Question and Answers as of 6-30-2014
View the file
Other files for this federal contract opportunity
Show all 50
South Park Grounds has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. Date of Question
Question Response Response Issued
1 6/10/2014 In regards to Solicitation Number: P14PS00906. Will it be possible to substitute, automated bollards, and fixed bollards, as long as it meets the same crash rating
Spec section 32 39 00 allows "-approved equal" for retractable bollards. There is also a complete performance specification in that section 6/18/2014
2 6/10/2014 We’re seeking some information regarding the CAD file used for the grading design.
We typically pull this file into our quantity takeoff software, in order for us to better calculate our cuts & fills for the grading operation. It just makes the whole estimating process faster and more accurate. Anyway, I was hoping that you would release this file to the public for this exact use. Is this something I need to request through you, or should I contact the engineer direct?
NPS does not release CAD drawings in native format to bidders. These drawings may be pprovided upon contract award. All bidders have access to all drawings and Specifications in .pdf format only.
6/18/2014
3 6/12/2014 RFP Clauses, Section L Pages 117 and 121. Project Experience ‐ How many projects can offerors submit? Experience Form says 5 Projects for any team member‐prime or major subcontractor. Factor 1 ‐ Technical Capability, Sub‐Factor A (p. 118) states a minimum of 3 and no more than 7 relevant projects completed within the previous 5 years. Please clarify the quantity ofprojects allowed and from which entities they can be submitted.
Experience form is being changed with Amendment No. 3, to match the RFP.
6/18/2014
4 6/12/2014 RFP Clauses, Section L, Volume 2, Item 10, Paragraph A and B (Page 123) Small Business Participation Plan: Instructions indicate that offerors should use a spreadsheet included in the Proposal Submissions Package to list the supplies and/or services to be subcontracted and the corresponding socio‐economic status of the business projected toreceive these subcontracts. The spreadsheet was not included in the Proposal Submissions Package. Please provide the spreadsheet.
Spreadsheet is being added with Amendment No. 3.
6/18/2014
5 6/12/2014 SF 1442 and RFP Clauses, Section L, Volume I and Volume II Proposal Copies: SF 1442 states that 1 original and 3 copies of the proposal are required. Section L states that 1 original and 4 copies of Volume 1 as well as 1 original and 1 copy of Volume 2 are required. Please clarify the correct quantities of each volume to be submitted.
SF 1442 has been changed to 4 copies with Amendment No. 3.
6/18/2014
6 6/12/2014 RFP Clauses, Section L, Volume 2, Item 1‐C (page 119) Schedule: Would NPS accept a schedule in Primavera 6 software? Primavera software is more of the standard inthe construction industry. If this is not acceptable, please provide the version of MS Project software you prefer theschedule
NPS will accept schedule in MS Project, Primavera P6 or Meridian Prolog - per Secificaiton Section 01 32 16 2.1 F.1.
RFP has been changed with Amendment No. 3.
6/18/2014
7 6/12/2014 Solicitation, Page 9 and 10 of 140: Durations: Page 9 and 10 of 140 of the solicitation refer to phase 2A and 2B, and refer the bidders to the Terms and Conditions for the duration of work for each phase. Please confirm that since the durations of the individual phases are not provided that phase 2A and 2B can run concurrently for the overall duration of work which is 645 days per page 1 of the solicitation
Yes, work on phase 2A and 2B may run concurrently for the entire duration of the project. The Contractor may complete Phase A earlier. In such event, the Contracting Officer may consider Beneficial Occupancy and return control of Phase 2A areas to the Park. 6/18/2014
8 6/12/2014 Solicitation, Page 12 of 140 Liquidated Damages: Please confirm that the Liquidated Damages indicated on sheet 12 of 140 of the solicitation are tied to the overall duration of the project (645 days), and are not tied individually to either phase 2A or 2B since there are no individual durations given for these phases.
Confirmed
6/18/2014
9 6/12/2014 FAR 52.229‐3 Federal, State and Local Taxes, Page 84 of 140 Sales Tax: Please refer to sheet 84 of 140, FAR 52.229‐3 Federal, State, and Local Taxes. On previous Federal projects, this FAR has been included to indicate that sales tax is required and it has also been included to indicate that sales tax is not required. Please confirm that since there is no explicit direction given that this project is sales tax exempt, that all bidders will be required to include sales tax in their bids for all temporary and permanent materials. Alternatively, if the project will be sales tax exempt, please confirm that the Government will “furnish evidence appropriate to establish exemption…” as required by FAR 52.229‐3.
Confirmed
6/18/2014
10 6/12/2014 Solicitation, Paragraph 4, Page 121 of 140 Major Work Price Breakdown:
Paragraph 4 titled Volume II –Business and Price Proposal, on page 121 of 140 of the solicitation, states, “Also provide a schedule of values showing the price breakdown by major work components. A schedule of values format is provided in the Proposal Submission Package.” Please confirm that since this schedule of values format was not provided, that a cost breakdown of the major work components will not be required.
Schedule of Values is not required at this time. RFP has been changed with Amendment No. 3.
6/18/2014
11 6/12/2014 Solicitation, Paragraph 4, Page 140 of 140 General Conditions Price Breakdown:
Paragraph 4 titled Non‐Technical Factor 3 – Price, on page 140 of 140 of the solicitation, states, “Contractors shall provide a detailed breakdown of their general conditions to demonstrate how the project will be executed. Reasonableness of this pricing shall be analyzed and should back up the approach presented in Sub‐factor 1 of this solicitation. Proposed staffing and allocation of time shall be clearly shown within the General conditions. Project specific field overhead costs shall be shown to support the overall approach to the project.” Please confirm that this price breakdown is not required since there was not format to follow provided. If this breakdown is required, please provide a template with cost categories for all bidders to follow.
The detailed breakdown of general conditions is a proposal requirement and consistent with Federal Acquisition Regulations. This information shall be accurate and consistent with contractor's staffing and operating costs.
No standard format or template is required, though sufficient detail is necessary.
6/18/2014
12 6/12/2014 SF 1442 and FAR 52.211‐10 Performance Begins: The SF 1442 indicates that the contractor must begin performance within 30 calendar days of Notice to Proceed.
Section F, page 12, FAR 52.211‐10 indicates that the contractor shall commence work within 15 calendar days of Notice to Proceed. Please clarify
SF 1442 has been changed to 15 days with Amendment No. 3.
6/18/2014
13 6/17/2014 Provision 52.219‐4(b)(2). Do the SBA and HUBZone advantages apply on this contract? If they do apply, how are they factored in to the proposal evaluation?
Yes, this clause applies. Clause 52.219-4(b)(1) explains how it will be factored.
6/18/2014
14 6/17/2014 Will you consider extending the bid date by one week due to the July 4 th Holiday? At this time we do not intend to change the proposal due date. 6/18/2014 15 6/23/2014 L200, S109: Salvaged Bench Footings: Will footings be required for the salvaged bench type 2A and 2B footings. Please provide if necessary. benches? All current details only reference
Yes, footings are required for salvaged benches. Refer to specification 12 93 00 section 3.5 for installation of benches 2A, 2B, and salvaged benches. Refer to drawing L983 for footing details. Bench Type 2A and embedded foundation type salvaged benches are dimensionally similar and both require type 2A footing shown on L983
6/26/2014
16 6/23/2014 Ram Barrier: Drawings G011 and G012 show the locations/limits as to where the new K‐8 Ram Barrier is to be installed. Drawings G041 and G042 show the locations/limits as to where the new construction fencing is to be installed. G011 and G012 show the Ram barrier on the inside of the new fencing. Please verify that this is correct and it is not traffic is.
The plans are correct. The Contractor will install new permanent Ram Barrier elements within the enclosure of the construction fence.
6/26/2014
18 6/23/2014 Salvaged Bollard Casings: Please refer to specification section 31 10 00, paragraph B. 1. c. This paragraph defines a damaged bollard casing vs. an undamaged casing. If the casings are considered damaged and need to be replaced, please confirm that the Government will be procuring the new casings, the contractors will still be responsible for the installation.
If the Contracting Officer determines that additional casings do need fabrication, then a separate contract with others will be procured to supply the Contractor with additional casings. The Contractor is only responsible in this bid for the work of salvaging existing casings and installing salvaged or new casings 6/26/2014
19 6/23/2014 Sales Tax: Please refer to RFI #9 included in amendment #4. The question asked to confirm one way or another if the project was sales tax exempt or not sales tax exempt and the response was unclear. Please advise if bidders are to include sales tax or if this will be a sales tax exempt project
Government will not be providing a tax exempt certification. See (b)(1) of the clause.
6/26/2014
20 6/23/2014 Sheet L900 calls for welded wire mesh reinforcement in details 1‐4 for pedestrian and vehicle pavements. Please clarify what size wire mesh is required for each of the conditions.
WWF in these pavement conditions is to be 6x6 –W2.9xW2.9 6/26/2014
21 6/23/2014 Is the contractor to furnish new sleeves for the 3 retractable bollards & the one with the control panel due to the differing size from the salvaged bollards or will the government furnish these sleeves? .
Contractor to furnish the stainless steel sleeves for retractable bollards noted in detail 3 L942 6/26/2014
22 6/23/2014 Is the contractor responsible for installing the government furnished wayside signage and pedestrian signage per sheet L949?
The contractor is responsible for providing the pad, footings, and bolts shown on L949.
The contractor will also be responsible for installing the owner supplied signs on the anchor bolt footing assemblies.
6/26/2014
23 6/23/2014 Should light pole footings for SG‐07, SP‐013, and SP‐25 be similar to detail 3/S111 instead of what is listed on L122 since these are located on top of the railroad tunnel lid?
For SG-07 use detail 11, S111. The depth above the rail tunnel at SP-13 and SP-25 is sufficient at those locations to accommodate detail 4, S111. 6/26/2014
24 6/25/2014 What is required for temporary K8 crash barrier? Temporary ram barriers during construction shall consist as noted on revised G043 “ Temporary ram barrier to consist of end-to-end typical concrete “Jersey Barriers” with Steel cable securing the barriers together.” The contractor will have to review proposed layout and cabling technique with the Contracting Officer and park security staff for approval.
6/26/2014
25 6/24/2014 Can shallow mount bollards be used as long as they are K8 rated? The bollard would only have a depth of 8”to 12” and still be K8 rated, the width of the foundation would be 6 ft wide.
No, shallow mounted bollards are not acceptable due to the adjacency of lawn and planting areas. Fixed bollards are to be provided as shown in the drawings. 6/26/2014
26 6/24/2014 I see on the site furnishing sheet it mentions 21 automated bollards. I have only found 6 new automated bollards. Did some of the bollards get labeled wrong as fixed? See attached file.
Per L200 Furnishing Schedule; only 3 retractable bollards are included in Contract 2.
These occur at the SW corner of the site as shown on sheet L201. The remaining retractable bollards are in Contracts 1, 3, and 5.
6/26/2014
27 6/24/2014 The Specifications read all main line needs to be C900 PVC Pipe. This needs to be changed to SDR21 200# PVC for several reasons.
#1 Harco does not make a Ductile Iron Fitting for C900 PVC Pipe the just make DI Fittings for SDR21 200# PVC.
#2 C900 sizing stops at 4". There is a lot of main line piping on this project that is smaller than 4".
#3 No transition gaskets allowed. The only way you can go from C900 PVC to the smaller main line is by using transition gaskets.
C900 Main Line is changed to SDR21 Main Line in revised specs dated 6‐25‐14
#1 Agreed. Harco and LEEMCO do, however, make ‘transition gaskets’ for their ductile iron couplings and fittings, which should be used when connecting to existing ductile iron pipe. This is addressed in revised specs dated 6-25-14.
#2 The specifications (2.4, A, 1) describe C900 pipe in 4”-12” diameters. Any 3” pipe (mainline or lateral) would be gasketed SDR21 Class 200 PVC. This is addressed in revised specs dated 6-25-14, where now all new pipe will be SDR21 Class 200 PVC.
#3 Agreed; that statement will be omitted from the spec. This is addressed in revised specs dated 6-25-14.
C900 Main Line is changed to SDR21 Main Line in revised specs dated 6-25-14
6/26/2014
28 6/23/2014 Are items listed as "Government Furnished" or "Owner Furnished" to be priced and included in the proposal.
No, all items listed as "Government Furnished" or "Owner Furnished" will be provided at no cost to the contractor. Please see Specification Section 01 11 00 1.5 A for details of delivery, inspection and contractor responsibility for protection and installation of government furnished items.
6/26/2014
29 6/23/2014 In the 29 page RFP_Proposal_Submission_Pkg document, section 4 of the template Small Business Subcontracting Plan notes an SB Plan flow down threshold of $500,000. FAR 52.219-9(d)(9), however, indicates an SB Plan flow down threshold of $650,000 ($1.5 million for construction of any public facility). These two thresholds conflict. Confirm the SB Plan flow down threshold is $650,000 ($1.5 million for construction of any public facility) pursuant to FAR 52.219-9(d)(9).
Confirmed. Update was made in Amendment No. 5.
6/26/2014
30 6/23/2014 The 137 page document noted as “Clauses” makes reference to FAR 52.219-25 and associated SDB reporting. We have been notified by DoD on December 2013 that the “Year-End Supplementary Report for SDBs" and the report for "Small Disadvantaged Participation" as required by this clause are no longer needed since the statute (10 U.S.C 2323) which required these reports has expired. We assume same is true for DOI and separate SDB specific reports are no longer required.
Please confirm.
FAR clause remains in effect.
6/26/2014
31 6/23/2014 The 137 page document noted as “Clauses”, Item 10A and 10B on page 120 refers to the SB Participation Plan and states “Complete the spreadsheet included in the Proposal Submission Package”. We can’t locate a spreadsheet in the document named RFP_Proposal_Submission_Pkg. Please clarify where this spreadsheet is located or provide if omitted.
See Amendment No. 3
6/26/2014
32 6/30/2014 Can you provide information as to the existing pavement thickness for the Processional Walk and the Sidewalk along Memorial/Poplar Street so we can determine the demolition cost properly?
The existing Processional walks concrete thickness is 5” reinforced with WWF.
7/3/2014
33 6/30/2014 Sheet L202 calls for a MODOT Standard type D Barrier along Memorial Drive in front of the Old Cathedral Parking Lot. The enlargement plan for this area on L705 states this is an existing MODOT type D Barrier. Currently there is no MODOT type D Barrier at this location. Please clarify if this barrier is to be included in this bid package for contract 2.
Do not include the barrier in your bid proposal
7/3/2014
34 6/30/2014 In the “Summary of Work” spec section 011100 section 1.6 item G states we are to provide the cost for a TRRA flag man when we are working within 25’ of the centerline of the railroad tracks. Can you provide an hourly rate for the flag man that would be provided by TRRA?
TRRA representatives stated that the cost for a TRRA flagman is $500 - $600 for an 8 hour day. TRRA encourages contractors schedule work to try to block out flagman time for several days in a row or week at a time in order to keep daily cost at the lower end of the stated average daily rate.
7/3/2014
35 6/30/2014 With this being a government owned property, will we be exempt from purchasing a City of St. Louis Building Permit for this project?
Building permit is not required. The only known permit needed is from MSD.
Contractor is responsible to pay the MSD fee to pull the permit. The improvements have already been approved by MoDOT and an MSD project number assigned as noted on drawings
7/3/2014
36 6/30/2014 Will a builders risk insurance policy be required for this project? Not required 7/3/2014 37 6/30/2014 Please confirm that it is acceptable to self-certify small business contractors that are not currently registered through the SBA for this project.
Confirmed
7/3/2014
38 6/30/2014 For the government furnished soils, will the contractor be able to dictate the quantity of soil delivered to the jobsite as needed to ensure production and schedule is being met?
Yes, See Amendment 5- Revised 32 91 19-3 Planting Soil System-Installation Paragraph 1.6.A.1 describing soil delivery scheduling protocol coordination with the Government Soil Blending Contractor.
7/3/2014
39 6/30/2014 Please confirm the Soils Blending contractor be responsible for the soils testing identified in specification section 329113?
Yes the Government Soils Blending Contractor is responsible for the soils testing identified in section 329113 7/3/2014
40 6/30/2014 Are we to include rock excavation in our base bid or will rock excavation be paid for under a unit price per Page 7 of the Earthwork Specification?
Rock excavation is not anticipated for Contract 2.
7/3/2014
41 6/30/2014 The 30” wide strip of paving at the base of the fixed security bollards is called out to be AC1 paving on L941. AC1 is an exposed aggregate pavement which will match the bike path pavement finish. Currently the existing 30” wide strip of paving at the bollards is broom finished concrete. The new exposed aggregate finish will not match the existing broom finish area where it ties together at bollards to remain. Should this new 30” wide strip be standard broom finish concrete to match the existing conditions?
The 30” wide strip shall be AC1 exposed aggregate pavement as specified
7/3/2014
42 6/30/2014 Sub-Factor E of the Technical Capability Section of the Technical Proposal asks us to identify subcontractors and their qualifications, personnel, etc., with our proposal. As it is not always feasible to get all of this information prior to bid submission, can we submit multiple possibilities and confirm upon project award?
You may list possibilites as requested. The review panel will review the qualifications of key-subcontractors. As stated in Sub-Factor E, Element 3 "Offeror whose proposed organization chart clearly identifies Key Personnel positions, lines of authority, and Key Subcontractors will be rated more favorably."
7/3/2014
43 6/27/2014 I am looking at the erosion control plan and sheet C452 says matchline: see sheet C452. There is no C452 that I can find, page 71 is C451 and page 72 is C453?
The erosion and sediment control plan was originally prepared as a comprehensive plan for the entire arch grounds, which was later split with the associated contract areas. As a result, only sheets C450 and C451 apply to the Contract 2 project area, and sheet C452 was omitted from this package.
7/3/2014
44 6/27/2014 On drawing E301 they show lighting control system one-line, but on the electrical drawings they just call out for empty conduits with quazite boxes, I am not really sure what are the locations of the Lighting control system rack, and also all the devices that are being fed from HH-2G, HH2-c, HH2-E, HH2-b, HH2-D, and how many cables are going to each device?
The lighting control system rack is within Contract 1 to be provided separately.
Contractor responsible for connections between equipment only within contract boundaries being bid. Riser is for informational purposes to allow for understanding of overall system architecture. See general sheet notes on E301 as well as Controls Scope Matrix on E305 for further information. See E302 for devices and equipment flow diagrams outlining what devices/fixtures are on each control loop and their associated handholes. A single 12 AWG 2mm² cable is required for the data signal after control distribution packs. Control protocol allows for daisy chain, star, and ‘Y’ configuration wiring within DALI standards.
7/3/2014
45 6/27/2014 Drawing E500 is the electrical one-line diagram, main feed coming from Panel DP- SVS is it all new or are we just pickling up from the (HH1 in contract #1)?
Contract 1 will be extending the feed for DP-SVS to HH1 in contract one near the contract limit. You will be responsible for extending that feed from HH1 7/3/2014
46 6/27/2014 Need conformation; conduit and quazite boxes on T drawings are part of contract #2, but the cameras, poles and fiber cabling are part of Contract #1
Correct. Concrete pole bases are also part of Contract 2, for those in that area 7/3/2014
47 6/27/2014 In the Site Improvement Specifications Section 2.3 page5 (see attached) there are Helicals specified. Foundation Supportworks is a manufacturer and installer of Helicals. In addition to meeting the specifications in section 2.3 we also comply with
ICC-ES AC358
NPS does not provide quantity takeoff information. Drawings and specifications are provided to allow contractors to determine quantities and locations.
7/3/2014
48 6/30/2014 Do we need to include camera pole and concrete pole bases in contract #2? It was my understanding that contract #2 only includes conduit and quazite boxes for the technology drawings. It is also shown on Sheet T401, responsibility matrix
Do not include camera poles in Contract #2 scope. Include concrete footing and conduit stubbed up from footing in Contract #2 scope. See T000 7/3/2014
6/26/2014 Specification 015000-5, paragraph 3.2,H.Site Surveillance Cameras: Specification section 01 50 00-5, Paragraph 3.2, H. states that the contractor shall temporarily re-locate removed site surveillance cameras to maintain surveillance during construction. On the Matrix on sheet T000 it states that the Removal and Relocation of Temporary cameras will be the responsibility of the Contract 1 Contractor. Please clarify if we are to include this scope with the Contract 2 bid.
Do not include temporary relocation of cameras in Contract 2 scope. Contractor 2 shall coordinate with Contractor 1 and Contractor 1 will be responsible for temporarily relocating site surveillance cameras as requested by Contractor 2. 01 50 00 to be amended to indicate this 7/3/2014
49 6/30/2014 Tree Pit Edge Angles: Please refer to details 1, 2, 3/L906. Please indicate if the corners of the HDG 4x3x5/16 edges angles need to be welded together as a complete frame or if they can be individual pieces.
The HDG edge angle pieces are individual; not to be welded together at corners.
50 6/30/2014 Bollard Steel Plate: Please refer to details 2/S103 and 5/S106. In both of these details there is a 7’long steel plate called out inside the security bollards. Per the details it appears that this steel plate is the entire length of the bollard. If you add up the dimensions on the details the bollards are longer than 7’. Please indicate if the 1” thick x 7’ long steel plate should actually be 7’ long or if it should be the entire length of the security bollards.
Make the steel plate the entire length of the security bollard.
7/3/2014
51 6/30/2014 Sheet L409, Missing Drawings Referenced: Sheet L409 notes “see L421 and 422 for geofoam placement. These drawings have not been provided. Please clarify.
Geofoam referenced is in Contract 1 scope not in Contract 2 scope.
7/3/2014
52 6/30/2014 Detail 3 on sheet L941 for the fixed security bollard shows overexcavation for the grade beam and does not show the 6 feet of rock backfill for the “protected” side of the grade beam. Detail 3 on sheet S103 is reversed showing the 6 feet of rock backfill for the “protected” side of the grade beam but it does not show any rock under the grade beam. All of the various details and cross-sections on the structural plans are consistent and show the 6 feet of rock backfill and do not indicate any overexcavation of the grade beams. Addendum 1 of the soils report states “that fill remediation is not required below the bollard wall foundations.” Which details should take precedence in determining structural excavation and backfill for the grade beam associated with the fixed security bollards?
Provide bid proposal based on rock backfill shown in detail 3 S103.
7/3/2014
53 6/30/2014 Project General Conditions. Please confirm that the Arch Grounds Maintenance Department will be responsible for grass cutting in the undisturbed areas within the Contract #2 construction limits.
The contractor is responsible for grass cutting within entire area of Contract 2 Limit of Work until the site is turned back over to NPS. 7/3/2014
54 6/30/2014 C100, Note 2. Referenced note states that verification of all underground utilities "shown or not shown" on the drawings is the responsibility of the contractor. Please confirm that contractors cannot verify locations of unknown utilities that are not shown on the drawings
Note 2, sheet C100, is unchanged. The contractor has resources that can locate uncharted utilities that were not utilized by the surveyor, the contractor must perform due diligence. 7/3/2014
55 6/30/2014 C109, Note 10. Referenced drawing says "see note 10". There is no Note 10 on the drawing
Note 10 should be: COORDINATE DEMOLITION OF EXISTING UTILITIES THAT
CROSS LIMITS OF WORK BOUNDARY WITH CONTRACTOR PERFORMING
UTILITY DEMOLITION FOR ADJOINING CONTRACT AREA.
7/3/2014
56 6/30/2014 C400, Sewer Construction Note 1. The last sentence of the referenced note states that detention for any future development shall be included in the improvements included under this project. Please confirm that this is a design requirement and is therefore not the responsibility of the successful contractor
The note is a design requirement for subsequent projects, and is a typical note the Metropolitan St. Louis Sewer District (MSD) requires for plan approval. Not required of Contract 2 scope. 7/3/2014
57 6/30/2014 PreBid RFI #9 and #19. The referenced RFI's are related to sales tax. RFI #19 states that no tax exempt certificate will be provided. Bidders will therefore need to include sales tax in their pricing. Sales tax percentage is based on where materials and equipment are delivered. Given that the project site is on Federal land and is not located within the City of St. Louis no sales tax percentage is available. Please confirm that bidders should include sales tax as if the project was a normal commercial project located in the City of St. Louis?
It is the Contractor's responsibility to determine and pay any applicable local, or state sales taxes.