This document is Amendment 0012 to a Design-Build Military Construction (MILCON) solicitation for a Low Altitude Radio Communication System (LARCS) project for the Marine Air Ground Task Force Training Command (MAGTFTC) at Twentynine Palms, CA. The amendment modifies the Request for Proposal (RFP) Parts 1-6, specifically updating the Project Description and Attachments section in response to multiple Requests for Information (RFIs).
Key modifications include updating the NAVSEA Collateral Equipment Design document date from 20250612 to 20250909, revising the Installation Schedule version, and adding new documents to the Attachments section such as the Collateral Equipment Final BOD with Civil-Structural Calculations and a LARCS Route Google Earth file. The amendment requires offerors to acknowledge receipt of all amendments on the offer schedule, with all other contract provisions remaining unchanged. The project involves design, construction, commissioning, testing, and acceptance of communication towers, with specific requirements for tower inspections and equipment design.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT 0012, SOLICITATION NO. N6247325R3443, DESIGN-BUILD MILCON P1241
LOW ALTITUDE RADIO COMMUNICATION SYSTEM (LARCS) COMMUNICATION
TOWERS FOR MARINE AIR GROUND TASK FORCE TRAINING COMMAND (MAGTFTC)
TWENTYNINE PALMS, CA
Date: September 16, 2025
The purpose of this Amendment is to revise the RFP Parts 1-6 as follows:
1. Modify RFP PART 3, CHAPTER 1 PROJECT DESCRIPTION, Design Consideration, in response to RFIs 26, 46 and 58 as follows:
FROM:
DESIGN CONSIDERATION. During design phase, concurrent tower inspections will be required for all applicable tower repair final design acceptance. Recent tower survey reports are provided as reference for Contractor baseline field tower inspections in Part 6 of this RFP. Contractor shall verify, validate and update tower data as applicable to incorporate into the design. Tower inspections shall be conducted during the NAVSEA Microwave Link and various technical refresh and upgrades to take advantage of the range pre-approved NAVSEA site and tower accesses. Contractor shall use the following documents in Part 6 Attachments of this RFP to develop the P1241 design, construction, commissioning, testing and acceptance plan to meet project, MAGTFTC, NAVSEA and other critical KE dates and GFE product deliverables deployment and migration sequences:
P1241 NAVSEA Collateral Equipment Design (NAVFAC Concept Dwg) 20250612 P1241 Installation Schedule (v0.33 20250605 1100 PDT wrw) P1241 Roles & Responsibilities (R&R) Matrix Rev 1 (v0.1 20241212 ldm + wrw) 20250312rev
TO:
DESIGN CONSIDERATION. During design phase, concurrent tower inspections will be required for all applicable tower repair final design acceptance. Recent tower survey reports are provided as reference for Contractor baseline field tower inspections in Part 6 of this RFP. Contractor shall verify, validate and update tower data as applicable to incorporate into the design. Tower inspections shall be conducted during the NAVSEA Microwave Link and various technical refresh and upgrades to take advantage of the range pre-approved NAVSEA site and tower accesses. Contractor shall use the following documents in Part 6 Attachments of this RFP to develop the P1241 design, construction, commissioning, testing and acceptance plan to meet project, MAGTFTC, NAVSEA and other critical KE dates and GFE product deliverables deployment and migration sequences:
P1241 NAVSEA Collateral Equipment Design (NAVFAC Concept Dwg) 20250909 P1241 Installation Schedule (v0.34 20250627 1000 PDT wrw) P1241 Roles & Responsibilities (R&R) Matrix Rev 1 (v0.1 20241212 ldm + wrw) 20250312rev
2. Modify RFP PART 6 ATTACHMENTS, Table of Contents, in response to RFI 26, 46 and 58 as follows:
FROM:
PART 6 – ATTACHMENTS
DOCUMENTS
DOC 01__P1241 NAVSEA Collateral Equipment Design (NAVFAC Concept Dwg) 20250612 DOC 02__P1241 Installation Schedule (v0.33 20250605 1100 PDT wrw) DOC 03__P1241 Roles & Responsibilities Matrix (v0.1 20241212 ldm) 20250312rev DOC 04__P1241 2022 CERS updated 2024Nov18 via Encl 6 DOC 05__Golden Eagle Surveys in Sunshine Peak and Bessemer Mine 2025FEB DOC 06__Golden Eagle Surveys in Argos Mountain and Quackenbush 2025MAR DOC 07__P1241 Staging Areas Map and Plan 20241024 DOC 08__CUI-CTI__P1241 Equipment Schedule for Existing Towers 20250703 DOC 09__CUI-CTI__P1241 Equipment Schedule for New Towers 20250703
TO:
PART 6 – ATTACHMENTS
All information in Part 6 is for information only and not to be used for installation or construction.
DOCUMENTS
DOC 01__P1241 NAVSEA Collateral Equipment Design (NAVFAC Concept Dwg) 20250612 DOC 01__P1241 NAVSEA Collateral Equipment Design (NAVFAC Concept Dwg) 20250909 DOC 02__P1241 Installation Schedule (v0.33 20250605 1100 PDT wrw) DOC 02__P1241 Installation Schedule (v0.34 20250627 1000 PDT wrw) DOC 03__P1241 Roles & Responsibilities Matrix (v0.1 20241212 ldm) 20250312rev DOC 03__P1241 Roles & Resp Matrix (v0.1 20241212 ldm) 20250312rev_20250911rev DOC 04__P1241 2022 CERS updated 2024Nov18 via Encl 6 DOC 05__Golden Eagle Surveys in Sunshine Peak and Bessemer Mine 2025FEB DOC 06__Golden Eagle Surveys in Argos Mountain and Quackenbush 2025MAR DOC 07__P1241 Staging Areas Map and Plan 20241024 DOC 08__CUI-CTI__P1241 Equipment Schedule for Existing Towers 20250703 DOC 09__CUI-CTI__P1241 Equipment Schedule for New Towers 20250703 DOC 10__P1241 Coll Equip Final BOD_App A_Civil-Struct Calcs 20250903 DOC 11__P1241 LARCS_RTE_GoogleEarth_20250731_updated20250905 DOC 12__P1241 PreProposalConference Virtual Site Visit_Slides_20250731
3. Modify RFP PART 6 ATTACHMENTS, in response to RFI 26 and 46 as follows:
ADD ATTACHMENT:
DOC 10__P1241 Coll Equip Final BOD (20250903)_App A_Civil-Struct Calcs
4. Modify RFP PART 6 ATTACHMENTS in response to RFI 58 as follows:
DELETE:
DOC 01__P1241 NAVSEA Collateral Equip Design (NAVFAC Concept Dwg) 20250612
ADD:
DOC 01__P1241 NAVSEA Collateral Equip Design (NAVFAC Concept Dwg) 20250909
NOTES:
1. The offeror must acknowledge receipt of all amendments on the offer schedule.
2. All other paragraphs, provisions, and conditions to this proposed contract remain unchanged.
ATTACHMENTS:
(1) Phase Two_ AMND 0012_ DOC 01__P1241 NAVSEA Collateral Equip Design (NAVFAC Concept Dwg) 20250909
(1) Phase Two_ AMND 0012_ DOC 10__P1241 Coll Equi Final BOD_App A_Civil-Struct Calcs 20250903
File details come from the government source that posted it. Updated .