About this file

This document is a Roles & Responsibility (R&R) Matrix for the P1241 Communication Towers project at Marine Corps Base Twentynine Palms, California. The matrix details the responsibilities of Naval Facilities Engineering Command (NAVFAC) and Naval Sea Systems Command (NAVSEA) throughout the project lifecycle, including design, construction, testing, and closeout phases for multiple operating positions (OP) such as Mesa, Mine, Galway, Argos, Creole, Crampton, America Mine, Noble, and Boullion.

The project involves constructing and modernizing communication towers across various sites, with most locations only accessible by helicopter and lacking basic utilities. NAVFAC is primarily responsible for real property and construction activities, including foundation preparation, tower erection, and site grounding. NAVSEA will handle personal property, collateral equipment installation, solar panel setup, interior equipment placement, antenna and RF cabling, and comprehensive system testing. The work includes demolishing existing infrastructure, preparing foundations, erecting 140' towers, installing communication equipment, and conducting detailed testing across multiple communication systems including Land Mobile Radio (LMR), Land Air Radio Communication Systems (LARCS), and microwave systems.

View the file

Other files

File Type Posted
Amendment - 0017 P1241_Request FPRs.pdf PDF
Amendment - 0015 P1241.pdf PDF
Amendment - 0014 P1241_Open Discussions.pdf PDF
Amendment - 0013 P1241.pdf PDF
Amendment - 0012 P1241.pdf PDF
Amendment - 0011 P1241.pdf PDF
Phase 2_ATT 4_Offer Schedule_P1241_REV 1.xlsx XLSX spreadsheet
Amendment - 0010 P1241.pdf PDF
Phase 2_ATT 2_Site Visit Map_P1241.pdf PDF
Phase 2_Exhibit F_P1241.docx DOCX document
Phase 2_Exhibit G_P1241.docx DOCX document
Phase 2_ATT 5_RFI Form_P1241.xlsx XLSX spreadsheet
Phase 2_ATT 4_Offer Schedule_P1241.xlsx XLSX spreadsheet
Amendment - 0008 P1241.pdf PDF
Amendment - 0009 P1241.pdf PDF
Phase 2_ATT 3_Site Visit RSVP List_P1241.xlsx XLSX spreadsheet
Phase 2_ATT 6_CA20250026_06-06-2025.pdf PDF
Phase 2_ATT 1_RFP Part 1_P1241.pdf PDF
PLA Request for Information N6247325R3443.docx DOCX document
RFI Responses - 04-10-2025.xlsx XLSX spreadsheet
Amendment - 0007 P1241.pdf PDF
Amendment0006.pdf PDF
RFI Responses - 04-04-2025.xlsx XLSX spreadsheet
Amendment0005.pdf PDF
RFI Responses - 03-27-2025.xlsx XLSX spreadsheet
Amendment0004.pdf PDF
RFI Responses - 03-24-2025.xlsx XLSX spreadsheet
Amendment0003.pdf PDF
RFI Responses - 03-14-2025.xlsx XLSX spreadsheet
Amendment-0002 P1241.pdf PDF
CA20250026_02-28-2025.pdf PDF
EXHIBIT C_P1241.pdf PDF
EXHIBIT D_P1241.pdf PDF
EXHIBIT F_P1241.pdf PDF
Financial Questionnaire_P1241.pdf PDF
Amendment0001-P1241.pdf PDF
EXHIBIT E_P1241.pdf PDF
EXHIBIT A_P1241.pdf PDF
EXHIBIT B_P1241.pdf PDF
Surety Form_P1241.pdf PDF
Instructions for Viewing Interested Vendors List.pdf PDF
EXHIBIT G_P1241.pdf PDF
Offerors Team Consent Form_P1241.pdf PDF
P1241 RFP ATT 3_RR Matrix.pdf PDF
P1241 RFP ATT 5_RFI Form.xlsx XLSX spreadsheet
N6247325R3443_P1241 Phase One Solicitation.pdf PDF
P1241 RFP ATT 1_Approval of Proposed Installation Schedule.pdf PDF
P1241 RFP ATT 2_Installation IMS Expanded.pdf PDF
P1241 RFP ATT 4_Offer Schedule.xlsx XLSX spreadsheet
P1241 RFP ATT 6_DBA WD CA20250026_2025 02 21.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P1241 Communication Towers Work Order Number 1737351 Marine Corps Base Twentynine Palms, CA

PART 3 - CHAPTER 1 - Page 1

PROJECT ROLES & RESPONSIBILITY (R&R) MATRIX

DM file: P1241 R&R Matrix Rev 1 (v0.1 20241212 ldm + wrw)_DM-faf 20250312

The following are P1241 project matrix delineating between real and personal properties roles and responsibilities. NAVFAC (FECSW) is the lead for P1241 MILCON real property. NAVSEA (NSWC) is the lead for P1241 personal property (collateral equipment) and SoS POR seamless integration and operational transparency.

This R&R Matrix is to be used with the IMS/ IMP/ WBS task items (v0.3 20241115 wrw).

LEGEND:

NAVFAC (FECSW Facilities Engineering Command Southwest) NAVSEA (NSWC - Naval Sea Warfare Center) Contract (NAVFAC MILCON Contract) KTR-N (NAVSEA Contractor) FEAD (Facilities Engineering and Acquisition Division) POR (Program Of Record) KTR-M (NAVFAC MILCON Contractor); RANGE/ENV (Range Environmental) PM (Project Manager) 29P (MCAGCC Twentynine Palms) DM (Design Manager) G3/G4/G6 (MAGTFTC Groups) CM (Construction Manager) IMS (Integrated Master Schedule) RFSC (Request For Solicitation Checklist) IMP(Integrated Master Plan) RTM (Requirements Traceability Matrix) WBS (Work Breakdown Schedule) SRD (Systems Requirements Document) LARCS (Land Air Radio Communication Systems) DBB (Design-Bid-Build documents by NAVSEA) LMR (Land Mobile Radio)

RESPONSIBILITY

WBS# Task/ Work Items LEAD ASSIST RESOURCE NOTES/ REMARKS

DESIGN

TBD Contract Award. Contract Turnover NAVFAC/

KTR-M

NAVSEA Contract

(SF 1442)

Post Award Design Services (PADS). NAVSEA to meet ANVFAC KTR-M design/ construction team (org. chart)

TBD Post Award Kick-Off (PAK) Meeting KTR-M/

NAVFAC

NAVSEA NAVFAC RFP

NAVSEA DBB

Design Charrette, KTR OP site conceptual design presentation. IMS/ IMP Construction Strategy

TBD Conceptual Design Submittal/ Review/ OTS meeting KTR-M/

NAVFAC

NAVSEA NAVFAC RFP

NAVSEA DBB

NAVSEA DBB Plan & Spec. IMS/ IMP/ WBS and R&R

TBD Design Developmental (DD) Submittal/ Review/ OTS meeting

KTR-M/

NAVFAC

NAVSEA NAVFAC RFP

NAVSEA DBB

IMS/ IMP/ WBS and R&R

TBD Pre-Final (PF) 100% Design Submittal/ Review/ OTS meeting

KTR-M/

NAVFAC

NAVSEA NAVFAC RFP

NAVSEA DBB

IMS/ IMP/ WBS and R&R (SAT-TO prep), DD1354, stakeholder/ RFSC prep

TBD Final (FIN) 100% Design Submittal/ Review/ OTS meeting KTR-M/

NAVFAC

NAVSEA RFP

NAVSEA DBB

IMS/ IMP/ WBS and R&R (SAT-TO signatories), TBD Final Design Approval NAVFAC/

KTR-M

FEAD KTR-M

Final Design

Signature routing

TBD Issue For Construction (IFC) NAVFAC FEAD

P1241 Communication Towers Work Order Number 1737351

PART 3 - CHAPTER 1 - Page 2

CONSTRUCTION

2 East Microwave Updates (FOR REFERENCE ONLY)

2.1 NAVSEA Microwave Phase I NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA will replace existing microwave hardware at remote sites and at Bearmat Hill (140’ tower and inside building)

2.2 NAVSEA Microwave Phase II NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA will replace existing microwave hardware at remote sites and at Bearmat Hill (140’ tower and inside building)

2.3 NAVSEA Microwave Phase III NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA will replace existing microwave hardware at remote sites and at Bearmat Hill (140’ tower and inside building)

2.4 NAVSEA Microwave Phase IV NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA will replace existing microwave hardware at remote sites and at Bearmat Hill (140’ tower and inside building)

X Bearmat Hill 140’ Tower Repair (PLACEHOLDER ONLY) Week 1 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Repair work will begin on Bearmat Hill 140’ tower

4 OP Mesa

4.1 Week 0 NAVFAC KTR-M (no site work) FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Staging for helo

4.2 Week 1 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Mobilization to hilltop

4.3 Week 2 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Foundation preparation Earth moving

4.4 Week 3 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Pour foundations

4.5 Week 4 NAVFAC KTR-M / NAVSEA FEAD/

ROICC/

KTR-M /

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Shelter foundation cure time to 70% NAVFAC KTR work/tower prep NAVSAEA staging for helo lift

4.6 Week 5 NAVSEA / NAVFAC KTR-M FEAD/

KTR-M

KTR-N/

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections

P1241 Communication Towers Work Order Number 1737351

PART 3 - CHAPTER 1 - Page 3

4.7 Week 6 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Erect 140' tower on site Tower: FAA lighting/lightning/ground

4.8 Week 7 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Ice bridge Conduit

4.9 Week 8 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Site grounding

4.10 Week 9 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demobilization Destaging

4.11 Week 10 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Install solar panels Install interior equipment Install antennas and RF cabling

4.12 Week 11 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Continue install solar panels Continue install interior equipment Continue install antennas and RF cabling

4.13 Week 12 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Complete installations

LMR

4.15 Week 14 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demobilization Destaging

5 OP Mine

5.1 Week 0 NAVSEA (no site work) NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Staging for helo

5.2 Week 1 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables

5.3 Week 2 NAVSEA NAVSEA/

KTR-N /

KTR-M

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables Demo/ready for demobilization LMR NAVFAC KTR-M Staging for helo

5.4 Week 3 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Mobilization to hilltop Demo/Remove two (2) Monopoles Demo/Remove two (2) above ground foundations Demo/Remove shelters

P1241 Communication Towers Work Order Number 1737351

PART 3 - CHAPTER 1 - Page 4

Demo/Remove solar

5.5 Week 4 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Foundation preparation Earth moving

5.6 Week 5 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Pour foundations

5.7 Week 6 NAVFAC KTR-M / NAVSEA FEAD/

ROICC/

KTR-M /

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Shelter foundation cure time to 70% NAVFAC KTR work/tower prep NAVSAEA staging for helo lift

5.8 Week 7 NAVSEA / NAVFAC KTR-M FEAD/

ROICC/

KTR-M /

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections

5.9 Week 8 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Erect 140' tower on site Tower: FAA lighting/lightning/ground

5.10 Week 9 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Ice bridge Conduit

5.11 Week 10 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Site grounding

5.12 Week 11 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVFAC KTR-M demobilization NAVFAC KTR-M destaging

5.13 Week 12 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Install solar panels Install interior equipment Install antennas and RF cabling

5.14 Week 13 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Continue install solar panels Continue install interior equipment Continue install antennas and RF cabling

5.15 Week 14 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Complete installations

LMR

5.17 Week 16 NAVSEA NAVSEA/

KTR-N

FEAD

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demobilization Destaging

6 OP Galway

P1241 Communication Towers Work Order Number 1737351

PART 3 - CHAPTER 1 - Page 5

6.1 Week 0 NAVSEA (no site work) NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Staging for helo

6.2 Week 1 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables

6.3 Week 2 NAVSEA NAVSEA/

KTR-N/

KTR-M

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables Demo/ready for demobilization LMR NAVFAC KTR-M Staging for helo

6.4 Week 3 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Mobilization to hilltop Demo/Remove two (2) Monopoles Demo/Remove two (2) above ground foundations Demo/Remove shelters Demo/Remove solar

6.5 Week 4 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Foundation preparation Earth moving

6.6 Week 5 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Pour foundations

6.7 Week 6 NAVFAC KTR-M / NAVSEA FEAD/

KTR-M/

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Shelter foundation cure time to 70% NAVFAC KTR-M work/tower prep NAVSAEA staging for helo lift

6.8 Week 7 NAVSEA / NAVFAC KTR-M FEAD/

KTR-M/

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections

6.9 Week 8 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Erect 140' tower on site Tower: FAA lighting/lightning/ground

6.10 Week 9 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Ice bridge Conduit

6.11 Week 10 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Site grounding

6.12 Week 11 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVFAC KTR-M demobilization NAVFAC KTR-M destaging

P1241 Communication Towers Work Order Number 1737351

PART 3 - CHAPTER 1 - Page 6

6.13 Week 12 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Install solar panels Install interior equipment Install antennas and RF cabling

6.14 Week 13 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Continue install solar panels Continue install interior equipment Continue install antennas and RF cabling

6.15 Week 14 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Complete installations

LMR

6.17 Week 16 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demobilization Destaging

7 OP Argos

7.1 Week 0 NAVSEA (no site work) NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Staging for helo

7.2 Week 1 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables

7.3 Week 2 NAVSEA NAVSEA/

KTR-N/

KTR-M

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables Demo/ready for demobilization LMR NAVFAC KTR-M Staging for helo

7.4 Week 3 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Mobilization to hilltop Demo/Remove two (2) Monopoles Demo/Remove two (2) above ground foundations Demo/Remove shelters Demo/Remove solar

7.5 Week 4 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Foundation preparation Earth moving

7.6 Week 5 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Pour foundations

7.7 Week 6 NAVFAC KTR-M / NAVSEA FEAD/

KTR-M/

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Shelter foundation cure time to 70% NAVFAC KTR-M work/tower prep NAVSAEA staging for helo lift

7.8 Week 7 NAVSEA / NAVFAC KTR-M FEAD/

KTR-M/

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections

P1241 Communication Towers Work Order Number 1737351

PART 3 - CHAPTER 1 - Page 7 etc.

7.9 Week 8 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Erect 140' tower on site Tower: FAA lighting/lightning/ground

7.10 Week 9 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Ice bridge Conduit

7.11 Week 10 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Site grounding

7.12 Week 11 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVFAC KTR demobilization NAVFAC KTR destaging

7.13 Week 12 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Install solar panels Install interior equipment Install antennas and RF cabling

7.14 Week 13 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Continue install solar panels Continue install interior equipment Continue install antennas and RF cabling

7.15 Week 14 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Complete installations

LMR

7.17 Week 16 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demobilization Destaging

8 Complete Microwave (FOR REFERENCE ONLY) NAVSEA Microwave Phase V NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA will update existing microwave link at remote sites and at Bearmat Hill (140’ tower and inside building)

X Bearmat Hill 200’ Tower Repair (PLACEHOLDER ONLY) Week 1 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Repair work will begin on Bearmat Hill 200’ tower

9 OP Creole

9.1 Week 0 NAVSEA (no site work) NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Staging for helo

9.2 Week 1 NAVSEA NAVSEA/ FEAD/ 29P G3/ G4/ Demo/remove electronics

P1241 Communication Towers Work Order Number 1737351

PART 3 - CHAPTER 1 - Page 8

KTR-N NAVFAC G6/ RANGE/

ENV, POR,

etc.

Demo/remove batteries Demo/remove antennas and cables

9.3 Week 2 NAVSEA NAVSEA/

KTR-N/

KTR-M

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables Demo/ready for demobilization LMR NAVFAC KTR-M Staging for helo

9.4 Week 3 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Mobilization to hilltop Demo/Remove two (2) Monopoles Demo/Remove two (2) above ground foundations Demo/Remove shelters Demo/Remove solar

9.5 Week 4 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Foundation preparation Earth moving

9.6 Week 5 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Pour foundations

9.7 Week 6 NAVFAC KTR-M / NAVSEA FEAD/

KTR-M/

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Shelter foundation cure time to 70% NAVFAC KTR-M work/tower prep NAVSAEA staging for helo lift

9.8 Week 7 NAVSEA / NAVFAC KTR-M FEAD/

KTR-M/

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections

9.9 Week 8 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Erect 140' tower on site Tower: FAA lighting/lightning/ground

9.10 Week 9 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Ice bridge Conduit

9.11 Week 10 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Site grounding

9.12 Week 11 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVFAC KTR-M demobilization NAVFAC KTR-M destaging

9.13 Week 12 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Install solar panels Install interior equipment Install antennas and RF cabling

9.14 Week 13 NAVSEA NAVSEA/ FEAD/ 29P G3/ G4/ Continue install solar panels

P1241 Communication Towers Work Order Number 1737351

PART 3 - CHAPTER 1 - Page 9

KTR-N NAVFAC G6/ RANGE/

ENV, POR,

etc.

Continue install interior equipment Continue install antennas and RF cabling

9.15 Week 14 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Complete installations

LMR

9.17 Week 16 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demobilization Destaging

10 OP Crampton

10.1 Week 0 NAVSEA (no site work) NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Staging for helo

10.2 Week 1 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables

10.3 Week 2 NAVSEA NAVSEA/

KTR-N/

KTR-M

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables Demo/ready for demobilization LMR NAVFAC KTR-M Staging for helo

10.4 Week 3 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Mobilization to hilltop Demo/Remove two (2) Monopoles Demo/Remove two (2) above ground foundations Demo/Remove shelters Demo/Remove solar

10.5 Week 4 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Foundation preparation Earth moving

10.6 Week 5 NAVFAC KTR-M FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Pour foundations

10.7 Week 6 NAVFAC KTR-M / NAVSEA FEAD/

KTR-M/

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Shelter foundation cure time to 70% NAVFAC KTR-M work/tower prep NAVSAEA staging for helo lift

10.8 Week 7 NAVSEA / NAVFAC KTR-M FEAD/

KTR-M/

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections

10.9 Week 8 NAVFAC KTR-M FEAD

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Erect 140' tower on site Tower: FAA lighting/lightning/ground

P1241 Communication Towers Work Order Number 1737351

PART 3 - CHAPTER 1 - Page 10

10.10 Week 9 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Ice bridge Conduit

10.11 Week 10 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Site grounding

10.12 Week 11 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVFAC KTR-M demobilization NAVFAC KTR-M destaging

10.13 Week 12 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Install solar panels Install interior equipment Install antennas and RF cabling

10.14 Week 13 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Continue install solar panels Continue install interior equipment Continue install antennas and RF cabling

10.15 Week 14 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Complete installations

LMR

10.17 Week 16 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demobilization Destaging

11 OP America Mine

11.1 Week 0 NAVSEA (no site work) NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Staging for helo

11.2 Week 1 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables

11.3 Week 2 NAVSEA NAVSEA/

KTR-N/

KTR-M

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables Demo/ready for demobilization LMR NAVFAC KTR-M Staging for helo

11.4 Week 3 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Mobilization to hilltop Demo/Remove two (2) Monopoles Demo/Remove two (2) above ground foundations Demo/Remove shelters Demo/Remove solar

11.5 Week 4 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

Foundation preparation Earth moving

P1241 Communication Towers Work Order Number 1737351

PART 3 - CHAPTER 1 - Page 11 etc.

11.6 Week 5 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Pour foundations

11.7 Week 6 NAVFAC KTR-M / NAVSEA FEAD/

ROICC/

KTR-M /

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Shelter foundation cure time to 70% NAVFAC KTR-M work/tower prep NAVSAEA staging for helo lift

11.8 Week 7 NAVSEA / NAVFAC KTR-M-M FEAD/

ROICC/

KTR-M /

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections

11.9 Week 8 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Erect 140' tower on site Tower: FAA lighting/lightning/ground

11.10 Week 9 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Ice bridge Conduit

11.11 Week 10 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Site grounding

11.12 Week 11 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVFAC KTR-M demobilization NAVFAC KTR-M destaging

11.13 Week 12 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Install solar panels Install interior equipment Install antennas and RF cabling

11.14 Week 13 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Continue install solar panels Continue install interior equipment Continue install antennas and RF cabling

11.15 Week 14 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Complete installations

LMR

11.17 Week 16 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demobilization Destaging

12 OP Noble

12.1 Week 0 NAVSEA (no site work) NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Staging for helo

P1241 Communication Towers Work Order Number 1737351

PART 3 - CHAPTER 1 - Page 12

12.2 Week 1 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables

12.3 Week 2 NAVSEA NAVSEA/

KTR-N/KTR

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables Demo/ready for demobilization LMR NAVFAC KTR-M Staging for helo

12.4 Week 3 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Mobilization to hilltop Demo/Remove two (2) Monopoles Demo/Remove two (2) above ground foundations Demo/Remove shelters Demo/Remove solar

12.5 Week 4 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Foundation preparation Earth moving

12.6 Week 5 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Pour foundations

12.7 Week 6 NAVFAC KTR-M / NAVSEA FEAD/

ROICC/

KTR-M /

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Shelter foundation cure time to 70% NAVFAC KTR-M work/tower prep NAVSAEA staging for helo lift

12.8 Week 7 NAVSEA / NAVFAC KTR-M FEAD/

ROICC/

KTR-M /

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections

12.9 Week 8 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Erect 140' tower on site Tower: FAA lighting/lightning/ground

12.10 Week 9 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Ice bridge Conduit

12.11 Week 10 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Site grounding

12.12 Week 11 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVFAC KTR-M demobilization NAVFAC KTR-M destaging

12.13 Week 12 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Install solar panels Install interior equipment Install antennas and RF cabling

P1241 Communication Towers Work Order Number 1737351

PART 3 - CHAPTER 1 - Page 13

12.14 Week 13 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Continue install solar panels Continue install interior equipment Continue install antennas and RF cabling

12.15 Week 14 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Complete installations

LMR

12.17 Week 16 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demobilization Destaging

13 OP Boullion

13.1 Week 0 NAVSEA (no site work) NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Staging for helo

13.2 Week 1 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables

13.3 Week 2 NAVSEA NAVSEA/

KTR-N/

KTR-M

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demo/remove electronics Demo/remove batteries Demo/remove antennas and cables Demo/ready for demobilization LMR NAVFAC KTR-M Staging for helo

13.4 Week 3 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Mobilization to hilltop Demo/Remove two (2) Monopoles Demo/Remove two (2) above ground foundations Demo/Remove shelters Demo/Remove solar

13.5 Week 4 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Foundation preparation Earth moving

13.6 Week 5 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Pour foundations

13.7 Week 6 NAVFAC KTR-M / NAVSEA FEAD/

ROICC/

KTR-M /

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Shelter foundation cure time to 70% NAVFAC KTR-M work/tower prep NAVSAEA staging for helo lift

13.8 Week 7 NAVSEA / NAVFAC KTR-M FEAD/

ROICC/

KTR-M /

NAVSEA

NAVFAC 29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA Heavy lift helo NAVSEA place shelters NAVFAC KTR-M build tower sections

13.9 Week 8 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

Erect 140' tower on site Tower: FAA lighting/lightning/ground

P1241 Communication Towers Work Order Number 1737351

PART 3 - CHAPTER 1 - Page 14 etc.

13.10 Week 9 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Ice bridge Conduit

13.11 Week 10 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Site grounding

13.12 Week 11 NAVFAC KTR-M FEAD/

ROICC/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVFAC KTR-M demobilization NAVFAC KTR-M destaging

13.13 Week 12 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Install solar panels Install interior equipment Install antennas and RF cabling

13.14 Week 13 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Continue install solar panels Continue install interior equipment Continue install antennas and RF cabling

13.15 Week 14 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Complete installations

LMR

13.17 Week 16 NAVSEA NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

Demobilization Destaging

TESTING, COMMISSIONING, ACCEPTANCE (FOR REFERENCE ONLY)

4 OP Mesa

(4.14.1) TESTING NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA Site tests

(4.14.1) MWL NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA microwave tests

(4.14.1) LMR NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA LMR tests

(4.14.1) LARCS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA LARCS tests

(4.14.2) SYSTEM TESTS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

NAVSEA complete system tests

P1241 Communication Towers Work Order Number 1737351

PART 3 - CHAPTER 1 - Page 15

ENV, POR,

etc.

5 OP Mine

(5.16.1) TESTING NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA Site tests

(5.16.1) MWL NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA microwave tests

(5.16.1) LMR NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA LMR tests

(5.16.1) LARCS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA LARCS tests

(5.16.2) SYSTEM TESTS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA complete system tests

6 OP Galway

(6.16.1) TESTING NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA Site tests

(6.16.1) MWL NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA microwave tests

(6.16.1) LMR NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA LMR tests

(6.16.1) LARCS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA LARCS tests

(6.16.2) SYSTEM TESTS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA complete system tests

7 OP Argos

(7.16.1) TESTING NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

NAVSEA Site tests

P1241 Communication Towers Work Order Number 1737351

PART 3 - CHAPTER 1 - Page 16

(7.16.1) MWL NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA microwave tests

(7.16.1) LMR NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA LMR tests

(7.16.1) LARCS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA LARCS tests

(7.16.2) SYSTEM TESTS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA complete system tests

8 Complete Microwave NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

9 OP Creole

(9.16.1) TESTING NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA Site tests

(9.16.1) MWL NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA microwave tests

(9.16.1) LMR NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA LMR tests

(9.16.1) LARCS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA LARCS tests

(9.16.2) SYSTEM TESTS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA complete system tests

10 OP Crampton

(10.16.1) TESTING NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA Site tests

(10.16.1) MWL NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

NAVSEA microwave tests

P1241 Communication Towers Work Order Number 1737351

PART 3 - CHAPTER 1 - Page 17

(10.16.1) LMR NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA LMR tests

(10.16.1) LARCS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA LARCS tests

(10.16.2) SYSTEM TESTS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA complete system tests

11 OP America Mine

(11.16.1) TESTING NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA Site tests

(11.16.1) MWL NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA microwave tests

(11.16.1) LMR NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA LMR tests

(11.16.1) LARCS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA LARCS tests

(11.16.2) SYSTEM TESTS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA complete system tests

12 OP Noble

(12.16.1) TESTING NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA Site tests

(12.16.1) MWL NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA microwave tests

(12.16.1) LMR NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA LMR tests

(12.16.1) LARCS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

NAVSEA LARCS tests

P1241 Communication Towers Work Order Number 1737351

PART 3 - CHAPTER 1 - Page 18

(12.16.2) SYSTEM TESTS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA complete system tests

13 OP Boullion

(13.16.1) TESTING NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA Site tests

(13.16.1) MWL NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA microwave tests

(13.16.1) LMR NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA LMR tests

(13.16.1) LARCS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA LARCS tests

(13.16.2) SYSTEM TESTS NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

NAVSEA complete system tests

CLOSEOUT (FOR REFERENCE ONLY)

Contract and Project Closeout FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

Post Construction Documents FEAD/

KTR-M

NAVSEA/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

DD1354 Real Property Cards, eOMSI, Training files, O&M manuals, AS-BUILT drawings with field corrections, Native CAD files verification, Shop Drawings, Project-specific Manufacturer installation notes, etc.

NAVSEA Oversight. Review, recommends approval if SAT

- LARCS/ SoS POR installation documents NAVSEA/

KTR-N

FEAD/

NAVFAC

29P G3/ G4/

G6/ RANGE/

ENV, POR,

etc.

RTM, SRD, O&M, etc.

NAVSEA Oversight. Review, recommends approval if SAT

Project Complete

NO FURTHER ENTRIES

File details come from the government source that posted it. Updated .