This is a pricing schedule template attachment for solicitation N6247325R3443, requiring contractors to submit firm-fixed-price bids for communication tower work at Marine Corps Air Ground Combat Center Twentynine Palms. The schedule includes 11 base items and 2 option items covering design and construction work across multiple sites.
The base items include design of four 140-foot communication towers, repair/analysis of seven existing towers, and foundation work for Government Furnished Equipment at ten tower sites. Specific locations include Bearmat Hill, OP Argos, OP American Mine, OP Bullion, OP Crampton, OP Creole, OP Galway, OP Mesa, OP Mine, and OP Noble. Most sites require helicopter transportation and include both primary facilities work (tower construction/repair) and supporting facilities work (site improvements, demolition, disposal). Option items cover additional work at Bearmat Hill (200-foot tower) and OP Round. Contractors must complete all pricing cells and acknowledge amendments, with proposals valid for 90 days.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Solicitation N6247325R3443 P1241 Communication Towers - Twentynine Palms MCAGCC
| OFFEROR: | Contractor's Name Here |
| DATE: | Date Here |
The offeror shall enter prices and rates in the yellow highlighted cells. Price entries shall be limited to 2 decimal places.
| BASE BID ITEMS | ||
| Base Item 0001 | Base Item 0001 (Design of All Sites): Firm-Fixed-Price (FFP) (lump sum) includes all bonds, design, materials, labor, and equipment for Design of All Sites. | $ - 0 |
| PRIMARY FACILITIES | ||
| Design of four (4) 140-Foot High Communciation Towers and Foundations | ||
| Inspection, Analysis and Design for Repair of seven (7) Existing Communication Towers | ||
| Design of foundations for GFE and Waveguide Bridges at ten (10) tower sites | ||
| SUPPORTING FACILITIES | ||
| Design for site improvements at ten (10) tower sites |
| Base Item 0002 | Base Item 0002 (Bearmat Hill 140-Foot Tower): FFP (lump sum) includes all bonds, materials, labor, and equipment for Bearmat Hill 140’ Tower. |
| PRIMARY FACILITIES | |
| Repair of 140-Foot High Communciation Tower and Foundation | |
| SUPPORTING FACILITIES | |
| Site Work | |
| Demolition, Removal, Transport & Disposal, including Waste |
| Base Item 0003 | Base Item 0003 (OP Argos): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Argos. | $ - 0 |
| PRIMARY FACILITIES | ||
| Repair of Existing 82 Foot 6 Inch Communication Tower and Foundation | ||
| Construction of Foundations for GFE and Waveguide Bridges | ||
| SUPPORTING FACILITIES | ||
| Site Work | ||
| Helicopter Transportation | ||
| Demolition, Removal, Transport & Disposal, including Waste |
| Base Item 0004 | Base Item 0004 (OP American Mine): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP American Mine. | $ - 0 |
| PRIMARY FACILITIES | ||
| Construction of 140-Foot High Communciation Tower and Foundation | ||
| Construction of Foundations for GFE and Waveguide Bridges | ||
| SUPPORTING FACILITIES | ||
| Site Work | ||
| Helicopter Transportion | ||
| Demolition, Removal, Transport & Disposal, including Waste |
| Base Item 0005 | Base Item 0005 (OP Bullion): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Bullion. | $ - 0 |
| PRIMARY FACILITIES | ||
| Repair of Existing 82 Foot 6 Inch Communication Tower and Foundation | ||
| Construction of Foundations for GFE and Waveguide Bridges | ||
| SUPPORTING FACILITIES | ||
| Site Work | ||
| Helicopter Transportion | ||
| Demolition, Removal, Transport & Disposal, including Waste |
| Base Item 0006 | Base Item 0006 (OP Crampton): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Crampton. | $ - 0 |
| PRIMARY FACILITIES | ||
| Repair of Existing 82 Foot 6 Inch Communication Tower and Foundation | ||
| Construction of Foundations for GFE and Waveguide Bridges | ||
| SUPPORTING FACILITIES | ||
| Site Work | ||
| Helicopter Transportion | ||
| Demolition, Removal, Transport & Disposal, including Waste |
| Base Item 0007 | Base Item 0007 (OP Creole): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Creole. | $ - 0 |
| PRIMARY FACILITIES | ||
| Repair of Existing 82 Foot 6 Inch Communication Tower and Foundation | ||
| Construction of Foundations for GFE and Waveguide Bridges | ||
| SUPPORTING FACILITIES | ||
| Site Work | ||
| Helicopter Transportion | ||
| Demolition, Removal, Transport & Disposal, including Waste |
| Base Item 0008 | Base Item 0008 (OP Galway): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Galway. | $ - 0 |
| PRIMARY FACILITIES | ||
| Construction of 140-Foot High Communciation Tower and Foundation | ||
| Construction of Foundations for GFE and Waveguide Bridges | ||
| SUPPORTING FACILITIES | ||
| Site Work | ||
| Helicopter Transportion | ||
| Demolition, Removal, Transport & Disposal, including Waste |
| Base Item 0009 | Base Item 0009 (OP Mesa): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Mesa. | $ - 0 |
| PRIMARY FACILITIES | ||
| Construction of 140-Foot High Communciation Tower & Foundations | ||
| Construction of Foundations for GFE and Waveguide Bridges | ||
| SUPPORTING FACILITIES | ||
| Site Work | ||
| Helicopter Transportation | ||
| Demolition, Removal, Transport & Disposal, including Waste |
| Base Item 0010 | Base Item 0010 (OP Mine): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Mine. | $ - 0 |
| PRIMARY FACILITIES | ||
| Construction of 140-Foot High Communciation Tower and Foundation | ||
| Construction of Foundations for GFE and Waveguide Bridges | ||
| SUPPORTING FACILITIES | ||
| Site Work | ||
| Helicopter Transportion | ||
| Demolition, Removal, Transport & Disposal, including Waste |
| Base Item 0011 | Base Item 0011 (OP Noble): FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Noble. | $ - 0 |
| PRIMARY FACILITIES | ||
| Repair of Existing 82 Foot 6 Inch Communication Tower and Foundation | ||
| Construction of Foundations for GFE and Waveguide Bridges | ||
| SUPPORTING FACILITIES | ||
| Site Work | ||
| Helicopter Transportion | ||
| Demolition, Removal, Transport & Disposal, including Waste |
TOTAL BASE ITEMS (0001-0011) $ - 0
| OPTION ITEMS | |
| Option Item 0001 | Option Item 0001 (Bearmat Hill 200-Foot Tower): FFP (lump sum) includes all incidental related work to support the design and construction including permits, taxes, bond cost, overhead and profit, complete and in accordance with the RFP and all Amendments, but not including work indicated or specified to be provided under any other Base Bid Items. |
| PRIMARY FACILITIES | |
| Repair of 200-Foot High Communciation Tower and Foundation | |
| SUPPORTING FACILITIES | |
| Site Work | |
| Demolition, Removal, Transport & Disposal, including Waste |
| Option Item 0002 | Option Item 0002 (OP Round): FFP (lump sum) includes all incidental related work to support the design and construction including permits, taxes, bond cost, overhead and profit, complete and in accordance with the RFP and all Amendments, but not including work indicated or specified to be provided under any other Base Bid Items. |
| PRIMARY FACILITIES |
| SUPPORTING FACILITIES |
| Site Work |
| Demolition, Removal, Transport & Disposal, including Waste |
TOTAL OPTION ITEMS (0001-0002) $ - 0
| TOTAL EVALUATED PRICE (Total of Base Items [F115] + Total of Option Items [F122]) | $ - 0 |
| EVALUATION OF PRICE | |
| In accordance with the Price Factor, the Total Evaluated Price will be in accordance with FAR 52.217-5 Evaluation of Options, which includes the total of Base Items 0001-0011 and Option Items 0001-0002. |
The Government reserves the right to verify the calculations in this spreadsheet. In the event that an error in the Contractor's calculations are found, the Government will use the actual amounts entered in for the Base Items and Option Items as the intended price. The Government will use these proposed amounts to determine the Total Evaluated Price.
All applicable cells must be completed. Failure to propose on all items shall result in proposal being rejected as nonresponsive. Failure to acknowledge all amendments may result in proposal being rejected as nonresponsive.
SUBMITTED PROPOSALS SHALL BE VALID FOR 90 DAYS FROM THE DATE OF RECEIPT.
THIS OFFEROR ACKNOWLEDGES RECEIPTS OF AMENDMENTS TO THE SOLICITATION:
AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________ AMD NO._______ DATE_____________
OFFEROR NAME: DUNS:
STREET ADDRESS: EIN (TAX ID):
CITY, STATE, ZIP CODE:
EMAIL ADDRESS: PHONE:
SIGNATURE OF PERSON AUTHORIZED TO SIGN OFFER:
SIGNATURE:
| PRINTED NAME: | DATE: |
| ************************************************************************************************************** | |
| SURETY COMPANY: | PHONE: |
| SURETY POC/BONDING AGENT: | |
| EMAIL ADDRESS: |