Addendum No. 1 Revised Supplemental Design Recommendations

View the file

Other files for this federal contract opportunity

Other files attached to South Park Grounds, newest first.
File Type Posted
1Revised_015000_Temporary_Facilities_and_Controls_-_revised_7-3-14_(3).pdf PDF
4C2_Sheet_1A.pdf PDF
3Revised_pages_321313_CONCRETE_PAVEMENT.pdf PDF
2Revised_265600__Exterior_Lighting.pdf PDF
5C2_Sheet_3A.pdf PDF
9C2_Sheet_64A.pdf PDF
7C2_Sheet_56A.pdf PDF
10C2_Sheet_65A.pdf PDF
12Q_and_As _6-30-2014.pdf PDF
8C2_Sheet_58A.pdf PDF
Amend__6_Package.pdf PDF
6C2_Sheet_55A.pdf PDF
321400_SITESTONEWORK_CAR2015_2_BID_revised_2014_06_23.pdf PDF
JEFF-6-SubContractingPlanForm.1doc.pdf PDF
329300_PLANTINGFINEGRADING_CAR2015_2_BID_revised_2014_06_24.pdf PDF
329200_LAWN_CAR2015_2_BID_revised_2014_06_23.pdf PDF
329119_PLANTING_SOIL_SYSTEM_INSTALLATION_CAR_2015_2_BID_revised_2014_06_23.pdf PDF
RFP_Clauses _Updated.pdf PDF
Q_and_A's_as_of_06-26-14.pdf PDF
328400_Irrigation_Specs_100__Bid_amended_6-25-14.pdf PDF
Subcontract_Calcs1.xlsx XLSX spreadsheet
Pre-Proposal_Conf _Presentation_Slides.pdf PDF
Q_and_As _6-17-2014.pdf PDF
Site_Visit _Pre-Proposal _Attendance.pdf PDF
Amend__3 _Package.pdf PDF
Amendment_4_pkg.pdf PDF
Subsurface_Exploration.pdf PDF
Subsurface_Exploration_Addendum_1.pdf PDF
AirKnife_Exploration.pdf PDF
Engineering_Analysis_of_Modified_DS-50_Barrier.pdf PDF
Utility_Locating_Services.pdf PDF
Subsurface_Exploration_Addendum_2.pdf PDF
Subsurface_Exploration_Addendum_2.pdf PDF
2011_0216_CAR_Geotech_Desk_Study_FINAL.pdf PDF
Subsurface_Exploration_Addendum_3.pdf PDF
Supplemental_Utility_Locating_Services.pdf PDF
2011_0211__CAR_Phase_1_ESA_R1.pdf PDF
Amend_2_Pkg.pdf PDF
JEFF_Draw_1_(1-75).pdf PDF
RFP _Proposal_Submission_Pkg.pdf PDF
Existing_Bollards_-_AS_BUILT.pdf PDF
JEFF_Electrical_as-builts_Site_Lighting.pdf PDF
JEFF_1-SF1442.pdf PDF
JEFF_Draw_4_(201-283).pdf PDF
JEFF_CAR2015_Archeological_monitoring_plan_FINAL.pdf PDF
32_91_13__Soil_Blending_Spec.pdf PDF
JEFF_Draw_3_(126-200).pdf PDF
GD__MO140001_05-09-2014__MO1.docx DOCX document
JEFF_Draw_2_(76-125).pdf PDF
2014.04.17_CAR_TTC_accessible_zones_during_construction_memo.pdf PDF
Show all 50

South Park Grounds has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

February 3, 2014 J017065.11 Revised Ms. Janis Cooper CAR 2015 Foundation One Memorial Drive Gateway Tower, Suite 700 St. Louis, Missouri 63102

ADDENDUM NO. 1 REVISED

SUPPLEMENTAL DESIGN RECOMMENDATIONS

CITY ARCH RIVER 2015

JEFFERSON NATIONAL EXPANSION MEMORIAL

ST. LOUIS, MISSOURI

Dear Ms. Cooper:

Presented herein are supplemental design recommendations for the referenced project.

Design recommendations are provided for remediation of existing fill below proposed retaining walls and other structures based on structural drawings provided by David Mason & Associates.

This report is prepared as an addendum to our April 26, 2013, subsurface exploration report1 for the proposed City Arch River 2015 project. Only items specifically mentioned are modified from the original report; conclusions, recommendations, and limitations contained in the report remain unchanged and apply to this addendum.

PROJECT DATA

Geotechnology reviewed Structural Drawings for retaining walls shown on Sheets S100 through S111. The drawings include details for remediation of existing fill below foundations for strip and spread footings (S101), cheek walls (S102), security walls and bollards (S103 through S106), concrete benches (S107 through S109), plaza fountain and drainage basin (S110), and light poles (S111).

SUPPLEMENTAL DESIGN CONSIDERATIONS AND RECOMMENDATIONS

SITE GRADING

Site Preparation. Cut areas and areas to receive fill and backfill should be stripped of topsoil, soft soil, rubble fill, and other deleterious materials. Topsoil can be stockpiled for later use during landscaping or removed from the site. Existing fill materials should be entirely removed and replaced from within and to a 5-foot horizontal distance beyond (outside of) the

1 Subsurface Exploration, City Arch River 2015, Jefferson National Expansion Memorial, St. Louis, Missouri;

prepared for City Arch River 2015 Foundation, by Geotechnology, Inc.; Report No. J017065.09 dated April 26, 2013.

CAR 2015 Foundation J017065.11 February 3, 2014 Addendum No.1 Revised footprint of the proposed museum expansion and any other buildings. Existing fill should also be removed and replaced to a depth of 2 feet below pavement subgrades. The overexcavations can be backfilled with compacted, well-graded, crushed rock.

We understand that sections of the east slope will be remediated using geogrid reinforcement and compacted soil. Pavements and lightly loaded structures in these areas do not require additional remediation.

SHALLOW FOUNDATIONS

Structures that can be supported on shallow foundations include security walls, concrete benches, the plaza fountain and drainage basin, and light poles. The extent of remediation performed can be determined based on the net applied load and susceptibility of the structure to settlement.

However, the risk of detrimental settlement must be accepted by the owner as balance for reduced construction costs.

General Bearing Pressure. Strip and spread footings can be proportioned for net allowable bearing pressures of 1,500 and 2,000 psf, respectively, provided they bear on firm, natural soil or remediated fill. Fill remediation shall consist of removal and replacement with compacted, well-graded crushed rock to a depth of 2 times the footing width below the design bearing elevation.

The remediation should extend one footing width and at least 2 feet minimum beyond the footing area on each side. The minimum lateral dimensions for strip and spread footings should be 18 and 24 inches, respectively. Exterior footings and footings in unheated interior areas should be embedded 30 inches below the lowest adjacent exterior grade to provide protection from seasonal moisture variations and frost penetration.

Lightly Loaded Structures. For lightly loaded items where settlements in excess of 1-inch can be tolerated, Geotechnology recommends remediating existing fill to a minimum depth of 2 feet below the footing bearing level and replacing with compacted, well-graded crushed rock. The lateral extent of fill remediation should be at least 1 foot beyond the foundation perimeter.

Geotechnology should observe the exposed subgrade soils in the overexcavations, to confirm that loose or open rubble fill is not present. If the excavations are large enough, the subgrade should be proof-rolled prior to placing backfill materials. The overexcavations should be backfilled with compacted, well-graded, crushed rock as recommended in our original report.

We understand that sections of the east slope will be remediated using geogrid reinforcement and compacted soil. Lightly loaded structures in these areas do not require additional remediation.

Bollard Walls. Geotechnology reviewed the design requirements for the bollard walls, including structural modeling of impacts and limitations on settlement. We understand that collision forces are resisted by passive pressure from the soil behind the walls and not from the bearing soil below the walls. We also understand that the bollard walls are entirely below-grade