About this file

This document is an Amendment (Amendment 0004) to a federal solicitation for a Design-Build contract for Communication Towers at Marine Corps Base Twentynine Palms, California. The amendment extends the Phase One proposal due date from March 27, 2025, to April 10, 2025, at 2:00 PM Pacific Time, and updates several sections of the original Request for Proposal (RFP).

The project involves constructing new communication towers and restoring/modernizing existing towers on remote mountaintops, with most sites only accessible by helicopter and lacking basic utilities. The contract is a two-phase design-build procurement for the Low Altitude Radio Communication System (LARCS) for Marine Air Ground Task Force Training Command. The solicitation requires offerors to have NAICS code 237130 (Power and Communication Line and Related Structures Construction) and National Association of Tower Erectors (NATE) certification. The government intends to award a firm-fixed-price contract using a best-value source selection approach, with a minimum small business participation requirement of 17% and specific subcontracting targets for various socio-economic categories.

View the file

Other files

File Type Posted
Amendment - 0017 P1241_Request FPRs.pdf PDF
Amendment - 0015 P1241.pdf PDF
Amendment - 0014 P1241_Open Discussions.pdf PDF
Amendment - 0013 P1241.pdf PDF
Amendment - 0012 P1241.pdf PDF
Amendment - 0011 P1241.pdf PDF
Phase 2_ATT 4_Offer Schedule_P1241_REV 1.xlsx XLSX spreadsheet
Amendment - 0010 P1241.pdf PDF
Amendment - 0009 P1241.pdf PDF
Phase 2_ATT 3_Site Visit RSVP List_P1241.xlsx XLSX spreadsheet
Phase 2_ATT 6_CA20250026_06-06-2025.pdf PDF
Phase 2_Exhibit F_P1241.docx DOCX document
Phase 2_Exhibit G_P1241.docx DOCX document
Phase 2_ATT 5_RFI Form_P1241.xlsx XLSX spreadsheet
Phase 2_ATT 4_Offer Schedule_P1241.xlsx XLSX spreadsheet
Amendment - 0008 P1241.pdf PDF
Phase 2_ATT 2_Site Visit Map_P1241.pdf PDF
Phase 2_ATT 1_RFP Part 1_P1241.pdf PDF
PLA Request for Information N6247325R3443.docx DOCX document
RFI Responses - 04-10-2025.xlsx XLSX spreadsheet
Amendment - 0007 P1241.pdf PDF
RFI Responses - 04-04-2025.xlsx XLSX spreadsheet
Amendment0006.pdf PDF
RFI Responses - 03-27-2025.xlsx XLSX spreadsheet
Amendment0005.pdf PDF
RFI Responses - 03-24-2025.xlsx XLSX spreadsheet
RR Matrix_Rev1.pdf PDF
Amendment0003.pdf PDF
RFI Responses - 03-14-2025.xlsx XLSX spreadsheet
Amendment-0002 P1241.pdf PDF
CA20250026_02-28-2025.pdf PDF
EXHIBIT A_P1241.pdf PDF
EXHIBIT B_P1241.pdf PDF
Surety Form_P1241.pdf PDF
Instructions for Viewing Interested Vendors List.pdf PDF
Amendment0001-P1241.pdf PDF
EXHIBIT E_P1241.pdf PDF
EXHIBIT C_P1241.pdf PDF
EXHIBIT D_P1241.pdf PDF
EXHIBIT F_P1241.pdf PDF
Financial Questionnaire_P1241.pdf PDF
EXHIBIT G_P1241.pdf PDF
Offerors Team Consent Form_P1241.pdf PDF
P1241 RFP ATT 3_RR Matrix.pdf PDF
P1241 RFP ATT 5_RFI Form.xlsx XLSX spreadsheet
N6247325R3443_P1241 Phase One Solicitation.pdf PDF
P1241 RFP ATT 1_Approval of Proposed Installation Schedule.pdf PDF
P1241 RFP ATT 2_Installation IMS Expanded.pdf PDF
P1241 RFP ATT 4_Offer Schedule.xlsx XLSX spreadsheet
P1241 RFP ATT 6_DBA WD CA20250026_2025 02 21.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR 6035630 P1241

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

AMENDMENT 0004; SOLICITATION NO. N6247325R3443; DESIGN-BUILD MILCON PROJECT P1241 See Continuation Page 2.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 29

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Mar-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247325R3443

X 9B. DATED (SEE ITEM 11)

26-Feb-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Mar-2025

CODE

NAVFAC SOUTHWEST

PLANNING, DESIGN & CONSTRUCTION CONTRACTING M

CODE: PDCMAR

750 PACIFIC HIGHWAY

SAN DIEGO CA 92132-0001

N62473 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247325R3443

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0004

The purpose of this Amendment is to revise and extend the Phase One proposal due date from 2:00 PM PT on March 27, 2025 to 2:00 PM PT on April 10, 2025.

NOTES:

1. The offeror must acknowledge receipt of all amendments on the offer schedule.

2. All other paragraphs, provisions, and conditions to this proposed task order remain unchanged.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 27-Mar-2025 02:00 PM to 10-Apr-2025 02:00 PM.

SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS

The following have been modified:

Section 00 21 16

INSTRUCTIONS TO OFFERORS

1. Inquiries

All inquiries concerning any part of this solicitation shall be submitted electronically as a Request for Information (RFI). The Point of Contract (POCs) for inquiries is Lauren Steigerwald via email at lauren.e.steigerwald.civ@us.navy.mil and Victor Mariscal via email at victor.m.mariscal.civ@us.navy.mil. The Government does not intend to respond to inquiries submitted after 2:00PM Pacific Time (PT) on March 13, 2025.

2. Proposal Submittal Requirements

In addition to the submittal requirements under each Factor, proposals submitted in response to this solicitation shall be formatted as follows and furnished in the number of copies stated herein. A cover letter shall accompany the proposal. The cover letter shall include:

a) The solicitation number;

b) The name, address, telephone and facsimile numbers, and email address of the Offeror;

c) The UEI Number, CAGE Code, and Tax Identification Number (TIN) of the Offeror;

d) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

e) Names, titles, phone and facsimile numbers, and email addresses of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation; and

f) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

Page limits, if stipulated, must be adhered to.

The format for the proposal is as follows:

Phase One (Qualification Phase):

Cover Letter First two (2) pages of SF 1442 – with blocks 14 through 20c completed Offeror’s Team Consent Forms Financial Questionnaire (to be completed and submitted by financial institution) Surety Form Section 00 45 00 – Representations and Certifications VETS-4212 Report Submission Confirmation (or Statement of Non-applicability) Tab 1 – Factor 1: Technical Approach Tab 2 – Factor 2: Experience Tab 3 – Factor 3: Past Performance Tab 4 – Factor 4: Safety

THE FOLLOWING EVALUATION FACTORS ARE APPLICABLE ONLY TO THOSE OFFERORS

WHO ARE SELECTED TO PROCEED TO PHASE TWO OF THE SOURCE SELECTION PROCESS. DO

NOT SUBMIT TABS 5 THROUGH 7 IN THE PHASE 1 (QUALIFICATION PHASE) PROPOSALS.

Phase Two:

Financial Questionnaire (to be completed and submitted by financial institution) Tab 5 – Factor 5: Technical Solution Tab 6 – Factor 6: Small Business Utilization and Participation Tab 7 – Factor 7: Price

INSTRUCTIONS FOR ELECTRONIC SUBMISSION OF PROPOSALS ARE PROVIDED BELOW:

Proposals shall be submitted electronically using the Department of Defense (DoD) Secure Access File Exchange (SAFE) service at https://safe.apps.mil, via the “Drop-off” feature. DoD SAFE is the only electronic commerce method authorized for the submission of Phase One proposals in response to this solicitation.

Submissions outside of DoD SAFE will not be considered.

Offerors are instructed to electronically submit their complete proposal in one (1) file, formatted in Portable Document Format (PDF) with a .pdf file extension as follows:

File #1:

Factor 1: Technical Approach Factor 2: Experience Factor 3: Past Performance Factor 4: Safety

Instructions for submission of Phase One proposals using the DoD SAFE “Drop-off” feature are provided below:

1. There are no user accounts for DoD SAFE. In order to submit a proposal in response to this solicitation, Offerors shall submit their point of contact (POC) name and email address via email to both the Contract Specialist and Contracting Officer identified below to obtain a “Request Code” for DoD SAFE “Drop-off” of the Phase One proposal.

Contract Specialist: Lauren Steigerwald via email at lauren.e.steigerwald.civ@us.navy.mil Contracting Officer: Victor Mariscal via email at victor.m.mariscal.civ@us.navy.mil

Note: The Government does not intend to respond to emails for drop-off request codes submitted less than 10 calendar days before the Phase One proposal due date (2:00 PM PT on April 10, 2025), as shown in the solicitation.

2. No later than four (4) calendar days prior to the proposal due date (2:00 PM PT on April 10, 2025), the Contract Specialist or Contracting Officer will send a “Request Code” to the Offeror’s specified POC via the email address provided. Only the Offeror’s identified POC will be able to drop off the proposal or proposal revisions in DoD SAFE. Failure to provide accurate POC information will preclude the Offeror from using DoD SAFE.

3. To submit the proposal, the Offeror will go to the DoD SAFE website at https://safe.apps.mil, accept the user agreement, click “Drop-off,” and enter the 12-digit “Request Code” that was provided by the Contract Specialist or Contracting Officer. The system will allow for inclusion of a short note to the Government recipient. The Offeror will then click to add their proposal file, or drag and drop the file. Click “Drop-off Files” to send the file to the Government recipient. Confirm that the file does not contain classified information and click “OK.” Once the file is uploaded, an email will be sent to the Government recipient notifying them of the “drop-off.” [Additional details can be viewed in the DoD SAFE User Guide available at https://safe.apps.mil/about.php]. The DoD SAFE system will record the date and time of proposal submission. The date and time of proposal submission recorded in DoD SAFE shall govern the timeliness of any proposal submission.

LATE SUBMISSIONS WILL NOT BE CONSIDERED.

It is an Offeror’s responsibility, when transmitting its proposal electronically, to ensure the proposal’s timely delivery by transmitting the proposal sufficiently in advance of the time set for receipt of proposals to allow for timely receipt by the Government no later than the date and time stated in Block 13 of the SF1442. Offerors shall allow adequate time to upload files, which may be slower for non-DoD users, and to avoid other technical difficulties that may be encountered. An Offeror risks the late receipt and rejection of a proposal where it delays transmitting its proposal until the last few minutes before the time set for receipt of proposals. Proposals that are received after the stated date and time in Block 13 of the SF1442 will not be considered.

Offerors are responsible for submitting their proposal in the format specified, consistent with requirements stated elsewhere in this solicitation. Offerors are asked to submit only the information/exhibits required. Page limits, if stipulated, must be adhered to. Files that cannot be opened, or are otherwise missing the required content are the responsibility of the Offeror.

No Assumptions: This is a firm fixed price contract, and any assumptions made by the Offeror in its proposal will not be binding on the Government. The Offeror will not be entitled to any equitable adjustments based on assumptions made by the Offeror in its proposal. If the Scope of Work is not clear, submit your request for clarification as an RFI.

Representations and Certifications and Financial Questionnaires will not be rated. However, they will be considered in assessing the Offeror’s responsibility.

3. Pre-Proposal Conference

A pre-proposal conference and site visit will not be conducted at this time and will be conducted during Phase Two of this solicitation.

Failure of a prospective Offeror to submit any questions will be construed to mean that the Offeror fully understands all requirements of the solicitation. Prospective Offerors are advised that the pre-proposal conference will be held solely for the purpose of explaining the concepts involved in the project and the specifications, terms, and conditions of the solicitation.

All prospective Offerors are advised that this solicitation will remain unchanged unless it is amended in writing.

Amendments will be posted on the sam.gov website at https://sam.gov under Contract Opportunities. However, if an amendment is issued, normal procedures relating to the acknowledgment and receipt of any such amendment as described in Contract Clause “Amendment to Solicitations” of this section shall be applicable.

The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigation and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.

4. Financial Questionnaire

Offerors shall submit the Financial Questionnaire to their financial institution and request the financial institution complete the questionnaire with regard to the Offeror’s firm. Upon completion of the questionnaire, the financial institution should send the completed questionnaire via email directly to Lauren Steigerwald via email at lauren.e.steigerwald.civ@us.navy.mil and Victor Mariscal via email at victor.m.mariscal.civ@us.navy.mil. Please ensure the financial institution utilizes the form provided in order to submit the requested information. Links to websites and/or files with .zip file extensions may not be accepted. Additionally, please ensure financial questionnaires are submitted by the Phase One proposal due date (2:00 PM PT on April 10, 2025). If the Offeror is a joint venture, information should be submitted for the joint venture. If there is no information for the joint venture, information should be submitted for each joint venture partner.

5. System for Award Management

Contractors must be registered in the System for Award Management (SAM) at the time that Phase 2 proposals are submitted. In order to participate on this solicitation, contractors must also complete electronic representations and certifications. For more information and to complete the electronic Reps & Certs, see the SAM website at http://www.sam.gov. A contract cannot be awarded to a contractor not registered in SAM. The NAICS code for this procurement (NAICS 237130 – Power and Communication Line and Related Structures Construction) must appear in the Offeror(s) SAM record to qualify for award; records should be reviewed and updated accordingly prior to submission of Phase 2 proposals.

Note: Offerors must complete and submit Section 00 45 00 - Representations and Certifications of the RFP as part of their proposal even if the Offeror is registered in SAM. Section 00 45 00 of the RFP contains clauses which are not found in the electronic Reps & Certs in SAM; therefore, we require them to be completed and submitted as part of your proposal. The clauses found in Section 00 45 00 of the RFP are also broken out as a separate form titled “Section 00 45 00–Representations and Certifications” which can be found with the other RFP Exhibits.

6. Federal Contractor Reporting

In accordance with Federal Acquisition Regulation (FAR) 22.13, any contractor or subcontractor with a contract or subcontract with the Federal Government of $150,000 or more that was entered into on or after October 1, 2015 (or $100,000 or more that was entered prior to October 1, 2015) must take affirmative action to hire and promote qualified covered veterans which includes, special disabled veterans, veterans of the Vietnam-era, recently separated veterans, and any other veterans who served on active duty during a war or in a campaign or expedition for which a campaign badge has been authorized.

If subject to the reporting requirements, companies must file an annual VETS-4212 Report, which shows the number of covered veterans in their workforce and number of new hires, including covered veterans hired during the reporting period. Instructions, information, and follow-up assistance is provided at VETS-4212 Internet site at https://www.dol.gov/agencies/vets/programs/vets4212 or employers may contact the VETS-4212 customer support at (866) 237-0275 or e-mail at VETS4212-customersupport@dol.gov.

VETS-4212 Reports must be filed between August 1 and September 30 of each year following a calendar year in which a contractor or subcontractor held a covered contract or subcontract.

Upon the successful submission of a VETS-4212 report, federal contractors will receive an email confirmation of receipt notification for their records. Offerors shall include a copy of their confirmation notification email in their proposal as verification of submission for the current reporting period. DO NOT SUBMIT A COPY OF THE REPORT ITSELF. If this requirement is not applicable to your firm, provide a statement that your firm does not have any contracts subject to this requirement.

A contract cannot be awarded to a contractor that has not submitted a required annual form VETS- 4212, Federal Contractor Veterans’ Employment Report (VETS-4212 Report) if subject to the reporting requirements of 38 U.S.C. 4212(d) for that fiscal year.

7. Incurred Expenses

The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.

8. No Alternate or Multiple Proposals

Neither multiple proposals, nor proposal variations or options, nor alternate or alternative proposals will be considered in the evaluation.

READ THE FOLLOWING IN CONJUNCTION WITH THE ACQUISITION REQUIREMENTS.

PROPOSALS MUST SET FORTH FULL, ACCURATE, AND COMPLETE INFORMATION AS REQUIRED

BY THIS REQUEST FOR PROPOSAL (INCLUDING ATTACHMENTS). THE PENALTY FOR MAKING

FALSE STATEMENTS IN PROPOSALS IS PRESCRIBED IN 18 U.S.C. §1001.

THE GOVERNMENT INTENDS TO EVALUATE PROPOSALS AND AWARD WITHOUT DISCUSSIONS.

HOWEVER, THE GOVERNMENT RESERVES THE RIGHT TO CONDUCT DISCUSSIONS IF IT IS LATER

DETERMINED BY THE CONTRACTING OFFICER TO BE NECESSARY. THEREFORE, EACH INITIAL

OFFER SHOULD CONTAIN THE BEST TERMS FROM A TECHNICAL AND PRICE STANDPOINT.

This solicitation includes FAR 52.225-11, Buy American Act – Construction Materials Under Trade Agreements, and FAR 52.225-12, Notice of Buy American Act Requirement – Construction Materials Under Trade Agreements.

9. Mentor Protégé Agreements

Only Mentor Protégé Agreements formally approved by the SBA will be considered for this procurement. Mentor Protégé Agreements approved by other agencies will not be considered. The proposal shall contain both the Mentor Protégé Agreement and the SBA letter of approval for the Mentor Protégé Agreement, showing the approval is valid as of the date of the proposal submission.

10. Subcontracting Plan

The successful contractor, if a large business, shall submit a Subcontracting plan for small business and small disadvantaged business concerns to the issuing office within five (5) working days after notification by the Contracting Officer pursuant to FAR 52.219-9.

11. Contract Description

This procurement includes 11 base items and two (2) option items. This procurement is located at Twentynine Palms, California and is being advertised on an unrestricted basis inviting full and open competition and uses the two-phase design-build selection procedures and consists of one solicitation covering both phases. Source Selection procedures will be used with the intent to award a firm-fixed price construction contract to the responsible Offeror whose proposal, conforming to the Request for Proposal (RFP), is the most advantageous and offers the best value to the Government, price and non-price factors considered. Price evaluation preference will be given to HUBZone Small Business concerns, in accordance with FAR 52.219-4.

12. Description of Work

System Overview. The Marine Corps Air Ground Combat Center (MCAGCC) Training Range is comprised of multiple system and subsystem functions that transports MCAGCC Twentynine Palms range data. Subsystems consists of: Terrestrial Microwave, IT Network Distribution, Low Altitude Radio Communication System (LARCS), Enterprise Land Mobile Range (ELMR or LMR), Shelter Infrastructure, Power Systems, Site Requirements, and Tower Requirements, Encryption, Inside/Outside Plant.

There will be multiple Department of Defense (DoD) agencies and their respective vendors & Contractors presence in the course of P1241 project duration in various Program of Record (POR) systems and subsystems tech refresh and upgrades.

P1241 Communication Towers, Marine Corps Base Twentynine Palms Ranges. Project shall expand the training area range LARCS for Marine Air Ground Task Force Training Command (MAGTFTC).

Contractor shall have NAICS code 237130 – Power and Communication Line and Related Structures Construction. Contractor construction personnel must have a current valid National Association of Tower Erectors (NATE) "The Communications Infrastructure Contractors Association" certification.

Scope. Project shall construct new communication towers and restore and modernize existing communication towers on remote mountaintops or hilltops. With the exception of the Operation Center (OC) Bearmat Hill, all other work sites are Observation Points (OP) which are only accessible by helicopter and are without any infrastructure for utilities such as electricity, communication, water and sewer. Contractor shall provide necessary utilities to the site as required. Refer to “P1241 major work scope matrix” table below for details.

Coordination. Project will require coordination and collaboration of multiple Government/ DOD command in performing all tasks and work as described in this RFP. Naval Sea Systems Command (NAVSEA) and its Contractors shall provide and install LARCS and other communication infrastructure support collateral and Government Furnished Equipment (GFE) on all OP sites in the immediate vicinity of P1241 site and communication tower work items.

Schedule. Project Integrated Master Schedule (IMS) and Integrated Master Plan (IMP) key events and product deliverables are pre-approved by MAGTFTC for power and communication outages and logistics, changes to the IMS/IMP schedule and plan will have cascading impact to the OP sites and MAGTFTC critical training missions especially in current escalating world affairs and geopolitical situation and therefore not allowed. Contractor shall meet critical project target key events (KE) and product deliverable dates in support of new expanded LARCS collateral equipment and various GFE support sub-systems. Contractor shall address all IMS and IMP deployment and migration plan to ensure uninterrupted mission critical communication systems for safety and tactical pictures awareness are sustained during construction. Project will require detailed sequencing and phasing construction schedule requirement in support of MAGTFTC Range Management Division (RMD) training with focus on Large Scale Exercises (LSE) and other mission essential evolutions for US military services and Foreign Military allies during this project construction. A “Roles & Responsibility” (R&R) matrix is provided to complement the IMS/IMP, identifying “lead” and “assist” groups and key resources in the work breakdown (WBS) structure task items. The R&R matrix also provides amplifying notes and remarks per WBS to provide more additional information and resource for coordination and task considerations.

Design Consideration. During design phase, concurrent tower inspections will be required for all applicable tower repair final design acceptance. Recent tower survey reports are provided as reference for Contractor baseline field tower inspections. Contractor shall verify, validate and update tower data as applicable to incorporate into the design. Tower inspections shall be conducted during NAVSEA Microwave Link and various tech refresh and upgrades to take advantage of the range pre-approved NAVSEA site and tower accesses. Contractor shall use the IMS/IMP and MAGTFTC memorandum of approved construction schedule with the R&R matrix to develop P1241 design, construction, commissioning, testing and acceptance plan to meet project, MAGTFTC, NAVSEA and other critical KE dates and GFE product deliverables deployment and migration sequences.

Construction Consideration

Range Contractor Communication. Range area has poor cellular communication reception and transmission not conducive for contractor reliable means of communication. Base shall provide Government LMR based radios programmed for contractor usage during the project duration. Radios shall be leased to qualified contractor personnel during the project after completion of MAGTFTC training on proper radio usage & operation.

Range Access. All contractor personnel shall check in in Bearmat Hill to acquire range pass ID to access range via Security Gate. Range Training Areas Maintenance Section (RTAMS) will designate area for P1241 contractor long-term storage for project construction materials, items and equipment. RTAMS designated area shall be the contractor main onload and offload of materials, items and equipment to the designated CP staging area. A 4x4 utility vehicle will be required for transport to the designated staging areas CP 13, 51, 69, 78. Due to the rugged and rough terrain conditions, travel/ transit time may take up to 4 hours from RTAMS onload/ offload area to the CP staging areas. CP staging areas will be the local onload/ offload area for helicopter cargo/ passenger services to bring personnel, materials, items and equipment to the top of the OP sites. Contractor shall plan range construction travel and material logistics accordingly to maximize effective daylight working hours.

Range Working Hours. Range working hours shall be 0400 to 1700H daily to include weekends and holidays to maximize productive daylight working hours and long travel/ transit time between RTAMS main staging area to the planned (scheduled) CP staging area. Base has allowed flexible hours to facilitate contractor in meeting P1241 IMS/IMP and 29 Palms/Range approved construction schedule. Construction may be interrupted up to 3 days (max) by the range operations but does not require contractor to demobilize sites within this interruption.

Radiation Hazards (RADHAZ). Contractor is required to have National Association of Tower Erectors (NATE) certified personnel and staff when working aloft the communication towers. Hazards of Electromagnetic Radiation to Personnel (HERP) must be observed at all times when working in the OP sites. Contractor shall comply with MCO 5104.2 “Marine Corps Radio Frequency (RF) Electromagnetic Field (EMF) Personnel Protection Program” to ensure personnel potentially exposed to RF EMF more than the permissible exposure limits (PEL) in reducing risks associated with RF EMF exposure. All work shall comply with EM 385-1-1 “Safety and Occupational Health Requirements”.

Helicopter Services. MCAGCC Twentynine Palms operates and maintains military training range areas established on U.S. DoD controlled federal lands within San Bernardino County, California. Radio repeaters, telemetry equipment, and microwave equipment are located at strategic mountaintop relay communication sites. The relay sites are positioned at altitudes ranging from 800 to 6,000 feet, and most of the relay sites are inaccessible by ground vehicles due to steep mountainous and desert terrain within the boundaries of MCAGCC.

Rotary wing transportation and operational services are required to transport maintenance personnel, parts, and equipment within the weight limits of the helicopter to the OP sites.

Contractor shall provide aircrew, ground personnel, supplies, ancillary support services and equipment to perform dedicated and/or ad hoc Federal Aviation Regulation 135 airlift operations (at both military and commercial airports/airfields/landing zones). Operations include the movement of passengers, light cargo and heavy cargo (or combination thereof). Helicopter services must currently be approved by DoD Commercial Airlift Review Board (CARB) in accordance with Department of Defense Instruction 4500.53. Contractor shall identify the qualifications and certifications held by the helicopter service personnel to include but not limited to corporate management, pilots, crews and others; specifically personnel who will directly support helicopter services.

Demolition, Removal and Disposal. Salvage demolished/ removed items and return to Government that are deemed usable by the base and MAGTFTC System Owner (SO) and POR.

Foundations and Steel Structures for Primary Structures. This project constructs four (4) new steel lattice-type communication towers with support systems comprised of pipe mast legs, horizontal braces and diagonal braces acting in tension and compression with special foundation features including micro-pile foundations and pre-cast concrete structural footings. This project provides reinforced shallow concrete foundations for CONEX based communication and various supporting facilities. This project restores and modernizes seven (7) existing communication towers consisting of structural modifications to accommodate new communication components such as dishes and antennas and/or repairs including replacement of missing and damaged bolts, washers, nuts, re-tensioning of loose guy cables, replacement of deteriorated ground bus bars, re-weatherproofing of existing antennas, re-galvanization of eroded parts and cracked foundation repair.

Infrastructure. This project provides and installs concrete pads, mounting and weldment, OSP communication and power pathways for all Government Furnished Equipment or Property for a complete and usable system. Facilities will be designed to meet or exceed the useful service life specified in Department of Defense (DoD) Unified Facility Criteria (UFC). These facilities will incorporate features that provide the lowest practical life cycle cost solutions satisfying the facility requirements with the goal of maximizing energy efficiency.

Site Work

Site preparation. Demolition and removal, site clearing, grading, earthwork and contaminated soil disposal without the availability of underground utilities such as electricity, water or sewer.

Site Development. The MILCON contract for this project includes the design and construction of communication towers and its foundations and the construction of the foundations designed by NAVSEA for the equipment shelters, PV solar panel arrays and their supporting site infrastructure. The landscape work includes the erosion and dust control for pre and post construction activities.

Fencing. Interior security fencing with gates at two (2) new sites and repair of existing fencing at one (1) site.

Antiterrorism. This project will provide Antiterrorism features and comply with applicable service and Geographic Combatant Commander policies and directive per UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings. As noted in the NAVSEA BOD located in Part 6 of this RFP, the project will be located within the controlled perimeter of MCAGCC Twentynine Palms, California, over 1,000-feet from the main gate. No threats are anticipated in the site areas. In accordance with Section 3-2.1, of UFC 4-010-01, the minimum allowable standoff distance for a new construction building is 20-feet to the controlled perimeter. This project exceeds those standoffs at all sites.

Discussion at the PDA charrette revealed no requirements for AT, physical security due to the remoteness of the various sites. The two sites in the Johnson Valley, OP Mine and OP Galway are to receive new fencing to enclose the sites due to its proximity to the public highway.

High Performance And Sustainability Building Requirements. DoD and Department of the Navy principles for high performance and sustainable building requirements are included in the design and construction of the project in accordance with federal laws and Executive Orders.

Low Impact Development. Low Impact Development will be included in the design and construction of this project as appropriate.

Commissioning, Testing And Validation Support. System of Systems (SoS) Performance Verification Test (PVT) for P1241 LARCS and Systems Operability Verification Test (SOVT) for the Program of Record (POR) MWL and systems shall be conducted by NAVSEA group. OP sites testing and acceptance shall ensure new/ upgrades/ repair and legacy system achieve SoS seamless integration and system transparency to the users and operators. Failure to achieve OP site SoS seamless integration and system transparency may impact next IMS/IMP SoS deployment and migration plan. Contractor shall provide support for P1241 in-scope work for any adjustment needed for all tower schedule equipment and ground GFE. NAVSEA shall inspect all P1241 and ascertain no tower and site discrepancies for Government acceptance and approval.

NAVFAC SW shall conduct site and tower inspection, test witness and shall incorporate NAVSEA’s P1241 discrepancy report for contractor corrective actions for final acceptance recommendation.

The period of performance for the design and construction of P1241 will be 1,460 calendar days (including 15 calendar days for bonds) from contract award as set forth in the schedule.

CLIN 0001 Description:

Major Work Scope by Base Bid Items and Option Items. The major work items are listed below as 11 Base Bid Items and two (2) Option Items. (NOTE: “RESERVED” in support of container shelter variants are “EMPTY” containers for MAGTFTC future systems expansions and design modularity.)

Base Item 0001: Design Of All Sites Firm-Fixed-Price (FFP) (lump sum) includes all bonds, design, materials, labor, and equipment for Design of All Sites.

• Provide project full plan design drawings and specifications for all base items and options: includes design of four (4) new 140-foot high communication towers and foundations (OP Mesa, OP American Mine, OP Galway)

• Provide structural inspections, analysis & design for repair of seven (7) existing towers (OP Argos, OP Bullion, OP Crampton, OP Creole, OP Mine, OP Noble, Bearmat Hill)

• Provide design of foundations and site improvements for equipment shelters for GFE and waveguide bridges (ice bridges) at 10 remote tower sites

Base Item 0002: Bearmat Hill – 140-Foot Tower FFP (lump sum) includes all bonds, materials, labor, and equipment for Bearmat Hill 140’ Tower.

• Inspection and repair of existing 140-foot high communication tower and foundation.

• Provide Site Work related to site preparation, erosion control, and staging areas

• Provide proper removal, transport and disposal of all construction waste, solid waste and Hazardous Waste

Base Item 0003: OP Argos FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Argos.

• Demolition, removal and disposal of existing solar PV array and foundations, waveguide bridges (ice bridges) and equipment shelters directly obstructing new P1241 GFE LARCS equipment and shelters

• Inspection and repair of existing 82’-6” high communication tower and foundation

• Provide new waveguide bridge (ice bridge) and support foundation

• Provide foundations for GFE and collateral equipment to include (2) 6-ISO Container shelter variants

(LARCS, LMR, POWER and RESERVED shelter combinations) and ground/ shelter-mounted PV array

• Provide Site Work related to site preparation, erosion control, and staging areas;

• Provide Helicopter Transportation for design personnel and construction crews, tools, equipment, materials, etc.

• Provide proper removal, transport and disposal of all construction waste, solid waste and Hazardous Waste

Base Item 0004: OP American Mine FFP (lump sum) includes all bonds, materials, labor, and equipment for OP American Mine.

• Demolition, removal and disposal of existing solar PV array and foundations, waveguide bridges (ice bridges) and equipment shelters directly obstructing new P1241 GFE LARCS equipment and shelters

• Design and Construction of OP Site to include a 140-foot high communication tower and foundation

• Provide waveguide bridge (ice bridge) and support foundation

• Provide foundations for GFE and collateral equipment to include (2) 6-ISO Container shelter variants

(LARCS, LMR, POWER and RESERVED shelter combinations) and ground/ shelter-mounted PV array

• Provide Site Work related to site preparation, erosion control, and staging areas

• Provide Helicopter Transportation for design personnel and construction crews, tools, equipment, materials,

• Provide proper removal, transport and disposal of all construction waste, solid waste and Hazardous Waste.

Base Item 0005: OP Bullion FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Bullion.

• Demolition, removal and disposal of existing solar PV array and foundations, waveguide bridges (ice bridges) and equipment shelters directly obstructing new P1241 GFE LARCS equipment and shelters

• Inspection and repair of existing 82’-6” high communication tower and foundation

• Provide new waveguide bridge (ice bridge) and support foundation

• Provide foundations for GFE and collateral equipment to include (2) 6-ISO Container shelter variants

(LARCS, LMR, POWER and RESERVED shelter combinations) and ground/ shelter-mounted PV array

• Provide Site Work related to site preparation, erosion control, and staging areas

• Provide Helicopter Transportation for design personnel and construction crews, tools, equipment, materials,

• Provide proper removal, transport and disposal of all construction waste, solid waste and Hazardous Waste

Base Item 0006: OP Crampton FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Crampton.

• Demolition, removal and disposal of existing solar PV array and foundations, waveguide bridges (ice bridges) and equipment shelters directly obstructing new P1241 GFE LARCS equipment and shelters

• Inspection and repair of existing 82’-6” high communication tower and foundation.

• Provide new waveguide bridge (ice bridge) and support foundation

• Provide foundations for GFE and collateral equipment to include (2) 6-ISO Container shelter variants

(LARCS, LMR, POWER and RESERVED shelter combinations) and ground/ shelter-mounted PV array

• Provide Site Work related to site preparation, erosion control, and staging areas

• Provide Helicopter Transportation for design personnel and construction crews, tools, equipment, materials,

• Provide proper removal, transport and disposal of all construction waste, solid waste and Hazardous Waste

Base Item 0007: OP Creole FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Creole.

• Demolition, removal and disposal of existing solar PV array and foundations, waveguide bridges (ice bridges) and equipment shelters directly obstructing new P1241 GFE LARCS equipment and shelters

• Inspection and repair of existing 82’-6” high communication tower and foundation.

• Provide new waveguide bridge (ice bridge) and support foundation

• Provide foundations for GFE and collateral equipment to include (2) 6-ISO Container shelter variants

(LARCS, LMR, POWER and RESERVED shelter combinations) and ground/ shelter-mounted PV array

• Provide Site Work related to site preparation, erosion control, and staging areas

• Provide Helicopter Transportation for design personnel and construction crews, tools, equipment, materials,

• Provide proper removal, transport and disposal of all construction waste, solid waste and Hazardous Waste

Base Item 0008: OP Galway FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Galway.

• Demolition, removal and disposal of two (2) existing 62-foot high communication tower and foundation.

• Demolition, removal and disposal existing solar PV array and foundations, waveguide bridges (ice bridges) and equipment shelters directly obstructing new P1241 GFE LARCS equipment and shelters

• Design and Construction of OP Site to include a 140-ft high communication tower and foundation.

• Provide waveguide bridge (ice bridge) and support foundation.

• Provide foundations for GFE and collateral equipment to include (2) 6-ISO Container shelter variants

(LARCS, LMR, POWER and RESERVED shelter combinations) and ground/ shelter-mounted PV array

• Provide Site Work related to site preparation, erosion control, and staging areas;

• Provide Helicopter Transportation for design personnel and construction crews, tools, equipment, materials,

• Provide proper removal, transport and disposal of all construction waste, solid waste and Hazardous Waste

Base Item 0009: OP Mesa FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Mesa.

• Design and Construction of OP Site to include a 140-foot high communication tower and foundation.

• Provide waveguide bridge (ice bridge) and support foundation

• Provide foundations for GFE and collateral equipment to include (2) 6-ISO Container shelter variants

(LARCS, LMR, POWER and RESERVED shelter combinations) and ground/ shelter-mounted PV array

• Provide Site Work related to site preparation, erosion control, and staging areas;

• Provide Helicopter Transportation for design personnel and construction crews, tools, equipment, materials,

• Provide proper removal, transport and disposal of all construction waste, solid waste and Hazardous Waste

Base Item 0010: OP Mine FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Mine.

• Demolition, removal and disposal of two (2) existing 62-foot high communication tower and foundation

• Demolition, removal and disposal existing solar PV array and foundations, waveguide bridges (ice bridges) and equipment shelters directly obstructing new P1241 GFE LARCS equipment and shelters

• Design and Construction of OP Site to include a 140-ft high communication tower and foundation.

• Provide waveguide bridge (ice bridge) and support foundation.

• Provide foundations for GFE and collateral equipment to include (2) 6-ISO Container shelter variants

(LARCS, LMR, POWER and RESERVED shelter combinations) and ground/ shelter-mounted PV array

• Provide Site Work related to site preparation, erosion control, and staging areas

• Provide Helicopter Transportation for design personnel and construction crews, tools, equipment, materials,

• Provide proper removal, transport and disposal of all construction waste, solid waste and Hazardous Waste

Base Item 0011: OP Noble FFP (lump sum) includes all bonds, materials, labor, and equipment for OP Noble.

• Demolition, removal and disposal of existing solar PV array and foundations, waveguide bridges (ice bridges) and equipment shelters directly obstructing new P1241 GFE LARCS equipment and shelters

• Inspection and repair of existing 82’-6” high communication tower and foundation.

• Provide new waveguide bridge (ice bridge) and support foundation.

• Provide foundations for GFE and collateral equipment to include (2) 6-ISO Container shelter variants

(LARCS, LMR, POWER and RESERVED shelter combinations) and ground/ shelter-mounted PV array

• Provide Site Work related to site preparation, erosion control, and staging areas;

• Provide Helicopter Transportation for design personnel and construction crews, tools, equipment, materials,

• Provide proper removal, transport and disposal of all construction waste, solid waste and Hazardous Waste

Option Item 0001: Bearmat Hill 200-Foot Tower FFP (lump sum) includes all incidental related work to support the design and construction including permits, taxes, bond cost, overhead and profit, complete and in accordance with the RFP and all Amendments, but not including work indicated or specified to be provided under any other Base Bid Items.

• Inspection and repair of existing 200-foot high communication tower and foundation.

• Provide Site Work related to site preparation, erosion control, and staging areas

• Provide proper removal, transport and disposal of all construction waste, solid waste and Hazardous Waste

The Option may be exercised within 365 calendar days from contract award

Option Item 0002: OP Round FFP (lump sum) includes all incidental related work to support the design and construction including permits, taxes, bond cost, overhead and profit, complete and in accordance with the RFP and all Amendments, but not including work indicated or specified to be provided under any other Base Bid Items.

• Demolition, removal and disposal of two (2) existing 40-foot high communication tower and foundation.

• Demolition, removal and disposal of existing solar PV array and foundations, waveguide bridges (ice bridges) and equipment shelters

• Provide site work related to site preparation, erosion control, and staging areas

• Provide helicopter transportation for design personnel and construction crews, tools, equipment, materials,

• Provide proper removal, transport and disposal of all construction waste, solid waste and hazardous waste

The Option may be exercised within 365 calendar days from contract award.

REFER TO THE FOLLOWING ATTACHMENTS IN SUPPORT OF THE SUBJECT RFP:

- Attachment 1: Proposed Installation Schedule

- Attachment 2: IMS

- Attachment 3: R&R Matrix

13. Basis Of Award

1) The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with Offerors in the competitive range; and to award the contract to the Offeror submitting the proposal(s) determined to represent the best value—the proposal(s) most advantageous to the Government, price and other factors considered.

2) The Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

3) The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced Offeror or other than the highest technically rated Offeror.

4) All technical factors when combined are of equal importance to the performance confidence assessment (past performance) rating; and all technical factors and the performance confidence assessment (past performance) rating, when combined are approximately equal to price.

5) Any proposal found to have a deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award, unless the deficiency is corrected through discussions. An Unacceptable rating in any of the non-cost/price factors and/or sub-factors will result in an overall rating of “Unacceptable” for the non-cost/price factors, unless corrected through discussions. Proposals may be found to have either a significant weakness or multiple weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board’s assessment of the identified weakness(s) and the associated risk to successful contract performance resulting from the weakness(s). This assessment must provide the rationale for proceeding to award without discussions.

14. Definitions

The following definitions are provided to assist evaluators in the evaluation of each non-cost/price factor.

1100% COMPLETE:

For construction projects: The facility is completely constructed and ready for the intended use.

For design projects: 100% plans and specifications signed off by an Architect-Engineer and ready for construction with final cost estimate. Does not include any Post Construction Award Support (PCAS).

ACCEPTABLE FEATURES: A proposed method or technique in the proposal that addresses solicitation requirements such that no further explanation or documentation is necessary.

BEST VALUE: The expected outcome of an acquisition that, in the Government’s estimation, provides the greatest overall benefit in response to the requirement. See FAR 2.101.

CLARIFICATIONS: Are limited exchanges between the Government and Offerors that may occur when award without discussion is contemplated. See FAR 15.306(a)(1).

COMMUNICATIONS: Are exchanges between the Government and Offerors after receipt of proposals, leading to establishment of the competitive range. See FAR 15.306(b).

COMBINED PROJECT(S): Projects with multiple starting and ending points, performed under separate task orders, delivery orders, or multiple contracts combined in a single description. No credit will be given for work performed under MACC/IDIQ contracts in the aggregate or for multiple projects completed under more than one task/delivery order.

COMPETITIVE RANGE: Is all the most highly rated proposals (based on the rating of each proposal against all evaluation criteria), unless the range is further reduced for purposes of efficiency. FAR 15.306(c).

CONTRACTOR TEAMING ARRANGEMENT: An arrangement in which two or more companies form a partnership or Joint Venture (JV) to act as a potential prime contractor, or a potential prime contractor agrees with one or more companies to have them act as its subcontractor(s), under a specified Government contract or acquisition program. A proposed contractor teaming arrangement will be recognized by the Government provided the Offeror identifies, in its proposal, the type of arrangement, fully discloses company relationships, and provides a copy of the partnership, JV agreement, or teaming agreement with the proposal package.

COMMERCIAL-OFF-THE-SHELF (COTS): Refers to products that are available for purchase from commercial sources and are ready to use. COTS products can be software, hardware, or IT products that is commercially ready-made and available for sale, lease, or license to the general public

DEFICIENCY: A material failure of a proposal to meet a solicitation requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract…