This is a comprehensive specifications and performance work statement document for Federal Contract Solicitation N62742-26-R-1300, a construction project to build the North Aircraft Parking Ramp (P-012) at Andersen Air Force Base, Guam, valued under FY24 appropriation AJJY183012. The project scope encompasses construction of approximately 191 acres of airfield infrastructure including aircraft parking aprons, taxiways, concrete pavements (approximately 80 acres), maintenance facilities, fueling systems with hydrant pits and piping, utility extensions, stormwater management infrastructure, and associated site work. Construction is estimated at 3 to 7 years beginning in 2024, requiring approximately 500 construction workers and generating 270 daily construction vehicle trips. The contracting agency is Naval Facilities Engineering Command (NAVFAC), with work location on the northern end of Guam.
The document includes extensive environmental compliance requirements, particularly a Natural Resources Performance Work Statement addressing Endangered Species Act conservation measures for five federally threatened plant species (Cycas micronesica, Tabernaemontana rotensis, Bulbophyllum guamense, Dendrobium guamense, and Tuberolabium guamense) and the Mariana fruit bat. Contractor responsibilities include salvaging and transplanting 120 Cycas micronesica, 63 Tabernaemontana rotensis, and 53 orchid specimens; establishing and maintaining a 173-acre bat habitat enhancement area with ungulate-proof fencing; managing invasive species through HACCP plans; implementing green waste management and processing; conducting pre-construction biological surveys; providing qualified biologists; and submitting weekly, monthly, and annual natural resources conservation reports. The specifications contain detailed technical divisions covering concrete, masonry, metals, electrical systems, utilities, pavements, drainage, telecommunications, fueling infrastructure, and archaeological monitoring protocols with specific Standard Operating Procedures for post-review discovery of archaeological remains and human remains.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY24 AJJY183012 (P-012), PDI: North Aircraft Parking Ramp 1665555 Andersen Air Force Base, Guam
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/24 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 02/24, CHG 1: 05/25 SUMMARY OF WORK
01 14 00 11/22, CHG 5: 05/25 WORK RESTRICTIONS
01 20 00 11/20, CHG 5: 02/25 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 5: 02/25 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 08/23, CHG 1: 02/24 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
(eCMS)
01 32 17.00 20 05/25 COST-LOADED NETWORK ANALYSIS SCHEDULES
(NAS)
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 29 02/21, CHG 1: 08/25 SUSTAINABILITY REQUIREMENTS AND
REPORTING
01 35 13.04 30 CES 01/25 FACILITY-RELATED CONTROL SYSTEMS
(FRCS) PROCUREMENT FOR AIR FORCE
CONTROL SYSTEMS
01 35 26 05/24, CHG 1: 05/25 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 29.13 11/15, CHG 1: 08/22 HEALTH, SAFETY, AND EMERGENCY RESPONSE
PROCEDURES FOR CONTAMINATED SITES
01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 08/23, CHG 3: 08/25 QUALITY CONTROL
01 45 35 05/24 SPECIAL INSPECTIONS
01 50 00 11/20, CHG 3: 08/24 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22, CHG 2: 08/25 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.03 21 07/25 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS SECRETARY OF THE NAVY
(SECNAV) EXPLOSIVE SAFETY RISK
ACCEPTANCE WITHIN JOINT REGION MARIANAS
01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 05/23, CHG 1: 05/25 OPERATION AND MAINTENANCE DATA
01 78 23.33 08/18, CHG 1: 02/21 OPERATION AND MAINTENANCE MANUALS FOR
AVIATION FUEL SYSTEMS
01 78 24.00 20 05/23, CHG 1: 11/23 FACILITY DATA WORKBOOK (FDW)
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
02 56 13.13 02/25 GEOMEMBRANE WASTE CONTAINMENT
02 61 13 02/25 EXCAVATION AND HANDLING OF
CONTAMINATED MATERIAL
02 81 00 08/25 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00 08/25 ASBESTOS REMEDIATION
02 83 00 11/18 LEAD REMEDIATION
02 84 16 11/22 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
02 84 33 11/22 REMOVAL AND DISPOSAL OF
POLYCHLORINATED BIPHENYLS (PCBs)
Jacobs D3430603 DOCUMENT PROJECT Page 1 17 April 2026 Amendment 0003
DIVISION 03 - CONCRETE
03 30 00 02/19, CHG 10: 08/25 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 05/25 UNIT MASONRY
DIVISION 05 - METALS
05 05 20 05/22, CHG 1: 08/24 POST-INSTALLED CONCRETE AND MASONRY
ANCHORS
05 50 13 08/24, CHG 1: 08/25 MISCELLANEOUS METAL FABRICATIONS
05 59 10 11/22 ROLLING COVER FOR AVIATION REFUELING
VAULTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 07 84 00
08/23
05/10, CHG 1: 08/13
BITUMINOUS DAMPPROOFING
FIRESTOPPING
DIVISION 09 - FINISHES
09 90 00 02/21 PAINTS AND COATINGS
09 96 00 11/14 HIGH-PERFORMANCE COATINGS
09 96 53.13 11/25 SILICONE ELASTOMERIC COATINGS
09 97 13.27 02/21, CHG 1: 08/22 HIGH PERFORMANCE COATING FOR STEEL
STRUCTURES
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.26 08/24 CYBERSECURITY FOR FACILITY-RELATED
CONTROL SYSTEMS UTILITY CONTROL
SYSTEMS TO INCLUDE ADVANCED METERING
INFRASTRUCTURE (AMI)
DIVISION 26 - ELECTRICAL
26 05 48 11/23 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 05 73 08/23 POWER SYSTEM STUDIES
26 08 00 11/22 APPARATUS INSPECTION AND TESTING
26 12 19 05/24 PAD-MOUNTED, LIQUID-FILLED,
MEDIUM-VOLTAGE TRANSFORMERS
26 13 00 05/21, CHG 1: 05/22 HIGH-FIREPOINT FLUIDS INSULATED
PAD-MOUNTED SWITCHGEAR
26 20 00 05/25 INTERIOR DISTRIBUTION SYSTEM
26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING
26 42 13 05/21 GALVANIC (SACRIFICIAL) ANODE CATHODIC
PROTECTION (GACP) SYSTEM
26 56 00 08/21 EXTERIOR LIGHTING
26 56 20 02/19 AIRFIELD AND HELIPORT LIGHTING AND
VISUAL NAVIGATION AIDS
DIVISION 31 - EARTHWORK
31 00 00 08/23 EARTHWORK
31 11 00 11/18 CLEARING AND GRUBBING
31 32 19.16 02/21 GEOTEXTILE SOIL STABILIZATION
Jacobs D3430603 DOCUMENT PROJECT Page 2 17 April 2026 Amendment 0003 adele.murakami Cross-Out adele.murakami Cross-Out adele.murakami Cross-Out
31 33 10 05/25 FOUNDATION DRILLING AND GROUTING IN
ROCK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 11/19, CHG 1: 11/24 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 11 20 05/22 BASE COURSE FOR RIGID PAVING
32 11 23 05/22 GRADED CRUSHED AGGREGATE BASE COURSES
32 11 23.23 08/22 BASE COURSE DRAINAGE LAYERS
32 12 13 05/24 BITUMINOUS TACK AND PRIME COATS
32 12 15.13 11/20, CHG 1: 05/22 ASPHALT PAVING FOR AIRFIELDS
32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING
32 13 14.13 11/22, CHG 1: 05/24 CONCRETE PAVING FOR AIRFIELDS AND
OTHER HEAVY DUTY PAVEMENTS
32 13 73.19 11/19 COMPRESSION CONCRETE PAVING JOINT
SEALANT
32 16 19 05/18 SIDEWALKS
32 17 23.16 11/24 ROAD AND PARKING LOT PAVEMENT MARKINGS
32 17 23.19 11/24 AIRFIELD PAVEMENT MARKINGS
32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK) AND
GATES
32 84 24 08/11, CHG 1: 05/17 TEMPORARY IRRIGATION SPRINKLER SYSTEMS
32 92 19 08/17, CHG 1: 08/21 SEEDING
32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 08 53 08/18 AVIATION FUEL DISTRIBUTION SYSTEM
START-UP
33 09 53 02/21 AVIATION FUEL PUMP CONTROL AND
ANNUNCIATION SYSTEM (TYPE III)
33 11 00 08/24 WATER UTILITY DISTRIBUTION PIPING
33 40 00 11/21 STORMWATER UTILITIES
33 46 16 05/18 SUBDRAINAGE PIPING
33 52 23.15 05/25 POL SERVICE PIPING WELDING
33 52 43.11 08/18 AVIATION FUEL MECHANICAL EQUIPMENT
33 52 43.13 08/18, CHG 1: 02/21 AVIATION FUEL PIPING
33 52 80 08/22 LIQUID FUELS PIPELINE COATING SYSTEMS
33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 34 - TRANSPORTATION
34 73 16 11/19 AIRFIELD GROUNDING
-- End of Project Table of Contents --
Jacobs D3430603 DOCUMENT PROJECT Page 3 17 April 2026
THIS PAGE INTENTIONALLY LEFT BLANK
Jacobs D3430603 DOCUMENT PROJECT Page 4 17 April 2026
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/24
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
DWG NO. NAVFAC DWG
NO.
TITLE
G-001 17361624 COVER SHEET
G-002 17361625 SHEET INDEX
G-003 17361626 SHEET INDEX
GI001 17361627 LOCATION MAP AND HAUL ROUTE
GI002 17361628 TYPICAL SYMBOLS AND ABBREVIATIONS
GI003 17361629 ABBREVIATIONS CONTINUED
GI108 17361630 PHASING PLAN
GI109 17361631 AIRFIELD PHASING PLAN
V-101 17361632 OVERALL EXISTING CONDITIONS
V-102 17361633 EXISTING CONDITIONS - AREA 1
V-103 17361634 EXISTING CONDITIONS - AREA 2
V-104 17361635 EXISTING CONDITIONS - AREA 3
V-105 17361636 EXISTING CONDITIONS - AREA 4
V-106 17361637 EXISTING CONDITIONS - AREA 5
V-107 17361638 EXISTING CONDITIONS - AREA 6
V-108 17361639 EXISTING CONDITIONS - AREA 7
V-109 17361640 EXISTING CONDITIONS - AREA 8
V-110 17361641 EXISTING CONDITIONS - AREA 9
V-111 17361642 EXISTING CONDITIONS - AREA 10
V-112 17361643 EXISTING CONDITIONS - AREA 11
V-113 17361644 EXISTING CONDITIONS - AREA 12
V-114 17361645 EXISTING CONDITIONS - AREA 13
V-115 17361646 EXISTING CONDITIONS - AREA 14
V-116 17361647 EXISTING CONDITIONS - AREA 15
V-117 17361648 EXISTING CONDITIONS - AREA 16
V-118 17361649 EXISTING CONDITIONS - AREA 17
V-119 17361650 EXISTING CONDITIONS - AREA 18
V-120 17361651 EXISTING CONDITIONS - AREA 19
V-121 17361652 EXISTING CONDITIONS - AREA 20
V-122 17361653 EXISTING CONDITIONS - AREA 21
V-123 17361654 EXISTING CONDITIONS - AREA 22
V-124 17361655 EXISTING CONDITIONS - AREA 23
V-125 17361656 EXISTING CONDITIONS - AREA 24
V-126 17361657 EXISTING CONDITIONS - AREA 25
V-127 17361658 EXISTING CONDITIONS - AREA 26
V-128 17361659 SURVEY CONTROL PLAN
Jacobs D3430603 DOCUMENT 00 01 15 Page 1 24 April 2026
BB101 17361660 LIMITED GEOTECHNICAL FIELD WORK PLAN
BB102 17361661 PHASE 2 GEOTECHNICAL FIELD WORK
BB103 17361662 BORING LOGS
BB104 17361663 BORING LOGS
BB105 17361664 BORING LOGS
BB106 17361665 BORING LOGS
BB107 17361666 BORING LOGS
BB108 17361667 BORING LOGS
BB109 17361668 BORING LOGS
BB110 17361669 BORING LOGS
BB111 17361670 BORING LOGS
BB112 17361671 BORING LOGS
BB113 17361672 BORING LOGS
BB114 17361673 BORING LOGS
BB115 17361674 BORING LOGS
BB116 17361675 BORING LOGS
BB117 17361676 BORING LOGS
BB118 17361677 BORING LOGS
BB119 17361678 BORING LOGS
BB120 17361679 BORING LOGS
BB121 17362005 EXISTING ERT SURVEY INFORMATION
BB122 17362006 EXISTING ERT SURVEY INFORMATION
BB123 17362007 EXISTING ERT SURVEY INFORMATION
BB124 17362008 EXISTING ERT SURVEY INFORMATION
BB125 17362009 EXISTING ERT SURVEY INFORMATION
BB126 17362010 APPROXIMATE LOCATIONS OF POTENTIAL KARST FEATURES
C-001 17361680 GENERAL NOTES
CD101 17361681 OVERALL DEMOLITION PLAN
CD102 17361682 DEMOLITION PLAN - AREA 1
CD103 17361683 DEMOLITION PLAN - AREA 2
CD104 17361684 DEMOLITION PLAN - AREA 3
CD105 17361685 DEMOLITION PLAN - AREA 4
CD106 17361686 DEMOLITION PLAN - AREA 5
CD107 17361687 DEMOLITION PLAN - AREA 6
CD108 17361688 DEMOLITION PLAN - AREA 7
CD109 17361689 DEMOLITION PLAN - AREA 8
CD110 17361690 DEMOLITION PLAN - AREA 9
CD112 17361691 DEMOLITION PLAN - AREA 11
CD113 17361692 DEMOLITION PLAN - AREA 12
CD114 17361693 DEMOLITION PLAN - AREA 13
CD115 17361694 DEMOLITION PLAN - AREA 14
CD116 17361695 DEMOLITION PLAN - AREA 15
CD117 17361696 DEMOLITION PLAN - AREA 16
CD118 17361697 DEMOLITION PLAN - AREA 17
CD119 17361698 DEMOLITION PLAN - AREA 18
CD120 17361699 DEMOLITION PLAN - AREA 19
CD121 17361700 DEMOLITION PLAN - AREA 20
CD122 17361701 DEMOLITION PLAN - AREA 21
CD123 17361702 DEMOLITION PLAN - AREA 22
CD124 17361703 DEMOLITION PLAN - AREA 23
CD125 17361704 DEMOLITION PLAN - AREA 24
CD126 17361705 DEMOLITION PLAN - AREA 25
CD127 17361706 DEMOLITION PLAN - AREA 26
CD130 17361707 NOT USED
Jacobs D3430603 DOCUMENT 00 01 15 Page 2 24 April 2026
CD131 17361708 NOT USED
CD132 17361709 NOT USED
CD134 17361710 NOT USED
CD135 17361711 NOT USED
CD136 17361712 NOT USED
CD137 17361713 NOT USED
CD138 17361714 NOT USED
CD139 17361715 NOT USED
CS101 17361716 OVERALL SITE & PAVING PLAN
CS102 17361717 SITE & PAVING PLAN - AREA 1
CS103 17361718 SITE & PAVING PLAN - AREA 2
CS104 17361719 SITE & PAVING PLAN - AREA 3
CS105 17361720 SITE & PAVING PLAN - AREA 4
CS106 17361721 SITE & PAVING PLAN - AREA 5
CS107 17361722 SITE & PAVING PLAN - AREA 6
CS108 17361723 SITE & PAVING PLAN - AREA 7
CS109 17361724 SITE & PAVING PLAN - AREA 8
CS110 17361725 SITE & PAVING PLAN - AREA 9
CS111 17361726 SITE & PAVING PLAN - AREA 10
CS112 17361727 SITE & PAVING PLAN - AREA 11
CS113 17361728 SITE & PAVING PLAN - AREA 12
CS114 17361729 SITE & PAVING PLAN - AREA 13
CS115 17361730 SITE & PAVING PLAN - AREA 14
CS120 17361731 SITE & PAVING PLAN - AREA 20
CS121 17361732 SITE & PAVING PLAN - AREA 21
CS122 17361733 SITE & PAVING PLAN - AREA 22
CS123 17361734 SITE & PAVING PLAN - AREA 23
CS124 17361735 SITE & PAVING PLAN - AREA 24
CS125 17361736 SITE & PAVING PLAN - AREA 25
CS126 17361737 SITE & PAVING PLAN - AREA 26
CS130 17361738 OVERALL PAVEMENT MARKING PLAN
CS131 17361739 PAVEMENT MARKING PLAN - AREA 1
CS132 17361740 PAVEMENT MARKING PLAN - AREA 2
CS133 17361741 PAVEMENT MARKING PLAN - AREA 3
CS134 17361742 PAVEMENT MARKING PLAN - AREA 5
CS135 17361743 PAVEMENT MARKING PLAN - AREA 6
CS136 17361744 PAVEMENT MARKING PLAN - AREA 7
CS137 17361745 PAVEMENT MARKING PLAN - AREA 11
CS138 17361746 PAVEMENT MARKING PLAN - AREA 12
CS139 17361747 PAVEMENT MARKING PLAN - AREA 13
CS140 17361748 PAVEMENT MARKING PLAN - AREA 20
CS141 17361749 PAVEMENT MARKING PLAN - AREA 21
CS142 17361750 PAVEMENT MARKING PLAN - AREA 22
CS143 17361751 PAVEMENT MARKING PLAN - AREA 23
CS144 17361752 PAVEMENT MARKING PLAN - AREA 24
CS145 17361753 PAVEMENT MARKING PLAN - AREA 25
CS146 17361754 PAVEMENT MARKING PLAN - AREA 26
CS201 17361755 ROADWAY PLAN & PROFILE RW01 STA 0+00-6+25 - AREA 22
CS202 17361756 ROADWAY PLAN & PROFILE RW01 STA 6+25-12+50 - AREA 22 & 23
CS203 17361757 ROADWAY PLAN & PROFILE RW01 STA 12+50-18+75 - AREA 23 & 24
CS204 17361758 ROADWAY PLAN & PROFILE RW01 STA 18+75-25+00 - AREA 24 & 25
CS205 17361759 ROADWAY PLAN & PROFILE RW01 STA 25+00-31+25 - AREA 25 & 26
CS206 17361760 ROADWAY PLAN & PROFILE RW01 STA 31+25-37+50 - AREA 21 & 26
Jacobs D3430603 DOCUMENT 00 01 15 Page 3 24 April 2026
CS207 17361761 ROADWAY PLAN & PROFILE RW01 STA 37+50-44+00 - AREA 21
CS212 17361762 TAXILANE PLAN & PROFILE L2 STA 00+00-06+50
CS213 17361763 TAXILANE PLAN & PROFILE L2 STA 06+50-13+00
CS215 17361764 TAXILANE PLAN & PROFILE L3 STA 00+00-06+50
CS216 17361765 TAXILANE PLAN & PROFILE L3 STA 06+50-13+00
CS301 17361766 ROADWAY SECTIONS - SAMPLE LINE PLAN
CS302 17361767 ROADWAY SECTIONS - RW01
CS303 17361768 ROADWAY SECTIONS - RW01
CS304 17361769 ROADWAY SECTIONS - RW01
CS305 17361770 ROADWAY SECTIONS - RW01
CS306 17361771 ROADWAY SECTIONS - RW01
CS307 17361772 ROADWAY SECTIONS - RW01
CS308 17361773 ROADWAY SECTIONS - RW01
CS309 17361774 ROADWAY SECTIONS - RW01
CS310 17361775 APRON SECTIONS - A01
CS311 17361776 APRON SECTIONS - A02
CS312 17361777 APRON SECTIONS - A03
CS501 17361778 SITE DETAILS
CS502 17361779 SITE DETAILS
CS503 17361780 SITE DETAILS
CS504 17361781 SITE DETAILS
CS505 17361782 SITE DETAILS
CS506 17361783 SITE DETAILS
CS507 17361784 SITE DETAILS
CT101 17361785 OVERALL JOINTING PLAN
CT102 17361786 JOINTING PLAN - AREA 1
CT103 17361787 JOINT ELEVATION PLAN - AREA 1
CT104 17361788 JOINTING PLAN - AREA 2
CT105 17361789 JOINT ELEVATION PLAN - AREA 2
CT106 17361790 JOINTING PLAN - AREA 3
CT107 17361791 JOINT ELEVATION PLAN - AREA 3
CT108 17361792 JOINTING PLAN - AREA 6
CT109 17361793 JOINT ELEVATION PLAN - AREA 6
CT110 17361794 JOINTING PLAN - AREA 7
CT111 17361795 JOINT ELEVATION PLAN - AREA 7
CT112 17361796 JOINTING PLAN - AREA 12
CT113 17361797 JOINT ELEVATION PLAN - AREA 12
CT114 17361798 JOINTING PLAN - AREA 13
CT115 17361799 JOINT ELEVATION PLAN - AREA 13
CG101 17361800 OVERALL GRADING AND DRAINAGE PLAN
CG102 17361801 GRADING AND DRAINAGE PLAN - AREA 1
CG103 17361802 GRADING AND DRAINAGE PLAN - AREA 2
CG104 17361803 GRADING AND DRAINAGE PLAN - AREA 3
CG105 17361804 GRADING AND DRAINAGE PLAN - AREA 4
CG106 17361805 GRADING AND DRAINAGE PLAN - AREA 5
CG107 17361806 GRADING AND DRAINAGE PLAN - AREA 6
CG108 17361807 GRADING AND DRAINAGE PLAN - AREA 7
CG109 17361808 GRADING AND DRAINAGE PLAN - AREA 8
CG110 17361809 GRADING AND DRAINAGE PLAN - AREA 9
CG112 17361810 GRADING AND DRAINAGE PLAN - AREA 11
CG113 17361811 GRADING AND DRAINAGE PLAN - AREA 12
CG114 17361812 GRADING AND DRAINAGE PLAN - AREA 13
CG115 17361813 GRADING AND DRAINAGE PLAN - AREA 14
CG116 17361814 GRADING AND DRAINAGE PLAN - AREA15
Jacobs D3430603 DOCUMENT 00 01 15 Page 4 24 April 2026
CG117 17361815 GRADING AND DRAINAGE PLAN - AREA 16
CG118 17361816 GRADING AND DRAINAGE PLAN - AREA 17
CG119 17361817 GRADING AND DRAINAGE PLAN - AREA 18
CG120 17361818 GRADING AND DRAINAGE PLAN - AREA 19
CG121 17361819 GRADING AND DRAINAGE PLAN - AREA 20
CG122 17361820 GRADING AND DRAINAGE PLAN - AREA 21
CG123 17361821 GRADING AND DRAINAGE PLAN - AREA 22
CG124 17361822 GRADING AND DRAINAGE PLAN - AREA 23
CG125 17361823 GRADING AND DRAINAGE PLAN - AREA 24
CG126 17361824 GRADING AND DRAINAGE PLAN - AREA 25
CG127 17361825 GRADING AND DRAINAGE PLAN - AREA 26
CG130 17361826 NOT USED
CG131 17361827 NOT USED
CG132 17361828 NOT USED
CG134 17361829 NOT USED
CG135 17361830 NOT USED
CG136 17361831 NOT USED
CG137 17361832 NOT USED
CG138 17361833 NOT USED
CG139 17361834 NOT USED
CG140 17361835 LIMITS OF GEOSYNTHETIC CLAY LINER
CG141 17361836 LIMITS OF GEOSYNTHETIC CLAY LINER
CG142 17361837 LAWN RESTORATION PLAN
CG143 17361838 NOT USED
CG144 17361839 KARST FEATURES PLAN
CG145 17361840 NOT USED
CG146 17361841 KARST FEATURES DETAIL
CG147 17361842 TURF REINFORCEMENT PLAN
CG148 17361843 NOT USED
CG201 17361844 DRAINAGE PROFILES
CG202 17361845 DRAINAGE PROFILES
CG203 17361846 DRAINAGE PROFILES
CG204 17361847 DRAINAGE PROFILES
CG205 17361848 DRAINAGE PROFILES
CG206 17361849 DRAINAGE PROFILES
CG207 17361850 DRAINAGE PROFILES
CG208 17361851 DRAINAGE PROFILES
CG209 17361852 DRAINAGE PROFILES
CG210 17361853 DRAINAGE PROFILES
CG211 17361854 DRAINAGE PROFILES
CG212 17361855 DRAINAGE PROFILES
CG501 17361856 DRAINAGE DETAILS
CG502 17361857 DRAINAGE DETAILS
CG503 17361858 DRAINAGE DETAILS
CG504 17361859 DRAINAGE DETAILS
CG505 17361860 DRAINAGE DETAILS
CG506 17361861 DRAINAGE DETAILS
CG507 17361862 SAND FILTER DETAILS
CU101 17361863 OVERALL UTILITY PLAN
CU102 17361864 UTILITY PLAN - AREA 1
CU103 17361865 UTILITY PLAN - AREA 6
CU104 17361866 UTILITY PLAN - AREA 7
CU105 17361867 UTILITY PLAN - AREA 8
CU106 17361868 UTILITY PLAN - AREA 23
Jacobs D3430603 DOCUMENT 00 01 15 Page 5 24 April 2026
CU107 17361869 UTILITY PLAN - AREA 24
CU108 17361870 UTILITY PLAN - AREA 25
CU109 17361871 UTILITY PLAN - AREA 26
CU201 17361872 UTILITY PROFILES
CU202 17361873 UTILITY PROFILES
CU203 17361874 UTILITY PROFILES
CU501 17361875 UTILITY DETAILS
CU502 17361876 UTILITY DETAILS
S-001 17361877 STRUCTURAL GENERAL NOTES
S-002 17361878 STRUCTURAL GENERAL NOTES
S-101 17361879 FOUNDATION PLANS
S-501 17361880 TYPICAL CONCRETE DETAILS
S-502 17361881 TYPICAL CONCRETE DETAILS
S-503 17361882 CONCRETE SECTIONS AND DETAILS
A-001 17361883 GENERAL NOTES, SYMBOLS, AND EXTERIOR PERSPECTIVE VIEWS
A-406 17361884 DETACHED EQUIPMENT YARD
E-001 17361885 ELECTRICAL LEGEND 1 OF 2
E-002 17361886 ELECTRICAL LEGEND 2 OF 2
ED101 17361887 ELECTRICAL DEMOLITION PLAN 1
ED102 17361888 ELECTRICAL DEMOLITION PLAN 2
ED601 17361889 EXISTING DISTRIBUTION ONE LINE DIAGRAM - DEMOLITION PLAN
ES101 17361890 ELECTRICAL SITE PLAN 1
ES102 17361891 ELECTRICAL SITE PLAN 2
ES103 17361892 ELECTRICAL SITE PLAN 3
ES104 17361893 ELECTRICAL SITE PLAN 4
ES105 17361894 ENLARGED ELECTRICAL SITE PLAN
ES201 17361895 EXISTING SWITCHING STATION - 13.8KV SWITCHGEAR ARRANGEMENT
ELEV.ES501 17361896 ELECTRICAL SITE DETAILS
ES502 17361897 ELECTRICAL SITE DETAILS
ES503 17361898 ELECTRICAL SITE DETAILS
ES504 17361899 ELECTRICAL SITE DETAILS
ES505 17361900 ELECTRICAL SITE DETAILS
ES506 17361901 ELECTRICAL SITE DETAILS
ES701 17361902 HIGH MAST LIGHT POLE LOCATIONS
EP601 17361903 EXISTING DISTRUBUTION ONE LINE DIAGRAM - NEW WORK
EP602 17361904 ONE-LINE DIAGRAMS
EP701 17361905 PANELBOARD SCHEDULES
EA101 17361906 AIRFIELD ELECTRICAL PLAN 1
EA102 17361907 AIRFIELD ELECTRICAL PLAN 2
EA501 17361908 AIRFIELD LIGHTING DETAILS
EA502 17361909 AIRFIELD LIGHTING DETAILS
EA503 17361910 AIRFIELD LIGHTING DETAILS
EA504 17361911 AIRFIELD LIGHTING DETAILS
EA701 17361912 AIRFIELD LIGHTING POINTS SCHEDULE
EA702 17361913 AIRFIELD LIGHTING ONE-LINE DIAGRAMS
TS001 17361914 TELECOMMUNICATIONS SITE LEGEND
TD101 17361915 TELECOMMUNICATIONS SITE DEMOLITION PLAN 1
TD102 17361916 TELECOMMUNICATIONS SITE DEMOLITION PLAN 2
TS101 17361917 TELECOMMUNICATIONS SITE PLAN 1
TS102 17361918 TELECOMMUNICATIONS SITE PLAN 2
TS103 17361919 TELECOMMUNICATIONS SITE PLAN 3
TS104 17361920 TELECOMMUNICATIONS SITE PLAN 4
TS105 17361921 TELECOMMUNICATIONS SITE PLAN 5
TS106 17362001
Jacobs D3430603 DOCUMENT 00 01 15 Page 6 24 April 2026
TELECOMMUNICATIONS SITE PLAN 6
TS107 17362002 TELECOMMUNICATIONS SITE PLAN 7
TS108 17362003 TELECOMMUNICATIONS SITE PLAN 8
TS109 17362004 TELECOMMUNICATIONS SITE PLAN 9
TS501 17361922 TELECOMMUNICATIONS SITE DETAILS
TS502 17361923 TELECOMMUNICATIONS SITE DETAILS
TS701 17361924 TELECOMMUNICATIONS INTERBUILDING BACKBONE RISER
CF101 17361925 OVERALL FUELING PLAN
CF102 17361926 OVERALL COMM PLAN
CF201 17361927 FUEL PLAN AND PROFILE - AREA 1
CF202 17361928 FUEL PLAN AND PROFILE - AREA 2
CF203 17361929 FUEL PLAN AND PROFILE - AREA 3
CF204 17361930 FUEL PLAN AND PROFILE - AREA 4
CF205 17361931 FUEL PLAN AND PROFILE - AREA 5
CF206 17361932 FUEL PLAN AND PROFILE - AREA 6
CF207 17361933 FUEL PLAN AND PROFILE - AREA 7
CF208 17361934 FUEL PLAN AND PROFILE - AREA 8
CF209 17361935 FUEL PLAN AND PROFILE - AREA 9
CF210 17361936 FUEL PLAN AND PROFILE - AREA 10
CF211 17361937 FUEL PLAN AND PROFILE - AREA 11
CF212 17361938 FUEL PLAN AND PROFILE - AREA 12
CF221 17361939 COMM PLAN - AREA 1
CF222 17361940 COMM PLAN - AREA 2
CF223 17361941 COMM PLAN - AREA 3
CF224 17361942 COMM PLAN - AREA 4
CF225 17361943 COMM PLAN - AREA 5
CF226 17361944 COMM PLAN - AREA 6
CF227 17361945 COMM PLAN - AREA 7
CF228 17361946 COMM PLAN - AREA 8
CF229 17361947 COMM PLAN - AREA 9
CF230 17361948 COMM PLAN - AREA 10
CF231 17361949 COMM PLAN - AREA 11
CF232 17361950 COMM PLAN - AREA 12
CF233 17361951 COMM PLAN - AREA 13
CF234 17361952 COMM PLAN - AREA 14
CF501 17361953 FUELING DETAILS
CF502 17361954 FUELING DETAILS
SF001 17361955 STRUCTURAL GENERAL NOTES - SHEET 1
SF002 17361956 STRUCTURAL GENERAL NOTES - SHEET 2
SF003 17361957 LEGENDS AND ABBREVIATIONS
SF101 17361958 OVERALL STRUCTURAL LAYOUT
SF111 17361959 ISOLATION VALVE VAULT 1 - PLANS
SF112 17361960 ISOLATION VALVE VAULT 2 - PLANS - SHEET 1
SF113 17361961 ISOLATION VALVE VAULT 2 - PLAN - SHEET 2
SF114 17361962 HYDRANT PIT - PLANS AND SECTIONS
SF115 17361963 HPV PITS - PLANS AND SECTIONS
SF501 17361964 STANDARD STRUCTURAL DETAILS - SHEET 1
SF502 17361965 STANDARD STRUCTURAL DETAILS - SHEET 2
SF511 17361966 ISOLATION VALVE VAULT - SECTIONS - SHEET 1
SF512 17361967 ISOLATION VALVE VAULT - SECTIONS - SHEET 2
SF513 17361968 ISOLATION VALVE VAULT - SECTIONS AND DETAILS
SF521 17361969 ROLLING COVER - SHEET 1
SF522 17361970 ROLLING COVER - SHEET 2
SF523 17361971 ROLLING COVER - SHEET 3
SF524 17361972 ROLLING COVER - SHEET 4
Jacobs D3430603 DOCUMENT 00 01 15 Page 7 24 April 2026
SF525 17361973 ROLLING COVER - SHEET 5
SF551 17361974 PIPE SUPPORT DETAILS
MF001 17361975 FUELING MECHANICAL LEGEND
MF002 17361976 FUELING MECHANICAL GENERAL NOTES
MF011 17361977 FUELING MECHANICAL FLOW DIAGRAM - OVERALL
MF101 17361978 FUELING MECHANICAL OVERALL SITE PLAN
MF501 17361979 FUELING MECHANICAL DETAILS - ISOLATION VALVE VAULT (IVV-1)
MF502 17361980 FUELING MECHANICAL DETAILS - ISOLATION VALVE VAULT (IVV-2)
MF503 17361981 FUELING MECHANICAL DETAILS
MF504 17361982 FUELING MECHANICAL DETAILS
MF505 17361983 FUELING MECHANICAL DETAILS
MF506 17361984 FUELING MECHANICAL DETAILS
MF601 17361985 FUELING MECHANICAL P&ID
EF001 17361986 ELECTRICAL FUELING LEGEND - 1
EF002 17361987 ELECTRICAL FUELING LEGEND - 2
EF011 17361988 OVERALL FUELING HAZARDOUS AREA PLAN
EF101 17361989 OVERALL FUELING ELECTRICAL SITE PLAN
EF401 17361990 ENLARGED PLAN - PUMPHOUSE
EF501 17361991 ELECTRICAL DETAILS - EPDS
EF502 17361992 ELECTRICAL DETAILS - GROUNDING
EF503 17361993 ELECTRICAL SITE DETAILS - HANDHOLES
EF504 17361994 ELECTRICAL SITE DETIALS - DUCT BANKS
EF511 17361995 ELEVATION - PUMP CONTROL PANEL
EF611 17361996 PCP - CONTROL DIAGRAM
EF621 17361997 NORTH APRON EPDS - FRONT LAYOUT
EF622 17361998 NORTH ARON EPDS WIRING - 1
EK501 17361999 CATHODIC PROTECTION DETAILS
EK501 17362000 CATHODIC PROTECTION DETAILS
1.3 REFERENCE DRAWINGS
The following reference drawings are intended only to show the original used for any purpose other than that intended by the contract.
Jacobs D3430603 DOCUMENT 00 01 15 Page 8 24 April 2026 construction. Drawings are the property of the Government and must not be
NAVFAC DWG NO. TITLE
3201807 REPAIR/REPLACE OIL/WATER SEPARATORS BUILDING NO. 2550 JET
ENGINE TEST FACILITY
7320181 REPAIR/REPLACE OIL/WATER SEPARATORS BLDG NO. 2550 JET ENGINE
TEST FACILITY
AND-W-122 CONSTRUCT OIL SEPARATOR WET ENGINE TEST STAND (BLG 2550)
AND B-230 CONSTRUCT JET TEST STAND READY ROOM
AND-R-60 AIR CONDITIONING SHAW ESTES JET ENGINE TEST CELL CONTROL RM.
BLDG. 2551
-- End of Document --
Jacobs D3430603 DOCUMENT 00 01 15 Page 9 24 April 2026
THIS PAGE INTENTIONALLY LEFT BLANK
Jacobs D3430603 DOCUMENT 00 01 15 Page 10 24 April 2026
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 65 PAGES
P-012 North Aircraft Parking Ramp
01 14 00 SD-01 Preconstruction Submittals
1.5.1.1List of Contact Personnel
1.6.1Personnel List
1.5.1.2 GFree-Zone Request
1.6.2 GVehicle List
1.6.3 GStatement Of Acknowledgement
01 20 00 SD-01 Preconstruction Submittals
1.2 GEarned Value Report
01 30 00 SD-01 Preconstruction Submittals
1.3View Location Map
1.4Progress and Completion
Pictures
01 31 23.13 20 SD-01 Preconstruction Submittals
1.4.2List of Contractor's Personnel
01 32 17.00 20 SD-01 Preconstruction Submittals
1.2.2 GBaseline NAS
1.9 GDesignated Project Scheduler
SD-07 Certificates
1.3Weekly Look Ahead Schedule
1.4.2 GMonthly NAS Updates
SD-11 Closeout Submittals
1.4.3 GAs-Built NAS
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 65 PAGES
01 33 29 1.5.3.2 GPreliminary High Performance and Sustainable Building Checklist
1.4.1 GSustainability Action Plan
1.5.3.2 GPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
1.5.3.2 GFinal High Performance and
Sustainable Building Checklist
1.5.3.2 GFinal Sustainability eNotebook
01 35 13.04 30 SD-01 Preconstruction Submittals
3.1 GSystem Authorization Access
Request (SAAR)
3.1 GICS IA Addendum
3.1 GDod CYBER AWARENESS
CHALLENGE Training
3.1 GPrivileged User Cybersecurity
Responsibilities Training
3.1 GCONTRACTOR PERSONNEL
REQUIREMENTS
3.1 GSAAR User Agreement
3.6.3.1 GPre-Construction Hardware List
3.6.3.2 GPre-Construction Software List
3.6.3.3 GPre-Construction Network
Diagam
SD-03 Product Data
2.3.2 GMedia Converters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 65 PAGES
01 35 13.04 30 2.3.3 GUninterruptible Power Supply
(UPS)
2.3.4 GRemote Terminal Unit (RTU)
2.3.5 GIntermediary Network Devices
2.3.1 GEthernet Switches
SD-10 Operation and Maintenance
Data
3.6.1 GOperator Manual
3.6.2 GSustainment Materials
3.6.3.7 GAccess Controls Summary
3.6.3.8 GAuditing Controls Summary
3.6.3.9 GConfiguration Management Plan
3.6.3.10 GContingency Plan
3.6.3.12 GVulnerability Management Plan
3.6.3.13 GMaintenance Plan
SD-11 Closeout Submittals
3.3.1 GTechnical Narrative
3.4 GSystems Testing
3.6.3.4 GFinal Hardware List
3.6.3.5 GFinal Software List
3.6.3.6 GFinal Network Diagram
3.6.3.11 GSecurity Features Guide
3.6.3.14 GDocumented Statements
3.6.3.15 GTest Results
01 35 26 SD-01 Preconstruction Submittals
1.9.1 GAccident Prevention Plan (APP)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 65 PAGES
01 35 26 1.17 GIndoor Air Quality (IAQ)
Management Plan
SD-06 Test Reports
1.13.2 GAccident Reports
1.13.3LHE Inspection Reports
1.5 GMonthly Exposure Reports
SD-07 Certificates
1.10 GActivity Hazard Analysis (AHA)
1.13.4Certificate of Compliance
1.6Contractor Safety Self-Evaluation
Checklist
1.14Hot Work Permit
1.15License Certificates
1.15.1 GPortable Gauge Operations
Planning Worksheet
1.15.1 GRadiography Operation Planning
Work Sheet
1.13.4.2 GStandard Lift Plan
1.13.4.2 GCritical Lift Plan
01 35 29.13 SD-02 Shop Drawings
3.8.1 GWork Zones
3.9.1 GDecontamination Facilities
SD-03 Product Data
1.4 GAmendments to the APP/SSHP
3.5 GG-RAM/LLRW Exposure
Monitoring/Air Sampling Program
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 65 PAGES
01 35 29.13 3.8.2Site Control Log
1.8SSHO's Daily Inspection Logs
SD-07 Certificates
1.7Certificate Of Worker/Visitor
Acknowledgement
1.5.3 GCertification Of 40 Hour Radiation
Safety Officer Training
SD-11 Closeout Submittals
1.9 GSafety And Health Phase-Out
Report
01 45 00 SD-01 Preconstruction Submittals
1.5.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
1.12.3Verification Statement
01 45 35 SD-06 Test Reports
3.1.1Special Inspection Daily Reports
3.1.2Special Inspection Daily Reports
3.1.1Special Inspection Biweekly
Reports
SD-07 Certificates
2.1AISC Certified Steel Fabricator
2.1Certificate of Compliance
1.5 GSpecial Inspector
SD-11 Closeout Submittals
3.1.2 GComprehensive Final Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 65 PAGES
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
1.6.1.4 GContractor Computer
Cybersecurity Compliance
Statements
1.6.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
SD-06 Test Reports
3.5Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
3.8.1 GContractor Hazardous Material
Inventory Log
1.5.4.1.2Storage Material Inventory
1.6.1Preconstruction Survey
1.6.2Regulatory Notifications
1.6.4Environmental Manager
Qualifications
1.6.5Employee Training Records
1.7 GEnvironmental Protection Plan
1.7.9.1Dirt and Dust Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 65 PAGES
01 57 19 1.10Solid Waste Management Permit
3.2.1.1 GStormwater Pollution Prevention
Plan
3.2.1.2Stormwater Notice of Intent
3.15.2 GSpill Prevention Control and
Countermeasure (SPCC) Plan
3.1.1 GHazard Analysis and Critical
Control Point (HACCP) Plan
3.2.1.1 GGEPA Clearing, Grubbing, Grading, and Stockpiling Permit /
General Permit Application
3.1.1 GFinal Work Plan for Tarague
Forest Enhancement Area
3.1.1 GDraft Work Plan for Tarague
Forest Enhancement Area
3.1.1 GDraft Natural Resource Work
Plan
3.1.1 GFinal Natural Resource Work
Plan
3.1.1 GNatural Resource Field
Assessment Report for P-012
Construction Footprint
3.1.1 GNatural Resource Field
Assessment Report for Tarague
Forest Enhancement Area
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 65 PAGES
01 57 19 3.4.4 GArchaeological Monitoring and
Discovery Plan
SD-02 Shop Drawings
3.1.1 GAlignment of Ungulate Fence
SD-06 Test Reports
1.10.1 GMonthly Solid Waste Disposal
Report
3.2.1.3SWPPP Inspection Reports
3.7.1.1.2Laboratory Analysis
SD-07 Certificates
1.4.1.2 GECATTS Certificate of
Completion
1.6.5 GEmployee Training Records
1.6.5Erosion and Sediment Control
Inspector Qualifications
3.1.1 GQualification of Qualified
Biologist(S)
3.4.2 GQualification of Archaeologist(s)
SD-10 Operation and Maintenance
Data
3.1.1 GWeekly Natural Resources
Conservation Status Report
3.1.1 GMonthly Natural Resources
Conservation Progress Report
3.1.1 GAnnual Natural Resources
Conservation Progress Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 65 PAGES
01 57 19 3.4.3.2 GReports and Submittals required by Data Recovery Plan
3.4.4 GEnd of Field (EOF) Letter for
Archaeological Monitoring -
Tarague FEA
SD-11 Closeout Submittals
3.8.1 GContractor Hazardous Material
Inventory Log
1.6.2 GRegulatory Notifications
1.6.5 GAssembled Employee Training
Records
1.10 GSolid Waste Management Permit
3.2.1.4 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 GStormwater Notice of Termination
3.2.1.5As-Built Topographic Survey
3.7.1 GWaste Determination
Documentation
3.7.2.1 GProject Solid Waste Disposal
Documentation Report
3.7.2.1 GSales Documentation
3.7.2.1Contractor Certification
3.7.3.1 GHazardous Waste/Debris
Management
3.7.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 65 PAGES
01 57 19 3.1.1 GDraft Natural Resources
Conservation Report
3.1.1 GFinal Natural Resources
Conservation Report
3.4.4 GWeekly archaeological monitoring
report-Tarague FEA
3.4.4 GDraft Archaeological Monitoring
Report-Tarague FEA
3.4.4 GFinal Archaeological Monitoring
Report-Tarague FEA
01 57 19.03 21 SD-01 Preconstruction Submittals
1.2.1 GMEC Work Plan
1.2.2Initial GIS Data Files
SD-11 Closeout Submittals
1.2.3Final GIS Data Files
01 58 00 SD-02 Shop Drawings
1.4.1 GPreliminary Drawing Indicating
Layout And Text Content
01 74 19 SD-01 Preconstruction Submittals
1.7Construction Waste Management
Plan
SD-06 Test Reports
1.12 GSampling and Analytical Report
for Surplus Soil
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 65 PAGES
01 74 19 1.12 GDisposal Documentation or
Acceptance of Surplus Soil
SD-11 Closeout Submittals
1.2.6 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.6.1Warranty Management Plan
1.6.4Warranty Tags
3.4Final Cleaning
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.6.1Instructions
SD-10 Operation and Maintenance
Data
3.3 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.2 GRecord Drawings
1.6.1As-Built Record of Equipment and Materials
2.1 GCertification of EPA Designated
Items
2.2 GCertification Of USDA Designated
Items
3.5.1 GInterim DD FORM 1354
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 65 PAGES
01 78 00 3.5.2 GChecklist for DD FORM 1354
3.5.2 GHigh Performance and
Sustainable Building (HPSB)
Checklist
01 78 23 SD-10 Operation and Maintenance
Data
1.4 GFacility Data Workbook
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
3.2.1 GOperation And Maintenance
Manual, Progress Submittal
3.2.2 GOperation And Maintenance
Manual, Prefinal Submittal
3.2.3 GOperation And Maintenance
Manual, Final Submittal
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
3.1.1 GTraining Plan
1.6.6.7 GRecord Drawings And Utility
Systems
01 78 23.33 SD-10 Operation and Maintenance
Data
2.1.1 GSystem Instructions
01 78 24.00 20 SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 65 PAGES
01 78 24.00 20 1.3.1 GFacility Data Workbook (FDW), Progress Submittal
1.3.2 GFacility Data Workbook (FDW), Prefinal Submittal
1.3.3 GFacility Data Workbook (FDW), Final Submittal
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
02 56 13.13 SD-02 Shop Drawings
2.1.1.1 GLayout And Detail Drawings
3.6 GAs-Built Drawings
SD-03 Product Data
1.4.1Manufacturer's Quality Control
Manual
1.4.2Installer's Quality Control Manual
2.2 GMaterials
1.7Manufacturer's Warranty
1.7Installer's Warranty
SD-06 Test Reports
2.5.2.2Product Acceptance Tests
3.3.2.1Trial Seam Logs
3.4.2Non-Destructive Field Seam
Testing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 65 PAGES
02 56 13.13 2.5.1Manufacturer's Certified Raw And
Sheet Material Test Reports
SD-07 Certificates
3.1.1Certificate Of Subgrade
Acceptance
1.4.3 GQualifications
SD-08 Manufacturer’s Instructions
3.3.1 GGeomembrane Manufacturer's
Installation Instructions
02 61 13 SD-01 Preconstruction Submittals
1.3Pre-Installation Meeting Agenda
1.3 GPre-Installation Meeting Minutes
1.2 GSMP Work Plan
1.2.1.1 GSMP Work Plan
3.1.2Pre-Installation Examination
Report
3.1.3Pre-Construction Equipment
Examination
1.2 GQualification of Professional
Engineer (PE) or Environmental
Consultant (EC)
1.2 GQualification of Nuclear
Regulatory Commission (NRC)
Licensed Service Provider
1.2 GKey Personnel Qualification for
G-RAM/LLRW
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 65 PAGES
02 61 13 1.2 GRadiation Work Plan
1.2 GQualification Of Radiation Safety
Officer (RSO)
SD-02 Shop Drawings
3.1.1Surveys
SD-03 Product Data
2.1.3 GSpecifications Of Geomembrane
SD-06 Test Reports
1.2 GReport for G-RAM Site Screening
Level
1.2 GAdditional PFAS Testing Report
With Sampling Procedures
SD-07 Certificates
1.5.2 GQualifications
SD-08 Manufacturer’s Instructions
1.2 GGeomembrane Manufacturer's
Installation Instructions
2.1.3 GGeomembrane Manufacturer's
Installation Instructions
SD-10 Operation and Maintenance
Data
1.2 GWeekly G-RAM/LLRW Inventory
Report
SD-11 Closeout Submittals
1.2 GSMP Closure Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 65 PAGES
02 61 13 1.2 GFinal G-RAM/LLRW Status
Survey Report
1.2 GG-RAM/LLRW Closure Report
1.2 GTopographic Survey Drawings for
PFAS-Impacted Soil Relocation
Area
02 81 00 SD-03 Product Data
2.1.1Packaging Notifications
3.1 GHazardous Waste Management
Plan
3.2 GOnsite Hazardous Waste
Management
3.3Notices of Non-Compliance and
Notices of Violation
SD-06 Test Reports
3.8 GRecordkeeping
3.8 GException Report
3.9Spill Response
SD-07 Certificates
1.4.1 GTransportation and Disposal
Coordinator
1.4.2 GTraining
1.4.3Pipeline Hazardous Materials
Safety Administration Certification
3.3.3 GShipping Documents and
Packagings Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 65 PAGES
02 81 00 3.3.4Security Plan
3.3.5Certificates of Disposal
3.7Waste Minimization
02 82 00 SD-01 Preconstruction Submittals
1.3.2 GAsbestos Sampling And
Analytical Report
SD-03 Product Data
1.2.1 GAmended Water
1.3.9 GSafety Data Sheets (SDS) for All
Materials
3.1.2.1 GRespirators
3.1.7 GLocal Exhaust Equipment
3.1.7 GPressure Differential Automatic
Recording Instrument
3.1.8 GVacuums
3.1.10 GGlovebags
SD-06 Test Reports
1.5.5 GAir Sampling Results
1.5.6 GPressure Differential Recordings
for Local Exhaust System
3.2.11.4 GClearance Sampling
3.3.3.2 GAsbestos Disposal Quantity
Report
SD-07 Certificates
1.3.4 GEmployee Training
1.3.5 GNotifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 65 PAGES
02 82 00 1.3.7 GRespiratory Protection Program
1.3.10 GAsbestos Hazard Abatement Plan
1.3.11 GTesting Laboratory
1.3.12 GLandfill Approval
1.3.12 GDelivery Tickets
1.3.12 GWaste Shipment Records
1.3.13 GTransporter Certification
1.3.14 GMedical Certification
1.5.1 GPrivate Qualified Person
Documentation
1.5.2 GDesignated Competent Person
1.5.3 GWorker's License
1.5.4 GContractor's License
1.5.7 GFederal, State or Local Citations
on Previous Projects
3.1 GEquipment Used to Contain
Airborne Asbestos Fibers
3.1.3.2 GWater Filtration Equipment
3.1.8 GVacuums
3.1.8 GVentilation Systems
SD-11 Closeout Submittals
1.3.5 GPermits and Licenses
1.3.5 GNotifications
1.3.7.1 GRespirator Program Records
1.7.1 GRental Equipment
02 83 00 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 65 PAGES
02 83 00 1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.4 GMedical Examinations
1.5.2.8 GLead, Cadmium, Chromium
Waste Management Plan
1.5.2.2 GLead, Cadmium, Chromium
Compliance Plan
3.1.1.3 GLead, Cadmium, Chromium
Compliance Plan
3.5.2.1 GWritten Evidence of TSD
Approval
SD-03 Product Data
1.6.1Respirators
1.6.4Vacuum Filters
1.6.6 GNegative Air Pressure System
2.1Materials and Equipment
2.1.1Expendable Supplies
3.1.1.3 GPressure Differential Log
SD-06 Test Reports
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.3 GSampling Results
1.5.3Pressure Differential Recordings
For Local Exhaust System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 65 PAGES
02 83 00 SD-07 Certificates
1.5.1.3 GTesting Laboratory
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 GHazardous Waste Manifest
3.5.2.1 GTurn-In Documents or Weight
Tickets
02 84 16 SD-07 Certificates
1.8.1 GQualifications of CIH
1.8.1 GTraining Certification
1.8.2 GPCB and Lamp Removal Work
Plan
1.8.3 GPCB and Lamp Disposal Plan
SD-11 Closeout Submittals
3.5.2 GTransporter Certification
3.2.4Certification of Decontamination
3.5.2.1Certificate of Disposal and/or recycling
3.3.1Testing Results
02 84 33 SD-01 Preconstruction Submittals
1.7.3 GPCB Removal Work Plan
1.7.4 GPCB Disposal Plan
SD-07 Certificates
1.7.1Training certification
1.7.2 GQualifications of IH
1.7.5Notification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 65 PAGES
02 84 33 3.8 GTransporter Certification
3.8 GDisposal Facility Certification
3.5.4Certification of Decontamination
3.5.5Post Cleanup Sampling
3.8.2Certificate of Disposal
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.5 GQuality Control Program
1.6.6 GQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
3.3.8Maturity Method Data
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.4.5 GJoint Sealants
2.4.4 GJoint Filler
2.1Formwork Materials
2.3.3.2 GRecycled Aggregate Materials
2.3.1 GCementitious Materials
2.4.6 GVapor Retarder
2.4.1 GConcrete Curing Materials
2.6 GReinforcement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 65 PAGES
03 30 00 2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4 GAdmixtures
2.6.2 GMechanical Reinforcing Bar
Connectors
2.2.2 GWaterstops
2.2.3Biodegradable Form Release
Agent
1.6.3.2 GPumping Concrete
2.4.2 GNonshrink Grout
SD-05 Design Data
2.2.5 GConstruction and Movement
Joints Locations and Details
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1 GFly Ash
1.6.4.1 GPozzolan
1.6.4.2 GSlag Cement
1.6.4.3 GAggregates
2.3.1.1 GPortland Cement
2.3.1.2 GBlended Cements
3.13.3.3 GCompressive Strength Tests
3.13.3.1Slump Tests
2.3.2Water
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .