Guide for Construction Site Signage
Business Center
DCAB/DES
1.0 Purpose
The purpose of this procedure is to outline the process, authority and responsibilities for requesting and obtaining construction signage for the NIH Bethesda, Maryland Campus. A further purpose of this proce-dure is to limit excessive use of signs on campus, establish when and where signs should be placed and the length of time signs will remain on the site.
2.0 Scope
This procedure applies to all the Design, Construction and Alterations Branch employees requesting construction signage. Signs should be placed as necessary for informational purposes, safety, proper notification of parking lot closures and for pedestrian or vehicular traffic changes.
3.0 Definitions
3.1 Construction signage – any signage, interior or
exterior associated with a construction project on the Bethesda, Maryland Campus.
4.0 Exterior Construction Signage Procedure
4.1 Project Officer’s are to complete the Signage
Request Form provided on pages 13-15 of the Guide for Construction Site Signage for all signage requests.
4.2 An “X” number will be provided to the Project
Officer for the signage request by the Business Center. “X” Numbers will be used for designated construction projects only.
Construction Signage
4.3 Placement of 4' x 8' and 3' x 4' site signage will be
approved through the DCAB Site Coordination Center.
4.4 Request for 4' x 8' site signage must be submit-
ted to Medical Arts & Photography Branch (MAPB), Design Section, 20 calendar days prior to the signage requirement date. Smaller projects and those of shorter duration (less than six months) shall order 3' x 4' site signage. Request for 3' x 4' site signage inserts shall be submitted to MAPB, 5 working days prior to requirement. Program Management Teams will be provided with reusable 3' x 4' signs for which 30" x 36" inserts will be designed and produced by MAPB. When possible, any additional exterior traffic and construction signage should be ordered at the same time.
4.5 All exterior construction sites shall have at least
one (1) and no more than three (3) site signs.
Additional site signage shall be approved through appropriate Program Manager.
4.6 MAPB, will arrange for the placement of the
4' x 8' project signs.
4.7 4' x 8' exterior signs shall be placed on site not less than 14 calendar days prior to commencement of construction.
4.8 All signage for temporary construction, closing
of roads, parking lots, sidewalks or other areas shall conform to the standards set forth in the Guide for Construction Site Signage.
4.9 The Project Officer will arrange for the placement
of all exterior signage except for 4' x 8' site signs.
4.10 In the case of an unforeseen occurrence, temporary signs may be used until standard signs are installed.
4.11 All exterior construction signage shall be
removed from the site no more than five (5) days after completion of project.
5.0 Interior Construction Signage Procedure
5.1 All interior construction areas shall have at least
two (2) 8-1/2" x 11" or 11" x 17" interior construction information signs. These signs shall be placed on site not less than 14 calendar days prior to start of construction.
5.2 Door hangers (Construction In Progress) shall
be hung on the outside of the entrance door(s) of the room(s) the construction is being performed.
5.3 Door hangers (Construction In Your
Neighborhood) shall be hung on the outside of the adjacent corridors entrance door(s) on floors above and below of the room(s) that may be effected by the construction.
5.4 All door hangers shall be in place not less
than 7 calendar days prior to construction.
5.5 The 8-1/2" x 11", 11" x 17" signs and door
hangers will be supplied by the Program Manager.
5.6 All interior construction signage shall be
removed from the site no more than five (5) days after completion of project.
AR EA
C LOS ED
Area Closed – CD-2
D EAD
E N D
Dead End – W14-1
D ETO U R
AH EAD
Detour Ahead – W20-2
D ET O U R
Detour Rte Aux. – M4-8
DD EETTOO UU RR
Detour Rte/Arrow– M4-9
DO NOT
BLOCK
INTERSECTION
Do Not Block Intersection – R10-7
EN D
R OAD WO R K
T HAN K YO U
End Road Work Thank You – G20-2
ROAD
C LOS ED
Road Closed – R11-2
Standard Exterior Traffic Signs
Pedestrian Crossing – W11A-2
ROAD
WO R K
AH EAD
Road Work Ahead – W21-4
Stop – R1-1
ROAD
C LOS ED
AH EAD
Road Closed Ahead – W20-3
Standard Exterior Traffic Signs
Workers – W21-1A
Staging Area
Custom Truck Route – TR-____
Truck Route see page 6
PARKING
CLOSED
Parking Closed – Custom CUST-P1
WALKWAY
Walkway+ information – Custom CUST-W
PARKING
Parking + Arrow – Custom CUST-P2
Custom Standards
Project Directional Signs
Sign Posts – 8' high
Long Term Projects Black square Allows sign placement around post
Short Term Projects U Channel delineator predrilled
These directional signs are used for directing construction traffic through the campus.
The signs have preassigned colors for specific projects and are abbreviated to match the Site Coordination Center Project Schedule.
Example uses of this signage would be site deliveries, lay down areas, traffic patterns for trucks, staging areas for trucks to exit or entrance to (street name) etc.
Truck Deliveries
Exit Old Georgetown
Lay Down Area
Staging Area
Building 50 – TR-50
Building 2 Renovation –
TR-2
Fire Station – TR-FS
Renovation of Boilers
– TR-11
Power Plant Building Expansion – TR-11A
Building 37 Renovation –
TR-37
Renovation MLP6 –
TR-P6
Renovation MLP6 –
TR-P7
AIDS Vaccine Building
– TR-AV
Building 37 – TR-37
CC: South Entrance Modification – TR-10E
CC: CRC Road Relocate/ Site Prep – TR-10I
CC: Utility Tunnel at CRC – TR-10L
CC: Clinical Research Center – TR-10M
UTE - Utility Tunnel East Expansion B – TR-UTE
Truck Route Signage by Project
Site Trailer Custom Signs
Signs for Site Trailer TS-Trailer Sign
Color coordinates with Truck Route Sign. Color System continues, sign is keyed to project color.
Construction company name in color bar, project code and title, and trailer number.
VANVILLE
PROJECT #
TRAILER
NUMBER TR46E
PROJECT NAME
UTE UTILITY TUNNEL
EXPANSION B EAST
Office of Research Services
Building 50 Construction
Estimated Start Date: October 1996
Estimated Completion Date: June 2000
For information or problem resolution call:
Project Officer: Fred Manuel Phone: 301/402-6970 Chief, Team: 1/ Scott Robinson, P.E.
Phone: 301/496-1975 Chief, DCAB: George Williams, P.E.
Construction Contractor: Lott Constructors, Inc.
DES After Hours Emergency Phone: 108
Off Campus Emergency Phone: 301/496-9828
Website: http://des.od.nih.gov
Building A Better NIH
Division of Engineering Services
Design, Construction and Alteration Branch c o n st ru c ti o n z o n e Interior Signs
Signs for hallway locations IS-Letter and IS-Tabloid
Available in 8 -1/2"x11" and 11"x17" as blanks to run through on your laser printer.
Door Hangers
Division of Engineering Services
Local construction should not effect your area.
Please, bear with our progress.
Project Title: _____________________________
Project Start Date: _____________________________
Project Finish Date: _____________________________
For information or problem resolution call:
Project Officer: ____________________________________
Phone: ____________________________________
Chief, Team: ____________________________________
Chief, DCAB: George Williams, P.E., 301-496-3193
Office of Research Services
Construction In Your Neighborhood
Design, Construction and Alteration Branch
Building A Better NIH Division of Engineering Services
Office of Research Services
Construction In Progress
Design, Construction and Alteration Branch
Building A Better NIH
Project Title: _____________________________
Project Start Date: _____________________________
Project Finish Date: _____________________________
Construction Contractor: _____________________________
For information or problem resolution call:
Project Officer: ____________________________________
Phone: ____________________________________
Chief Team 1, DCAB
Chief, DCAB: George Williams, P.E.
please see reverse side
Chief, Team: ____________________________________
Chief, DCAB: George Williams, P.E., 301-496-3193
Door Hanger/Site DH-1– Blank
2 sided hanger with site instructions on back
Door Hanger/Off Site DH-2– Blank
3' x 4' Exterior Site Signs
Site Signs ES-3x4
Se pt
- O ct
Phase 1
Oc t 2
- N ov
Phase 2
No v
Ja n
Phase 3 construction zone
C lin ic al
R e se ar ch
C e n te r S o u th
E n tr y P ar ki n g C h an g e s
DC
AB
P ro je ct
O ffi ce r:
Do n
Se ba st ia n, /4
-8
Pr oj ec t D ire ct or : Y on g
Du k
Ch yu n Ch ie f, DC
AB
: G eo rg e
W ill ia m s, P
.E
Pa rk in g
Co or di na to r:
St el la S er ra s- Fi ot es
Ph as es o f P ar tia l P ar ki ng C ha ng es
DE
S Af te r H ou rs
Em er ge nc y Ph on e:
Of f C am pu s Em er ge nc y
Ph on e:
1/
6-
W eb si te ht tp w w w .n ih .g ov /o d/ or s/ pa rk in g/ pa rk in g.
ht m
De si gn
Co ns tru ct io n an d
Al te ra tio n Br an ch
Di vi si on o f
En gi ne er in g
Se rv ic es
Of fic e of
Re se ar ch
Se rv ic es
4' x 8' Exterior Site Signs
Site Signs ES-4x8 construction zone
Fa ci lit y
Im pr ov em en t C os t:
$7
M ill io n
Es tim at ed
S ta rt Da te : S um m er
Es tim at ed C om pl et io n Da te : S um m er
B u ild in g
C o n st ru c ti o n
DC
AB
P ro je ct
O ffi ce r:
Fr an k Ku tla k, /4
-6
Ch ie f, Te am
: K ris ty L on g, A .I.
A.
Ch ie f, DC
AB
: G eo rg e
W ill ia m s, P
.E
Co nt ra ct in g
Of fic er : C oo ki e M ue lle r Co ns tru ct io n Co nt ra ct or
: L ot t C on st ru ct or s, In c.
DE
S
Af te r H ou rs Em er ge nc y
Ph on e:
Of f C am pu s Em er ge nc y
Ph on e:
1/
6-
W eb si te ht tp de s.
od .n ih .g ov Bu ild in g p ro vi de s
8, GS
F of s ta te o f t he a rt la bo ra to ry , o ffi ce a nd c on fe re nc e fa ci lit ie s.
Ar ch ite ct
He ns on
, L in d, M ay er
Co ns ul ta nt s:
GP
R- Pl an ne rs C ol la bo ra tiv e
Ro ss
, M ur ph y, F in ke ls te in
Co ns tru ct io n
M an ag er
Ja co bs
/C
RS
S Co ns tru ct or s, In c.
De si gn
Co ns tru ct io n an d Al te ra tio n
Br an ch
Di vi si on o f
En gi ne er in g
Se rv ic es
Of fic e of
Re se ar ch
Se rv ic es
Requestor: Date:
Phone #: Fax#:
Work Request #: SSFAS/Delpro X#:
Information for ES-4x8 Site Signage or ES-3x4 Site Signage
Project Headline:
Project Subhead:
Estimated Start Date:
Estimated Completion Date:
DCA Project Officer/Phone:
Chief Team #/Title:
Contracting Officer:
Construction Contractor:
Architect:
Consultants:
Construction Manager:
Number of Signs: Requested Delivery Date:
POSITION OF SIGN(S): Supply description below and diagram of sign placement location with contact person name/phone to contact for signs installation.
Image/Request for Visuals/Artwork:
Caption:
Request for Signage
Copy these forms and fill out when ordering signage
Request for Signage
Sign Number Size Qty Text with Arrow Direction
Custom Signage
CUST-P1 18x24 _____ _________________________________________
CUST-P2* 18x24 _____ _________________________________________
CUST-P2* 18x24 _____ _________________________________________
CUST-P2* 18x24 _____ _________________________________________
CUST-W* 18x24 _____ _________________________________________
CUST-W* 18x24 _____ _________________________________________
CUST-W* 18x24 _____ _________________________________________
CUST-W* 18x24 _____ _________________________________________
Standard Signage
CD-2 18x24 _____ _________________________________________
W14-1 24x24 _____ _________________________________________
W20-2 24x24 _____ _________________________________________
M4-8 12x24 _____ _________________________________________
M4-9 18x24 _____ _________________________________________
R10-7 18x24 _____ _________________________________________
G20-2 18x24 _____ _________________________________________
W11A-2 24x24 _____ _________________________________________
R11-2 18x24 _____ _________________________________________
W20-3 24x24 _____ _________________________________________
W21-4 24x24 _____ _________________________________________
R1-1 30x30 _____ _________________________________________
W21-1A 24x24 _____ _________________________________________
Signage from this Standards Guide
Copy these forms and fill out when ordering signage
1 WALKWAY (EXAMPLE)
*Add arrows or graphics
Custom* Size Qty Text, Graphics, Arrow Direction
Diamond 24x24 _____ _________________________________________
Diamond 24x24 _____ _________________________________________
Square 24x24 _____ _________________________________________
Square 24x24 _____ _________________________________________
Horizontal 18x24 _____ _________________________________________
Horizontal 12x18 _____ _________________________________________
Vertical 18x24 _____ _________________________________________
Vertical 12x18 _____ _________________________________________
Directional Size Qty Sign #, Text with Arrow Direction
TR-Truck Rte 12x18 _____ _________________________________________
TR-Truck Rte 12x18 _____ _________________________________________
TR-Truck Rte 12x18 _____ _________________________________________
TR-Truck Rte 12x18 _____ _________________________________________
TR-Truck Rte 12x18 _____ _________________________________________
Site Trailer Size Qty Contractor, Project # & Name, Trailer #
TS-Trailer Sign 30x30 ____ _________________________________________
TS-Trailer Sign 30x30 ____ _________________________________________
TS-Trailer Sign 30x30 ____ _________________________________________
Copy these forms and fill out when ordering signage
*Add arrows or graphics
Custom Planner Worksheet
Copy these forms and fill out when ordering signage
TRAILER
NUMBER
PROJECT # PROJECT NAME
TRAILER
NUMBER
PROJECT # PROJECT NAME
TRAILER
NUMBER
PROJECT # PROJECT NAME
Use blanks to plan your project with text, arrows and graphics
TR-Truck Rte
TS-Trailer Sign
File details come from the government source that posted it. Updated .