Amend_2_Pkg.pdf

PDF 958 KB Posted

Attached to
South Park Grounds Federal contract opportunity
Solicitation number
P14PS00906
Issued by
Department of the Interior National Park Service National Office

About this file

Amendment No. 2 - Package

View the file

Other files for this federal contract opportunity

Other files attached to South Park Grounds, newest first.
File Type Posted
5C2_Sheet_3A.pdf PDF
9C2_Sheet_64A.pdf PDF
7C2_Sheet_56A.pdf PDF
10C2_Sheet_65A.pdf PDF
12Q_and_As _6-30-2014.pdf PDF
Amend__6_Package.pdf PDF
6C2_Sheet_55A.pdf PDF
11C2_Sheet_284.pdf PDF
8C2_Sheet_58A.pdf PDF
1Revised_015000_Temporary_Facilities_and_Controls_-_revised_7-3-14_(3).pdf PDF
JEFF-6-SubContractingPlanForm.1doc.pdf PDF
329300_PLANTINGFINEGRADING_CAR2015_2_BID_revised_2014_06_24.pdf PDF
329200_LAWN_CAR2015_2_BID_revised_2014_06_23.pdf PDF
329119_PLANTING_SOIL_SYSTEM_INSTALLATION_CAR_2015_2_BID_revised_2014_06_23.pdf PDF
RFP_Clauses _Updated.pdf PDF
011100_SECTION__SUMMARY_OF_WORK_-_revised_6-24-14.pdf PDF
Amendment_5_Pkg.pdf PDF
Q_and_A's_as_of_06-26-14.pdf PDF
328400_Irrigation_Specs_100__Bid_amended_6-25-14.pdf PDF
321400_SITESTONEWORK_CAR2015_2_BID_revised_2014_06_23.pdf PDF
Site_Visit _Pre-Proposal _Attendance.pdf PDF
Amend__3 _Package.pdf PDF
Amendment_4_pkg.pdf PDF
AirKnife_Exploration.pdf PDF
Engineering_Analysis_of_Modified_DS-50_Barrier.pdf PDF
Utility_Locating_Services.pdf PDF
Subsurface_Exploration_Addendum_2.pdf PDF
Subsurface_Exploration.pdf PDF
2012_1121_JEFF_GeoArcheology_study.pdf PDF
AirKnife_Exploration.pdf PDF
Subsurface_Exploration_Addendum_3.pdf PDF
Subsurface_Exploration.pdf PDF
Subsurface_Exploration_Addendum_2.pdf PDF
2011_0216_CAR_Geotech_Desk_Study_FINAL.pdf PDF
Subsurface_Exploration_Addendum_3.pdf PDF
Supplemental_Utility_Locating_Services.pdf PDF
2011_0211__CAR_Phase_1_ESA_R1.pdf PDF
Subsurface_Exploration_Addendum_1.pdf PDF
Amendment_1_Pkg.pdf PDF
JEFF_CAR2015_Archeological_monitoring_plan_FINAL.pdf PDF
32_91_13__Soil_Blending_Spec.pdf PDF
JEFF_Draw_3_(126-200).pdf PDF
GD__MO140001_05-09-2014__MO1.docx DOCX document
2014.04.17_CAR_TTC_accessible_zones_during_construction_memo.pdf PDF
JEFF_Specification.R1_-revised_5-13-14.pdf PDF
RFP_Clauses.docx DOCX document
JEFF_Draw_2_(76-125).pdf PDF
JEFF_Draw_1_(1-75).pdf PDF
RFP _Proposal_Submission_Pkg.pdf PDF
P14PS00906 _Pre-Sol _Amend__1.docx DOCX document
Show all 50

South Park Grounds has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

P14PS00906

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

JEFF-18120206/09/2014000002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/03/2014

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

JEFF-181202 - South Park Grounds, Jefferson National Expansion Memorial, Clayton County, St. Louis, MO

The purpose of this Amendment #2 is to correct the Notice Information posted on June

4,2014; Replace pages 01 50 00-1 and 01 50 00-4 of the Specifications; and replace pages

18, 19, and 20 of the drawings. See following Page(s)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

David E. Thomas

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

a. Correct the Notice Information, posted on Jun 4, 2014, Change:

FROM:

The work associated with the contract will be completed no later than 495 calendar days after the Notice To Proceed.

TO:

The work associated with the contract will be completed no later than 645 calendar days after the Notice To Proceed.

b. Specification Section 01 50 00, Temporary Facilities and Controls:

(1) Paragraph 1.4B titled Water Service is DELETED in its entirety

(2) Paragraph 1.4C titled Electric Power Service is DELETED in its entirety

(3) Paragraph 3.2 Temporary Utility Installation line (D) is changed:

Potable water is available on site. Make connections to existing facilities as needed. Facilities must be cleaned and maintained in a condition acceptable to the NPS. At Substantial Completion, restore these facilities to condition existing before initial use.

TO:

Potable water is not available on site. Furnish cool, potable water for construction personnel in locations convenient to work stations.

(4) Paragraph 3.2 Temporary Utility Installation line (F) titled Electric Power Service is changed:

Electric Power Service: Use of existing electric power service will be permitted, as long as equipment is maintained in a condition acceptable to the NPS.

TO:

Electric Power Service: Provide electric power service and distribution system of sufficient size capacity, and power characteristics required for construction operations.

1. Install electric power service overhead unless otherwise indicated.

c. Included are replacement pages (01 50 00-1 and 01 50 00-4) which, reflect the specification changes.

d. Drawings, pages 18, 19, & 20 are replaced with 18A, 19A and 20A which, are attached.

All other terms and conditions remain unchanged

Confidential and Proprietary Information Contract # 2

JEFF - 181202 01 50 00 - 1

031814 TEMPORARY FACILITIES AND CONTROLS

SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes requirements for temporary utilities, support facilities, and security and protection facilities.

1.2 DEFINITIONS

A. Permanent Enclosure: As determined by Contracting Officer, permanent or temporary roofing is complete, insulated, and weather tight; exterior walls are insulated and weather tight; and all openings are closed with permanent construction or substantial temporary closures.

1.3 REFERENCES

A. MoDOT Standard Specification.

B. Manual on Uniform Traffic Control Devices (MUTCD), latest edition.

C. Memorandum dated 17 April 2014 outlining additional accessibility requirements for Temporary Traffic Control Plans.

1.4 USE CHARGES

A. General: Cost or use charges for temporary facilities shall be included in the Contract Sum as required.

B. Water Service: Water from existing water system is available for use without metering and without payment of use charges. Provide connections and extensions of temporary services as required for construction operations.

C. Electric Power Service: Electric power from existing system is available for use without metering and without payment of use charges. Provide connections and extensions of temporary services as required for construction operations.

1.5 ACTION SUBMITTALS

A. Temporary Traffic Control (TTC) Zone Plan

1. Plan shall be submitted to MoDOT and Contracting Officer for approval.

Confidential and Proprietary Information Contract # 2

JEFF - 181202 01 50 00 - 4

031814 TEMPORARY FACILITIES AND CONTROLS

connection and costs associated with the internet service provider through the warranty period of this contract. Upon completion of the warranty period the service shall be transferable to the Government at which time all future costs for the connection will no longer be the responsibility of the Contractor.

PART 3 - EXECUTION

3.1 INSTALLATION, GENERAL

A. Locate facilities where they will serve Project adequately and result in minimum interference with performance of the Work. Relocate and modify facilities as required by progress of the Work.

1. Locate facilities to limit site disturbance and as directed by the Contracting Officer.

B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities are no longer needed or are replaced by authorized use of completed permanent facilities.

3.2 TEMPORARY UTILITY INSTALLATION

A. General: Install temporary service or connect to existing service.

1. Arrange with utility company, NPS, and existing users for time when service can be interrupted, if necessary, to make connections for temporary services.

B. Storm Sewers and Drainage: Provide temporary utilities to remove effluent lawfully.

1. Connect temporary sewers to municipal system as directed by authorities having jurisdiction.

C. Non-potable water for construction is not available within the park boundaries. The Contractor shall furnish non-potable water from a source outside the park boundary.

D. Potable water is available on site. Make connections to existing facilities as needed. Facilities must be cleaned and maintained in a condition acceptable to the NPS. At Substantial Completion, restore these facilities to condition existing before initial use. Potable water is not available on site. Furnish cool, potable water for construction personnel in locations convenient to work stations.

E. Sanitary Facilities:

1. Toilets: Use of existing toilet facilities will not be permitted.

F. Electric Power Service: Use of existing electric power service will be permitted, as long as equipment is maintained in a condition acceptable to the NPS. Provide electric power and distribution system of sufficient size, capacity, and power characteristics required for construction operations

1. When temporary connections are removed, restore existing utility services to their original condition. Install electric power service overhead unless otherwise indicated.

G. Lighting: Provide temporary lighting with local switching that provides adequate illumination for construction operations, observations, inspections, and traffic conditions.

SF30 Amend 2
Amendment 2 Narrative
Page 1 from C2 SECTION 015000 - revised 6-9-14
Page 4 from C2 SECTION 015000 - revised 6-9-14
C2_G041-G043_(sheets 18-20)
G041
G042
G043