AirKnife_Exploration.pdf

PDF 548 KB Posted

Attached to
South Park Grounds Federal contract opportunity
Solicitation number
P14PS00906
Issued by
Department of the Interior National Park Service National Office

About this file

Air Knife Exploration

View the file

Other files for this federal contract opportunity

Other files attached to South Park Grounds, newest first.
File Type Posted
5C2_Sheet_3A.pdf PDF
9C2_Sheet_64A.pdf PDF
7C2_Sheet_56A.pdf PDF
10C2_Sheet_65A.pdf PDF
12Q_and_As _6-30-2014.pdf PDF
1Revised_015000_Temporary_Facilities_and_Controls_-_revised_7-3-14_(3).pdf PDF
4C2_Sheet_1A.pdf PDF
3Revised_pages_321313_CONCRETE_PAVEMENT.pdf PDF
2Revised_265600__Exterior_Lighting.pdf PDF
8C2_Sheet_58A.pdf PDF
Amend__6_Package.pdf PDF
6C2_Sheet_55A.pdf PDF
JEFF-6-SubContractingPlanForm.1doc.pdf PDF
329300_PLANTINGFINEGRADING_CAR2015_2_BID_revised_2014_06_24.pdf PDF
329200_LAWN_CAR2015_2_BID_revised_2014_06_23.pdf PDF
329119_PLANTING_SOIL_SYSTEM_INSTALLATION_CAR_2015_2_BID_revised_2014_06_23.pdf PDF
RFP_Clauses _Updated.pdf PDF
321400_SITESTONEWORK_CAR2015_2_BID_revised_2014_06_23.pdf PDF
Q_and_A's_as_of_06-26-14.pdf PDF
328400_Irrigation_Specs_100__Bid_amended_6-25-14.pdf PDF
Subcontract_Calcs1.xlsx XLSX spreadsheet
Pre-Proposal_Conf _Presentation_Slides.pdf PDF
Q_and_As _6-17-2014.pdf PDF
Site_Visit _Pre-Proposal _Attendance.pdf PDF
Amend__3 _Package.pdf PDF
Amendment_4_pkg.pdf PDF
Engineering_Analysis_of_Modified_DS-50_Barrier.pdf PDF
Utility_Locating_Services.pdf PDF
Subsurface_Exploration_Addendum_2.pdf PDF
Subsurface_Exploration.pdf PDF
Subsurface_Exploration_Addendum_1.pdf PDF
Subsurface_Exploration_Addendum_2.pdf PDF
2011_0216_CAR_Geotech_Desk_Study_FINAL.pdf PDF
Subsurface_Exploration_Addendum_3.pdf PDF
Supplemental_Utility_Locating_Services.pdf PDF
2011_0211__CAR_Phase_1_ESA_R1.pdf PDF
Subsurface_Exploration_Addendum_1.pdf PDF
Amend_2_Pkg.pdf PDF
JEFF_CAR2015_Archeological_monitoring_plan_FINAL.pdf PDF
32_91_13__Soil_Blending_Spec.pdf PDF
JEFF_Draw_3_(126-200).pdf PDF
GD__MO140001_05-09-2014__MO1.docx DOCX document
JEFF_Draw_1_(1-75).pdf PDF
RFP _Proposal_Submission_Pkg.pdf PDF
Existing_Bollards_-_AS_BUILT.pdf PDF
JEFF_Electrical_as-builts_Site_Lighting.pdf PDF
JEFF_1-SF1442.pdf PDF
JEFF_Draw_4_(201-283).pdf PDF
JEFF_Draw_2_(76-125).pdf PDF
2014.04.17_CAR_TTC_accessible_zones_during_construction_memo.pdf PDF
Show all 50

South Park Grounds has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Doc/proj/del/J017065.10 CAR 2015 Air Knife RF.doc

FINAL REPORT

AIR KNIFE EXPLORATION

CITY ARCH RIVER 2015

JEFFERSON NATIONAL EXPANSION MEMORIAL

ST. LOUIS, MISSOURI

Prepared For:

CITY ARCH RIVER 2015 FOUNDATION

St. Louis, Missouri

Prepared By:

GEOTECHNOLOGY, INC.

St. Louis, Missouri

Geotechnology, Inc. Project No. J017065.10

November 15, 2013

November 15, 2013 J017065.10

Ms. Janis Cooper CityArchRiver 2015 Foundation One South Memorial Drive Gateway Tower, Suite 700 St. Louis, Missouri 63102

FINAL REPORT

AIR KNIFE EXPLORATION

CITY ARCH RIVER 2015

JEFFERSON NATIONAL EXPANSION MEMORIAL

ST. LOUIS, MISSOURI

Dear Ms. Cooper:

Geotechnology, Inc. performed air knife excavations for the referenced project in accordance with the scope of services described in our Proposal No. P021301.02, Revision #2 dated June 7, 2013. The purpose of our services was to perform excavations using air knife vacuum extraction equipment to measure the depth and elevation of the roof of the museum and railroad tunnel.

Air knife (vacuum extraction) holes were performed at nine locations over the Visitor Center Museum and seven locations over the Terminal Railroad tunnel. Alper Audi and Michael Van Valkenburgh Associates, Inc. selected the air knife locations over the museum and railroad tunnel, respectively. The air knife equipment is designed to remove the soil overburden through compressed air without damaging underlying utilities or, in this case, roof structures.

SUBSURFACE EXPLORATION

Air knife holes AK-1 through AK-9 were excavated above the museum generally using a trailer-mounted VacMasters 1000 unit at approximately the locations shown on Plate 1. The locations were surveyed and staked in the field by Engineering Design Source, Inc. (EDSI), who determined ground surface elevations. Upon excavation of each location, Geotechnology measured the depth to the top of the roof membrane using a tape measure and backfilled the excavation with soil cuttings and sand. We also recorded the apparent edge of the museum roof relative to the survey stake at locations AK-7 and AK-9.

CityArchRiver 2015 Foundation J017065.10 November 15, 2013 Air Knife Exploration

Air knife holes TAK-1 through TAK-7 were excavated above the railroad tunnel at approximately the locations shown on Plates 2 through 4. EDSI surveyed and staked the locations and determined ground surface elevations. Initially, Geotechnology attempted air knife excavations using the VacMasters 1000 unit. However, roots, rubble, and hard clay soils prohibited excavating to the tunnel roof at every location except TAK-1. We subsequently contracted with Kantex Subsurface, Inc., to excavate the holes using a more powerful air vacuum unit. Upon excavation of each location, Geotechnology measured the depth to the top of the roof using a tape measure. The excavations were then backfilled with soil cuttings. The apparent edge of the tunnel roof was recorded relative to the survey stake at location TAK-4.

An engineer from Geotechnology provided technical direction during field exploration, observed excavation, collected samples, and prepared descriptive logs of the material encountered.

SUBSURFACE CONDITIONS

The soil above the museum consists generally of silty clay underlain by a layer of tan, fine-grained sand. The museum roof appears to be covered by an asphaltic or geosynthetic membrane. The depth of the museum roof measured in the air knife holes ranges from 1.1 to 2.1 feet.

In discussion with Mr. Randy Dreiling, P.E., and Mr. Mike Rachford, Executive Vice President of Elastizell of St. Louis, Inc., we understand that the museum roof was repaired circa 1990. The repair included placing a layer of bituminous waterproofing material (used on bridge decks) on the existing roof, pouring Elastizell lightweight concrete over the roof, and installing another layer of waterproofing over the Elastizell. The covering had an apex in the center of the roof and sloped down towards the edges. The covering overhangs the museum walls by approximately 2 feet with a 3-foot downturn that is steel-reinforced within the Elastizell. An irrigation system was installed above the repaired roof which is covered by approximately 18 inches of soil.

The soil above the railroad tunnel consists generally of silty clay with gravel, brick, and concrete rubble. The soil is also heavily rooted from shrubs and trees planted on or adjacent to the roof. The tunnel roof appears to be covered by a bituminous coating. The depth of the tunnel roof measured in the air knife holes ranges from 2.9 to 5.9 feet.

A summary of the air knife excavation data is presented in Table 1. Groundwater was not observed in the air knife excavations.

CityArchRiver 2015 Foundation J017065.10 November 15, 2013 Air Knife Exploration

TABLE 1

SUMMARY OF AIR KNIFE EXPLORATION DATA

Air Knife Excavation

No.

Northing Easting

Ground Surface

Elevation (ft msl)*

Approximate Depth to Museum/

Tunnel Roof (ft)

Approximate Museum/Tunnel Roof Elevation

(ft msl)

Comments

AK-1 14038491.89 2444262.71 446.11 1.7 444.4

AK-2 14038354.09 2444214.80 446.64 2.1 444.6

AK-3 14038212.96 2444182.17 445.93 1.3 444.6

AK-4 14038452.32 2444400.25 445.98 1.4 444.6

AK-5 14038312.33 2444359.97 447.13 1.1 446.0

AK-6 14038173.32 2444319.98 446.08 1.5 444.6

AK-7 14038409.60 2444545.15 445.70 1.1 444.6

Edge of museum roof

1.5 feet east of survey stake

AK-8 14038270.56 2444505.15 445.61 1.1 444.5

AK-9 14038132.51 2444465.43 445.59 1.1 444.5

Edge of museum roof

1.25 feet east of survey stake

TAK-1 14037944.76 2444482.13 446.50 2.5 444.0

TAK-1A 14037944.65 2444482.16 446.39 2.5 443.9

TAK-2 14037964.11 2444506.75 447.99 4.3 443.7 Edge of tunnel roof not encountered

TAK-3 14038558.26 2444662.05 446.84 3.0 443.8

Orange utility cable encountered running north-south above tunnel roof

TAK-4 14038526.76 2444675.59 447.65 3.9 443.8

Edge of tunnel roof encountered 0.7 feet east of stake

TAK-5 14039445.35 2444920.01 459.82 -- --

Tunnel roof not encountered to total depth of 8.8 feet

TAK-6 14039475.47 2444965.46 456.43 4.0 452.4

TAK-7 14039444.68 2444958.71 456.63 5.9 450.7 Edge of tunnel roof not encountered

TAK-7A Offset 3 feet east of TAK-7 -- 5.3 -- Edge of tunnel roof not encountered

* Elevations are in units of feet and referenced to mean sea level (msl) datum.

APPENDIX

LIMITATIONS OF REPORT

This report has been prepared on behalf of and for the exclusive use of the client for specific application to the named project as described herein. If this report is provided to prospective contractors, the client should make it clear that the information is provided for factual data only and not as a warranty of subsurface conditions included in this report.

Geotechnology has attempted to conduct the services reported herein in a manner consistent with that level of care and skill ordinarily exercised by members of the profession currently practicing in the same locality and under similar conditions. The data and conclusions contained in this report are professional opinions. No other representation, expressed or implied, is included or intended.

The field exploration methods used indicate subsurface conditions only at the specific locations where samples were obtained, only at the time they were obtained, and only to the depths penetrated. Discrete sampling cannot be relied on to accurately reflect natural variations in stratigraphy that could exist between sample locations and/or intervals.