Supplemental_Utility_Locating_Services.pdf

PDF 2 MB Posted

Attached to
South Park Grounds Federal contract opportunity
Solicitation number
P14PS00906
Issued by
Department of the Interior National Park Service National Office

About this file

Supplemental Utility Locating Services at North Service Center

View the file

Other files for this federal contract opportunity

Other files attached to South Park Grounds, newest first.
File Type Posted
5C2_Sheet_3A.pdf PDF
9C2_Sheet_64A.pdf PDF
7C2_Sheet_56A.pdf PDF
10C2_Sheet_65A.pdf PDF
12Q_and_As _6-30-2014.pdf PDF
Amend__6_Package.pdf PDF
6C2_Sheet_55A.pdf PDF
11C2_Sheet_284.pdf PDF
8C2_Sheet_58A.pdf PDF
1Revised_015000_Temporary_Facilities_and_Controls_-_revised_7-3-14_(3).pdf PDF
JEFF-6-SubContractingPlanForm.1doc.pdf PDF
329300_PLANTINGFINEGRADING_CAR2015_2_BID_revised_2014_06_24.pdf PDF
329200_LAWN_CAR2015_2_BID_revised_2014_06_23.pdf PDF
329119_PLANTING_SOIL_SYSTEM_INSTALLATION_CAR_2015_2_BID_revised_2014_06_23.pdf PDF
RFP_Clauses _Updated.pdf PDF
011100_SECTION__SUMMARY_OF_WORK_-_revised_6-24-14.pdf PDF
Amendment_5_Pkg.pdf PDF
Q_and_A's_as_of_06-26-14.pdf PDF
328400_Irrigation_Specs_100__Bid_amended_6-25-14.pdf PDF
321400_SITESTONEWORK_CAR2015_2_BID_revised_2014_06_23.pdf PDF
Site_Visit _Pre-Proposal _Attendance.pdf PDF
Amend__3 _Package.pdf PDF
Amendment_4_pkg.pdf PDF
AirKnife_Exploration.pdf PDF
Engineering_Analysis_of_Modified_DS-50_Barrier.pdf PDF
Utility_Locating_Services.pdf PDF
Subsurface_Exploration_Addendum_2.pdf PDF
Subsurface_Exploration.pdf PDF
2012_1121_JEFF_GeoArcheology_study.pdf PDF
AirKnife_Exploration.pdf PDF
Subsurface_Exploration_Addendum_3.pdf PDF
Subsurface_Exploration.pdf PDF
Subsurface_Exploration_Addendum_2.pdf PDF
2011_0216_CAR_Geotech_Desk_Study_FINAL.pdf PDF
Subsurface_Exploration_Addendum_3.pdf PDF
2011_0211__CAR_Phase_1_ESA_R1.pdf PDF
Subsurface_Exploration_Addendum_1.pdf PDF
Amend_2_Pkg.pdf PDF
Amendment_1_Pkg.pdf PDF
JEFF_CAR2015_Archeological_monitoring_plan_FINAL.pdf PDF
32_91_13__Soil_Blending_Spec.pdf PDF
JEFF_Draw_3_(126-200).pdf PDF
GD__MO140001_05-09-2014__MO1.docx DOCX document
2014.04.17_CAR_TTC_accessible_zones_during_construction_memo.pdf PDF
JEFF_Specification.R1_-revised_5-13-14.pdf PDF
RFP_Clauses.docx DOCX document
JEFF_Draw_2_(76-125).pdf PDF
JEFF_Draw_1_(1-75).pdf PDF
RFP _Proposal_Submission_Pkg.pdf PDF
P14PS00906 _Pre-Sol _Amend__1.docx DOCX document
Show all 50

South Park Grounds has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VIA EMAIL: janis.cooper@cityarchriver.org

March 19, 2014 J017065.14

Ms. Janis Cooper City Arch River 2015 Foundation Gateway Tower, Suite 700 One South Memorial Drive St. Louis, Missouri 63102

Re: Supplemental Utility Locating Services at North Service Center

CAR 2015

Jefferson National Expansion Memorial St. Louis, Missouri

Dear Ms. Cooper:

Geotechnology, Inc. has completed supplemental utility locating services for the Jefferson National Expansion Memorial Project CAR 2015 North Service Center Building located in St. Louis, Missouri. The project was performed in general accordance with original proposal number P017065.09 revised dated December 13, 2013 and the Work Authorization dated February 18, 2014. The project scope was comprised of locating utilities at six locations in the vicinity of the southeast corner of the North Service Center. Utility drawings provided by Michael Van Valkenburgh Associates, Inc.

(MVVA) were reviewed. In general, site utilities included electric and water lines.

Geophysical surveys were performed to locate utilities in the vicinity of the six locations previously staked by the project surveyor, Engineering Design Source, Inc. (EDSI). The surveys were performed on February 25 through February 29, 2014 using a GSSI SIR 3000 ground penetrating radar unit with a 400 MHz antenna, Radiodetection RD-4000 meter, Pipehorn 800 Pipe and Cable locator, and EM31 frequency domain electromagnetic unit. Utilities were marked on site using pin flags.

Vacuum excavations were performed at eight locations. Observations made during excavation activities are summarized in Table 1. Field reports with site sketches are presented in Appendix A and photographs are presented in Appendix B.

Electric lines were observed at six locations. In four of these locations the electric lines were encased within a concrete duct. The depth to the top of the electric lines ranged between approximately 18 inches and 60 inches. Water lines were observed at two location locations and appeared to be constructed of steel or PVC. The depth of the water lines ranged between approximately 34 inches and 46 inches.

Geotechnology’s geophysical crew coordinated with Engineering Design Source, Inc. (EDSI) survey crews who surveyed vacuum excavation locations. Coordinates of vacuum excavation locations, as provided by EDSI, are included in the summary table. Refer to EDSI for the utility location drawing.

TABLE 1

UTILITY LOCATING SERVICES

JEFFERSON NATIONAL EXPANSION MEMORIAL

NORTH SERVICE CENTER

ST. LOUIS, MISSOURI

VACUUM EXCAVATION SUMMARY

J017065.14

Size Type Material Northing Easting Elevation at

Ground Surface (ft-msl)

Depth to Top of Utility

(in)

Elevation at Top of Utility

(ft-msl)

Condition of Utility

PH-1 None Silty Clay NA NA NA 14038596.04 2444255.85 445.60 NA NA NA Utility not observed at this location PH-2 None Silty Clay 2" Electric Plastic 14038577.86 2444257.52 445.57 18 444.07 Good PH-3 None Silty Clay NA NA NA 14038586.21 2444264.02 445.41 NA NA NA Utility not observed at this location

PH-3A None Silty Clay 36" Electric Concrete Duct 14038585.37 2444267.62 445.45 60 440.45 Good PH-4 None Silty Clay 2" Electric Plastic 14038583.45 2444272.95 445.32 24 443.32 Good

PH-4A None Silty Clay 2" Electric Plastic 14038579.07 2444264.94 445.70 20 444.03 Good 2 utilities observed in PH-4A PH-4A None Silty Clay 36" Electric Concrete Duct 14038579.07 2444264.94 445.70 58 440.86 Good 2 utilities observed in PH-4A PH-5 None Silty Clay 2" Water PVC 14038589.34 2444275.38 445.24 34 442.41 Good 2 utilities observed in PH-5 PH-5 None Silty Clay 36" Electric Concrete Duct 14038589.69 2444275.32 445.30 37 442.21 Good 2 utilities observed in PH-5 PH-6 None Silty Clay 6" Water Steel 14038571.50 2444285.33 446.31 46 442.48 Good Electric not observed in this location.

Pavement Thickness/T ype Comments

Test Hole

Utility Information

Soil/Fill Material doc/proj/del/J017065.14 Vac Exc TH Data2.xls

APPENDIX A

FIELD REPORTS

APPENDIX B

EXCAVATION PHOTOGRAPHS

CAR 2015 - Jefferson National Expansion Memorial J017065.14 Utility Locating Services

Photograph 1 - PH-2: View of plastic electric line.

Photograph 2 - PH-3A: View of hole with concrete duct bank exposed.

Photograph 3 - PH-4: View of plastic electric line.

Photograph 4 - PH-4A: View of concrete covering electric line. Plastic electric line is also visible.

Photograph 5 - PH-5: View of PVC water line above concrete duct bank.

Photograph 6 - PH-6: View of steel water line exposed. Electric line was not exposed in this excavation.

APPENDIX C

LIMITATIONS OF REPORT

UTILITY SURVEYING LIMITATIONS

1. This report was prepared for the exclusive use of the owner, architect, and engineer for evaluating the project as it relates to the technical aspects discussed herein. It can be made available to prospective contractors for information on factual data only and not as a warranty of subsurface conditions included in this report. Unless other contractual agreements were made, the services described in this report were carried out in accordance with the Terms for Geotechnology's Services that were attached to the proposal.

2. Geotechnology endeavored to perform the utility surveying in accordance with generally accepted practices of other consultants undertaking similar studies at the same time and in the same geographical area. The findings and conclusions stated herein must be considered not as scientific certainties, but rather as professional opinions concerning the significance of the limited data gathered during the course of the survey. No warranty, express or implied, is made.

3. The geophysical analyses and conclusions contained in this report are based on the site conditions, project layout, grid size, geophysical data, and interpretive procedures described herein and are for preliminary planning purposes only. Geotechnology can make no interpretation as to the presence of underground features at locations beyond the survey lines.

4. The possibility exits that abandoned, forgotten, non-tonable utilities or utilities without a tracer wire, utilities buried excessively deep beyond detection limits of standard geophysical survey methods, or undocumented utilities may be missed using standard utility surveying services. Geophysical exploration methods are non-intrusive, indirect, and potentially influenced by a variety of natural or man-made conditions. The potential for detecting the presence or absence of underground objects or voids is based on the quality of the recorded data as limited by site conditions, and on the interpretation of the data received;

hence, there will always be the potential of not observing a subsurface object or interpreting the presence of a subsurface object where one does not exist.