32_91_13__Soil_Blending_Spec.pdf
PDF 248 KB Posted
- Attached to
- South Park Grounds Federal contract opportunity
- Solicitation number
- P14PS00906
About this file
Soil Blending
View the file
Other files for this federal contract opportunity
Show all 50
South Park Grounds has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Confident
JEFF
053014
SECTION
PART 1
1.1 SU
A. T
1.2 R
A. A tial and Propr
N 32 91 13 – P
GENERAL
UMMARY
The scope of w equipment fo contract docu
Soil M.
a.
b.
c.
Testin.
a.
b.
Record.
Delive.
Coord.
provid
REFERENCE
All standards for bids. For manufacturer recognized l following:
Ameri.
rietary Inform
PLANTING
work intended or Planting S uments. Such
Materials
Furnish Pla
1) Sou
2) Dry
3) Co
4) Soi
Prepare Ba
Prepare Pla
1) Ho
2) Law
3) Tre
4) Bio
5) Bio
6) Str
7) Sta g and analysi
Planting So
Planting So d -keeping Lo ery of Planting ination with t ding a schedul
STANDARD
shall include r each type o r’s certified laboratory ma ican Society f mation
SOIL SYSTE
d under this s Soil Mix man h work shall i anting Soil M urce Soil y Screened Sa mpost il Reinforcem se Loam anting Soil M orticultural Su wn Soil (LS1 ee Soil (TS1) oswale Soil 1 oswale Soil 2 uctural Soil ( abilized Horti is for specific oil Mix Comp oil Mixes og g Soil Mixes the Governme le indicating d
DS FOR ANA
the latest ad of packaged analysis. Fo ade in strict for Testing M
PLANT
EM – BLEND
section includ nufacturing, o nclude but is ix Componen and ment (Geofibe ixes ubsoil
(BS1)
(BS2)
SP4)
cultural Subs ation conform ponents to the Project ent’s Soil Ins delivery need
ALYSIS AND
dditions and a material requ r all other m compliance
Material (ASTM
TING SOIL S
DING
des furnishin or as may be not limited to nts:
ers) soil mance.
t Site.
tallation Con ds.
D TESTING
amendments uired for the materials, pro with the sta
M).
SYSTEM - BL
ng all labor, m e reasonably o the followin ntractors who as of the date work of thi ovide compl andards and
32 91 13-1
LENDING
materials, tool inferred from ng:
are responsib e of advertise s Section, pr lete analysis procedures o ls and m the ble for ement rovide by a of the
1.3 D
A. C po ap
B. D in
C. F ha
D. F th M Sp
E. G
F. So E G
G. M sh an so
H. P co in
I. Sa un
J. Sc to de sp
K. Su m
L. Su
M. T or or tial and Propr
Ameri.
Soil Sc.
Associ.
U.S. C.
(TMEC
Soil Fo.
DEFINITIONS
Compaction: C orosity and w pplications of
Dry Soil: The n which the so
Frozen Soil: T ard and clodd
Field Capacity hree days afte
Moisture conte pecification.
GRG Represen oil Installatio Expansion Me Government fo
Moist Soil: Th hape. Deform nd is usually oil.
Project: Refers onstruction si ndividually bi aturated: All nder gravitati carification:
o alleviate com ependent on m pecifications.
ubsoil: The so matter content ubgrade: The
Topsoil: The m riginal rock s rganic matter rietary Inform ican Society o cience Societ iation of Offi
Composting C
CC)
ood Web
S
Compaction o where 90 perce f force under condition of t oil is powdery
The point at w
dy. Ice crystal y: The percen er having been ents for the Pl ntative: A rep on Contractor morial projec or installing th e condition o mation of the s considered th s to the Jeffer ite. The JEFF id and awarde the pore spac ional forces to
The loosening mpaction or s material and e oil horizon di , and often lo e in-situ soil m mineral surfac tructure and m r closely mixe mation of Agronomy ty of America cial Agricultu
Council Test M of the soil fabr ent of all com optimum soil the soil at or b y and subject which the soil w ls can be seen ntage of water n saturated an lanting Soil o presentative fr r: Refers to th ct (JNEM or J he planting so f the soil in w soil is difficul he point betwe rson National /JNEM proje ed by the Gov ce within a so o drain throug g of the surfa smoothed surf extent of com irectly below wer nutrient s material that t ce layer of soi must show th ed with the m a ural Chemists
Method for th ric is any forc mpaction can b l moisture con below the wil to blowing.
water has fro n in the pore s r remaining in nd after free g on the Project rom Great Riv he Contractors JEFF) who ar oil mixes.
where it can b lt with hand p een the wiltin
Expansion M ct is subdivid vernment.
oil is filled wi gh the profile ace of a soil li faces of the so mpaction. Dep topsoil that ty supply capaci the planting s il that exhibit e following: ( ineral fraction
TING SOIL S
s (AOAC) he Examinatio ce applied to be accomplish nditions.
lting point of zen and the s spaces of the n a soil at app gravimetric dr are defined i vers Greenwa s for the Jeffe re under separ be formed into pressure. Free ng point and f
Memorial (JEF ded into five c ith water and ift by mechan oil. Depth of pths are noted ypically exhib ity than the to oil will be ins t obliteration o
(1) an accumu n and not dom
SYSTEM - BL
on of Compo the soil that r hed with only f plant availab soil has becom soil.
proximately tw rainage has ce in Part 3 of th ay.
erson Nationa rate contract w o a ball and m e water is not field capacity
FF or JNEM) contracts whic the remaining nical or manua scarification d within the bits lower org opsoil..
stalled upon.
of all or much ulation of hum minated by pr
32 91 13-2
LENDING
sting and Com reduces y three ble water me very wo or eased.
his al with the maintain its visible of the ch are g water is al means is ganic h of the mified roperties mpost ch ph
N. W m co
O. R an
1.4 SU
A. A
B. In
1.5 Q
A. L tial and Propr haracteristic o hysical prope a bulk .
less th.
loose, .
no con.
Wet Soils: Soil maintain their ontent at this edoximorphic naerobic soil
UBMITTAL
Action Submit submit the fo
Produc.
Sampl.
a.
Labora.
Certifi.
by the nformational submit the fo
Produc.
reflect as requ
Record.
QUALITY AS
Long Lead Tim procurement, requiring tim Contractor sh begin immed this notice sh rietary Inform of subsurface erties) to supp density of le han 10 percent friable structu ntamination (i ls that are con shape, and fr soil condition c Features: T conditions in
S ttals: In addit ollowing:
ct Data: Subm les:
Concurrent submit to th
1) Pla
2) Bas atory Test Re icates: Provid U.S. Compo
Submittals:
ollowing:
ction Schedu ts project need uested by the d keeping log
SSURANCE
me Item: The , and blendin mely attention hall consider diately after t hall not be a re mation horizons; (2) port plant grow ss than 1.4g/c t by weight co ure (easily br
ie. Toxic wee nsidered wet w ee water will n is considere
The iron staini n association w tion to the re mit for Stalite tly with the su he GRG Repr anting Soil Co se Loam eports: Submi de certificates sting Council
In addition t ule: Provide ds per Projec GRG Repres g: Submit to G e Soil Blendin ng of plantin n to meet th planting soil the award of eason for sub
) has reasonab wth; as well a cc installed oarse fragmen roken into cru eds, chemicals will easily be be visible wi ed at field cap ing or gray de with a seasona equirements o
Lightweight ubmission of resentative on omponents it certified rep s of compost l.
to the requir production ct Contract Ar sentative.
GRG Represen ng Contracto ng componen he requireme l mixes to be the contract.
bstitution of un
TING SOIL S
ble tilth (biolo as the followi nts greater tha umbs or peds) s, heavy meta deformed by ithin the pore pacity or wette epletion of so al high water of Section 01
Aggregate.
f laboratory te ne gallon sam ports for tests completion/m rements of S schedule to rea. Submit a ntative two ti or shall be adv nts and soil nts of the D e A LONG LE . Soil Blendin unacceptable m
SYSTEM - BL
ogical, chemi ng qualities:
an 2mm
), no massive als, constructi y hand pressur spaces. The w er.
oil colors due r table.
33 23 “Subm est reports, th mple bags, in d s as described maturation/sta
Section 01 33 the GRG R an updated pr imes per mon vised that the is a CRITIC
Documents. T
EAD TIME I
ng Contracto material(s).
32 91 13-3
LENDING
ical and structure ion debris) re, water to mittal Proced he Contractor duplicate, for:
d in this Secti ability as spe
3 23 “Submi
Representative roduction sch nth e sourcing, te
CAL PATH
The Soil Ble ITEM. Work or’s failure to dures” r shall on.
ecified ittals” e that hedule esting, item, ending k must o heed
B. Pr
C. Pr
D. Pr
E. R
1.6 T
A. G tial and Propr
Each o.
for ini and on re-Submittal Management work of this re-Blending C for the work re-Installation required to a Blending Con
Record-keepin
Plantin.
yards o
Record.
submis
Volum.
a.
b.
c.
d.
e.
Volum.
a.
b.
c.
Testin.
or loc unacce Repres
Submi.
Submi.
TESTING ME
General:
Sampl.
testing charac rietary Inform of the Govern itial soil deliv ne (1) week no
Conference:
t and Coordi Section shall
Conference: A of this Sectio n Conference attend a confe ntractor is req ng Log: Main ng Soil Mix of soil produc d-keeping log ssion.
me of planting
Source Soil
Dry Screen
Compost
Base Loam
Planting So me of planting
Soil Installa
Type(s) of
Total volum
g. Include for cation. Recor eptable test re sentative.
it updates to t it a complete
ETHODS
les of all soil g laboratory.
cteristics.
mation nment’s Soil I very, thirty (3 otice for deliv
In addition nation”, a C be held prior
A pre-blendi on and shall b e: Each of th erence with t quired to atten ntain an activi production:
ced.
g is cumulati g soil material l ned Sand m oil Mixes, all g soil delivere ation Contrac
Planting Soil me in cubic ya r each soil ma rd both acce eports to the the GRG Rep record-keepin materials sh All soil m
Installation C
30) day antic veries to the J n to the req onference wi r to beginning ng conferenc e held prior to he Governme the Governme nd.
ity log trackin date, weathe ive; every bi-ls on hand at t types ed to the Proje ctor receiving
Mixes delive ards, for each aterial: Inclu eptable and u GRG Repres resentative on ng log to the G all be submit materials shal
TING SOIL S
Contractors sh cipated delive JEFF project quirements o ith the GRG g submittals fo ce with the G o starting full ent’s Soil In ent’s Contrac ng the followi er, type of so
-weekly upda the Soil Blen ect Site. Reco g the material.
ered.
h Planting Soi ude material ty unacceptable sentative. Sub n a bi-weekly
GRG Represe tted for testin ll be tested
SYSTEM - BL
hall provide a ery schedule site.
f Section 0 G Representat for this Sectio
GRG Represe l production b nstallation Co cting Officer, ing:
oil produced, ate is append nding Contrac ord:
il Mix deliver ype, test type e findings. Im bmit all test r y basis.
entative at clo ng and analys to confirm
32 91 13-4
LENDING
3 month lead provided mo
1 31 00 “P tive to discus n.
entative is req blending.
ontractors sha , at which the volume, in ded to the pre ctor’s facility:
red.
e, date, and in mmediately r reports to the oseout.
sis to the app to the spe d time nthly, Project ss the quired all be e Soil cubic evious nterval report
GRG
proved ecified
B. T
C. T tial and Propr
Mainta.
and re
All tes.
Testing Facilit
For ea.
Repres has ap
Labora.
the tes
The fo.
compo approv a.
b.
c.
d.
Tests Definitio
Mecha.
a.
b.
rietary Inform ain clear, con sults in the re sts shall be ma ties:
ach test type, sentative of a proved the ch atory shall be sting indicated following test onents and bl ved by the GR
Soil Physic
1) Tur
2) Or
Compost T
1) Wo
2) Un Ha
3) Or
Soil Nutrien
1) Mi
2) Un Ha (57
3) Or
Biological
1) Soi
2) Ear ons and Metho anical Gradati
Mechanical USDA Soil 270.
Tests for s compliance shall be tes mation ncise records ecord keeping ade on the sp
, use the sam any change in hange.
e an independ d and that spe ting facilities ended plantin
RG Represent cal Parameters rf Diagnostic 052, Phone: 9 approved equ
Testing:
oods End Re 352, Phone: 2 niversity of M ll, Columbia, approved equ nt/Micronutri dwest Testin 118, Phone (3 niversity of M ll, Columbia
73) 882-0623 approved equ
Testing:
il Foodweb In
1.750.1553 w rthfort Labora 7-2612 ods:
ion l gradation (s l Classificatio silt and clay e with ASTM ted and repor for all testing g log.
ecific materia me testing lab n laboratory a dent laborator ecializes in th s have been ng soil mixes tative.
s:
cs & Design 913-723-3700 ual search Labor 207-293-2457
Missouri Soil
MO 65211, (
ual ient Testing:
ng Laboratori
314) 773-3035
Missouri, Soil a, MO 65211 ual nc, 1645 Wa www.soilfoodw atory, 635 SW sieve analysi on System for shall be by M D-422-63, rted as separat
TING SOIL S
g and samplin als proposed f boratory thro and do not pr ry, with exper he types of tes pre-approve . Testing age n, Inc., 613 0, Fax: 913-7 ratory, 290 B 7, Fax: 207-2 and Plant Te
(573) 882-06 ies, 2645 Gr and Plant Te 1, (573) 882 ashington Ave web.com
W Western Bl
is) shall be p r sieve screen combined h hydrometer ate particles.
SYSTEM - BL
ng procedures for use on thi oughout the w roceed until C rience and cap sts to be perfo ed for testing encies not lis
East 1st Stre 723-3701, ww
Belgrade Road 293-2488, ww esting Labora ravois Ave, esting Laborat 2-0623, Colum enue Bohemi lvd, Corvallis performed and n sizes 4, 10, 1 hydrometer an method. Per
32 91 13-5
LENDING
s and log acti is Project.
work. Notify Contracting O pability to co ormed.
g of planting sted below sh eet, Linwood ww.turfdiag.c d, Mt Vernon ww.woodsend atory, 23 Mum
Saint Louis, tory , 23 Mum mbia, MO 6 ia, NY, 1171 s, OR 97333, d compared t 18, 35, 60, 14 nd wet sievi rcent clay an ivities
GRG
Office onduct g soil hall be d, KS com.
n ME d.org mford
, MO
mford 65211, 6, tel:
(541) to the 40 and ing in nd silt tial and Propr c.
Soil C.
a.
b.
c.
Biolog.
a.
b.
c.
d.
e.
f.
g.
rietary Inform
The results listed in thi cycle semi-hemical Prop
General: T References Accreditati
Testing for Phosphorus Cation Exc
1) Nu Ext
2) Tes Me
3) Tes me
4) Tes sus
Total Organ
1) Tes
2) Ref org Org Tab Am gical Propertie
Active bact
Total bacte
Active fung
Total funga
Protozoa, to
Total nema
Hyphal diam mation s of gradation is Section and -log graph.
perties
Testing shall b in associa on Program.
r soil chemis s, Potassium, hange Capaci utrient conten tension Offic a) b) st for soil So ethod as descr
1)
2) st for soil CE ethod.
1) st for Soil p spension using
1) nic Matter st for soil org ferences: Sch ganic matter b ganic matter:
batabai and E mer. Madison, es (Direct Mi terial biomass rial biomass.
gal biomass.
al biomass.
o include flag atode numbers meter.
n must be re d by plotting be conducted ation with stry shall incl , Calcium, M ity (CEC), So nt shall be d e – St. Louis
Available p Melich-3 Me ppm= mg.kg oluble Salts s ribed in Test f
Reference: S Test Procedu ds=deciSiem
EC (Cation E
Reference: M Methods.
Agronomy, p pH shall be g a glass elec
Reference: A Soil Analysis ganic matter c hulte, E.E. an by weight by : Analysis an
E.A. Hanlon, J
, WI.
icroscopy) s.
gellates, amoe s.
TING SOIL S
eported at the as a particle s d in accordan the Missou lude Total N Magnesium, oluble Salts, a determined b County” or e phosphorus s ethod.
g-1 shall be by t for Buffer pH
Soluble Salts:
ures for the N mens (Conduc
Exchange Cap
Methods of Madison,
pp. 1367–137 determined f ctrode pH met
American Soc s, part 2, 198 content nd B.G. Hop y weight Loss nd Interpretat Jr. Special pu ebae, and cilia
SYSTEM - BL
e specified p size distributi nce with Met uri Soil Te
Nitrogen, Amm Aluminum, M and acidity (p by the “Soil equivalent lab shall be de the 1:2 (v:v) H by the SMP
Recommen North Central R ctivity) = mnh pacity) by ex
Soil Analysi WI: Amer
78.
from a 1:1 s ter.
ciety of Agro 6.
pkins. 1996.
s-On-Ignition tion. (ed.) F.R ublication No ates.
32 91 13-6
LENDING
particle size b ion curve on thods and M sting Assoc monium Nitr Manganese, pH).
Test of Mi boratory.
etermined by soil:water E P method.
nded Chemica Region hos.cm-1 changeable a s, Pt. 2, Che rican Societ soil-distilled onomy Metho
Estimation o . p. 21-32. In R. Magdoff,
o. 46. Soil Sci breaks a five
Method ciation rogen, Lead, ssouri y the
Extract al Soil acidity emical ty of water ods of of soil n: Soil
M.A.
i. Soc.
1.7 SA
A. S
B. S tial and Propr h.
Compo.
a.
Compo.
a.
b.
c.
d.
e.
f.
g.
h.
i.
Geofib.
Fiber A
AMPLING A
ample and pe tests shall be
No pla.
test re Repres
The G.
for con the site
If, at a.
mixes Soil B testing
Additi.
change ampling Meth
Compo.
assemb sample rietary Inform
Total availa ost: Maturity
Maturity sh method ar Assurance"
1) CO
2) Reh
3) Sol ost: Physical
Reaction (p
Carbon/Nit
Foreign Ma
Organic Ma
Ammonium
Salinity usi
Basic Nutri
The compo Departmen
E.coli, in co bers: The app Analysis, a te
AND TESTIN
erform soil te come the stan anting soil co eports by an sentative.
GRG Represen nfirmation of e.
any time durin require adjus
Blending Con g as specified ional testing e after initial hods:
ost and Plan bled from a m es together an mation able N from b y Index hall be assess re specified " and the Solv
O2 Evolution t heating test: U lvita test l and Chemica pH) in 1:1 wa trogen ratio (C aterial on a dr ater percent o m-N using an ing a 1:1 wate ient content o ost material m t of Environm onformance w lication rate o est developed
NG FOR APP
ests to demo ndard for the j mponents, ba n approved ntative may re f mix quality ng the project stment to me ntractor shall herein.
for re-approv approval.
nting Soil Mi minimum of nd submit for biological cyc sed in one of by the “U.
vita manual (v test (respirom
Use the Dewa al Requireme ater
C:N) ry weight bas on a dry weigh extract metho er paste metho of macro nutri must be tested mental Conser with USDA te of fiber reinfo by Turf Diag
ROVAL
nstrate that m job.
ase loam, or p Testing Ag equest additio and/or soil m t, the planting et the specifi submit the a val shall be r ixes: All sam 6 subsample testing the qu
TING SOIL S
cling, reported f the followin S. Compost version 3.5).
metry) ar self-heating ents is ht basis od od ients (P, K, C to meet EPA rvation levels esting procedu orcement shal gnostics & De materials mee planting soil m gency have onal testing b mix amendmen g soil compon ications and/o adjusted soil required shou mples shall b es taken from uantity requir
SYSTEM - BL
d as pounds p ng methods.
ing Council g test
Ca, Mg)
A Chapter 503 s for human u dures.
ll be verified esign.
et the specifi mix shall be u been approv by the Soil Bl nts at any tim nents, base lo or performanc components uld any of th be composite m the stockpil red by the test
32 91 13-7
LENDING
per acre.
Protocols for Seal of Te
3 and/or New use.
by a Percenta ications. App used until cer ved by the lending Cont me until deliv am or plantin ce criteria the s and/or mixe he material so e samples tha ed material. B ting agency.
r each esting w York age of proved rtified
GRG
tractor ery to ng soil en the es for ources at are Blend
C. T
D. T
E. T
F. T
1.8 O
(P tial and Propr a.
Testing shall b
Gain t.
(Sourc
Gain t.
Plantin
Gain t.
Subsoi and St
Testing of Plan
Source.
Chemi a.
Compo.
Physic
Sand s.
Testing of Bas
After t.
Base proper
Testing of Plan
After t.
mix fo a.
b.
c.
ONGOING S
PRODUCTIO
Sampl.
assuran labeled test at a.
rietary Inform
Compost sa be sequenced the GRG Re ce Soil, Comp the GRG Rep ng Soil Mixes the GRG Rep il, Lawn Soil tructural Soil nting Soil Com e soil shall ical Propertie
Samples sh labeled wi Samples sh ost shall be te cal Requireme sources shall b se Loam tests for Plan Loam and t rties (Section nting Soil Mix tests for Base or approval. T
Horticultur
Lawn Soil ( Chemical p
Structural properties (
SAMPLING
ON RUN)
ling: During nce. Collect d with the pla the following
Planting So yards of pla Section 1.7 mation amples shall b such that app epresentative’ post, Dry Scre presentative’ s for approval presentative’s (LS1), Tree S (SP4)) prior t mponents be tested fo s (Section 1.6 hall be colle th source na hould be colle ested for Com ents (Section be tested for M ting Soil Com test for mech 1.6.C.2).
xes e Loam have Tests required ral Subsoil: Ch
(LS1), Tree S properties (Se
Soil (SP4):
(Section 1.6.C
AND TEST
soil blendin samples in a anting soil mi g interval:
oil Mixes: Sam anting soil m
7.F.
be taken from provals build u
’s acceptance eened Sand) p s acceptance l.
acceptance o Soil (TS1), B to producing or Mechanic 6.C.2).
cted from ea ame, sample ected from eac mpost Maturit 1.6.C.5), and
Mechanical G mponents hav hanical grada been accepte shall include hemical prop
Soil (TS1), Bi ction 1.6.C.2
Mechanica C.2).
TING OF A
ng operation accordance wi x, batch numb mples shall b mix during soi
TING SOIL S
m the interior o upon prior su e of testing prior to testin of the Base of each Plant Bioswale Soil a particular P al Gradation ach 12” dept location (at ch 10 acres of ty (Section 1 d Biological P
Gradations (S ve been accep ation (Sectio ed, create sam e:
perties (Sectio ioswale Soil 1 al gradation
APPROVED
ns, samples s ith this Spec mber, and date be collected a l blending pr
SYSTEM - BL
of the stockpi uccessful tests for Planting g Base Loam e Loam testin ting Soil Mix 1 (BS1), Bio
Planting Soil M n (Section 1 th interval o t source), an f soil source a
.6.C.4), Com Properties (Se ection 1.6.C.
pted, create a on 1.7.C.1) a mple mixes of on 1.6.C.2).
1 (BS1), Bios
(Section 1.
D PLANTING
shall be col ification. Eac of sample. C and tested for roduction. Tes
32 91 13-8
LENDING
ile.
s, as follows:
Soil Compo m for approval ng prior to te x test (Horticu swale Soil 2 ( Mix.
.65.C.1) and f source are nd depth int area.
mpost Chemica ection 1.6.C.3
1).
sample mix and soil che f each plantin swale Soil 2 (
.6.C.1), Che
G SOIL M
lected for q ch sample sh
Collect sample r every 1,000 st shall confo onents l.
esting ultural
(BS2)
d Soil a and terval.
al and of the emical ng soil
(BS2):
emical
MIXES
quality hall be es and cubic orm to
1.9 A
A. T
B. R
PART 2
2.1 P
A. S tial and Propr b.
After .
consec yards.
Tests .
Gover
ACCEPTANC
The GRG Rep any time, any
The ba.
initial
Physic.
examin minera constru The pr soils d
Rejected plan Government’
PRODUCT
LANTING S
ource Soil
The so.
the fol a.
U.S. S 0.002 b.
rietary Inform
Compost: S compost us 1.7.D.4.
planting soi cutive tests, f shall be com nment’s Soil
CE
presentative s y soil that doe aseline criteri tests for com cal soil samp nation. Exam alized organic uction debris resence of th despite accept nting soil co ’s Soil Install
S
OIL MIX CO
ource soil sha llowing requir
Gradation s
Sieve Size No mm
Chemical P mation
Samples shal sed during so il mixes (pe frequency for mpleted and a Installation C shall evaluate es not meet th ion for accept mponents, base ples shall be mination will cs including b s, gravel beyo hese contamin able results fo omponents or ation Contrac
OMPONENT
all consist of rements:
shall conform
o. % Passin
Properties:
l be collected oil blending p er type) and r testing may approved prio Contractor.
all of the te he baseline cri tance is estab e loam and pl e submitted l be for evid but not limited ond the speci nants and/or for gradation a r mixes sha ctors.
S uniform silt m to the follow ng Minimum
TING SOIL S
d and tested production.
compost ha be decreased or to deliveri est results and iteria for acce blished by the lanting soil m to the GRG dence of pet d to slag, the ified limits, a materials wil and chemistry all not be r loam or loam wing grain siz
% Pass
SYSTEM - BL
for every 1,0 Tests shall c ave successf d to one test ing Planting d reserves the eptance.
e GRG Repre mixes are appr
G Representa troleum cont presence of s and other del ll be cause f y.
released or d m soil from a ze distribution sing Maximum
32 91 13-9
LENDING
000 cubic yar conform to Se fully passed every 2,500
Soil Mixes t e right to reje sentative whe oved.
ative for ph tamination, s saline compon leterious elem for rejection o distributed t a clean source n:
m rds of ection three cubic to the ect, at en the hysical sulfur, nents, ments.
of the o the e with
B. D
C. C tial and Propr
Item pH Salt co Total n Total p
CEC
Alumi Manga Lead c.
Dry Screened
Sand s.
rounde mica, a a.
Mech.
passin
U.S. S 0.002 a.
Compost
Compo.
and cu stems, by vo suppor water o
Chemi.
rietary Inform oncentration nitrogen phosphorus inum (availab anese
Source soil clay clods, Sand shall be a un ed grains of q and other dele
Sand shall b hanical Gradat g a Number 4
Sieve Size No mm
Maximum on the #4 particle siz shall be 3.0 ost shall be a uring of orga leaves, grass lume). The c rting plant g or dust, with ical Propertie mation ble) l shall not con gravel, or oth niformly grade quartz or othe eterious mate be from nativ tion: Dry scre 4 Sieve for wa
o. % Passin size shall be sieve shall b ze for 80% p 0 or less. (D80 stable, humu anic vegetativ s cuttings, and compost shal growth with a no unpleasan s: Compost s
Units dS.m-1 ppm ppm n/a ppm ppm ppm ntain objects her foreign m ed coarse san er durable roc erials.
ve river source eened sand sh ashed sieving ng Minimum one half-inch be 5% by we assing (D80) 0/030 <3.0) us-like materi ve residues d d livestock m ll be a dark appropriate m nt odor.
hall conform
TING SOIL S
Range
6.5 – 7.8 <10 10 - 50 2-30 >15 <1 100 – 2,0 <50 larger than 1/ matter.
nd consisting ck free from
es. Manufactu hall have the f g:
% Pass h largest dim eight of the ) to the partic ial produced f derived from manure (up to k brown to b management to the follow
SYSTEM - BL
/2” in any dim g of clean, ine loam or clay ured sand sha following gra sing Maximum mension. The m total sample cle size for 3 from the aero feedstock co 10 percent o black color a practices wi wing values:
2 91 13-10
LENDING
mension, incl ert, sub-angu y, surface coa all not be used adation for ma m maximum ret
e. The ratio o 30% passing obic decompo onsisting of w of the compos and be capab ith no visible luding ular or atings, d.
aterial tained of the (030) osition woody st mix ble of e free
D. G tial and Propr
Ite To Ex To A pH Sa M a.
b.
c.
d.
Maturi.
a.
b.
c.
Biolog.
a.
b.
c.
d.
e.
Pathog.
Total a.
Geofibers
Provid.
reinfor
Property Polypro
Color Moistur rietary Inform em otal nitrogen xtractable nitr otal phosphor
Available phos H alt concentrat
Moisture
The ratio of
Organic ma hundred pe such as met shall not be
The compo contain no determined
Additional the results may be req ity:
C02 test: Co
Reheating above room
Solvita tes gical Values:
Active bact and fungi re
Total bacte
Total fungi
Protozoa to
Nematodes gens/Metals/V 9392, Vol. 58 available N fr de 3620-Den rcement shall y opylene re Absorption mation rate rus sphorus tion f carbon to ni atter content o ercent of the m tal, glass, pla e visible and s ost shall be more that 3 d by sieve ana tests defined will be utiliz uired.
ompost respir test: The m m temperature t: The compo teria and fun espectfully.
ria to be a mi i to be a minim o be 100,000 ( s minimum of
Vector Attrac No. 32.
rom biologica nier fiber re l conform to t
Test
ASTM
1/ Cl n ----
Units ppm ppm ppm ppm dS.m-1 % wt itrogen (C:N) of compost sh material shall astic, wood (o shall not exce screened to 3 percent ma alysis.
d in Part I as zed to evaluate ration shall be maximum hea e (20 to 25 de ost must achie ngi are not to inimum of 50 mum of 400 u
(amoeba and f 10 beneficia tion reduction al cycling: 15 einforcement the following
Method M D 4101/Gr lass 1/ Grade
TING SOIL S
Range 2000 - 8 20 -200 5 - 2000 5 - 200
5.5 – 8.0 <6 30-55
) shall range b hall be at lea l pass a 1/2-i other than resi eed one perce
1/2 inch ma aterial finer t
Chemical Pro e amendment e no more tha at rise shall b grees C).
eve a maturity o be higher th
00 ug/g ug/g flagellates w al, no root fee n shall meet
0 lbs per acre t, batch mix minimum sp
Typica roup
99%
Varies Nil
SYSTEM - BL
between 10:1 ast 40 percent inch (or smal idual chips), a nt dry weight aximum parti than 1.0mm operties shall ts to the plant an 6 mg C02-be no greater y index of 6 o han 10 percen ith no more 3 ders
40 CFR Part e.
xed with L ecifications:
al Values s
2 91 13-11
LENDING
to 25:1.
t (dry weight) ller) screen. D asphalt or ma t.
icle size and (No. 18 siev l be performe ting soil mixe
ClgBVS day.
r than 9 deg or more.
nt of total ba
3000 ciliates)
503 rule, Ta
Lawn Soil.
). One Debris asonry shall
ve) as ed and es that gree C acteria able 3, Fiber
2.2 S
A. G
B. D
C. C
D. G
2.3 B
A. T tial and Propr
Applic.
OURCES FO
General: Sour guarantee is specification
Dry Screened
Simps.
Winter.
Or app.
Compost
St. Lou.
Fick S.
Oldcas.
Or app.
Geofibers
Stabili.
Fax: (6
Fiber S.
(225) 7
Or app.
BASE LOAM
The base loam distribution (
U.S. S
Fiber L Specific Tensile Tensile Young's Denier Estimat rietary Inform cation rate sha
OR PLANTIN
rces for plan made or im s.
Sand on Constructi r Brothers Ma proved equal uis Composti
Supply Compa stle Lawn & G proved equal izer Solutions
602) 225-590
Soils, P.O. B 772-7436, Fa proved equal m soil shall con (mechanical g
Sieve Size ength c Gravity Strength Elongation s Modulus ted Mixing Ra mation all conform to
NG SOIL COM
nting soil com mplied that th ion Materials aterials Comp ing, St. Louis any, Wildwoo
Garden Midw s, Inc., 33 S.
ox 80198, Ba ax: (225) 752-nsist of natur gradation) for
% Passing M
ASTM
ASTM
ASTM
ASTM
ate ----o the approve
MPONENTS
mponents ma he source list
, Fenton, MO pany, St. Loui
, MO (636) 8
od, MO (636) west, Sauget, I
28th Street, P aton Rouge, L -7975 ral or blended material pass
Minimum
M D 792 M D 2256 M 2256 M 2101
TING SOIL S
ed submittal.
S ay include th ted will be
O (636) 343-4 is, MO (314)
861-3344
) 532-4978
IL (618) 274
Phoenix, AZ
LA 70898, P
d soil conform sing the #4 si
% Passing
2” - 2
0.91 g 40,000 20% 600,00 3620 B 6 lb/cu
SYSTEM - BL
he providers able to meet
) 843-1400
4-1222
85034, Phon
Phone: (225) ming to the fo ieve :
g Maximum
½” gr./cm 0 psi
00 psi
BF
ubic yard of s
2 91 13-12
LENDING
listed below t the soil ma e: (800) 336-
757-9136, M ollowing grai soil
w. No aterial
-2468, Mobile:
in size
Confidential and Proprietary Information
JEFF 32 91 13-13
053014 PLANTING SOIL SYSTEM - BLENDING
18 90 100 35 85 95 60 65 85 140 55 65 270 40 55
0.002 mm 0 10
B. The chemical properties of the Base Loam shall conform to the following values:
Item Units Range Available Nitrogen (NH4/NO3) ppm 20 -150 Available phosphorus ppm 2 - 80 pH 6.5 – 7.8 Salinity dS.m-1 <6
C. Base loam soil shall not contain objects larger than 1/2” in any dimension, including clay clods, gravel, or other foreign matter.
2.4 PLANTING SOIL MIXES – REFERENCE CHART
A. Planting soils shall consist of base loam soil or dry screened sand blended with compost in the ratios presented in the following chart. Mix ratios are approximate and shall be adjusted as required to meet the specific requirements of the planting soil mixes.
Planting Soil Mix Base Material Second Component Ratio by Volume
Horticultural Sub Soil Base Loam Compost 9 to 1
Lawn Soil Base Loam Compost 3 to 1
Tree Soil Base Loam Compost 2 to 1
Bioswale Soil 1 Dry Screened Sand Compost 3 to 2
Bioswale Soil 2 Dry Screened Sand Compost 9 to 1
Structural Soil DS Sand (4) to Base
Loam (1) Compost 9 to 1
2.5 HORTICULTURAL SUBSOIL
A. Horticultural Subsoil shall consist of 9 parts Base Loam and 1 part compost by volume (9:1 Ratio). Horticultural subsoil shall be free of solids larger than 1/2 inch in any dimension and not consisting of such solids more than 2 percent by volume.
B. M
C. C
2.6 L
A. L
B. C
C. L
2.7 T
A. T
B. C
2.8 B
tial and Propr
Mechanical Gr soil compone
Chemical Prop
Organ.
pH: 6..
Total n.
Availa.
Total a.
LAWN SOIL (
Lawn Soil sha Lawn Soil sh conforming t
Chemical Pro
Organ.
pH: La.
Total n.
Availa.
Total a.
Lawn soils w approximatel blending pro
TREE SOIL (T
Tree Soil shall Soil shall b conforming t
Chemical Prop
Organ.
pH: Tr.
Total n.
Availa.
Total a.
BIOSWALE S
rietary Inform radation: The ents with a gr perties shall m ic Content: B
5 to 7.5.
nitrogen (all f able nitrogen available P co
(LS1)
all consist of hall be a unif to the approve operties shall ic Matter Con awn soil pH s nitrogen (all f able nitrogen available P co with slope rat ly 6 pounds p cess.
TS1).
l consist of 2 e a uniform to the approve perties shall m ic Matter Con ree soil pH sh nitrogen (all f able nitrogen available P co
SOIL 1 (BS1)
mation e Horticultura radation confo meet the follow
Between 0.5 a forms) betwee
(NH4 and NO ontent betwee
3 parts Base form, homog ed Base Loam meet the follo ntent: Betwee shall be betwe forms): betwe
(NH4 and NO ontent betwee tios of 3:1 ( per cubic yar parts Base Lo m, homogeniz ed Base Loam meet the follow ntent: Betwee hall be betwee forms) betwee
(NH4 and NO ontent betwee al subsoil shal orming to the wing:
and 2.0 percen en 50 to 200 m
O3) between en 5 to 50 mg/ e Loam and genized mixtu m.
owing:
en 3.5 and 6.0 een 6.5 and 7 een 1200 to 3
O3) content b en 20 to 40 m
(H:V) and st d of soil. Geo oam and 1 pa zed mixture m.
wing:
en 4.5 and 6.5 en 6.5 and 7.8 en 1200 to 40
O3) content b en 20 to 40 m
TING SOIL S
ll be a uniform approved Ba nt on a dry w mg/kg soil
10 to 80 mg/k
/kg.
1 part compo ure of the soi
0 percent on a
.8.
500 mg/kg so between 50 to mg/kg.
teeper shall ofibers shall art compost by of the soil
5 percent on a
8.
000 mg/kg soi between 50 to mg/kg.
SYSTEM - BL
m, homogeni ase Loam.
weight basis.
kg.
ost by volum il component a dry weight b oil
200 mg/kg contain geof be incorpora y volume (2:1 components a dry weight b il
150 mg/kg.
2 91 13-14
LENDING
ized mixture me (3:1 Ratio) ts with a grad basis fibers at a ra ated during th
1 Ratio). The with a grad basis.
of the
). The dation ate of he soil e Tree dation
A. B
B. C
2.9 B
A. B
B. C
2.10 S
A. St
B. St
C. C tial and Propr
Bioswale Soil by volume (3 compost com
Chemical Prop
Organ.
pH: Bi.
BIOSWALE S
Bioswale Soil volume (9:1 compost com
Chemical Prop
Organ.
pH:.Bi.
TRUCTURA
tructural Soil
Step O.
create
Step T.
volum tructural Soil conforming t
Chemical Prop
Organ.
pH: S.
U.S. Siev No.
0.002 mm rietary Inform
1 (BS1) shal 3:2 ratio). Th mponents with perties shall m ic Matter Con ioswale soil 1
SOIL 2 (BS2)
2 (BS2) shall ratio). The mponents with perties shall m ic Content: B ioswale soil 2
AL SOIL (SP4
blending sha
One shall con a Modified B
Two shall con me (9:1 ratio).
l shall be a un to the followin perties shall m ic Content: B tructural soil ve Size % m 0 mation ll consist of 3 he Bioswale S h grain size co meet the follow ntent: Betwe
1 pH shall be l consist of 9 Bioswale Soi h grain size co meet the follow
Between 1.0 a
2 pH shall be
4).
all be a two-st nsist of 4 part Base Loam.
nsist of 9 part niform, homo ng:
meet the follow
Between 0.5 an pH shall be b
% Passing Min
3 parts Dry Sc Soil shall be a onforming to wing:
en 6.5 and 10 between 6.5 t parts Dry Scr il shall be a onforming to wing:
and 2.0 percen between 6.5 a tep process.
ts Dry Screen ts Modified B ogenized mixt wing:
nd 1.5 percen between 6.5 a nimum
TING SOIL S
creened Sand a uniform, ho the approved
0.0 percent on to 7.5.
reened Sand b uniform, hom the approved nt on a dry w and 7.5 ned Sand blen
Base Loam b ture of the so nt on a dry we and 7.5.
% Passing
SYSTEM - BL
d blended wit omogenized m d Dry Screene n a dry weight blended with mogenized m d Dry Screene weight basis.
nded with 1 p lended with oil component eight basis.
g Maximum
2 91 13-15
LENDING
th 2 parts Com mixture of san ed Sand.
t basis.
1 part Compo mixture of san ed Sand.
part Base Lo
1 part Compo ts with a grad mpost nd and ost by nd and am to ost by dation
D. S
2.11 S
A. St
2.12 C
A. C
PART 3
3.1 C
A. C
3.2 S
A. M
B. St tial and Propr oil Chemistry results will b
TABILIZED
tabilized Hor by volume of
Lightw.
proces of dura a.
b.
c.
COMPOST TO
Compost topdr
EXECUTIO
COORDINAT
Coordinate wit planting soil
TORAGE AN
Material shoul when the mo consulted to
The So.
Soil In
Soil M.
tockpiles: Sto the contents perforated ae
Height.
Aerati.
a.
rietary Inform y: All tests d e utilized to e
HORTICUL
rticultural Sub f Stalite Light weight Aggre ss and meetin ability and be
Soundness with AASH
Abrasion R
Chloride C
OPDRESSIN
ressing shall c
ON
TION
th the Govern mixes to the
ND HANDLI
ld not be han oisture conte determine if t oil Blending nstallation Co
Material that is ockpile each of each pile, eration pipe w t of pile: Soil on Pipe: Prov
Layout: La from the fa mation defined in Pa evaluate amen
LTURAL SUB
bsoil shall co tweight Aggr gate shall be g the requirem e non-corrosiv
Loss: Max 3
HTO T 104
Resistance: Ma ontent: Max.
NG
conform to Pl nment’s Soil I Project Site.
ING.
ndled or haule ent is less tha the soil is too
Contractor sh ontractor if the s handled wet
Soil Materia , for example within the soil stockpiles sh vide 4” diame ay aeration p ace of the sto art I as Chem ndments to th
BSOIL
onsist of appro regate.
a ¾” Stalite ments of AST ve, with the fo
30% with 4 c ax 40% in acc
100 ppm in a lanting Soil C
Installation C ed, when it is an at field c o wet to handl hall not deliv e mixes are w t shall be disc al separately a e; “Sand” or stockpiles.
hall not excee eter Schedule ipe horizonta ockpile by a m
TING SOIL S
mical Properti he planting so oved Horticu e Expanded S TM C 330. St following prop cycles of Ma cordance with accordance w
Components:
Contractors for s wet or froze capacity. The le.
ver planting s wet or frozen.
carded.
and provide “Base Loam ed 12’ in heigh
40, smooth, r ally in the so minimum of
SYSTEM - BL
ies shall be p oil mixes that ultural Subsoi
Slate produce talite shall ha perties:
agnesium sulf h ASTM C13 with AASHTO
Compost.
r quantities an
en. Soil shoul e GRG Repre soil mixes to large, clear s m” or “Tree S ht.
rigid, perfora oil stockpile.
18”. Provide
2 91 13-16
LENDING
performed an may be requi il blended wit by the rotary ave a proven r fate, in accor
31.
O T 291.
nd date requir ld be handled esentative sha the Governm signage identi Soil TS1”. Pr ated HDPE pip
Pipe shall e e 3 layers of p nd the ired th 1/3 y kiln record rdance red of d only all be ment’s ifying rovide pe.
extend pipes:
3.3 P
A. A
B. A
C. H
D. C
E. N
3.4 E
A. A tial and Propr b.
Protec.
a.
b.
c.
d.
In no .
irrever soil m have b before
LANTING S
All mixing sha
All planting so Trommel scr planting soil
Hammer mills reduce soil st
Compost shall
No amendmen have been co
EXCESS MAT
After all work responsible f Blending Con rietary Inform one at grou 15’ on cen pipes. Slop
The require does not ex ction:
Construct s minimum o
Cover stora erosion.
Protect stoc
Prohibit veh
1) On
PSI
case shall th rsible and ren management w become anaer e aerating stoc
OIL BLEND
all be accomp oil mixes and reen (rotating mix.
s or blending tructural stabi be maintaine nts shall be ad onducted to ve
TERIALS
k for the Proj for legal disp ntractors faci mation und level, one nter for each e pipes at 1.0 ement for Ae xceed 6’.
storage piles t of 3%.
age piles if r ckpiles from c hicles and pe nly low groun I shall be belo he stockpiled nders the soil while it is in s robic, notify t ckpiles.
DING
plished when t d base loam m g drum screen knives are no ility.
ed dry to mois dded unless a erify type and ect is comple posal of all u lity.
END
e at 4 feet he layer. Stagg
0%.
eration pipe w to allow free d required to p contamination destrian traffi nd pressure ve ow 4.
d soil be allo unusable for stockpiles. If the GRG Rep the soil moist must be blen
n) only, with ot permitted st, not wet, du approved by t d quantity of a eted and acce unused soil co
OF SECTION
TING SOIL S
eight and one ger each laye will be waive drainage of su prevent windb n of any sort.
fic on or aroun ehicles are pe owed to go planting. Th the Contracto presentative a ture content is nded to a unif h 1/2” screen in preparatio uring mixing.
the GRG Rep amendments epted, the So omponents an
N
SYSTEM - BL
e at 8 feet hei er by 1/3 the ed if the heig urface water.
blown dust a nd stockpiled ermitted to d anaerobic as he Contractor or suspects th and wait for f s less than 20 form, homog n openings to n of the soil presentative a acceptable.
il Blending C nd mixes tha
2 91 13-17
LENDING
ight. Provide e distance bet ght of the stoc
Slope top of and protect ag d soil material drive on stock s this conditi shall keep lo hat stockpiled further instruc
0% by weight enous mix us o produce the as these proc and additiona
Contractor sh at are stored pipes tween ckpile f pile a gainst ls.
kpiles.
ion is gs for d soils ctions sing a e final cesses l tests hall be at the
| 2014 05 30_FINAL_Soil_Blending_RFP |
| 321913_PLANTING SOIL BLENDING_CAR2015_BID |
| 013100 Project Management and Coordination- Reference |
| 013323 Submittal Procedures- Reference |
| 2014 05 30 FINAL GRG Forms Soil Blending RFP |
| INVITATION TO BID (CityArchRiver) |
| FORM GRG 1- BID FORM (CityArchRiver) |
| FORM GRG 2- SUBCONTRACTORS (CityArchRiver) |
| FORM GRG 3 - QUALIFICATION FORM (CityArchRiver) |
| FORM GRG 4 - PURCHASE CONTRACT (CityArchRiver) |
| FORM GRG 5 - MATERIALS (CityArchRiver) |
| FORM GRG 6 - DELIVERY (CityArchRiver) |
| FORM GRG 7 - CONTRACT PRICE AND PAYMENTS (CityArchRiver) |
| FORM GRG 8 - INDEX TO GENERAL CONDITIONS (CityArchRiver) |
| FORM GRG 8 - GENERAL CONDITIONS (CityArchRiver) |
| FORM GRG 9 - LIQUIDATED DAMAGES |
File details come from the government source that posted it. Updated .