GD__MO140001_05-09-2014__MO1.docx
DOCX document 49 KB Posted
- Attached to
- South Park Grounds Federal contract opportunity
- Solicitation number
- P14PS00906
About this file
Wage Determination
View the file
Other files for this federal contract opportunity
Show all 50
South Park Grounds has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: MO140001 05/09/2014 MO1
Superseded General Decision Number: MO20130001
State: Missouri
Construction Types: Heavy and Highway
Counties: Missouri Statewide.
HEAVY AND HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 01/03/2014 1 01/10/2014 2 01/31/2014 3 03/28/2014 4 05/09/2014
CARP0002-002 05/01/2010
ST. LOUIS COUNTY AND CITY
Rates Fringes
Carpenters.......................$ 32.78 12.25
CARP0005-006 04/01/2008
CASS (Richards-Gebauer AFB ONLY), CLAY, JACKSON, PLATTE AND RAY
COUNTIES
Rates Fringes
Carpenters:
CARPENTERS & LATHERS........$ 33.00 12.03
MILLWRIGHTS & PILEDRIVERS...$ 33.00 12.03
CARP0011-001 05/01/2011
Rates Fringes
Carpenter and Piledriver ADAIR, AUDRAIN (West of Hwy 19), BOONE, CALLAWAY, CHARITON, COLE, COOPER, HOWARD, KNOX,LINN, MACON, MILLER, MONITEAU,MONROE, OSAGE, PUTNAM, RANDOLPH, SCHUYLER, SHELBY AND
SULLIVAN COUNTIES...........$ 28.57 11.00
ATCHISON, ANDREW, BATES,
CALDWELL, CARROLL,DAVIESS,
DEKALB,GENTRY, GRUNDY,
HARRISON, HENRY, HOLT,
LIVINGSTON, MERCER,
NODAWAY,ST. CLAIR, SALINE
AND WORTH COUNTIES..........$ 27.67 10.55
AUDRAIN (East of Hwy.19), RALLS, MARION, LEWIS, CLARK AND SCOTLAND COUNTIES.$ 28.83 13.05
BARRY, BARTON, CAMDEN,
CEDAR, CHRISTIAN, DADE,
DALLAS, DOUGLAS, GREENE,
HICKORY,JASPER, LACLEDE,
LAWRENCE, MCDONALD,
NEWTON, OZARK, POLK,
STONE, TANEY, VERNON,
WEBSTER AND WRIGHT COUNTIES.$ 27.32 10.55
BENTON, MORGAN AND PETTIS...$ 27.27 11.00
BOLLINGER, BUTLER, CAPE
GIRARDEAU, DUNKLIN,
MISSISSIPPI, NEW MADRID,
PEMISCOT, PERRY, STE.
GENEVIEVE, SCOTT, STODDARD
AND WAYNE COUNTIES..........$ 28.67 13.07
BUCHANAN, CLINTON, JOHNSON
AND LAFAYETTE COUNTIES......$ 28.32 10.55
CARTER, HOWELL, OREGON AND
RIPLEY COUNTIES.............$ 27.75 13.07
CRAWFORD, DENT, GASCONADE,
IRON, MADISON, MARIES,
MONTGOMERY, PHELPS,
PULASKI, REYNOLDS, SHANNON
AND TEXAS COUNTIES..........$ 28.68 13.05
FRANKLIN COUNTY.............$ 31.23 13.05
JEFFERSON AND ST. CHARLES
COUNTIES....................$ 33.38 13.05
LINCOLN COUNTY..............$ 30.34 13.05
PIKE, ST. FRANCOIS AND
WASHINGTON COUNTIES.........$ 29.39 13.05
WARREN COUNTY...............$ 30.73 13.05
ELEC0001-002 06/01/2012
BOLLINGER, BUTLER, CAPE GIRARDEAU, CARTER, DUNKLIN, FRANKLIN,
IRON, JEFFERSON, LINCOLN, MADISON, MISSISSIPPI, NEW MADRID,
PEMISCOT, PERRY,REYNOLDS, RIPLEY, ST. CHARLES, ST. FRANCOIS,
ST. LOUIS (City and County), STE. GENEVIEVE, SCOTT, STODDARD, WARREN, WASHINGTON AND WAYNE COUNTIES
Electricians.....................$ 31.75 22.37
ELEC0002-001 09/01/2013
ADAIR, AUDRAIN, BOONE, CALLAWAY, CAMDEN, CARTER, CHARITON,
CLARK, COLE, COOPER, CRAWFORD, DENT, FRANKLIN, GASCONADE,
HOWARD, HOWELL, IRON, JEFFERSON, KNOX, LEWIS, LINCON, LINN,
MACON, MARIES, MARION, MILLER, MONITEAU, MONROE, MONTGOMERY,
MORGAN, OREGON, OSAGE, PERRY, PHELPS, PIKE, PULASKI, PUTNAM,
RALLS, RANDOLPH, REYNOLDS, RIPLEY, ST. CHARLES, ST. FRANCOIS,
ST. LOUIS (City and County), STE. GENEVIEVE, SCHUYLER, SCOTLAND, SHANNON, SHELBY, SULLIVAN, TEXAS, WARREN AND
WASHINGTON COUNTIES
Line Construction:
Equipment Operator..........$ 34.26 29.5%+5.00 Groundman & Truck Driver....$ 26.49 29.5%+5.00 Lineman & Cable Splicer.....$ 39.69 29.5%+5.00
ELEC0053-004 09/02/2012
Rates Fringes
Line Construction: (ANDREW, ATCHINSON, BARRY, BARTON, BUCHANAN, CALDWELL, CEDAR, CHRISTIAN, CLINTON, DADE, DALLAS, DAVIES,, DEKALB, DOUGLAS, GENTRY, GREENE, GRUNDY, HARRISON, HICKORY, HOLT, JASPER, LACLEDE, LAWRENCE, LIVINGSTON, MCDONALD, MERCER, NEWTON, NODAWAY, OZARK, POLK, ST.
CLAIR, STONE, TANEY, VERNON,
WEBSTER, WORTH AND WRIGHT
COUNTIES)
Groundman Powderman.........$ 25.88 13.93 Groundman...................$ 24.46 29.5%+6.22 Lineman Operator............$ 35.82 29.5%+6.79 Lineman.....................$ 37.84 29.5%+6.89 Line Construction; (BATES, BENTON, CARROLL, CASS, CLAY, HENRY, JACKSON, JOHNSON, LAFAYETTE, PETTIS, PLATTE, RAY AND SALINE COUNTIES)
Groundman Powderman.........$ 26.84 14.26 Groundman...................$ 25.95 29.5%+6.30 Lineman Operator............$ 36.54 29.5%+6.83 Lineman.....................$ 39.17 29.5%+6.96
ELEC0095-001 06/01/2013
BARRY, BARTON, CEDAR, DADE, JASPER, LAWRENCE, MCDONALD, NEWTON,
ST CLAIR, AND VERNON COUNTIES
Electricians:
Cable Splicers..............$ 25.40 3%+16.82 Electricians................$ 25.05 3%+16.82
ELEC0124-007 09/02/2013
BATES, BENTON, CARROLL, CASS, CLAY, COOPER, HENRY, JACKSON,
JOHNSON, LAFAYETTE, MORGAN, PETTIS, PLATTE, RAY AND SALINE
COUNTIES:
Electricians.....................$ 35.23 19.53
ELEC0257-003 03/01/2014
AUDRAIN (Except Cuivre Township), BOONE, CALLAWAY, CAMDEN, CHARITON, COLE, CRAWFORD, DENT, GASCONADE, HOWARD, MARIES, MILLER, MONITEAU, OSAGE, PHELPS AND RANDOLPH COUNTIES
Electricians:
Cable Splicers..............$ 30.42 16.085 Electricians................$ 31.04 13%+12.47
* ELEC0350-002 12/01/2013
ADAIR, AUDRAIN (East of Highway 19), CLARK, KNOX, LEWIS, LINN, MACON, MARION, MONROE, MONTGOMERY, PIKE, PUTNAM, RALLS, SCHUYLER, SCOTLAND, SHELBY AND SULLIVAN COUNTIES
Electricians.....................$ 29.41 5.67+35%
ELEC0453-001 09/01/2013
Rates Fringes
Electricians:
CHRISITAN, DALLAS,
DOUGLAS, GREENE, HICKORY,
HOWELL, LACLEDE, OREGON,
OZARK, POLK, SHANNON,
WEBSTER and WRIGHT COUNTIES.$ 24.15 14.14 PULASKI and TEXAS COUNTIES..$ 28.80 14.58 STONE and TANEY COUNTIES....$ 19.94 13.33
ELEC0545-003 06/01/2011
ANDREW, BUCHANAN, CLINTON, DEKALB, ATCHISON, HOLT, MERCER,
GENTRY, HARRISON, DAVIESS, GRUNDY, WORTH, LIVINGSTON, NODAWAY,
AND CALDWELL COUNTIES
Electricians:....................$ 31.00 12.22
ELEC0702-004 07/01/2013
BOLLINGER, BUTLER, CAPE GIRARDEAU, DUNKLIN, MADISON,
MISSISSIPPI, NEW MADRID, PEMISCOT, SCOTT, STODDARD AND WAYNE
Line Construction:
Groundman - Class A.........$ 25.51 29%+5.76 Groundman-Equipment Operator Class II (all other equipment)............$ 32.28 29%+5.76 Heavy-Equipment Operator Class I (all crawler type equipment D-4 and larger)...$ 36.77 29%+5.76 Lineman.....................$ 44.73 29%+5.76
ENGI0101-001 05/01/2013
ANDREW, ATCHISON, BATES, BENTON, BUCHANAN, CALDWELL, CARROLL,
CHARITON, CLINTON, COOPER, DAVIESS, DEKALB, GENTRY, GRUNDY,
HARRISON, HENRY, HOLT, HOWARD, JOHNSON, LAFAYETTE, LINN,
LIVINGSTON, MERCER, NODAWAY, PETTIS, SALINE, SULLIVAN AND WORTH
COUNITES
Power equipment operators:
GROUP 1.....................$ 31.49 14.71
GROUP 2.....................$ 31.09 14.71
GROUP 3.....................$ 29.09 14.71
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Asphalt roller operator, finish; asphalt paver and spreader; asphalt plant operator; auto grader or trimmer or sub-grader; backhoe; blade operator (all types); boilers - 2; booster pump on dredge; bulldozer operator; boring machine (truck or crane mounted); clamshell operator;
concrete mixer paver; concrete plant operator; concrete pump operator; crane operator; derrick or derrick trucks;
ditching machine; dragline operator; dredge engineman;
dredge operator; drill cat with compressor mounted (self-contained) or similar type self- propelled rotary drill (not air tract); drilling or boring machine (rotary-self-propelled); finishing machine operator;
greaser; high loader-fork lift-skid loader (all types);
hoisting engineer (2 active drums); locomotive operator (standard guage); mechanics and welders (field and plants);
mucking machine operator; pile drive operator; pitman crane or boom truck (all types); push cat; quad track; scraper operators (all types); shovel operator; sideboom cats; side discharge spreader; skimmer scoop operators; slip form paver operator (CMI, Rex, Gomeco or equal); la tourneau rooter (all tiller types); tow boat operator; truck crane;
wood and log chippers (all types).
GROUP 2: A-frame truck operator; articulated dump truck;
back filler operator; boilers (1); chip spreader; churn drill operator; compressor; concrete mixer operator, skip loader; concrete saws (self-propelled); conveyor operator;
crusher operator; distributor operator; elevating grader operator; farm tractor (all attachments); fireman rig;
float operator; form grade operator; hoisting engine (one drum); maintenance operator; multiple compactor; pavement breaker, self-propelled hydra-hammer (or similar type);
paymill operator; power shield; pumps; roller operator (with or without blades); screening and washing plant;
self-propelled street broom or sweeper; siphons and jets;
straw blower; stump cutting machine; siphons and jets; tank car heater operator (combination boiler and booster);
welding machine; vibrating machine operator (not hand held); welding machine.
GROUP 3: (a) Oiler;
(b) Oiiler driver
(c) Mechanic.
HOURLY PREMIUMS:
THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .25) ABOVE
GROUP 1 RATE: Dragline operator - 3 yds. & over; shovel 3 yds. & over; clamshell 3 yds. & over; Crane, rigs or piledrivers, 100' of boom or over (incl. jib.), hoist -each additional active drum over 2 drums
THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .50) ABOVE
GROUP 1 RATE: Tandem scoop operator; crane, rigs or piledrivers 150' to 200' of boom (incl. jib.)
THE FOLLOWING CLASSIFICATIONS SHALL RECEIVE ($ .75) ABOVE
GROUP 1 RATE: Crane rigs, or piledrivers 200 ft. of boom or over (including jib.)
ENGI0101-005 04/01/2013
CASS, CLAY, JACKSON,PLATTE AND RAY COUNTIES
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 33.88 14.83
GROUP 2.....................$ 32.84 14.83
GROUP 3.....................$ 31.72 14.83
GROUP 4.....................$ 30.97 14.83
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Asphalt roller operator, finish; asphalt paver and spreader; asphalt plant operator; auto grader or trimmer or sub-grader; backhoe; blade operator (all types); boilers-2;
booster pump on dredge; boring machine (truck or crane mounted); bulldozer operator; clamshell operator; concrete cleaning decontamination machine operator; concrete mixer paver; concrete plant operator; concrete pump operator;
crane operator; derrick or derrick trucks; ditching machine; dragline operator; dredge engineman; dredge operator; drillcat with compressor mounted (self-contained) or similar type self propelled rotary drill (not air tract); drilling or boring machine (rotary -self-propelled); finishing machine operator; greaser; heavy equipment robotics operator/mechanic; horizontal directional drill operator; horizontal directional drill locator; loader-forklift - skid loader (all types);
hoisting engineer (2 active drums); locomotive operator (standard guage); master environmental maintenance mechanic; mechanics and welders (field and plants);
mucking machine operator; piledrive operator; pitman crane or boom truck (all types); push cat; quad-track; scraper operators (all types); shovel operator; side discharge spreader; sideboom cats; skimmer scoop operator; slip-form paver (CMI, REX, Gomaco or equal); la tourneau rooter (all tiller types); tow boat operator; truck crane; ultra high perssure waterjet cutting tool system operator/mechanic;
vacuum blasting machine operator/mechanic; wood and log chippers (all types)
GROUP 2: "A" Frame truck operator; back filler operator;
boilers (1); chip spreader;churn drill operator; concrete mixer operator, skip loader; concrete saws (self-propelled); conveyor operator; crusher operator;
distributor operator; elevating grader operator; farm tractor (all attachments); fireman rig; float operator;
form grader operator; hoisting engine (1 drum); maintenance operator; multiple compactor; pavement breaker, self-propelled hydra- hammer (or similar type); power shield; paymill operator; pumps; siphons and jets; stump cutting machine; tank car heater operator (combination boiler and booster); compressor; roller operator (with or without blades); screening and washing plant;
self-propelled street broom or sweeper; straw blower; tank car heater operator (combination boiler and booster);
vibrating machine operator (not hand held)
GROUP 3: Oilers
GROUP 4: Oiler Driver (All Types)
FOOTNOTE:
HOURLY PREMIUMS FOLLOWING CLASSIFICATIONS SHALL RECEIVE
($1.00) ABOVE GROUP 1 RATE:
Clamshells - 3 yd. capacity or over; Cranes or rigs, 80 ft.
of boom or over (including jib); Draglines, 3 yd. capacity or over;
Piledrivers 80 ft. of boom or over (including jib);
Shovels & backhoes, 3 yd. capacity or over.
ENGI0101-022 05/01/2013
BARRY, BARTON, CAMDEN, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS,
GREENE, HICKORY, JASPER, LACLEDE, LAWRENCE, MCDONALD, NEWTON,
OZARK, POLK, ST. CLAIR, STONE, TANEY, VERNON, WEBSTER AND
WRIGHT COUNTIES and CITY OF SPRINGFIELD
GROUP 1.....................$ 28.53 12.49
GROUP 2.....................$ 28.18 12.49
GROUP 3.....................$ 27.98 12.49
GROUP 4.....................$ 25.93 12.49
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Asphalt finishing machine & trench widening spreader; asphalt plant console operator; autograder;
automatic slipform paver; backhoe; blade operator - all types; boat operator - tow; boilers-2; central mix concrete plant operator; clamshell operator; concrete mixer paver;
crane operator; derrick or derrick trucks; ditching machine; dozer operator; dragline operator; dredge booster pump; dredge engineman; dredge operator; drill cat with compressor mounted on cat; drilling or boring machine rotary self-propelled; highloader; hoisting engine - 2 active drums; launch hammer wheel; locomotive operator; -standard guage; mechanic and welders; mucking machine;
off-road trucks; piledriver operator; pitman crane operator; push cat operator; quad trac; scoop operator -all types; shovel operator; sideboom cats; skimmer scoop operators; trenching machine operator; truck crane.
GROUP 2: A-frame; asphalt hot-mix silo; asphalt plant fireman (drum or boiler); asphalt plant man; asphalt plant man; asphalt plant mixer operator; asphalt roller operator;
backfiller operator; barber-greene loader; boat operator (bridges and dams); chip spreader; concrete mixer operator
- skip loader; concrete plant operator; concrete pump operator; crusher operator; dredge oiler; elevating grader operator; fork lift; greaser-fleet; hoisting engine - 1;
locomotive operator - narrow gauge; multiple compactor;
pavement breaker; powerbroom - self-propelled; power shield; rooter; side discharge concrete spreader; slip form finishing machine; stumpcutter machine; throttle man;
tractor operator (over 50 h.p.); winch truck.
GROUP 3: Boilers - 1; chip spreader (front man); churn drill operator; clef plane operator; concrete saw operator (self-propelled); curb finishing machine; distributor operator;
finishing machine operator; flex plane operator; float operator; form grader operator; pugmill operator; roller operator, other than high type asphalt; screening & washing plant operator; siphons & jets; sub-grading machine operator; spreader box operator, self-propelled (not asphalt); tank car heater operator (combination boiler & booster); tractor operator (50 h.p. or less); Ulmac, Ulric or similar spreader; vibrating machine operator, not hand;
GROUP 4: Grade checker; Oiler; Oiler-Driver
HOURLY PREMIUMS:
The following classifications shall receive $ .25 above GROUP 1 rate:
Clamshells - 3 yds. or over; Cranes - Rigs or Piledrivers, 100 ft. of boom or over (including jib);
Draglines - 3 yds. or over; Hoists - each additional active drum over 2 drums; Shovels - 3 yds. or over;
The following classifications shall receive $ .50 above GROUP 1 rate:
Tandem scoop operator; Cranes - Rigs or Piledrivers, 150 ft.
to 200 ft. of boom (including jib); Tandem scoop.
The following classifications shall receive $ .75 above GROUP 1 rate:
Cranes - Rigs or Piledrivers, 200 ft. of boom or over (including jib.).
ENGI0513-004 05/06/2013
FRANKLIN, JEFFERSON, LINCOLN, ST CHARLES, AND WARREN COUNTIES
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 30.51 23.35
GROUP 2.....................$ 30.51 23.35
GROUP 3.....................$ 29.21 23.35
GROUP 4.....................$ 28.76 23.35
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Backhoe, Cable; Backhoe, Hydraulic (2 cu yds bucket and under regardless of attachment, one oiler for 2 or 3, two oilers for 4 through 6); Backhoe, Hydraulic over 2 cu yds; Cableway; Crane, Crawler or Truck; Crane, Hydraulic - Truck or Cruiser mounted, 16 tons and over; Crane, Locomotive; crane with boom including jib over 100 ft from pin to pin; Crane using rock socket tool; Derrick, Steam;
Derrick Car and Derrick Boat; Dragline, 7 cu yds and over;
Dredge; Gradall, Crawler or tire mounted; Locomotive, Gas, Steam & other powers; Pile Driver, Land or Floating; Scoop, Skimmer; Shovel, Power (Electric, Gas, Steam or other powers); Shovel, Power (7 cu yds and over); Switch Boat;
Whirley; Air Tugger with air compressor; Anchor Placing Barge; Asphalt Spreaker; Athey Force Feeder Loader, self-propelled; Backfilling Machine; Boat Operator - Push Boat or Tow Boat (job site); Boiler, High Pressure Breaking in Period; Boom Truck, Placing or Erecting; Boring Machine, Footing Foundation; Bullfloat; Cherry Picker; Combination Concrete Hoist and Mixer (such as Mixermobile); Compressor, Two 125 CFM and under; Compressor, Two through Four over 125 CFM; Compressor when operator runs throttle; Concrete Breaker (Truck or Tractor mounted); Concrete Pump (such as Pumpcrete machine); Concrete Saw (self-propelled); Concrete Spreader; Conveyor, Large (not selfpropelled) hoisting or moving brick and concrete into, or into and on floor level, one or both; Crane, Cimbing (such as Linden); Crane, Hydraulic - Rough Terrain, self-propelled; Crane, Hydraulic
- Truck or Cruiser mounted - under 16 tons; Drilling machine - Self-powered, used for earth or rock drilling or boring (wagon drills and any hand drills obtaining power from other souces including concrete breakers, jackhammers and Barco equipmnet no engineer required); Elevating Grader; Engine Man, Dredge; Excavator or Powerbelt Machine;
Finishing Machine, self- propelled oscillating screed;
Forklift; Generators, Two through Six 30 KW or over;
Grader, Road with power blade; Greaser; Highlift; Hoist, Concrete and Brick (Brick cages or concrete skips operating or on tower, Towermobile, or similar equipment); Hoist, Three or more drums in use; Hoist, Stack; Hydro-Hammer;
Lad-A-Vator, hoisting brick or concrete; Loading Machine such as Barber-Greene; Mechanic on job site
GROUP 2: Air Tugger with plant air; Boiler (for power or heating shell of building or temporary enclosures in connection with construction work); Boiler, Temporary;
Compressor, One over 125 CFM; Compressor, truck mounted;
Conveyor, Large (not self- propelled); Conveyor, Large (not self- propelled) moving brick and concrete (distributing) on floor level; Curb Finishing Machine; Ditch Paving Machine; Elevator (outside); Endless Chain Hoist; Fireman (as required); Form Grader; Hoist, One Drum regardless of size (except brick or concrete); Lad-A-Vator, other hoisting; Manlift; Mixer, Asphalt, over 8 cu ft capacity;
Mixer, one bag capacity or less; Mixer, without side loader, two bag capacity or more; Mixer, with side loader, regardless of size, not Paver; Mud Jack (where mud jack is used in conjenction with an air compressor, operator shall be paid $ .55 per hour in addition to his basic hourly rate for covering both operations); Pug Mill operator; Pump, Sump - self powered, automatic controlled over 2"; Scissor Lift (used for hoisting); Skid Steer Loader; Sweeper, Street; Tractor, small wheel type 50 HP and under with grader blade and similar equipment; Welding Machine, One over 400 amp; Winch, operating from truck
GROUP 3: Boat operator - outboard motor, job site; Conveyors (such as Con-Vay-It) regardless of how used; Elevator (inside); Heater operator, 2 through 6; Sweeper, Floor
GROUP 4: Crane type
HOURLY PREMIUMS:
Backhoe, Hydraulic 2 cu yds or less without oiler - $2.00;
Crane,climbing (such as Linden) - $.50;
Crane, Pile Driving and Extracting - $ .50 Crane with boom (including job) over 100 ft from pin to pin - add $.01 per foot to maximum of $4.00);
Crane, using rock socket tool - $ .50;
Derrick, diesel, gas or electric hoisting material and erecting steel (150 ft or more above ground) - $ .50;
Dragline, 7 cu yds and over - $ .50;
Hoist, Three or more drums in use - $ .50;
Scoop, Tandem - $.50;
Shovel, Power - 7 cu yds and over - $ .50;
Tractor, Tandem Crawler - $ .50;
Tunnel, man assigned to work in tunnel or tunnel shaft - $ .50;
Wrecking, when machines are working on second floor or higher - $ .50
ENGI0513-006 05/01/2013
ADAIR, AUDRAIN, BOLLINGER, BOONE, BUTLER, CALLAWAY, CAPE
GIRARDEAU, CARTER, CLARK, COLE, CRAWFORD, DENT, DUNKLIN,
GASCONADE, HOWELL, IRON, KNOX, LEWIS, MACON, MADISON, MARIES,
MARION, MILLER, MISSISSIPPI, MONITEAU, MONROE, MONTGOMERY,
MORGAN, NEW MADRID, OREGON, OSAGE, PEMISCOT, PERRY, PHELPS,
PIKE, PULASKI, PUTNAM, RALLS, RANDOLPH, REYNOLDS, RIPLEY, ST.
FRANCOIS, STE. GENEVIEVE, SCHUYLER, SCOTLAND, SCOTT, SHANNON,
SHELBY, STODDARD, TEXAS, WASHINGTON, AND WAYNE COUNTIES
GROUP 1.....................$ 26.09 23.32
GROUP 2.....................$ 25.74 23.32
GROUP 3.....................$ 25.54 23.32
GROUP 4.....................$ 21.89 23.32
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Asphalt finishing machine & trench widening spreader, asphalt plant console operator; autograder;
automatic slipform paver; back hoe; blade operator - all types; boat operator tow; boiler two; central mix concrete plant operator; clam shell operator; concrete mixer paver;
crane operator; derrick or derrick trucks; ditching machine; dozer operator; dragline operator; dredge booster pump; dredge engineman; dredge operator; drill cat with compressor mounted on cat; drilling or boring machine rotary self-propelled; highloader; hoisting engine 2 active drums; launchhammer wheel; locomotive operator standrad guage; mechanics and welders; mucking machine; piledriver operator; pitman crane operator; push cat operator;
guad-trac; scoop operator; sideboom cats; skimmer scoop operator; trenching machine operator; truck crane, shovel operator.
GROUP 2: A-Frame; asphalt hot-mix silo; asphalt roller operator asphalt plant fireman (drum or boiler); asphalt plant man; asphalt plant mixer operator; backfiller operator; barber-greene loader; boat operator (bridge & dams); chip spreader; concrete mixer operator skip loader;
concrete plant operator; concrete pump operator; dredge oiler; elevating graded operator; fork lift; grease fleet;
hoisting engine one; locomotive operator narrow guage;
multiple compactor; pavement breaker; powerbroom self-propelled; power shield; rooter; slip-form finishing machine; stumpcutter machine; side discharge concrete spreader; throttleman; tractor operator (over 50 hp); winch truck; asphalt roller operator; crusher operator.
GROUP 3: Spreader box operator, self-propelled not asphalt;
tractor operator (50 h.p. or less); boilers one; chip spreader (front man); churn drill operator; compressor over 105 CFM 2-3 pumps 4" & over; 2-3 light plant 7.5 KWA or any combination thereof; clef plane operator; compressor maintenance operator 2 or 3; concrete saw operator (self-propelled); curb finishing mancine; distributor operator; finishing machine operator; flex plane operator;
float operator; form grader operator; pugmill operator;
riller operator other than high type asphalt; screening & washing plant operator; siphons & jets; subgrading machine operator; tank car heater (combination boiler & booster);
ulmac, ulric or similar spreader; vibrating machine operator; hydrobroom.
GROUP 4: Oiler; grout machine; oiler driver; compressor over 105 CFM one; conveyor operator one; maintenance operator;
pump 4" & over one.
FOOTNOTE: HOURLY PREMIUMS
Backhoe hydraulic, 2 cu. yds. or under Without oiler - $2.00 Certified Crane Operator - $1.50;
Certified Hazardous Material Operator $1.50;
Crane, climbing (such as Linden) - $0.50;
Crane, pile driving and extracting - $0.50;
Crane, with boom (including jib) over 100' from pin to pin add $0.01 per foot to maximum of $4.00;
Crane, using rock socket tool - $0.50;
Derrick, diesel, gas or electric, hoisting material and erecting steel (150' or more above the ground) - $0.50;
Dragline, 7 cu. yds, and over - $0.50;
Hoist, three or more drums in use - $0.50; Scoop, Tandem - $0.50;
Shovel, power - 7 cu. yds. or more - $0.50;
Tractor, tandem crawler - $0.50;
Tunnel, man assigned to work in tunnel or tunnel shaft - $0.50;
Wrecking, when machine is working on second floor or higher - $0.50;
ENGI0513-007 05/06/2013
ST. LOUIS CITY AND COUNTY
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 30.51 23.35
GROUP 2.....................$ 30.51 23.35
GROUP 3.....................$ 29.21 23.35
GROUP 4.....................$ 28.76 23.35
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Backhoe, cable or hydraulic; cableway; crane crawler or truck; crane, hydraulic-truck or cruiser mounted 16 tons & over; crane locomotive; derrick, steam; derrick car & derrick boat; dragline; dredge; gradall, crawler or tire mounted; locomotive, gas, steam & other powers; pile driver, land or floating; scoop, skimmer; shovel, power (steam, gas, electric or other powers); switch boat;
whirley.
GROUP 2: Air tugger w/air compressor; anchor-placing barge;
asphalt spreader; athey force feeder loader (self-propelled); backfilling machine; backhoe-loader; boat operator-push boat or tow boat (job site); boiler, high pressure breaking in period; boom truck, placing or erecting; boring machine, footing foundation; bull- float;
cherry picker; combination concrete hoist & mixer (such as mixer mobile); compressor (when operator runs throttle);
concrete breaker (truck or tractor mounted); concrete pump, such as pump-crete machine; concrete saw (self-propelled), concrete spreader; conveyor, large (not self-propelled), hoisting or moving brick and concrete into, or into and on floor level, one or both; crane, hydraulic-rough terrain, self-propelled; crane hydraulic-truck or cruiser mounted-under 16 tons; drilling machines, self-powered use for earth or rock drilling or boring (wagon drills nd any hand drills obtaining power from other sources including concrete breakers, jackhammers and barco equipment-no engineer required); elevating grader; engineman, dredge;
excavator or powerbelt machine; finishing machine, self-propelled oscillating screed; forklift; grader, road with power blade; highlift. greaser; hoist, stack, hydro-hammer; loading machine (such as barber-greene);
machanic, on job site; mixer, pipe wrapping machines; plant asphalt; plant, concrete producing or ready-mix job site;
plant heating-job site; plant mixing-job site; plant power, generating-job site; pumps, two through six self-powered over 2"; pumps, electric submersible, two through six, over 4"; quad-track; roller, asphalt, top or sub-grade; scoop, tractor drawn; spreader box; sub-grader; tie tamper;
tractor-crawler, or wheel type with or without power unit, power take-offs and attachments regardless of size;
trenching machine; tunnel boring machine; vibrating machine automatic, automatic propelled; welding machines (gasoline or diesel) two through six; well drilling machine
GROUP 3: Conveyor, large (not self-propelled); conveyor, large (not self-propelled) moving brick and concrete distributing) on floor level; mixer two or more mixers of one bag capacity or less; air tugger w/plant air; boiler, for power or heating on construction projects; boiler, temporary; compressor (mounted on truck; curb finishing machine; ditch paving machine; elevator; endless chain hoist; form grader; hoist, one drum regardless of size;
lad-a-vator; manlift; mixer, asphalt, over 8 cu. ft.
capacity, without side loader, 2 bag capacity or more;
mixer, with side loader, regardless of size; pug mill operator; pump, sump-self-powered, automatic controlled over 2" during use in connection with construction work;
sweeper, street; welding machine, one over 400 amp.; winch operating from truck; scissor lift (used for hoisting);
tractor, small wheel type 50 h.p. & under with grader blade & similar equipment; Oiler on dredge and on truck crane.
GROUP 4: Boat operator-outboard motor (job site); conveyor (such as con-vay-it) regardless of how used; sweeper, floor
HOURLY PREMIUMS:
Backhoe, hydraulic 2 cu. yds. or under without oiler $2.00 Certified Crane Operator 1.50 Certified Hazardous Material Operator 1.50 Crane, climbing (such as Linden) .50 Crane, pile driving and extracting .50 Crane, with boom (including jib) over 100' (from pin to pin) add $.01 per foot to maximum of 4.00 Crane, using rock socket tool .50 Derrick, diesel, gas or electric, hoisting material and erecting steel (150' or more above ground) .50 Dragline, 7 cu. yds. and over .50 Hoist, three (3) or more drums in use .50 Scoop, Tandem .50 Shovel, power - 7 cu. yds. or more .50 Tractor, tandem crawler .50 Tunnel, man assigned to work in tunnel or tunnel shaft .50 Wrecking, when machine is working on second floor or higher .50
IRON0010-012 04/01/2013
Rates Fringes
Ironworkers:
ANDREW, ATCHISON, BARTON,
BATES, BENTON, CALDWELL,
CAMDEN, CARROLL, CEDAR,
CHARITON, CHRISTIAN,
CLINTON, COOPER, DADE,
DALLAS, DAVIESS, DE KALB,
GENTRY, GREENE, GRUNDY,
HARRISON, HENRY, HICKORY,
HOLT, HOWARD, LACLEDE,
LINN, LIVINGSTON, MERCER,
MONITEAU, MORGAN, NODAWAY,
PETTIS, POLK, PUTNAM,
RANDLOPH, ST. CLAIR,
SALINE, SULLIVAN, TANEY,
VERNON, WEBSTER, WRIGHT
and WORTH Counties and portions of ADAIR, BOONE, MACON, MILLER and RANDOLPH Counties....................$ 26.90 26.10
BUCHANAN, CASS, CLAY,
JACKSON, JOHNSON,
LAFAYETTE, PLATTE AND RAY
Counties....................$ 29.90 26.10
IRON0321-002 08/01/2012
DOUGLAS, HOWELL and OZARK COUNTIES
Rates Fringes
Ironworker.......................$ 18.40 14.68
IRON0396-004 08/01/2012
ST. LOUIS (City and County), ST. CHARLES, JEFFERSON, IRON, FRANKLIN, LINCOLN, WARREN, WASHINGTON, ST. FRANCOIS, STE.
GENEVIEVE, and REYNOLDS Counties; and portions of MADISON, PERRY, BOLLINGER, WAYNE, and CARTER Counties
Ironworker.......................$ 32.28 20.31
IRON0396-009 08/01/2013
AUDRAIN, CALLAWAY, COLE, CRAWFORD, DENT, GASCONADE, MARIES,
MONTGOMERY, OSAGE, PHELPS, PIKE, PULASKI, TEXAS and WRIGHT Counties; and portions of BOONE, CAMDEN, DOUGLAS, HOWELL, LACLEDE, MILLER, MONROE, OREGON, SHANNON and RALLS Counties
Ironworker.......................$ 27.91 21.75
IRON0577-005 08/01/2012
ADAIR, CLARK, KNOX, LEWIS, MACON, MARION, MONROE, RALLS,
SCHUYLER, SCOTLAND, AND SHELBY COUNTIES
Ironworker.......................$ 24.44 17.31
IRON0584-004 06/01/2013
BARRY, JASPER, LAWRENCE, MCDONALD, NEWTON AND STONE Counties
Rates Fringes
Ironworkers:.....................$ 23.10 12.88
IRON0782-003 08/01/2013
CAPE GIRARDEAU, MISSISSIPPI, NEW MADRID, SCOTT, & STODDARD
Counties; and portions of BOLLINGER, BUTLER, CARTER, DUNKLIN, MADISON, PEMISCOT, PERRY, RIPLEY, and WAYNE Counties
Ironworkers:
Locks, Dams, Bridges and other major work on the Mississippi and Ohio River only........................$ 29.39 18.79 All Other Work..............$ 24.12 18.79
LABO0042-003 03/06/2013
ST. LOUIS (City and County)
Rates Fringes
LABORER
Plumber Laborer.............$ 29.52 13.22
LABO0042-005 03/08/2013
ST. LOUIS (City and County)
Rates Fringes
LABORER
Dynamiter, Powderman........$ 29.90 13.22 Laborers, Flaggers..........$ 29.52 13.22 Wrecking....................$ 29.40 13.22
LABO0424-002 05/01/2009
Rates Fringes
LABORER
ADAIR, AUDRAIN, BOONE,
CALLAWAY, CHARITON, CLARK,
COLE, COOPER, HOWARD,
IRON, KNOX, LEWIS, LINN,
MACON, MADISON, MARION,
MILLER, MONITEAU, MONROE,
PERRY, PIKE, PUTNAM,
RALLS, RANDOLPH, REYNOLDS,
ST. FRANCOIS, STE.
GENEVIEVE, SCHUYLER,
SCOTLAND, SHELBY AND
SULLIVAN COUNTIES
GROUP 1....................$ 24.56 9.29
GROUP 2....................$ 25.16 9.29
BOLLINGER, BUTLER, CAPE
GIRARDEAU, CARTER,
CRAWFORD, DENT, DUNKLIN,
GASCONADE, HOWELL, MARIES,
MISSISSIPPI, NEW MADRID,
OREGON, OSAGE, PEMISCOT,
PHELPS, PULASKI, RIPLEY,
SCOTT, SHANNON, STODDARD,
TEXAS, WASHINGTON AND
WAYNE COUNTIES
GROUP 1....................$ 24.56 9.29
GROUP 2....................$ 25.16 9.29
FRANKLIN COUNTY
GROUP 1....................$ 26.01 9.29
GROUP 2....................$ 26.61 9.29
JEFFERSON COUNTY
GROUP 1....................$ 26.06 9.29
GROUP 2....................$ 26.66 9.29
LINCOLN, MONTGOMERY AND
WARREN COUNTIES
GROUP 1....................$ 24.81 9.29
GROUP 2....................$ 25.41 9.29
ST.CHARLES COUNTY
GROUP 1....................$ 27.33 9.29
GROUP 2....................$ 27.33 9.29
LABORERS CLASSIFICATIONS
GROUP 1 - General laborer-flagman, carpenter tenders;
salamander Tenders; Dump Man; Ticket Takers; loading trucks under bins, hoppers, and conveyors; track man; cement handler; dump man on earth fill; georgie buggie man;
material batch hopper man; spreader on asphalt machine;
material mixer man (except on manholes); coffer dams;
riprap pavers rock, block or brick; scaffolds over ten feet not self-supported from ground up; skip man on concrete paving; wire mesh setters on concrete paving; all work in connection with sewer, water, gas, gasoling, oil, drainage pipe, conduit pipe, tile and duct lines and all other pipe lines; power tool operator; all work in connection with hydraulic or general dredging operations; form setters, puddlers (paving only); straw blower nozzleman; asphalt plant platform man; chuck tender; crusher feeder; men handling creosote ties or creosote materials; men working with and handling epoxy material; topper of standing trees;
feeder man on wood pulverizers, board and willow mat weavers and cabelee tiers on river work; deck hands; pile dike and revetment work; all laborers working on underground tunnels less than 25 ft. where compressed air is not used; abutement and pier hole men working six (6)
ft. or more below ground; men working in coffer dams for bridge piers and footing in the river; barco tamper;
jackson or any other similar tamp; cutting torch man;
liners, curb, gutters, ditch lines; hot mastic kettlemen;
hot tar applicator; hand blade operator; mortar men or brick or block manholes; rubbing concrete, air tool operator under 65 lbs.; caulker and lead man; chain or concrete saw under 15 h.p.; signal Gan; Guard rail and sign erectors.
GROUP 2 - Skilled laborers - Vibrator man; asphalt raker;
head pipe layer on sewer work; batterboard man on pipe and ditch work; cliff scalers working from bosun's chairs;
scaffolds or platforms on dams or power plants over 10 ft.
high; air tool operator over 65 lbs.; stringline man on concrete paving; sandblast man; laser beam man; wagon drill; churn drill; air track drill and all other similar type drills, gunite nozzle man; pressure grout man; screed man on asphalt; concrete saw 15 h.p. and over; grade checker; strigline man on electronic grade control; manhole builder; dynamite man; powder man; welder; tunnel man;
waterblaster - 1000 psi or over; asbestos and/or hazardous waste removal and/or disposal
LABO0579-005 05/01/2013
Rates Fringes
LABORER (ANDREW, ATCHISON,
BUCHANAN, CALDWELL, CLINTON,
DAVIESS, DEKALB, GENTRY,
GRUNDY, HARRISON, HOLT,
LIVINGSTON, MERCER, NODAWAY
and WORTH COUNTIES.)
GROUP 1.....................$ 24.42 11.71
GROUP 2.....................$ 24.77 11.71
LABORER (BARRY, BARTON,
BATES, BENTON, CAMDEN,
CARROLL, CEDAR, CHRISTIAN,
DADE, DALLAS, DOUGLAS,
GREENE, HENRY. HICKORY,
JASPER, JOHNSON, LACLEDE,
LAWRENCE, MCDONALD, MORGAN,
NEWTON, OZARK, PETTIS, POLK,
ST.CLAIR, SALINE, STONE,
TANEY, VERNON, WEBSTER and
WRIGHT COUNTIES)
GROUP 1.....................$ 22.77 11.56
GROUP 2.....................$ 23.32 11.56
LABORER (LAFAYETTE COUNTY)
GROUP 1.....................$ 24.32 11.81
GROUP 2.....................$ 24.67 11.81
LABORERS CLASSIFICATIONS
GROUP 1: General Laborers - Carpenter tenders; salamander tenders; loading trucks under bins; hoppers & conveyors;
track men & all other general laborers; air tool operator;
cement handler-bulk or sack; dump man on earth fill;
georgie buggie man; material batch hopper man; material mixer man (except on manholes); coffer dams; riprap pavers
- rock, block or brick; signal man; scaffolds over ten feet not self-supported from ground up; skipman on concrete paving; wire mesh setters on concrete paving; all work in connection with sewer, water, gas, gasoline, oil drainage pipe, conduit pipe, tile and duct lines and all other pipe lines; power tool operator, all work in connection with hydraulic or general dredging operations; puddlers (paving only); straw blower nozzleman; asphalt plant platform man;
chuck tender; crusher feeder; men handling creosote ties or creosote materials; men working with and handling epoxy material or materials (where special protection is required); rubbing concrete; topper of standing trees;
batter board man on pipe and ditch work; feeder man on wood pulverizers; board and willow mat weavers and cable tiers on river work; deck hands; pile dike and revetment work;
all laborers working on underground tunnels less than 25 feet where compressed air is not used; abutment and pier hole men working six (6) feet or more below ground; men working in coffer dams for bridge piers and footings in the river; ditchliners; pressure groutmen; caulker; chain or concrete saw; cliffscalers working from scaffolds, bosuns' chairs or platforms on dams or power plants over (10) feet above ground; mortarmen on brick or block manholes; toxic and hazardous waste work.
GROUP 2: Skilled Laborers - Head pipe layer on sewer work;
laser beam man; Jackson or any other similar tamp; cutting torch man; form setters; liners and stringline men on concrete paving, curb, gutters; hot mastic kettleman; hot tar applicator; sandblasting and gunite nozzlemen; air tool operator in tunnels; screed man on asphalt machine; asphalt raker; barco tamper; churn drills; air track drills and all similar drills; vibrator man; stringline man for electronic grade control; manhole builders-brick or block; dynamite and powder men; grade checker.
LABO0663-002 04/01/2013
CASS, CLAY, JACKSON, PLATTE AND RAY COUNTIES
Rates Fringes
LABORER
GROUP 1.....................$ 27.86 13.45
GROUP 2.....................$ 29.07 13.45
LABORERS CLASSIFICATIONS
GROUP 1: General laborers, Carpenter tenders, salamander tenders, loading trucks under bins, hoppers and conveyors, track men and all other general laborers, air tool operator, cement handler (bulk or sack), chain or concrete saw, deck hands, dump man on earth fill, Georgie Buggies man, material batch hopper man, scale man, material mixer man (except on manholes), coffer dams, abutments and pier hole men working below ground, riprap pavers rock, black or brick, signal man, scaffolds over ten feet not self-supported from ground up, skipman on concrete paving, wire mesh setters on concrete paving, all work in connection with sewer,water, gas, gasoling, oil, drainage pipe, conduit pipe, tile and duct lines and all other pipelines, power tool operator, all work in connection with hydraulic or general dredging operations, straw blower nozzleman,asphalt plant platform man, chuck tender, crusher feeder, men handling creosote ties on creosote materials, men working with and handling epoxy material or materials (where special protection is required), topper of standing trees, batter board man on pipe and ditch work, feeder man on wood pulverizers, board and willow mat weavers and cable tiers on river work, deck hands, pile dike and revetment work, all laborers working on underground tunnels less than 25 feet where compressed air is not used, abutment and pier hole men working six (6) feet or more below ground, men working in coffer dams for bridge piers and footings in the river, ditchliners, pressure groutmen, caulker and chain or concrete saw, cliffscalers working from scaffolds, bosuns' chairs or platforms on dams or power plants over (10) feet above ground, mortarmen on brick or block manholes, signal man.
GROUP 2: Skilled Laborer - spreader or screed man on asphalt machine, asphalt raker, grade checker, vibrator man, concrete saw over 5 hp., laser beam man, barco tamper, jackson or any other similar tamp, wagon driller, churn drills, air track drills and other similar drills, cutting torch man, form setters, liners and stringline men on concrete paving, curb, gutters and etc., hot mastic kettleman, hot tar applicator, hand blade operators, mortar men on brick or block manholes, sand blasting and gunnite nozzle men, rubbing concrete, air tool operator in tunnels, head pipe layer on sewer work, manhole builder (brick or block), dynamite and powder men.
PAIN0002-002 09/01/2007
CLARK, FRANKLIN, JEFFERSON, LEWIS, LINCOLN, MARION, PIKE,
RALLS, ST. CHARLES, ST. LOUIS (CITY & COUNTY), AND WARREN
Painters:
Brush and Roller; Taper.....$ 28.61 10.24 High work over 60 feet......$ 29.11 10.24 Lead Abatement..............$ 29.36 10.24 Pressure Roller; High work under 60 ft.................$ 28.86 10.24 Spray & Abrasive Blasting;
Water Blasting (Over 5000
PSI)........................$ 30.61 10.24
Taper (Ames Tools & Bazooka)....................$ 30.21 10.24
PAIN0002-006 04/01/2011
ADAIR, AUDRAIN, BOONE, CALLAWAY, CHARITON, COLE, GASCONADE,
HOWARD, KNOX, LINN, MACON, MONROE, MONTGOMERY, OSAGE, PUTNAM,
RANDOLPH, SCHUYLER, SCOTLAND, SHELBY AND SULLIVAN COUNTIES and the City of Booneville.
Bridges, Dams, Locks or Powerhouses.................$ 22.80 10.87 Brush and Roll; Taping, Paperhanging................$ 20.80 10.87 Epoxy or Any Two Part Coating; Sandblasting;
Stage or other Aerial Work
- Platforms over 50 feet high; Lead Abatement........$ 21.80 10.87 Spray; Structural Steel (over 50 feet)..............$ 21.30 10.87 Tapers using Ames or Comparable Tools............$ 21.05 10.87
PAIN0003-004 04/01/2013
CASS, CLAY, CLINTON, JACKSON, JOHNSON, LAFAYETTE, PLATTE & RAY
Bridgeman; Lead Abatement;
Sandblast; Storage Bin & Tanks.......................$ 30.20 15.07 Brush & Roller..............$ 28.58 15.07 Drywall.....................$ 28.80 15.07 Paper Hanger................$ 29.08 15.07 Stageman; Beltman;
Steelman; Elevator Shaft;
Bazooka, Boxes and Power Sander; Sprayman; Dipping...$ 29.70 15.07 Steeplejack.................$ 33.77 15.07
PAIN0003-011 04/01/2011
BATES, BENTON, CALDWELL, CARROLL, COOPER, DAVIESS, GRUNDY,
HARRISON, HENRY, LIVINGSTON, MERCER, MONITEAU, MORGAN, PETTIS &
SALINE COUNTIES
Bridgeman; Lead Abatement;
Sandblast; Storage Bin & Tanks.......................$ 24.06 14.04 Brush & Roller..............$ 22.67 14.04 Drywall.....................$ 22.84 14.04 Paper Hanger................$ 23.07 14.04 Stageman; Beltman;
Steelman; Elevator Shaft;
Bazooka, Boxes and Power Sander; Sprayman; Dipping...$ 23.56 14.04 Steeplejack.................$ 26.82 14.04
PAIN0098-002 05/01/2012
ANDREW, ATCHISON, BUCHANAN, DE KALB, GENTRY, HOLT, NODAWAY &
WORTH COUNTIES
Brush & Roller..............$ 22.93 11.51 Sandblaster.................$ 23.93 11.51 Steeplejack.................$ 25.93 11.51
PAIN0203-001 04/01/2012
BARRY, BARTON, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS, GREENE,
HICKORY, HOWELL, JASPER, LAWRENCE, MCDONALD, NEWTON, OZARK,
POLK, ST. CLAIR, STONE, TANEY, VERNON, WEBSTER, and WRIGHT
Finisher....................$ 20.18 11.33 Painter.....................$ 19.75 11.76 Sandblaster, High Man, Spray Man, Vinyl Hanger, Tool Operator...............$ 21.18 11.33
PAIN1265-003 07/01/2013
CAMDEN, CRAWFORD, DENT, LACLEDE, MARIES, MILLER, PHELPS,
PULASKI AND TEXAS COUNTIES
Brush and Roller............$ 25.64 13.27 Floor Work..................$ 26.14 13.27 Lead Abatement..............$ 27.89 13.27 Spray.......................$ 27.14 13.27 Structural Steel, Sandblasting and All Tank Work........................$ 26.89 13.27 Taping, Paperhanging........$ 26.64 13.27
PAIN1292-002 09/01/2013
BOLLINGER, BUTLER, CAPE GIRARDEAU, CARTER, DUNKLIN,
MISSISSIPPI, NEW MADRID, OREGON, PEMISCOT, PERRY, REYNOLDS,
RIPLEY, SCOTT, SHANNON, STODDARD and WAYNE COUNTIES
Bridges, Stacks & Tanks.....$ 29.44 10.65 Brush & Roller..............$ 24.49 10.65 Spray & Abrasive Blasting;
Waterblasting (over 5000
PSI)........................$ 26.49 10.65
Height Rates (All Areas):
Over 60 ft. $0.50 per hour.
Under 60 ft. $0.25 per hour.
PAIN1292-003 09/01/2013
IRON, MADISON, ST. FRANCOIS, STE. GENEVIEVE and WASHINGTON
Bridges, Stacks & Tanks.....$ 29.44 10.65 Brush & Roller..............$ 25.09 10.65 Spray & Abrasive Blasting;
Waterblasting (Over 5000
PSI)........................$ 27.09 10.65
Height Rates (All Areas):
0ver 60 ft. $0.50 per hour Under 60 ft. $0.25 per hour.
PLAS0518-006 03/01/2013
BARRY, BARTON, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS, GREENE,
HICKORY, JASPER, LACLEDE, LAWRENCE, MCDONALD, NEWTON, OZARK,
POLK, ST. CLAIR, STONE, TANEY, VERNON, WEBSTER, AND WRIGHT
CEMENT MASON/CONCRETE FINISHER...$ 22.40 9.05
PLAS0518-007 04/01/2013
CASS (Richards-Gebaur AFB only), CLAY, JACKSON, PLATTE AND RAY
Cement Masons:...................$ 30.09 14.68
PLAS0518-011 04/01/2012
ANDREW, ATCHISON, BATES, BUCHANNAN, CLINTON, DEKALB, GENTRY,
HENRY, HOLT, JOHNSON, LAFAYETTE, NODAWAY & WORTH COUNTIES
CEMENT MASON/CONCRETE FINISHER...$ 31.08 16.15
PLAS0527-001 04/01/2013
Rates Fringes
CEMENT MASON
FRANKLIN, LINCOLN AND
WARREN COUNTIES.............$ 29.03 15.03
JEFFERSON, ST. CHARLES
COUNTIES AND ST.LOUIS
(City and County)...........$ 30.20 15.03
PLAS0527-004 04/01/2013
CRAWFORD, DENT, IRON, MADISON, MARION, PHELPS, PIKE, PULASKI,
RALLS, REYNOLDS, ST. FRANCOIS, STE. GENEVIEVE, SHANNON, TEXAS,
WASHINGTON COUNTIES
CEMENT MASON.....................$ 27.04 15.03
PLAS0908-001 05/01/2012
BOLLINGER, BUTLER, CAPE GIRARDEAU, CARTER, DUNKLIN, HOWELL,
MISSISSIPPI, NEW MADRID, OREGON, PEMISCOT, PERRY, RIPLEY,
SCOTT, STODDARD, AND WAYNE COUNTIES
CEMENT MASON.....................$ 25.25 12.55
PLAS0908-005 05/01/2012
BENTON, CALDWELL, CALLAWAY, CAMDEN, CARROLL, COLE, DAVIESS,
GASCONADE, GRUNDY, HARRISON, LIVINGSTON, MACON, MARIES, MERCER,
MILLER, MONTGOMERY, MORGAN, OSAGE, PETTIS & SALINE COUNTIES
CEMENT MASON.....................$ 25.25 12.55
PLUM0008-003 06/01/2013
CASS, CLAY, JACKSON, JOHNSON, AND PLATTE COUNTIES
Rates Fringes
Plumbers.........................$ 38.75 19.96
PLUM0008-017 06/01/2012
BATES, BENTON, CARROLL, HENRY, LAFAYETTE, MORGAN, PETTIS, RAY,
ST. CLAIR, SALINE AND VERNON COUNTIES
Plumbers.........................$ 35.01 20.41
PLUM0045-003 09/01/2013
ANDREW, ATCHISON, BUCHANAN, CALDWELL, CLINTON, DAVIESS, DEKALB,
GENTRY, HARRISON, HOLT, NODAWAY AND WORTH COUNTIES
Plumbers and Pipefitters.........$ 33.50 18.85
PLUM0178-003 11/01/2013
BARRY, CEDAR, CHRISTIAN, DADE, DALLAS, DOUGLAS, GREENE,
HICKORY, LACLEDE, LAWRENCE, POLK, STONE, TANEY, WEBSTER AND
WRIGHT COUNTIES
Plumbers and Pipefitters.........$ 28.00 14.45
PLUM0178-006 11/01/2013
BARTON, JASPER, MCDONALD AND NEWTON COUNTIES
Rates Fringes
Plumbers and Pipefitters Projects $750,000 & under...$ 25.03 14.45 Projects over $750,000......$ 28.00 14.45
PLUM0533-004 06/01/2013
BATES, BENTON, CARROLL, CASS, CLAY, HENRY, HICKORY, JACKSON,
JOHNSON, LAFAYETTE, MORGAN, PETTIS, PLATTE, RAY, SALINE, ST.
CLAIR AND VERNON COUNTIES
Pipefitters......................$ 40.58 19.07
PLUM0562-004 07/01/2013
ADAIR, AUDRAIN, BOLLINGER, BOONE, BUTLER, CALLAWAY,CAMDEN, CAPE
GIRARDEAU,CARTER, CHARITON, CLARK, COLE, COOPER, CRAWFORD,
DENT, DUNKLIN, FRANKLIN, GASCONADE, GRUNDY, HOWARD, HOWELL,
IRON, JEFFERSON, KNOX, LEWIS, LINCOLN, LINN, LIVINGSTON, MACON,
MADISON, MARIES, MARION, MERCER, MILLER, MISSISSIPPI, MONITEAU,
MONROE, MONTGOMERY, NEW MADRID, OREGON, OSAGE, PEMISCOTT,
PERRY, PHELPS, PIKE, PULASKI, PUTNAM, RALLS, RANDOLPH,
REYNOLDS, RIPLEY, ST. CHARLES, ST.FRANCOIS, STE. GENEVIEVE, ST.
LOUIS, SCHUYLER, SCOTLAND, SCOTT, SHANNON, SHELBY, STODDARD,
SULLIVAN, TEXAS, WARREN, WASHINGTON,AND WAYNE COUNTIES.
Plumbers and Pipefitters Mechanical Contracts including all piping and temperature control work $7.0 million & under........$ 33.41 20.89 Mechanical Contracts including all piping and temperature control work over $7.0 million...........$ 34.75 26.28
PLUM0562-016 07/01/2013
CAMDEN, COLE, CRAWFORD, FRANKLIN, JEFFERSON, MARIES, MILLER,
MONITEAU, OSAGE, PHELPS, PULASKI, ST. CHARLES, ST. LOUIS (City and County), WARREN and WASHINGTON COUNTIES
Plumbers Mechanical Contracts including all piping and temperature control work $7.0 million & under........$ 33.41 20.89 Mechanical Contracts including all piping and temperature control work over $7.0 million...........$ 34.75 26.28
TEAM0013-001 05/01/2010
Rates Fringes
Truck drivers (ADAIR, BUTLER, CLARK, DUNKIN, HOWELL, KNOX, LEWIS, OREGON, PUTNAM, RIPLEY, SCHUYLER AND SCOTLAND
COUNTIES)
GROUP 1.....................$ 25.84 9.85
GROUP 2.....................$ 26.00 9.85
GROUP 3.....................$ 25.99 9.85
GROUP 4.....................$ 26.11 9.85
Truck drivers (AUDRAIN, BOLLINGER, BOONE, CALLAWAY, CAPE GIRARDEAU, CARTER, COLE, CRAWFORD, DENT, GASCONADE, IRON, MACON, MADISON, MARIES, MARION, MILLER, MISSISSIPPI, MONROE, MONTGOMERY, NEW
MADRID, OSAGE, PEMISCOT,
PERRY, PHELPS, PIKE, PULASKI,
RALLS, REYNOLDS, ST.
FRANCOIS, STE. GENEVIEVE,
SCOTT, SHANNON, SHELBY,
STODDARD, TEXAS, WASHINGTON
AND WAYNE COUNTIES)
GROUP 1.....................$ 26.57 9.85
GROUP 2.....................$ 26.73 9.85
GROUP 3.....................$ 26.72 9.85
GROUP 4.....................$ 26.84 9.85
Truck drivers (FRANKLIN, JEFFERSON and ST. CHARLES
COUNTIES)
GROUP 1.....................$ 28.93 9.85
GROUP 2.....................$ 29.04 9.85
GROUP 3.....................$ 29.08 9.85
GROUP 4.....................$ 29.15 9.85
Truck drivers (LINCOLN and
WARREN COUNTIES)
GROUP 1.....................$ 27.58 9.85
GROUP 2.....................$ 27.69 9.85
GROUP 3.....................$ 28.73 9.85
GROUP 4.....................$ 27.80 9.85
TRUCK DRIVERS CLASSIFICATIONS:
GROUP 1: Flat Bed Trucks, Single Axle; Station Wagons;
Pickup Trucks; Material Trucks, Single Axle; Tank Wagon, Single Axle
GROUP 2: Agitator and Transit Mix Trucks
GROUP 3: Flat Bed Trucks, Tandem Axle; Articulated Dump Trucks; Material Trucks, Tandem Axle; Tank Wagon, Tandem Axle
GROUP 4: Semi and/or Pole Trailers; Winch, Fork & Steel Trucks; Distributor Drivers and Operators; Tank Wagon, Semi-Trailer; Insley Wagons, Dumpsters, Half-Tracks, Speedace, Euclids and other similar equipment; A-Frame and Derrick Trucks; Float or Low Boy
TEAM0056-001 05/01/2010
Rates Fringes
Truck drivers (ANDREW, BARTON, BATES, BENTON, CALDWELL, CAMDEN, CARROLL, CEDAR, CHARITON, CHRISTIAN, CLINTON, COOPER, DADE, DALLAS, DAVIESS, DEKALB, DOUGLAS, GREENE, HENRY, HICHKORY, HOWARD, JASPER, LACLEDE, LAWRENCE, LINN, LIVINGSTON, MONITEAU, MORGAN, NEWTON, PETTIS, POLK, RANDOLPH, ST. CLAIR, SALINE, VERNON, WEBSTER AND WRIGHT
COUNTIES)
GROUP 1.....................$ 26.27 9.85
GROUP 2.....................$ 26.43 9.85
GROUP 3.....................$ 26.42 9.85
GROUP 4.....................$ 26.54 9.85
Truck drivers: (ATCHISON, BARRY, GENTRY, GRUNDY,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .