Q_and_As _6-17-2014.pdf

PDF 106 KB Posted

Attached to
South Park Grounds Federal contract opportunity
Solicitation number
P14PS00906
Issued by
Department of the Interior National Park Service National Office

About this file

Q A's June 17 2014

View the file

Other files for this federal contract opportunity

Other files attached to South Park Grounds, newest first.
File Type Posted
5C2_Sheet_3A.pdf PDF
9C2_Sheet_64A.pdf PDF
7C2_Sheet_56A.pdf PDF
10C2_Sheet_65A.pdf PDF
12Q_and_As _6-30-2014.pdf PDF
Amend__6_Package.pdf PDF
6C2_Sheet_55A.pdf PDF
11C2_Sheet_284.pdf PDF
8C2_Sheet_58A.pdf PDF
JEFF-6-SubContractingPlanForm.1doc.pdf PDF
329300_PLANTINGFINEGRADING_CAR2015_2_BID_revised_2014_06_24.pdf PDF
329200_LAWN_CAR2015_2_BID_revised_2014_06_23.pdf PDF
329119_PLANTING_SOIL_SYSTEM_INSTALLATION_CAR_2015_2_BID_revised_2014_06_23.pdf PDF
RFP_Clauses _Updated.pdf PDF
011100_SECTION__SUMMARY_OF_WORK_-_revised_6-24-14.pdf PDF
Amendment_5_Pkg.pdf PDF
Q_and_A's_as_of_06-26-14.pdf PDF
328400_Irrigation_Specs_100__Bid_amended_6-25-14.pdf PDF
321400_SITESTONEWORK_CAR2015_2_BID_revised_2014_06_23.pdf PDF
Site_Visit _Pre-Proposal _Attendance.pdf PDF
Amend__3 _Package.pdf PDF
Amendment_4_pkg.pdf PDF
AirKnife_Exploration.pdf PDF
Engineering_Analysis_of_Modified_DS-50_Barrier.pdf PDF
Utility_Locating_Services.pdf PDF
Subsurface_Exploration_Addendum_2.pdf PDF
Subsurface_Exploration.pdf PDF
2012_1121_JEFF_GeoArcheology_study.pdf PDF
AirKnife_Exploration.pdf PDF
Subsurface_Exploration_Addendum_3.pdf PDF
Subsurface_Exploration.pdf PDF
Subsurface_Exploration_Addendum_2.pdf PDF
2011_0216_CAR_Geotech_Desk_Study_FINAL.pdf PDF
Subsurface_Exploration_Addendum_3.pdf PDF
Supplemental_Utility_Locating_Services.pdf PDF
2011_0211__CAR_Phase_1_ESA_R1.pdf PDF
Subsurface_Exploration_Addendum_1.pdf PDF
Amend_2_Pkg.pdf PDF
Amendment_1_Pkg.pdf PDF
JEFF_CAR2015_Archeological_monitoring_plan_FINAL.pdf PDF
32_91_13__Soil_Blending_Spec.pdf PDF
JEFF_Draw_3_(126-200).pdf PDF
GD__MO140001_05-09-2014__MO1.docx DOCX document
2014.04.17_CAR_TTC_accessible_zones_during_construction_memo.pdf PDF
JEFF_Specification.R1_-revised_5-13-14.pdf PDF
RFP_Clauses.docx DOCX document
JEFF_Draw_2_(76-125).pdf PDF
JEFF_Draw_1_(1-75).pdf PDF
RFP _Proposal_Submission_Pkg.pdf PDF
P14PS00906 _Pre-Sol _Amend__1.docx DOCX document
Show all 50

South Park Grounds has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No.

Date of

Question Question Response Response Issued

6/10/2014 In regards to Solicitation Number: P14PS00906. Will it be possible to substitute, automated bollards, and fixed bollards, as long as it meets the same crash rating

Spec section 32 39 00 allows "-approved equal" for retractable bollards. There is also a complete performance specification in that section 6/18/2014

6/10/2014 We’re seeking some information regarding the CAD file used for the grading design.

We typically pull this file into our quantity takeoff software, in order for us to better calculate our cuts & fills for the grading operation. It just makes the whole estimating process faster and more accurate. Anyway, I was hoping that you would release this file to the public for this exact use. Is this something I need to request through you, or should I contact the engineer direct?

NPS does not release CAD drawings in native format to bidders. These drawings may be pprovided upon contract award. All bidders have access to all drawings and Specifications in .pdf format only.

6/18/2014

6/12/2014 RFP Clauses, Section L Pages 117 and 121. Project Experience - How many projects can offerors submit? Experience Form says 5 Projects for any team member-prime or major subcontractor. Factor 1 - Technical Capability, Sub-Factor A (p. 118) states a minimum of 3 and no more than 7 relevant projects completed within the previous 5 years. Please clarify the quantity ofprojects allowed and from which entities they can be submitted.

Experience form is being changed with Amendment No. 3, to match the RFP.

6/18/2014

6/12/2014

RFP Clauses, Section L, Volume 2, Item 10, Paragraph A and B (Page 123) Small Business Participation Plan: Instructions indicate that offerors should use a spreadsheet included in the Proposal Submissions Package to list the supplies and/or services to be subcontracted and the corresponding socio-economic status of the business projected toreceive these subcontracts. The spreadsheet was not included in the Proposal Submissions Package. Please provide the spreadsheet.

Spreadsheet is being added with Amendment No. 3. 6/18/2014

6/12/2014 SF 1442 and RFP Clauses, Section L, Volume I and Volume II Proposal Copies: SF 1442 states that 1 original and 3 copies of the proposal are required. Section L states that 1 original and 4 copies of Volume 1 as well as 1 original and 1 copy of Volume 2 are required. Please clarify the correct quantities of each volume to be submitted.

SF 1442 has been changed to 4 copies with Amendment No. 3.

6/18/2014

6/12/2014 RFP Clauses, Section L, Volume 2, Item 1-C (page 119) Schedule: Would NPS accept a schedule in Primavera 6 software? Primavera software is more of the standard inthe construction industry. If this is not acceptable, please provide the version of MS Project software you prefer theschedule

NPS will accept schedule in MS Project, Primavera P6 or Meridian Prolog - per Secificaiton Section 01 32 16 2.1 F.1.

RFP has been changed with Amendment No. 3.

6/18/2014

6/12/2014 Solicitation, Page 9 and 10 of 140: Durations: Page 9 and 10 of 140 of the solicitation refer to phase 2A and 2B, and refer the bidders to the Terms and Conditions for the duration of work for each phase. Please confirm that since the durations of the individual phases are not provided that phase 2A and 2B can run concurrently for the overall duration of work which is 645 days per page 1 of the solicitation

Yes, work on phase 2A and 2B may run concurrently for the entire duration of the project. The Contractor may complete Phase A earlier. In such event, the Contracting Officer may consider Beneficial Occupancy and return control of Phase 2A areas to the Park.

6/18/2014

6/12/2014 Solicitation, Page 12 of 140 Liquidated Damages: Please confirm that the Liquidated Damages indicated on sheet 12 of 140 of the solicitation are tied to the overall duration of the project (645 days), and are not tied individually to either phase 2A or 2B since there are no individual durations given for these phases.

Confirmed 6/18/2014

6/12/2014 FAR 52.229-3 Federal, State and Local Taxes, Page 84 of 140 Sales Tax: Please refer to sheet 84 of 140, FAR 52.229-3 Federal, State, and Local Taxes. On previous Federal projects, this FAR has been included to indicate that sales tax is required and it has also been included to indicate that sales tax is not required. Please confirm that since there is no explicit direction given that this project is sales tax exempt, that all bidders will be required to include sales tax in their bids for all temporary and permanent materials. Alternatively, if the project will be sales tax exempt, please confirm that the Government will “furnish evidence appropriate to establish exemption…” as required by FAR 52.229-3.

Confirmed

6/18/2014

6/12/2014 Solicitation, Paragraph 4, Page 121 of 140 Major Work Price Breakdown: Paragraph 4 titled Volume II –Business and Price Proposal, on page 121 of 140 of the solicitation, states, “Also provide a schedule of values showing the price breakdown by major work components. A schedule of values format is provided in the Proposal Submission Package.” Please confirm that since this schedule of values format was not provided, that a cost breakdown of the major work components will not be required.

Schedule of Values is not required at this time. RFP has been changed with Amendment No. 3.

6/18/2014

6/12/2014 Solicitation, Paragraph 4, Page 140 of 140 General Conditions Price Breakdown:

Paragraph 4 titled Non-Technical Factor 3 – Price, on page 140 of 140 of the solicitation, states, “Contractors shall provide a detailed breakdown of their general conditions to demonstrate how the project will be executed. Reasonableness of this pricing shall be analyzed and should back up the approach presented in Sub-factor 1 of this solicitation. Proposed staffing and allocation of time shall be clearly shown within the General conditions. Project specific field overhead costs shall be shown to support the overall approach to the project.” Please confirm that this price breakdown is not required since there was not format to follow provided. If this breakdown is required, please provide a template with cost categories for all bidders to follow.

The detailed breakdown of general conditions is a proposal requirement and consistent with Federal Acquisition Regulations. This information shall be accurate and consistent with contractor's staffing and operating costs.

No standard format or template is required, though sufficient detail is necessary.

6/18/2014

6/12/2014 SF 1442 and FAR 52.211-10 Performance Begins: The SF 1442 indicates that the contractor must begin performance within 30 calendar days of Notice to Proceed.

Section F, page 12, FAR 52.211-10 indicates that the contractor shall commence work within 15 calendar days of Notice to Proceed. Please clarify

SF 1442 has been changed to 15 days with Amendment No. 3. 6/18/2014

6/17/2014 Provision 52.219-4(b)(2). Do the SBA and HUBZone advantages apply on this contract? If they do apply, how are they factored in to the proposal evaluation?

Yes, this clause applies. Clause 52.219-4(b)(1) explains how it will be factored.

6/18/2014

6/17/2014 Will you consider extending the bid date by one week due to the July 4th Holiday?

At this time we do not intend to change the proposal due date.

6/18/2014

Sheet1