in this Competitive Solicitation.
5. Exhibit 5, Subcontractor Inclusion Plan: This Exhibit’s purpose is to encourage and track the participation of Subcontractors on the Project. This form is required for Bidders that plan to utilize Subcontractors.
6. Exhibit 6A, ORT RTS Contract Proposer Checklist
7. Exhibit 6B, Side-Fire RTS Contract Proposer Checklist
8. Exhibit 8, Washington State Prevailing Wage Rates
State of Washington Department of Transportation
12. PROPOSAL DOCUMENT
12.1 Page Limits
Proposals shall be limited to page numbers as shown in Table 12-1. Only material included in the Proposal will be considered. Links and references to other external documents not included with the proposal will be disregarded. Section dividers and navigational guides will not count towards the page limits.
Table 12-1. Proposal Page Limits
Section Number Title Page Limit
1 Letter of Submittal 4 pages
2 Table of Contents No Limit
3 Executive Summary 5 pages
4 Proposal Narrative ▪ ORT RTS Contract: 120 pages
▪ Side-Fire RTS Contract: 100 pages
5 Compliance Matrix No Limit
6 Key Personnel Resumes 2 pages per person
7 Cost Proposal No Limit
8 Required Documents and Documentation, including RFP Exhibits
No Limit
9 Corporate Financial Information No Limit
10 Bidder's Contract Issues List No Limit
12.2 Proposal Section 1: Letter of Submittal
The Letter of Submittal must include an Electronic Signature of a…