This document is a Roles & Responsibility (R&R) Matrix for the P1241 Communication Towers project at Marine Corps Base Twentynine Palms, California. The matrix details the responsibilities of Naval Facilities Engineering Command (NAVFAC) and Naval Sea Systems Command (NAVSEA) throughout the project lifecycle, including design, construction, testing, and closeout phases for multiple operating positions (OP) such as Mesa, Mine, Galway, Argos, Creole, Crampton, America Mine, Noble, and Boullion.
The project involves constructing and modernizing communication towers across various sites, with most locations only accessible by helicopter and lacking basic utilities. NAVFAC is primarily responsible for real property and construction activities, including foundation preparation, tower erection, and site grounding. NAVSEA will handle personal property, collateral equipment installation, solar panel setup, interior equipment placement, antenna and RF cabling, and comprehensive system testing. The work includes demolishing existing infrastructure, preparing foundations, erecting 140' towers, installing communication equipment, and conducting detailed testing across multiple communication systems including Land Mobile Radio (LMR), Land Air Radio Communication Systems (LARCS), and microwave systems.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P1241 Communication Towers Work Order Number 1737351 Marine Corps Base Twentynine Palms, CA
PART 3 - CHAPTER 1 - Page 1
PROJECT ROLES & RESPONSIBILITY (R&R) MATRIX
DM file: P1241 R&R Matrix Rev 1 (v0.1 20241212 ldm + wrw)_DM-faf 20250312
The following are P1241 project matrix delineating between real and personal properties roles and responsibilities. NAVFAC (FECSW) is the lead for P1241 MILCON real property. NAVSEA (NSWC) is the lead for P1241 personal property (collateral equipment) and SoS POR seamless integration and operational transparency.
This R&R Matrix is to be used with the IMS/ IMP/ WBS task items (v0.3 20241115 wrw).
LEGEND:
NAVFAC (FECSW Facilities Engineering Command Southwest) NAVSEA (NSWC - Naval Sea Warfare Center) Contract (NAVFAC MILCON Contract) KTR-N (NAVSEA Contractor) FEAD (Facilities Engineering and Acquisition Division) POR (Program Of Record) KTR-M (NAVFAC MILCON Contractor); RANGE/ENV (Range Environmental) PM (Project Manager) 29P (MCAGCC Twentynine Palms) DM (Design Manager) G3/G4/G6 (MAGTFTC Groups) CM (Construction Manager) IMS (Integrated Master Schedule) RFSC (Request For Solicitation Checklist) IMP(Integrated Master Plan) RTM (Requirements Traceability Matrix) WBS (Work Breakdown Schedule) SRD (Systems Requirements Document) LARCS (Land Air Radio Communication Systems) DBB (Design-Bid-Build documents by NAVSEA) LMR (Land Mobile Radio)
RESPONSIBILITY
WBS# Task/ Work Items LEAD ASSIST RESOURCE NOTES/ REMARKS
DESIGN
TBD Contract Award. Contract Turnover NAVFAC/
KTR-M
NAVSEA Contract
(SF 1442)
Post Award Design Services (PADS). NAVSEA to meet ANVFAC KTR-M design/ construction team (org. chart)
TBD Post Award Kick-Off (PAK) Meeting KTR-M/
NAVFAC
NAVSEA NAVFAC RFP
NAVSEA DBB
Design Charrette, KTR OP site conceptual design presentation. IMS/ IMP Construction Strategy
TBD Conceptual Design Submittal/ Review/ OTS meeting KTR-M/
NAVFAC
NAVSEA NAVFAC RFP
NAVSEA DBB
NAVSEA DBB Plan & Spec. IMS/ IMP/ WBS and R&R
TBD Design Developmental (DD) Submittal/ Review/ OTS meeting
KTR-M/
NAVFAC
NAVSEA NAVFAC RFP
NAVSEA DBB
IMS/ IMP/ WBS and R&R
TBD Pre-Final (PF) 100% Design Submittal/ Review/ OTS meeting
KTR-M/
NAVFAC
NAVSEA NAVFAC RFP
NAVSEA DBB
IMS/ IMP/ WBS and R&R (SAT-TO prep), DD1354, stakeholder/ RFSC prep
TBD Final (FIN) 100% Design Submittal/ Review/ OTS meeting KTR-M/
NAVFAC
NAVSEA RFP
NAVSEA DBB
IMS/ IMP/ WBS and R&R (SAT-TO signatories), TBD Final Design Approval NAVFAC/
KTR-M
FEAD KTR-M
Final Design
Signature routing
TBD Issue For Construction (IFC) NAVFAC FEAD
P1241 Communication Towers Work Order Number 1737351
PART 3 - CHAPTER 1 - Page 2
CONSTRUCTION
2 East Microwave Updates (FOR REFERENCE ONLY)
2.1 NAVSEA Microwave Phase I NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA will replace existing microwave hardware at remote sites and at Bearmat Hill (140’ tower and inside building)
2.2 NAVSEA Microwave Phase II NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA will replace existing microwave hardware at remote sites and at Bearmat Hill (140’ tower and inside building)
2.3 NAVSEA Microwave Phase III NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA will replace existing microwave hardware at remote sites and at Bearmat Hill (140’ tower and inside building)
2.4 NAVSEA Microwave Phase IV NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA will replace existing microwave hardware at remote sites and at Bearmat Hill (140’ tower and inside building)
X Bearmat Hill 140’ Tower Repair (PLACEHOLDER ONLY) Week 1 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Repair work will begin on Bearmat Hill 140’ tower
4 OP Mesa
4.1 Week 0 NAVFAC KTR-M (no site work) FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Staging for helo
4.2 Week 1 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Mobilization to hilltop
4.3 Week 2 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Foundation preparation Earth moving
4.4 Week 3 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Pour foundations
4.5 Week 4 NAVFAC KTR-M / NAVSEA FEAD/
ROICC/
KTR-M /
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Shelter foundation cure time to 70% NAVFAC KTR work/tower prep NAVSAEA staging for helo lift
4.6 Week 5 NAVSEA / NAVFAC KTR-M FEAD/
KTR-M
KTR-N/
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections
P1241 Communication Towers Work Order Number 1737351
PART 3 - CHAPTER 1 - Page 3
4.7 Week 6 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Erect 140' tower on site Tower: FAA lighting/lightning/ground
4.8 Week 7 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Ice bridge Conduit
4.9 Week 8 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Site grounding
4.10 Week 9 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demobilization Destaging
4.11 Week 10 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Install solar panels Install interior equipment Install antennas and RF cabling
4.12 Week 11 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Continue install solar panels Continue install interior equipment Continue install antennas and RF cabling
4.13 Week 12 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Complete installations
LMR
4.15 Week 14 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demobilization Destaging
5 OP Mine
5.1 Week 0 NAVSEA (no site work) NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Staging for helo
5.2 Week 1 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables
5.3 Week 2 NAVSEA NAVSEA/
KTR-N /
KTR-M
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables Demo/ready for demobilization LMR NAVFAC KTR-M Staging for helo
5.4 Week 3 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Mobilization to hilltop Demo/Remove two (2) Monopoles Demo/Remove two (2) above ground foundations Demo/Remove shelters
P1241 Communication Towers Work Order Number 1737351
PART 3 - CHAPTER 1 - Page 4
Demo/Remove solar
5.5 Week 4 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Foundation preparation Earth moving
5.6 Week 5 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Pour foundations
5.7 Week 6 NAVFAC KTR-M / NAVSEA FEAD/
ROICC/
KTR-M /
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Shelter foundation cure time to 70% NAVFAC KTR work/tower prep NAVSAEA staging for helo lift
5.8 Week 7 NAVSEA / NAVFAC KTR-M FEAD/
ROICC/
KTR-M /
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections
5.9 Week 8 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Erect 140' tower on site Tower: FAA lighting/lightning/ground
5.10 Week 9 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Ice bridge Conduit
5.11 Week 10 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Site grounding
5.12 Week 11 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVFAC KTR-M demobilization NAVFAC KTR-M destaging
5.13 Week 12 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Install solar panels Install interior equipment Install antennas and RF cabling
5.14 Week 13 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Continue install solar panels Continue install interior equipment Continue install antennas and RF cabling
5.15 Week 14 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Complete installations
LMR
5.17 Week 16 NAVSEA NAVSEA/
KTR-N
FEAD
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demobilization Destaging
6 OP Galway
P1241 Communication Towers Work Order Number 1737351
PART 3 - CHAPTER 1 - Page 5
6.1 Week 0 NAVSEA (no site work) NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Staging for helo
6.2 Week 1 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables
6.3 Week 2 NAVSEA NAVSEA/
KTR-N/
KTR-M
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables Demo/ready for demobilization LMR NAVFAC KTR-M Staging for helo
6.4 Week 3 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Mobilization to hilltop Demo/Remove two (2) Monopoles Demo/Remove two (2) above ground foundations Demo/Remove shelters Demo/Remove solar
6.5 Week 4 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Foundation preparation Earth moving
6.6 Week 5 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Pour foundations
6.7 Week 6 NAVFAC KTR-M / NAVSEA FEAD/
KTR-M/
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Shelter foundation cure time to 70% NAVFAC KTR-M work/tower prep NAVSAEA staging for helo lift
6.8 Week 7 NAVSEA / NAVFAC KTR-M FEAD/
KTR-M/
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections
6.9 Week 8 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Erect 140' tower on site Tower: FAA lighting/lightning/ground
6.10 Week 9 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Ice bridge Conduit
6.11 Week 10 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Site grounding
6.12 Week 11 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVFAC KTR-M demobilization NAVFAC KTR-M destaging
P1241 Communication Towers Work Order Number 1737351
PART 3 - CHAPTER 1 - Page 6
6.13 Week 12 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Install solar panels Install interior equipment Install antennas and RF cabling
6.14 Week 13 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Continue install solar panels Continue install interior equipment Continue install antennas and RF cabling
6.15 Week 14 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Complete installations
LMR
6.17 Week 16 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demobilization Destaging
7 OP Argos
7.1 Week 0 NAVSEA (no site work) NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Staging for helo
7.2 Week 1 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables
7.3 Week 2 NAVSEA NAVSEA/
KTR-N/
KTR-M
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables Demo/ready for demobilization LMR NAVFAC KTR-M Staging for helo
7.4 Week 3 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Mobilization to hilltop Demo/Remove two (2) Monopoles Demo/Remove two (2) above ground foundations Demo/Remove shelters Demo/Remove solar
7.5 Week 4 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Foundation preparation Earth moving
7.6 Week 5 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Pour foundations
7.7 Week 6 NAVFAC KTR-M / NAVSEA FEAD/
KTR-M/
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Shelter foundation cure time to 70% NAVFAC KTR-M work/tower prep NAVSAEA staging for helo lift
7.8 Week 7 NAVSEA / NAVFAC KTR-M FEAD/
KTR-M/
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections
P1241 Communication Towers Work Order Number 1737351
PART 3 - CHAPTER 1 - Page 7 etc.
7.9 Week 8 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Erect 140' tower on site Tower: FAA lighting/lightning/ground
7.10 Week 9 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Ice bridge Conduit
7.11 Week 10 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Site grounding
7.12 Week 11 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVFAC KTR demobilization NAVFAC KTR destaging
7.13 Week 12 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Install solar panels Install interior equipment Install antennas and RF cabling
7.14 Week 13 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Continue install solar panels Continue install interior equipment Continue install antennas and RF cabling
7.15 Week 14 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Complete installations
LMR
7.17 Week 16 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demobilization Destaging
8 Complete Microwave (FOR REFERENCE ONLY) NAVSEA Microwave Phase V NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA will update existing microwave link at remote sites and at Bearmat Hill (140’ tower and inside building)
X Bearmat Hill 200’ Tower Repair (PLACEHOLDER ONLY) Week 1 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Repair work will begin on Bearmat Hill 200’ tower
9 OP Creole
9.1 Week 0 NAVSEA (no site work) NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Staging for helo
9.2 Week 1 NAVSEA NAVSEA/ FEAD/ 29P G3/ G4/ Demo/remove electronics
P1241 Communication Towers Work Order Number 1737351
PART 3 - CHAPTER 1 - Page 8
KTR-N NAVFAC G6/ RANGE/
ENV, POR,
etc.
Demo/remove batteries Demo/remove antennas and cables
9.3 Week 2 NAVSEA NAVSEA/
KTR-N/
KTR-M
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables Demo/ready for demobilization LMR NAVFAC KTR-M Staging for helo
9.4 Week 3 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Mobilization to hilltop Demo/Remove two (2) Monopoles Demo/Remove two (2) above ground foundations Demo/Remove shelters Demo/Remove solar
9.5 Week 4 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Foundation preparation Earth moving
9.6 Week 5 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Pour foundations
9.7 Week 6 NAVFAC KTR-M / NAVSEA FEAD/
KTR-M/
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Shelter foundation cure time to 70% NAVFAC KTR-M work/tower prep NAVSAEA staging for helo lift
9.8 Week 7 NAVSEA / NAVFAC KTR-M FEAD/
KTR-M/
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections
9.9 Week 8 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Erect 140' tower on site Tower: FAA lighting/lightning/ground
9.10 Week 9 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Ice bridge Conduit
9.11 Week 10 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Site grounding
9.12 Week 11 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVFAC KTR-M demobilization NAVFAC KTR-M destaging
9.13 Week 12 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Install solar panels Install interior equipment Install antennas and RF cabling
9.14 Week 13 NAVSEA NAVSEA/ FEAD/ 29P G3/ G4/ Continue install solar panels
P1241 Communication Towers Work Order Number 1737351
PART 3 - CHAPTER 1 - Page 9
KTR-N NAVFAC G6/ RANGE/
ENV, POR,
etc.
Continue install interior equipment Continue install antennas and RF cabling
9.15 Week 14 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Complete installations
LMR
9.17 Week 16 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demobilization Destaging
10 OP Crampton
10.1 Week 0 NAVSEA (no site work) NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Staging for helo
10.2 Week 1 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables
10.3 Week 2 NAVSEA NAVSEA/
KTR-N/
KTR-M
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables Demo/ready for demobilization LMR NAVFAC KTR-M Staging for helo
10.4 Week 3 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Mobilization to hilltop Demo/Remove two (2) Monopoles Demo/Remove two (2) above ground foundations Demo/Remove shelters Demo/Remove solar
10.5 Week 4 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Foundation preparation Earth moving
10.6 Week 5 NAVFAC KTR-M FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Pour foundations
10.7 Week 6 NAVFAC KTR-M / NAVSEA FEAD/
KTR-M/
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Shelter foundation cure time to 70% NAVFAC KTR-M work/tower prep NAVSAEA staging for helo lift
10.8 Week 7 NAVSEA / NAVFAC KTR-M FEAD/
KTR-M/
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections
10.9 Week 8 NAVFAC KTR-M FEAD
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Erect 140' tower on site Tower: FAA lighting/lightning/ground
P1241 Communication Towers Work Order Number 1737351
PART 3 - CHAPTER 1 - Page 10
10.10 Week 9 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Ice bridge Conduit
10.11 Week 10 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Site grounding
10.12 Week 11 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVFAC KTR-M demobilization NAVFAC KTR-M destaging
10.13 Week 12 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Install solar panels Install interior equipment Install antennas and RF cabling
10.14 Week 13 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Continue install solar panels Continue install interior equipment Continue install antennas and RF cabling
10.15 Week 14 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Complete installations
LMR
10.17 Week 16 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demobilization Destaging
11 OP America Mine
11.1 Week 0 NAVSEA (no site work) NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Staging for helo
11.2 Week 1 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables
11.3 Week 2 NAVSEA NAVSEA/
KTR-N/
KTR-M
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables Demo/ready for demobilization LMR NAVFAC KTR-M Staging for helo
11.4 Week 3 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Mobilization to hilltop Demo/Remove two (2) Monopoles Demo/Remove two (2) above ground foundations Demo/Remove shelters Demo/Remove solar
11.5 Week 4 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
Foundation preparation Earth moving
P1241 Communication Towers Work Order Number 1737351
PART 3 - CHAPTER 1 - Page 11 etc.
11.6 Week 5 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Pour foundations
11.7 Week 6 NAVFAC KTR-M / NAVSEA FEAD/
ROICC/
KTR-M /
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Shelter foundation cure time to 70% NAVFAC KTR-M work/tower prep NAVSAEA staging for helo lift
11.8 Week 7 NAVSEA / NAVFAC KTR-M-M FEAD/
ROICC/
KTR-M /
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections
11.9 Week 8 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Erect 140' tower on site Tower: FAA lighting/lightning/ground
11.10 Week 9 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Ice bridge Conduit
11.11 Week 10 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Site grounding
11.12 Week 11 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVFAC KTR-M demobilization NAVFAC KTR-M destaging
11.13 Week 12 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Install solar panels Install interior equipment Install antennas and RF cabling
11.14 Week 13 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Continue install solar panels Continue install interior equipment Continue install antennas and RF cabling
11.15 Week 14 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Complete installations
LMR
11.17 Week 16 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demobilization Destaging
12 OP Noble
12.1 Week 0 NAVSEA (no site work) NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Staging for helo
P1241 Communication Towers Work Order Number 1737351
PART 3 - CHAPTER 1 - Page 12
12.2 Week 1 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables
12.3 Week 2 NAVSEA NAVSEA/
KTR-N/KTR
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables Demo/ready for demobilization LMR NAVFAC KTR-M Staging for helo
12.4 Week 3 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Mobilization to hilltop Demo/Remove two (2) Monopoles Demo/Remove two (2) above ground foundations Demo/Remove shelters Demo/Remove solar
12.5 Week 4 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Foundation preparation Earth moving
12.6 Week 5 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Pour foundations
12.7 Week 6 NAVFAC KTR-M / NAVSEA FEAD/
ROICC/
KTR-M /
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Shelter foundation cure time to 70% NAVFAC KTR-M work/tower prep NAVSAEA staging for helo lift
12.8 Week 7 NAVSEA / NAVFAC KTR-M FEAD/
ROICC/
KTR-M /
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections
12.9 Week 8 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Erect 140' tower on site Tower: FAA lighting/lightning/ground
12.10 Week 9 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Ice bridge Conduit
12.11 Week 10 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Site grounding
12.12 Week 11 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVFAC KTR-M demobilization NAVFAC KTR-M destaging
12.13 Week 12 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Install solar panels Install interior equipment Install antennas and RF cabling
P1241 Communication Towers Work Order Number 1737351
PART 3 - CHAPTER 1 - Page 13
12.14 Week 13 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Continue install solar panels Continue install interior equipment Continue install antennas and RF cabling
12.15 Week 14 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Complete installations
LMR
12.17 Week 16 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demobilization Destaging
13 OP Boullion
13.1 Week 0 NAVSEA (no site work) NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Staging for helo
13.2 Week 1 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables
13.3 Week 2 NAVSEA NAVSEA/
KTR-N/
KTR-M
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables Demo/ready for demobilization LMR NAVFAC KTR-M Staging for helo
13.4 Week 3 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Mobilization to hilltop Demo/Remove two (2) Monopoles Demo/Remove two (2) above ground foundations Demo/Remove shelters Demo/Remove solar
13.5 Week 4 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Foundation preparation Earth moving
13.6 Week 5 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Pour foundations
13.7 Week 6 NAVFAC KTR-M / NAVSEA FEAD/
ROICC/
KTR-M /
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Shelter foundation cure time to 70% NAVFAC KTR-M work/tower prep NAVSAEA staging for helo lift
13.8 Week 7 NAVSEA / NAVFAC KTR-M FEAD/
ROICC/
KTR-M /
NAVSEA
NAVFAC 29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections
13.9 Week 8 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
Erect 140' tower on site Tower: FAA lighting/lightning/ground
P1241 Communication Towers Work Order Number 1737351
PART 3 - CHAPTER 1 - Page 14 etc.
13.10 Week 9 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Ice bridge Conduit
13.11 Week 10 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Site grounding
13.12 Week 11 NAVFAC KTR-M FEAD/
ROICC/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVFAC KTR-M demobilization NAVFAC KTR-M destaging
13.13 Week 12 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Install solar panels Install interior equipment Install antennas and RF cabling
13.14 Week 13 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Continue install solar panels Continue install interior equipment Continue install antennas and RF cabling
13.15 Week 14 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Complete installations
LMR
13.17 Week 16 NAVSEA NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
Demobilization Destaging
TESTING, COMMISSIONING, ACCEPTANCE (FOR REFERENCE ONLY)
4 OP Mesa
(4.14.1) TESTING NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA Site tests
(4.14.1) MWL NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA microwave tests
(4.14.1) LMR NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA LMR tests
(4.14.1) LARCS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA LARCS tests
(4.14.2) SYSTEM TESTS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
NAVSEA complete system tests
P1241 Communication Towers Work Order Number 1737351
PART 3 - CHAPTER 1 - Page 15
ENV, POR,
etc.
5 OP Mine
(5.16.1) TESTING NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA Site tests
(5.16.1) MWL NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA microwave tests
(5.16.1) LMR NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA LMR tests
(5.16.1) LARCS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA LARCS tests
(5.16.2) SYSTEM TESTS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA complete system tests
6 OP Galway
(6.16.1) TESTING NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA Site tests
(6.16.1) MWL NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA microwave tests
(6.16.1) LMR NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA LMR tests
(6.16.1) LARCS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA LARCS tests
(6.16.2) SYSTEM TESTS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA complete system tests
7 OP Argos
(7.16.1) TESTING NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
NAVSEA Site tests
P1241 Communication Towers Work Order Number 1737351
PART 3 - CHAPTER 1 - Page 16
(7.16.1) MWL NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA microwave tests
(7.16.1) LMR NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA LMR tests
(7.16.1) LARCS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA LARCS tests
(7.16.2) SYSTEM TESTS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA complete system tests
8 Complete Microwave NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
9 OP Creole
(9.16.1) TESTING NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA Site tests
(9.16.1) MWL NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA microwave tests
(9.16.1) LMR NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA LMR tests
(9.16.1) LARCS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA LARCS tests
(9.16.2) SYSTEM TESTS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA complete system tests
10 OP Crampton
(10.16.1) TESTING NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA Site tests
(10.16.1) MWL NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
NAVSEA microwave tests
P1241 Communication Towers Work Order Number 1737351
PART 3 - CHAPTER 1 - Page 17
(10.16.1) LMR NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA LMR tests
(10.16.1) LARCS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA LARCS tests
(10.16.2) SYSTEM TESTS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA complete system tests
11 OP America Mine
(11.16.1) TESTING NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA Site tests
(11.16.1) MWL NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA microwave tests
(11.16.1) LMR NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA LMR tests
(11.16.1) LARCS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA LARCS tests
(11.16.2) SYSTEM TESTS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA complete system tests
12 OP Noble
(12.16.1) TESTING NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA Site tests
(12.16.1) MWL NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA microwave tests
(12.16.1) LMR NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA LMR tests
(12.16.1) LARCS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
NAVSEA LARCS tests
P1241 Communication Towers Work Order Number 1737351
PART 3 - CHAPTER 1 - Page 18
(12.16.2) SYSTEM TESTS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA complete system tests
13 OP Boullion
(13.16.1) TESTING NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA Site tests
(13.16.1) MWL NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA microwave tests
(13.16.1) LMR NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA LMR tests
(13.16.1) LARCS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA LARCS tests
(13.16.2) SYSTEM TESTS NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
NAVSEA complete system tests
CLOSEOUT (FOR REFERENCE ONLY)
Contract and Project Closeout FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
Post Construction Documents FEAD/
KTR-M
NAVSEA/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
DD1354 Real Property Cards, eOMSI, Training files, O&M manuals, AS-BUILT drawings with field corrections, Native CAD files verification, Shop Drawings, Project-specific Manufacturer installation notes, etc.
NAVSEA Oversight. Review, recommends approval if SAT
- LARCS/ SoS POR installation documents NAVSEA/
KTR-N
FEAD/
NAVFAC
29P G3/ G4/
G6/ RANGE/
ENV, POR,
etc.
RTM, SRD, O&M, etc.
NAVSEA Oversight. Review, recommends approval if SAT
Project Complete
NO FURTHER ENTRIES