Attachment J-9 - SF 1413 - Statement of Acknowledgement .pdf

Standard Form PDF 112 KB Posted

Attached to
MULTIPLE-AWARD INDEFINITE DELIVERY INDEFINITE QUANTITY CONSTRUCTION CONTRACT TO RENOVATE VARIOUS ROOMS IN VARIOUS BUILDINGS AT NIH, BETHESDA CAMPUS AND OTHER SATELITE LOCATONS IN THE WASHINGTON DC AREA
Solicitation number
NIHOF2007011
Issued by

About this file

Attachment J-9 Statement and Acknowledgement Standard Form 1413 (Rev 6-89

View the file

Other versions and copies of SF 1413

File Revision Posted Attached to
B2_DRAFT_08.3_Sec_J_SF1413_exp_05-2027.pdf May 2027 SLAC Job Order Contract
Exhibit F - Statement of Acknowledgment (SF-1413).pdf Revision not stated KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS
S02_Attachment - SF 1413 updated.pdf Revision not stated Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies
SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf Revision not stated IE181 - WHS Greenhouse Construction
SF 1413-23A - Statement and Acknowledgment.pdf Revision not stated 70Z03026QCLEV0106 - USCG STA/ANT BUFFALO GENERATOR MAINTENANCE
B08_Attachment_9_Subcontractor_Ack_SF1413-23a_upon_award.pdf Revision not stated EROS Removal and replacement of chilled and conden
Exhibit I - Statement of Acknowledgment (SF-1413).pdf Revision not stated Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB
S02_Attachment - Standard Form 1413.pdf Revision not stated Fort Bliss National Cemetery, Gravesite Expansion and FCA Deficiencies
S02_Attachment - Standard Form 1413.pdf Revision not stated CAMP NELSON NATIONAL CEMETERY, KY 833CM3030 – CORRECT FCA DEFICIENCIES
Exhibit K - SF1413.pdf Revision not stated Fire Sprinkler Repair_XGal_IB2A_Lab1_MI50
SF 1413-23A - Statement and Acknowledgment (2).pdf Revision not stated 70Z03026QCLEV0100 - GROUND MAINTENANCE AND SNOW REMOVAL FOR USCG STATION ST. IGNACE
SF 1413-23A - Statement and Acknowledgment (2).pdf Revision not stated 70Z03026QCLEV0101 - GROUND MAINTENANCE AND SNOW REMOVAL FOR SECTOR NORTHERN GRREAT LAKES
SF 1413 - Statement and Acknowledgment.pdf Revision not stated 70Z03026QCLEV0071 - USCG STA LORAIN SECURITY SYSTEM WITH CCTV PROJECT
Exhibit I SF1413_fill-ins.pdf Revision not stated MINOS High Bay Roof Replacement & Masonry Wall Repair
SF 1413 - Statement and Acknowledgment.pdf Revision not stated 70Z03026QCLEV0099 Replacement HVAC Station Building at STA Sodus Point
S02_Attachment - Standard Form 1413.pdf Revision not stated Leavenworth National Cemetery, Gravesite Expansion
SF 1413 - Statement and Acknowledgment.pdf Revision not stated 70Z03026QCLEV0097 - U. S. Coast Guard Station Lorain Gate Replacement
B08_Attachment_7_Subcontractor_Statement_and_Acknowledgment_SF1413-23a.pdf Revision not stated DREDGING OF SEDIMENT POND & CONTACT POOL
SF 1413-23A - Statement and Acknowledgment (1) (1).pdf Revision not stated 70Z03026QCLEV0053- USCG STATION ST. IGNACE REPLACEMENT SHOWER STALL
Exhibit K SF1413_printed.pdf Revision not stated Roof Maintenance and Repair Services IDIQ
Show all 20

Who attaches SF 1413

State Files
Florida 3
Colorado 1

Other files

File Type Posted
Questions Answers as of 2 July 2008.pdf PDF
Amendment Number 000004.zip ZIP file
Amendment Number 000003.zip ZIP file
SF 30 -- Amendment 000002.pdf PDF
Amendment 000001.zip ZIP file
Attachment J-11 - Past Perfomance Questionnaire.pdf PDF
Attachment J-2 Wage Rate Determination Montgomery County MD070056 dtd 05-30-2008.htm HTM file
Attachment J-2 Wage Rate Determination District of Columbia DC080003 dtd 06-06-2008.htm HTM file
SF 1442 —
Attachment J-13 - Guide for Construction Site Signage.pdf PDF
Section A thru M.pdf PDF
Attachment J-4 Sample Indirect Cost Worksheet Two Tier.xls XLS spreadsheet
Attachment J-16 - Construction Specs.zip ZIP file
Attachment J-14 Functional Description Information Form.pdf PDF
Attachment J-2 Wage Rate Determination Frederick Co MD030009 dtd 05-16-2008.htm HTM file
Attachment J-7 - SF 25 - Performance Bond.pdf PDF
Attachment J-3 -- Sample Construction Cost Estimate.xls XLS spreadsheet
Attachment J-6 - NIH 2582 - Contractor's Release for all Contracts.pdf PDF
Attachment J-8 - SF 25A - Payment Bond.pdf PDF
Attachment J-10 -- SF LLL - Disclosure of Lobbying Activities.pdf PDF
Attachment J-15 Update of Construction Details.pdf PDF
Attachment J-11 - Past Perfomance Questionnaire.pdf PDF
Attachment J-5 -- Statement of Work - Specificarion for Seed Project or Sample Task.PDF PDF
Attachment J-1 -- PACKAGING AND DELIVERY OF PROPOSALS.pdf PDF
Attachment J-12 Standard Details and References.pdf PDF
Attachment J-2 wage Rate Determination Baltimore City MD 070001 dtd 05-23-2008.htm HTM file
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT AND ACKNOWLEDGMENT OMB No.: 9000-0014 Expires: 4/30/2008

Public reporting burden for this collection of information is estimated to average 30 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretariat, (VIR), Regulatory and Federal Assistance Division, GSA, Washington, DC 20405; and to the Office of Management and Budget, Paperwork Reduction Project (9000-0014), Washington, DC 20503.

PART I - STATEMENT OF PRIME CONTRACTOR

1. PRIME CONTRACT NO. 2.DATE SUBCONTRACT

AWARDED

3. SUBCONTRACT NUMBER

15b. TITLE OF PERSON SIGNING

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1413 (REV. 7/2005)

Prescribed by GSA/FAR (48 CFR) 53.222(e)

4. PRIME CONTRACTOR 5. SUBCONTRACTOR

a. NAME a. NAME

b. STREET ADDRESS b. STREET ADDRESS

c. CITY d. STATE e. ZIP CODE c. CITY d. STATE e. ZIP CODE

6. The prime contract does, does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation."

7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in item 5 by the following firm:

a. NAME OF AWARDING FIRM

b. DESCRIPTION OF WORK BY SUBCONTRACTOR

8. PROJECT 9. LOCATION

10a. NAME OF PERSON SIGNING 11. BY (Signature) 12. DATE SIGNED

10b. TITLE OF PERSON SIGNING

PART II - ACKNOWLEDGMENT OF SUBCONTRACTOR

13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract:

Contract Work Hours and Safety Standards Act - Overtime Compensation - (If included in prime contract see Block 6)

Payrolls and Basic Records Withholding of Funds Disputes Concerning Labor Standards Compliance with Davis-Bacon and Related Act Regulations

Davis-Bacon Act Apprentices and Trainees Compliance with Copeland Act Requirements Subcontracts (Labor Standards) Contract Termination - Debarment Certification of Eligibility

14. NAME(S) OF ANY INTERMEDIATE SUBCONTRACTORS, IF ANY

A C

B D

15a. NAME OF PERSON SIGNING 16. BY (Signature) 17. DATE SIGNED

1.6 Presentation Agent PDFlib 3.02 (C++/Win32) D:20050617125503-04'00' D:20080212101247-05'00'

STATEMENT AND ACKNOWLEDGMENT

OMB No.:

9000-0014 Expires:

4/30/2008 Public reporting burden for this collection of information is estimated to average 30 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the FAR Secretariat, (VIR), Regulatory and Federal Assistance Division, GSA, Washington, DC 20405; and to the Office of Management and Budget, Paperwork Reduction Project (9000-0014), Washington, DC 20503.

PART I - STATEMENT OF PRIME CONTRACTOR

1. PRIME CONTRACT NO.

2.DATE SUBCONTRACT

AWARDED

3. SUBCONTRACT NUMBER

15b. TITLE OF PERSON SIGNING

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1413

(REV. 7/2005)

Prescribed by GSA/FAR (48 CFR) 53.222(e)

4. PRIME CONTRACTOR

5. SUBCONTRACTOR

a. NAME

a. NAME

b. STREET ADDRESS

b. STREET ADDRESS

c. CITY

d. STATE

e. ZIP CODE

c. CITY

d. STATE

e. ZIP CODE

6. The prime contract does, does not contain the clause entitled "Contract Work Hours and Safety Standards Act -- Overtime Compensation."

7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in item 5 by the following firm:

a. NAME OF AWARDING FIRM

b. DESCRIPTION OF WORK BY SUBCONTRACTOR

8. PROJECT

9. LOCATION

10a. NAME OF PERSON SIGNING

11. BY

(Signature)

12. DATE SIGNED

10b. TITLE OF PERSON SIGNING

PART II - ACKNOWLEDGMENT OF SUBCONTRACTOR

13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract:

Contract Work Hours and Safety Standards Act - Overtime Compensation - (If included in prime contract see Block 6) Payrolls and Basic Records Withholding of Funds Disputes Concerning Labor Standards Compliance with Davis-Bacon and Related Act Regulations Davis-Bacon Act Apprentices and Trainees Compliance with Copeland Act Requirements Subcontracts (Labor Standards) Contract Termination - Debarment Certification of Eligibility

14. NAME(S) OF ANY INTERMEDIATE SUBCONTRACTORS, IF ANY

A C B D 15a. NAME OF PERSON SIGNING

16. BY

(Signature)

17. DATE SIGNED

Part 1 - Statement of Prime Contractor 1 Prime Contract Number:
Part 1 Statement of Prime Contractor 2 Date Subcontract Awarded:
Part 1 Statement of Prime Contractor 3 Subcontract Number:
Part 1 Statement of Prime Contractor 4 Name of Prime Contractor:
Part 1 Statement of Prime Contractor 4 Street Address of Prime Contractor:
Part 1 Statement of Prime Contractor 4 City of Prime Contractor:
Part 1 Statement of Prime Contractor 4 State of Prime Contractor Two Letter Abbrebviation:
Part 1 Statement of Prime Contractor 4 Zip Code of Prime Contractor:
Part 1 Statement of Prime Contractor 5 Name of Subcontractor:
Part 1 Statement of Prime Contractor 5 Street Address of Subcontractor:
Part 1 Statement of Prime Contractor 5 City of Subcontractor:
Part 1 Statement of Prime Contractor 5 State of Subcontractor Two Letter Abbreviation:
Part 1 Statement of Prime Contractor 5 Zip Code of Subcontractor:
Part 1 Statement of Prime Contractor 6 The Prime Contract Does Contain the Clause Entitled Contract Work Hours and Safety Standards Act Overtime Compensation Check Box.:
Part 1 Statement of Prime Contractor 6 The Prime Contract Does Not Contain the Clause Entitled Contract Work Hours and Safety Standards Act Overtime Compensation Checkbox:
Part 1 Statement of Prime Contractor 7 Name of Awarding Firm:
Part 1 Statement of Prime Contractor 7 Description of Work by Subcontractor:
Part 1 Statement of Prime Contractor 8 Project:
Part 1 Statement of Prime Contractor 9 Location:
Part 1 Statement of Prime Contractor 10 Name of Person Signing Statement:
Part 1 Statement of Prime Contractor Title of Person Signing Statement:
Part 1 Statement of Prime Contractor 12 Date Statement Signed:
Part 2 Acknowledgment of Subcontractor 14 Name of Any Intermediate Subcontractors If Any 1:
Part 2 Acknowledgment of Subcontractor 14 Name of Any Intermediate Subcontractor If Any 2:
Part 2 Acknowledgment of Subcontractor 14 Name of Any Intermediate Subcontractors If Any 3:
Part 2 Acknowlegment of Subcontractor 14 Name of Any Intermediate Subcontractors If Any 4:
Part 2 Acknowledgment of Subcontractor 15 Name of Person Signing Acknowldgment:
Part 2 Acknowledgment of Subcontractor 15 Title of Person Signing Acknowledgment:
Part 2 Acknowledgment of Subcontractor 17 Date Acknowledgment Signed:

File details come from the government source that posted it. Updated .