This is a pricing schedule template attachment for solicitation N6247325R3443, requiring contractors to submit firm-fixed-price bids for communication tower work at Marine Corps Air Ground Combat Center Twentynine Palms. The schedule includes 11 base items and 2 option items covering design and construction work across multiple sites.

The base items include design of four 140-foot communication towers, repair/analysis of seven existing towers, and foundation work for Government Furnished Equipment at ten tower sites. Specific locations include Bearmat Hill, OP Argos, OP American Mine, OP Bullion, OP Crampton, OP Creole, OP Galway, OP Mesa, OP Mine, and OP Noble. Most sites require helicopter transportation and include both primary facilities work (tower construction/repair) and supporting facilities work (site improvements, demolition, disposal). Option items cover additional work at Bearmat Hill (200-foot tower) and OP Round. Contractors must complete all pricing cells and acknowledge amendments, with proposals valid for 90 days.

View the file

Other files

File Type Posted
Amendment - 0016 P1241_Close Discussions.pdf PDF
Amendment - 0015 P1241.pdf PDF
Amendment - 0014 P1241_Open Discussions.pdf PDF
Amendment - 0013 P1241.pdf PDF
Amendment - 0012 P1241.pdf PDF
Amendment - 0011 P1241.pdf PDF
Phase 2_ATT 4_Offer Schedule_P1241_REV 1.xlsx XLSX spreadsheet
Amendment - 0010 P1241.pdf PDF
Amendment - 0009 P1241.pdf PDF
Phase 2_ATT 3_Site Visit RSVP List_P1241.xlsx XLSX spreadsheet
Phase 2_ATT 6_CA20250026_06-06-2025.pdf PDF
Phase 2_ATT 1_RFP Part 1_P1241.pdf PDF
Phase 2_Exhibit F_P1241.docx DOCX document
Phase 2_Exhibit G_P1241.docx DOCX document
Phase 2_ATT 5_RFI Form_P1241.xlsx XLSX spreadsheet
Phase 2_ATT 4_Offer Schedule_P1241.xlsx XLSX spreadsheet
Amendment - 0008 P1241.pdf PDF
Phase 2_ATT 2_Site Visit Map_P1241.pdf PDF
PLA Request for Information N6247325R3443.docx DOCX document
Amendment - 0007 P1241.pdf PDF
RFI Responses - 04-10-2025.xlsx XLSX spreadsheet
RFI Responses - 04-04-2025.xlsx XLSX spreadsheet
Amendment0006.pdf PDF
RFI Responses - 03-27-2025.xlsx XLSX spreadsheet
Amendment0005.pdf PDF
Amendment0004.pdf PDF
Amendment0003.pdf PDF
RFI Responses - 03-24-2025.xlsx XLSX spreadsheet
RR Matrix_Rev1.pdf PDF
Amendment-0002 P1241.pdf PDF
RFI Responses - 03-14-2025.xlsx XLSX spreadsheet
CA20250026_02-28-2025.pdf PDF
EXHIBIT A_P1241.pdf PDF
EXHIBIT B_P1241.pdf PDF
Surety Form_P1241.pdf PDF
Instructions for Viewing Interested Vendors List.pdf PDF
EXHIBIT G_P1241.pdf PDF
Offerors Team Consent Form_P1241.pdf PDF
Amendment0001-P1241.pdf PDF
EXHIBIT E_P1241.pdf PDF
EXHIBIT C_P1241.pdf PDF
EXHIBIT D_P1241.pdf PDF
EXHIBIT F_P1241.pdf PDF
Financial Questionnaire_P1241.pdf PDF
N6247325R3443_P1241 Phase One Solicitation.pdf PDF
P1241 RFP ATT 1_Approval of Proposed Installation Schedule.pdf PDF
P1241 RFP ATT 2_Installation IMS Expanded.pdf PDF
P1241 RFP ATT 6_DBA WD CA20250026_2025 02 21.pdf PDF
P1241 RFP ATT 3_RR Matrix.pdf PDF
P1241 RFP ATT 5_RFI Form.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Solicitation N6247325R3443 P1241 Communication Towers - Twentynine Palms MCAGCC

OFFEROR:Contractor's Name Here
DATE:Date Here

The offeror shall enter prices and rates in the yellow highlighted cells. Price entries shall be limited to 2 decimal places.

BASE BID ITEMS
Base Item 0001Base Item 0001 (Design of All Sites): Firm-Fixed-Price (FFP) (lump sum) includes all bonds, design, materials, labor, and equipment for Design of All Sites.$ - 0
PRIMARY FACILITIES
Design of four (4) 140-Foot High Communciation Towers and Foundations
Inspection, Analysis and Design for Repair of seven (7) Existing Communication Towers
Design of foundations for GFE and Waveguide Bridges at ten (10) tower sites
SUPPORTING FACILITIES
Design for site improvements at ten (10) tower sites
Base Item 0002Base Item 0002 (Bearmat Hill 140-Foot Tower): FFP (lump sum) includes all bonds, materials, labor, and equipment for Bearmat Hill 140’ Tower.
PRIMARY FACILITIES
Repair of 140-Foot High Communciation Tower and Foundation
SUPPORTING FACILITIES
Site Work
Demolition, Removal, Transport & Disposal, including Waste
Base Item 0003Base Item 0003 (OP Argos): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Argos.$ - 0
PRIMARY FACILITIES
Repair of Existing 82 Foot 6 Inch Communication Tower and Foundation
Construction of Foundations for GFE and Waveguide Bridges
SUPPORTING FACILITIES
Site Work
Helicopter Transportation
Demolition, Removal, Transport & Disposal, including Waste
Base Item 0004Base Item 0004 (OP American Mine): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP American Mine.$ - 0
PRIMARY FACILITIES
Construction of 140-Foot High Communciation Tower and Foundation
Construction of Foundations for GFE and Waveguide Bridges
SUPPORTING FACILITIES
Site Work
Helicopter Transportion
Demolition, Removal, Transport & Disposal, including Waste
Base Item 0005Base Item 0005 (OP Bullion): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Bullion.$ - 0
PRIMARY FACILITIES
Repair of Existing 82 Foot 6 Inch Communication Tower and Foundation
Construction of Foundations for GFE and Waveguide Bridges
SUPPORTING FACILITIES
Site Work
Helicopter Transportion
Demolition, Removal, Transport & Disposal, including Waste
Base Item 0006Base Item 0006 (OP Crampton): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Crampton.$ - 0
PRIMARY FACILITIES
Repair of Existing 82 Foot 6 Inch Communication Tower and Foundation
Construction of Foundations for GFE and Waveguide Bridges
SUPPORTING FACILITIES
Site Work
Helicopter Transportion
Demolition, Removal, Transport & Disposal, including Waste
Base Item 0007Base Item 0007 (OP Creole): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Creole.$ - 0
PRIMARY FACILITIES
Repair of Existing 82 Foot 6 Inch Communication Tower and Foundation
Construction of Foundations for GFE and Waveguide Bridges
SUPPORTING FACILITIES
Site Work
Helicopter Transportion
Demolition, Removal, Transport & Disposal, including Waste
Base Item 0008Base Item 0008 (OP Galway): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Galway.$ - 0
PRIMARY FACILITIES
Construction of 140-Foot High Communciation Tower and Foundation
Construction of Foundations for GFE and Waveguide Bridges
SUPPORTING FACILITIES
Site Work
Helicopter Transportion
Demolition, Removal, Transport & Disposal, including Waste
Base Item 0009Base Item 0009 (OP Mesa): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Mesa.$ - 0
PRIMARY FACILITIES
Construction of 140-Foot High Communciation Tower & Foundations
Construction of Foundations for GFE and Waveguide Bridges
SUPPORTING FACILITIES
Site Work
Helicopter Transportation
Demolition, Removal, Transport & Disposal, including Waste
Base Item 0010Base Item 0010 (OP Mine): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Mine.$ - 0
PRIMARY FACILITIES
Construction of 140-Foot High Communciation Tower and Foundation
Construction of Foundations for GFE and Waveguide Bridges
SUPPORTING FACILITIES
Site Work
Helicopter Transportion
Demolition, Removal, Transport & Disposal, including Waste
Base Item 0011Base Item 0011 (OP Noble): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Noble.$ - 0
PRIMARY FACILITIES
Repair of Existing 82 Foot 6 Inch Communication Tower and Foundation
Construction of Foundations for GFE and Waveguide Bridges
SUPPORTING FACILITIES
Site Work
Helicopter Transportion
Demolition, Removal, Transport & Disposal, including Waste

TOTAL BASE ITEMS (0001-0011) $ - 0

OPTION ITEMS
Option Item 0001Option Item 0001 (Bearmat Hill 200-Foot Tower): FFP (lump sum) includes all incidental related work to support the design and construction including permits, taxes, bond cost, overhead and profit, complete and in accordance with the RFP and all Amendments, but not including work indicated or specified to be provided under any other Base Bid Items.
PRIMARY FACILITIES
Repair of 200-Foot High Communciation Tower and Foundation
SUPPORTING FACILITIES
Site Work
Demolition, Removal, Transport & Disposal, including Waste
Option Item 0002Option Item 0002 (OP Round): FFP (lump sum) includes all incidental related work to support the design and construction including permits, taxes, bond cost, overhead and profit, complete and in accordance with the RFP and all Amendments, but not including work indicated or specified to be provided under any other Base Bid Items.
PRIMARY FACILITIES
SUPPORTING FACILITIES
Site Work
Demolition, Removal, Transport & Disposal, including Waste

TOTAL OPTION ITEMS (0001-0002) $ - 0

TOTAL EVALUATED PRICE (Total of Base Items [F115] + Total of Option Items [F122])$ - 0
EVALUATION OF PRICE
In accordance with the Price Factor, the Total Evaluated Price will be in accordance with FAR 52.217-5 Evaluation of Options, which includes the total of Base Items 0001-0011 and Option Items 0001-0002.

The Government reserves the right to verify the calculations in this spreadsheet. In the event that an error in the Contractor's calculations are found, the Government will use the actual amounts entered in for the Base Items and Option Items as the intended price. The Government will use these proposed amounts to determine the Total Evaluated Price.

All applicable cells must be completed. Failure to propose on all items shall result in proposal being rejected as nonresponsive. Failure to acknowledge all amendments may result in proposal being rejected as nonresponsive.

SUBMITTED PROPOSALS SHALL BE VALID FOR 90 DAYS FROM THE DATE OF RECEIPT.

THIS OFFEROR ACKNOWLEDGES RECEIPTS OF AMENDMENTS TO THE SOLICITATION:

AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________

OFFEROR NAME: DUNS:

STREET ADDRESS: EIN (TAX ID):

CITY, STATE, ZIP CODE:

EMAIL ADDRESS: PHONE:

SIGNATURE OF PERSON AUTHORIZED TO SIGN OFFER:

SIGNATURE:

PRINTED NAME:DATE:
**************************************************************************************************************
SURETY COMPANY:PHONE:
SURETY POC/BONDING AGENT:
EMAIL ADDRESS:

File details come from the government source that posted it. Updated .