This is a Submittal Register form for federal construction contract P-012 North Aircraft Parking Ramp, dated January 1996 (Amendment No. 0005). The document serves as a comprehensive tracking template for contractor submittals throughout the project lifecycle, organized by specification sections and submission types.
The register tracks required submittals across multiple construction disciplines and project phases, including preconstruction submittals (SD-01), shop drawings (SD-02), product data (SD-03), samples (SD-04), design data (SD-05), test reports (SD-06), certificates (SD-07), manufacturer's instructions (SD-08), field reports (SD-09), operation and maintenance data (SD-10), and closeout submittals (SD-11). Key construction elements addressed include site management, safety and environmental compliance, concrete and masonry work, asphalt and concrete pavements, structural steel, electrical systems (transformers, switchgear, lighting, grounding), water systems (piping, hydrants, meters), telecommunications infrastructure, and various finishing and landscaping items. Specific requirements include certifications for qualified personnel (inspectors, engineers, safety officers), equipment approvals, testing and inspection reports, as-built documentation, and operational manuals. The form designates approval authority responsibilities and tracks submission and approval dates through multiple review cycles. Items marked with "G" indicate government approval requirements, while unmarked items represent contractor-controlled submittals. The register covers specification sections from 01 14 00 through 34 73 16, encompassing the full range of construction work for an airfield parking ramp project.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 65 PAGES
P-012 North Aircraft Parking Ramp
01 14 00 SD-01 Preconstruction Submittals
1.5.1.1List of Contact Personnel
1.6.1Personnel List
1.5.1.2 GFree-Zone Request
1.6.2 GVehicle List
1.6.3 GStatement Of Acknowledgement
01 20 00 SD-01 Preconstruction Submittals
1.2 GEarned Value Report
01 30 00 SD-01 Preconstruction Submittals
1.3View Location Map
1.4Progress and Completion
Pictures
01 31 23.13 20 SD-01 Preconstruction Submittals
1.4.2List of Contractor's Personnel
01 32 17.00 20 SD-01 Preconstruction Submittals
1.2.2 GBaseline NAS
1.9 GDesignated Project Scheduler
SD-07 Certificates
1.3Weekly Look Ahead Schedule
1.4.2 GMonthly NAS Updates
SD-11 Closeout Submittals
1.4.3 GAs-Built NAS
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 33 29 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Amendment No. 0005
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 65 PAGES
01 33 29 1.5.3.2 GPreliminary High Performance and Sustainable Building Checklist
1.4.1 GSustainability Action Plan
1.5.3.2 GPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
1.5.3.2 GFinal High Performance and
Sustainable Building Checklist
1.5.3.2 GFinal Sustainability eNotebook
01 35 13.04 30 SD-01 Preconstruction Submittals
3.1 GSystem Authorization Access
Request (SAAR)
3.1 GICS IA Addendum
3.1 GDod CYBER AWARENESS
CHALLENGE Training
3.1 GPrivileged User Cybersecurity
Responsibilities Training
3.1 GCONTRACTOR PERSONNEL
REQUIREMENTS
3.1 GSAAR User Agreement
3.6.3.1 GPre-Construction Hardware List
3.6.3.2 GPre-Construction Software List
3.6.3.3 GPre-Construction Network
Diagam
SD-03 Product Data
2.3.2 GMedia Converters
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 65 PAGES
01 35 13.04 30 2.3.3 GUninterruptible Power Supply
(UPS)
2.3.4 GRemote Terminal Unit (RTU)
2.3.5 GIntermediary Network Devices
2.3.1 GEthernet Switches
SD-10 Operation and Maintenance
Data
3.6.1 GOperator Manual
3.6.2 GSustainment Materials
3.6.3.7 GAccess Controls Summary
3.6.3.8 GAuditing Controls Summary
3.6.3.9 GConfiguration Management Plan
3.6.3.10 GContingency Plan
3.6.3.12 GVulnerability Management Plan
3.6.3.13 GMaintenance Plan
SD-11 Closeout Submittals
3.3.1 GTechnical Narrative
3.4 GSystems Testing
3.6.3.4 GFinal Hardware List
3.6.3.5 GFinal Software List
3.6.3.6 GFinal Network Diagram
3.6.3.11 GSecurity Features Guide
3.6.3.14 GDocumented Statements
3.6.3.15 GTest Results
01 35 26 SD-01 Preconstruction Submittals
1.9.1 GAccident Prevention Plan (APP)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 65 PAGES
01 35 26 1.17 GIndoor Air Quality (IAQ)
Management Plan
SD-06 Test Reports
1.13.2 GAccident Reports
1.13.3LHE Inspection Reports
1.5 GMonthly Exposure Reports
SD-07 Certificates
1.10 GActivity Hazard Analysis (AHA)
1.13.4Certificate of Compliance
1.6Contractor Safety Self-Evaluation
Checklist
1.14Hot Work Permit
1.15License Certificates
1.15.1 GPortable Gauge Operations
Planning Worksheet
1.15.1 GRadiography Operation Planning
Work Sheet
1.13.4.2 GStandard Lift Plan
1.13.4.2 GCritical Lift Plan
01 35 29.13 SD-02 Shop Drawings
3.8.1 GWork Zones
3.9.1 GDecontamination Facilities
SD-03 Product Data
1.4 GAmendments to the APP/SSHP
3.5 GG-RAM/LLRW Exposure
Monitoring/Air Sampling Program
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 65 PAGES
01 35 29.13 3.8.2Site Control Log
1.8SSHO's Daily Inspection Logs
SD-07 Certificates
1.7Certificate Of Worker/Visitor
Acknowledgement
1.5.3 GCertification Of 40 Hour Radiation
Safety Officer Training
SD-11 Closeout Submittals
1.9 GSafety And Health Phase-Out
Report
01 45 00 SD-01 Preconstruction Submittals
1.5.2 GContractor Quality Control (CQC)
Plan
SD-06 Test Reports
Verification Statement
01 45 35 SD-06 Test Reports
3.1.1Special Inspection Daily Reports
3.1.2Special Inspection Daily Reports
3.1.1Special Inspection Biweekly
Reports
SD-07 Certificates
2.1AISC Certified Steel Fabricator
2.1Certificate of Compliance
1.5 GSpecial Inspector
SD-11 Closeout Submittals
3.1.2 GComprehensive Final Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 65 PAGES
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
1.6.1.4 GContractor Computer
Cybersecurity Compliance
Statements
1.6.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
SD-06 Test Reports
3.5Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
3.8.1 GContractor Hazardous Material
Inventory Log
1.5.4.1.2Storage Material Inventory
1.6.1Preconstruction Survey
1.6.2Regulatory Notifications
1.6.4Environmental Manager
Qualifications
1.6.5Employee Training Records
1.7 GEnvironmental Protection Plan
1.7.9.1Dirt and Dust Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 65 PAGES
01 57 19 1.10Solid Waste Management Permit
3.2.1.1 GStormwater Pollution Prevention
Plan
3.2.1.2Stormwater Notice of Intent
3.15.2 GSpill Prevention Control and
Countermeasure (SPCC) Plan
3.1.1 GHazard Analysis and Critical
Control Point (HACCP) Plan
3.2.1.1 GGEPA Clearing, Grubbing, Grading, and Stockpiling Permit /
General Permit Application
3.1.1 GFinal Work Plan for Tarague
Forest Enhancement Area
3.1.1 GDraft Work Plan for Tarague
Forest Enhancement Area
3.1.1 GDraft Natural Resource Work
Plan
3.1.1 GFinal Natural Resource Work
Plan
3.1.1 GNatural Resource Field
Assessment Report for P-012
Construction Footprint
3.1.1 GNatural Resource Field
Assessment Report for Tarague
Forest Enhancement Area
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 65 PAGES
01 57 19 3.4.4 GArchaeological Monitoring and
Discovery Plan
SD-02 Shop Drawings
3.1.1 GAlignment of Ungulate Fence
SD-06 Test Reports
1.10.1 GMonthly Solid Waste Disposal
Report
3.2.1.3SWPPP Inspection Reports
3.7.1.1.2Laboratory Analysis
3.4.5.1 GCultural Resources and
Inspection Reports
3.4.5.2 GCultural Resources and
Inspection Reports
3.4.5.3 GCultural Resources and
Inspection Reports
3.4.5.4 GCultural Resources and
Inspection Reports
3.1.1 GDraft Natural Resources
Conservation Report
3.1.1 GFinal Natural Resources
Conservation Report
3.4.3.2 GReports and Submittals required
by Data Recovery Plan
3.4.4 GEnd of Field (EOF) Letter for
Archaeological Monitoring -
Tarague FEA
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 65 PAGES
01 57 19 3.4.4 GDraft Archaeological Monitoring
Report-Tarague FEA
3.4.4 GFinal Archaeological Monitoring
Report-Tarague FEA
SD-07 Certificates
1.4.1.2 GECATTS Certificate of
Completion
1.6.5 GEmployee Training Records
1.6.5Erosion and Sediment Control
Inspector Qualifications
3.1.1 GQualification of Qualified
Biologist(S)
3.4.2 GQualification of Archaeologist(s)
SD-10 Operation and Maintenance
Data
3.1.1 GWeekly Natural Resources
Conservation Status Report
3.1.1 GMonthly Natural Resources
Conservation Progress Report
3.1.1 GAnnual Natural Resources
Conservation Progress Report
3.4.4 GWeekly archaeological monitoring
report-Tarague FEA
SD-11 Closeout Submittals
3.8.1 GContractor Hazardous Material
Inventory Log
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 65 PAGES
01 57 19 1.6.2 GRegulatory Notifications
1.6.5 GAssembled Employee Training
Records
1.10 GSolid Waste Management Permit
3.2.1.4 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 GStormwater Notice of Termination
3.2.1.5As-Built Topographic Survey
3.7.1 GWaste Determination
Documentation
3.7.2.1 GProject Solid Waste Disposal
Documentation Report
3.7.2.1 GSales Documentation
3.7.2.1Contractor Certification
3.7.3.1 GHazardous Waste/Debris
Management
3.7.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
01 57 19.03 21 SD-01 Preconstruction Submittals
1.2.1 GMEC Work Plan
1.2.2Initial GIS Data Files
SD-11 Closeout Submittals
1.2.3Final GIS Data Files
01 58 00 SD-02 Shop Drawings
1.4.1 GPreliminary Drawing Indicating
Layout And Text Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 65 PAGES
01 74 19 SD-01 Preconstruction Submittals
1.7Construction Waste Management
Plan
SD-06 Test Reports
1.12 GSampling and Analytical Report
for Surplus Soil
SD-07 Certificates
1.12 GDisposal Documentation or
Acceptance of Surplus Soil
SD-11 Closeout Submittals
1.2.6 SFinal Construction Waste
Diversion Report
01 78 00 SD-03 Product Data
1.6.1Warranty Management Plan
1.6.4Warranty Tags
3.4Final Cleaning
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.6.1Instructions
SD-10 Operation and Maintenance
Data
3.3 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.2 GRecord Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 65 PAGES
01 78 00 1.6.1As-Built Record of Equipment and Materials
2.1 GCertification of EPA Designated
Items
2.2 GCertification Of USDA Designated
Items
3.5.1 GInterim DD FORM 1354
3.5.2 GChecklist for DD FORM 1354
3.5.2 GHigh Performance and
Sustainable Building (HPSB)
Checklist
01 78 23 SD-10 Operation and Maintenance
Data
1.4 GFacility Data Workbook
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
3.2.1 GOperation And Maintenance
Manual, Progress Submittal
3.2.2 GOperation And Maintenance
Manual, Prefinal Submittal
3.2.3 GOperation And Maintenance
Manual, Final Submittal
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 65 PAGES
01 78 23 3.1.1 GTraining Plan
1.6.6.7 GRecord Drawings And Utility
Systems
01 78 23.33 SD-10 Operation and Maintenance
Data
2.1.1 GSystem Instructions
01 78 24.00 20 SD-11 Closeout Submittals
1.3.1 GFacility Data Workbook (FDW), Progress Submittal
1.3.2 GFacility Data Workbook (FDW), Prefinal Submittal
1.3.3 GFacility Data Workbook (FDW), Final Submittal
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
02 56 13.13 SD-02 Shop Drawings
2.1.1.1 GLayout And Detail Drawings
3.6 GAs-Built Drawings
SD-03 Product Data
1.4.1Manufacturer's Quality Control
Manual
1.4.2Installer's Quality Control Manual
2.2 GMaterials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 65 PAGES
02 56 13.13 1.7Manufacturer's Warranty
1.7Installer's Warranty
SD-06 Test Reports
2.5.2.2Product Acceptance Tests
3.3.2.1Trial Seam Logs
3.4.2Non-Destructive Field Seam
Testing
2.5.1Manufacturer's Certified Raw And
Sheet Material Test Reports
SD-07 Certificates
3.1.1Certificate Of Subgrade
Acceptance
1.4.3 GQualifications
SD-08 Manufacturer’s Instructions
3.3.1 GGeomembrane Manufacturer's
Installation Instructions
02 61 13 SD-01 Preconstruction Submittals
1.3Pre-Installation Meeting Agenda
1.3 GPre-Installation Meeting Minutes
1.2 GSMP Work Plan
1.2.1.1 GSMP Work Plan
3.1.2Pre-Installation Examination
Report
3.1.3Pre-Construction Equipment
Examination
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 65 PAGES
02 61 13 1.2 GQualification of Professional
Engineer (PE) or Environmental
Consultant (EC)
1.2 GQualification of Nuclear
Regulatory Commission (NRC)
Licensed Service Provider
1.2 GKey Personnel Qualification for
G-RAM/LLRW
1.2 GRadiation Work Plan
1.2 GQualification Of Radiation Safety
Officer (RSO)
SD-02 Shop Drawings
3.1.1Surveys
SD-03 Product Data
2.1.3 GSpecifications Of Geomembrane
SD-06 Test Reports
1.2 GReport for G-RAM Site Screening
Level
1.2 GAdditional PFAS Testing Report
With Sampling Procedures
SD-07 Certificates
1.5.2 GQualifications
SD-08 Manufacturer’s Instructions
1.2 GGeomembrane Manufacturer's
Installation Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 65 PAGES
02 61 13 2.1.3 GGeomembrane Manufacturer's
Installation Instructions
SD-10 Operation and Maintenance
Data
1.2 GWeekly G-RAM/LLRW Inventory
Report
SD-11 Closeout Submittals
1.2 GSMP Closure Report
1.2 GFinal G-RAM/LLRW Status
Survey Report
1.2 GG-RAM/LLRW Closure Report
1.2 GTopographic Survey Drawings for
PFAS-Impacted Soil Relocation
Area
02 81 00 SD-03 Product Data
2.1.1Packaging Notifications
3.1 GHazardous Waste Management
Plan
3.2 GOnsite Hazardous Waste
Management
3.3Notices of Non-Compliance and
Notices of Violation
SD-06 Test Reports
3.8 GRecordkeeping
3.8 GException Report
3.9Spill Response
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 65 PAGES
02 81 00 SD-07 Certificates
1.4.1 GTransportation and Disposal
Coordinator
1.4.2 GTraining
1.4.3Pipeline Hazardous Materials
Safety Administration Certification
3.3.3 GShipping Documents and
Packagings Certification
3.3.4Security Plan
3.3.5Certificates of Disposal
3.7Waste Minimization
02 82 00 SD-01 Preconstruction Submittals
1.3.2 GAsbestos Sampling And
Analytical Report
SD-03 Product Data
1.2.1 GAmended Water
1.3.9 GSafety Data Sheets (SDS) for All
Materials
3.1.2.1 GRespirators
3.1.7 GLocal Exhaust Equipment
3.1.7 GPressure Differential Automatic
Recording Instrument
3.1.8 GVacuums
3.1.10 GGlovebags
SD-06 Test Reports
1.5.5 GAir Sampling Results
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 65 PAGES
02 82 00 1.5.6 GPressure Differential Recordings for Local Exhaust System
3.2.11.4 GClearance Sampling
3.3.3.2 GAsbestos Disposal Quantity
Report
SD-07 Certificates
1.3.4 GEmployee Training
1.3.5 GNotifications
1.3.7 GRespiratory Protection Program
1.3.10 GAsbestos Hazard Abatement Plan
1.3.11 GTesting Laboratory
1.3.12 GLandfill Approval
1.3.12 GDelivery Tickets
1.3.12 GWaste Shipment Records
1.3.13 GTransporter Certification
1.3.14 GMedical Certification
1.5.1 GPrivate Qualified Person
Documentation
1.5.2 GDesignated Competent Person
1.5.3 GWorker's License
1.5.4 GContractor's License
1.5.7 GFederal, State or Local Citations
on Previous Projects
3.1 GEquipment Used to Contain
Airborne Asbestos Fibers
3.1.3.2 GWater Filtration Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 65 PAGES
02 82 00 3.1.8 GVacuums
3.1.8 GVentilation Systems
SD-11 Closeout Submittals
1.3.5 GPermits and Licenses
1.3.5 GNotifications
1.3.7.1 GRespirator Program Records
1.7.1 GRental Equipment
02 83 00 SD-01 Preconstruction Submittals
1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.4 GMedical Examinations
1.5.2.8 GLead, Cadmium, Chromium
Waste Management Plan
1.5.2.2 GLead, Cadmium, Chromium
Compliance Plan
3.1.1.3 GLead, Cadmium, Chromium
Compliance Plan
3.5.2.1 GWritten Evidence of TSD
Approval
SD-03 Product Data
1.6.1Respirators
1.6.4Vacuum Filters
1.6.6 GNegative Air Pressure System
2.1Materials and Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 65 PAGES
02 83 00 2.1.1Expendable Supplies
3.1.1.3 GPressure Differential Log
SD-06 Test Reports
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.3 GSampling Results
1.5.3Pressure Differential Recordings
For Local Exhaust System
SD-07 Certificates
1.5.1.3 GTesting Laboratory
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 GHazardous Waste Manifest
3.5.2.1 GTurn-In Documents or Weight
Tickets
02 84 16 SD-07 Certificates
1.8.1 GQualifications of CIH
1.8.1 GTraining Certification
1.8.2 GPCB and Lamp Removal Work
Plan
1.8.3 GPCB and Lamp Disposal Plan
SD-11 Closeout Submittals
3.5.2 GTransporter Certification
3.2.4Certification of Decontamination
3.5.2.1Certificate of Disposal and/or recycling
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 65 PAGES
02 84 16 3.3.1Testing Results
02 84 33 SD-01 Preconstruction Submittals
1.7.3 GPCB Removal Work Plan
1.7.4 GPCB Disposal Plan
SD-07 Certificates
1.7.1Training certification
1.7.2 GQualifications of IH
1.7.5Notification
3.8 GTransporter Certification
3.8 GDisposal Facility Certification
3.5.4Certification of Decontamination
3.5.5Post Cleanup Sampling
3.8.2Certificate of Disposal
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.5 GQuality Control Program
1.6.6 GQuality Control Personnel
Certifications
1.6.6Quality Control Organizational
Chart
1.6.8 GLaboratory Accreditation
3.3.8Maturity Method Data
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.4.5 GJoint Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 65 PAGES
03 30 00 2.4.4 GJoint Filler
2.1Formwork Materials
2.3.3.2 GRecycled Aggregate Materials
2.3.1 GCementitious Materials
2.4.6 GVapor Retarder
2.4.1 GConcrete Curing Materials
2.6 GReinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4 GAdmixtures
2.6.2 GMechanical Reinforcing Bar
Connectors
2.2.2 GWaterstops
2.2.3Biodegradable Form Release
Agent
1.6.3.2 GPumping Concrete
2.4.2 GNonshrink Grout
SD-05 Design Data
2.2.5 GConstruction and Movement
Joints Locations and Details
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1 GFly Ash
1.6.4.1 GPozzolan
1.6.4.2 GSlag Cement
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 65 PAGES
03 30 00 1.6.4.3 GAggregates
2.3.1.1 GPortland Cement
2.3.1.2 GBlended Cements
3.13.3.3 GCompressive Strength Tests
3.13.3.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.9Welder Qualifications
1.6.3.3VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.4Safety Data Sheets
1.8.1Forest Stewardship Council
(FSC) Certification
1.6.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.5 SJoint Sealants
2.4.1Curing Compound
04 20 00 SD-02 Shop Drawings
3.3.2.1 GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 65 PAGES
04 20 00 1.5.1 GHot Weather Procedures
2.4.1.1 GCementitious Materials
SD-04 Samples
2.2.2.2 GConcrete Masonry Units (CMU)
2.4.1.3 GAdmixtures for Masonry Mortar
2.6.2 GAnchors, Ties, and Bar
Positioners
2.6.3 GJoint Reinforcement
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
3.2.4 GBracing Calculations
SD-06 Test Reports
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
SD-07 Certificates
2.2.2.2Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
05 05 20 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 65 PAGES
05 05 20 1.5.1.1 GInstaller Qualifications
1.5.1.2 GPost-Installed Anchor Special
Inspector Qualifications
SD-03 Product Data
2.1.1.3 GMechanical Anchors in Concrete
2.1.1.4 GAdhesive Anchor System in
Concrete
3.1.3 GNon-Shrink, Non-Metallic Grout
SD-06 Test Reports
3.3.4 GPost-Installed Anchor Special
Inspections Report
SD-07 Certificates
2.1.1.1 GPost-Installed Anchor
Certification
SD-08 Manufacturer’s Instructions
2.1.1.2 GManufacturer's Printed
Installation Instructions
3.1.3 GNon-Shrink, Non-Metallic Grout
1.5Manufacturer's Safety Data
Sheets
05 50 13 SD-02 Shop Drawings
2.4 GFloor Gratings
2.5 GBollards/Pipe Guards
2.6 GAngles and Plates
2.7 GPit Access Hatches
2.6 GInstallation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 65 PAGES
05 50 13 1.5.1 GStructural System
SD-03 Product Data
2.4 GFloor Gratings
2.7 GPit Access Hatches
2.2 GCertified Mill
05 59 10 SD-01 Preconstruction Submittals
2.6.2 GAssembly Tests
3.3 GAcceptance Testing
SD-02 Shop Drawings
1.4.3 GDetail Drawings
SD-03 Product Data
2.1.7 GWheel Assemblies
1.4.3 GMaterials List
2.4 GWelding
2.4.2 GWelding of Aluminum
2.4.4 GSteel Welding Repairs
SD-07 Certificates
1.4.1Welder Qualifications
2.4.2Welding of Aluminum
07 11 13 SD-03 Product Data
2.1 GAsphalt Primer
2.2.1 GFibrated Emulsion-Based Asphalt
2.3 GGlass Fabric Reinforcement
2.4.1 GSaturated Felt
2.4.2 GGeotextile Fabric
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 65 PAGES
07 11 13 1.3Materials
09 90 00 SD-02 Shop Drawings
3.9Piping Identification
SD-03 Product Data
2.1 GCoating
2.1Product Data Sheets
SD-07 Certificates
1.6.5.2 GQualification Testing
1.6.4Indoor Air Quality for Paints and
Primers
SD-08 Manufacturer’s Instructions
2.1Mixing
1.8.1Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1 GCoatings
09 96 00 SD-01 Preconstruction Submittals
1.3Equipment List
SD-03 Product Data
2.2.1 GEpoxy Coatings
SD-04 Samples
1.3 GColor Chips
SD-07 Certificates
2.2.1 GEpoxy Coatings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 65 PAGES
09 96 00 3.1.4Manufacturer's Printed
Instructions
09 96 53.13 SD-01 Preconstruction Submittals
1.3Equipment List
SD-03 Product Data
2.2.1Silicone Elastomeric Coating
2.3Primer
2.4Sealants
SD-04 Samples
2.2.1Color Selection Guide
09 97 13.27 SD-05 Design Data
1.4.4.1Containment System
SD-06 Test Reports
1.4.5.1Joint Sealant Qualification Test
Reports
1.4.5.2Coatings Qualification Test
Reports
1.4.5.3Metallic Abrasive Qualification
Test Reports
3.1.3Coating Sample Test Reports
3.1.4 GAbrasive Sample Test Reports
3.8.2.2Inspection Report Forms
3.8.2.3Daily Inspection Reports
1.4.5.4Recycled Metallic Abrasive Field
Test Reports (Daily and Weekly)
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 65 PAGES
09 97 13.27 1.4.1Contract Errors, Omissions, and
Other Discrepancies
1.4.2.1Corrective Action Procedures
1.4.3 GCoating Work Plan
1.4.6.1Qualifications of Certified
Industrial Hygienist (CIH)
1.4.6.5Qualifications Of Individuals
Performing Abrasive Blasting
1.4.6.2Qualifications of Certified
Protective Coatings Specialist
(PCS)
1.4.6.3Qualifications of Coating
Inspection Company
1.4.6.4Qualifications of QC Specialist
Coating Inspector
1.4.6.6Qualifications of Testing
Laboratory for Coatings
1.4.6.7Qualifications of Testing
Laboratory for Abrasive
1.4.6.8Qualifications of Coating
Contractors
1.4.6.9Joint Sealant Materials
1.4.6.10Coating Materials
1.4.6.11Coating System Component
Compatibility
1.4.6.12Non-metallic Abrasive
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 65 PAGES
09 97 13.27 1.4.6.13Metallic Abrasive
SD-08 Manufacturer’s Instructions
1.5.1Joint Sealant Instructions
1.5.2Coating System Instructions
SD-11 Closeout Submittals
3.5.6 GDisposal of Used Abrasive
3.8.2.4 GInspection Logbook
25 05 11.26 SD-01 Preconstruction Submittals
3.3.2 GDevice Account Lock Exception
Request
1.10.1.6 GContractor Computer
Cybersecurity Compliance
Statements
1.10.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
1.7.2 GCybersecurity Subject Matter
Expert Qualifications
SD-02 Shop Drawings
1.8.1 GNetwork Communication, Ports, Protocols and Services Report
1.8.4 GCybersecurity Network (Riser)
Diagram
SD-03 Product Data
1.8.6 GControl System Cybersecurity
Documentation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 65 PAGES
25 05 11.26 SD-06 Test Reports
3.12.1 GControl System Cybersecurity
Testing Procedures
3.12.3 GControl System Cybersecurity
Testing Report
SD-07 Certificates
1.9 GSoftware Licenses
SD-11 Closeout Submittals
3.4.5.3 GPassword Change Summary
Report
3.3.5 GEnclosure Keys
1.8.3 GSoftware and Configuration
Backups
3.5.3 GAuditing Front End Software
3.5.4.1 GDevice Audit Record Upload
Software
3.9 GSystem Maintenance Tool
Software
3.11.1 GControl System Scanning Tools
1.8.5 GVendor Guide Compliance Result
Report
1.8.2 GFinal Control System Inventory
Report
26 05 48 SD-02 Shop Drawings
2.1 GEquipment Requirements
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 65 PAGES
26 05 48 2.1 GEquipment Requirements
3.3 GAnchors
SD-06 Test Reports
3.3 GAnchors
26 05 73 SD-01 Preconstruction Submittals
3.1 GField Examination Plan
3.2.9 GArc Flash Label Formats
SD-06 Test Reports
3.1.1Field Examination
SD-07 Certificates
1.4.1 GSystem Analyzer
SD-11 Closeout Submittals
3.3 GModel Files
3.2.4 GLoad Flow Study
3.2.5 GFault Current Study
3.2.6 GSystem Coordination Study
3.2.7 GArc Flash Hazard Study
26 08 00 SD-06 Test Reports
3.1 GAcceptance Tests and
Inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance Test and Inspections
Procedure
26 12 19 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 65 PAGES
26 12 19 1.5.1 GPad-mounted Transformer
Drawings
SD-03 Product Data
2.2 GPad-mounted Transformers
SD-06 Test Reports
3.7.1 GAcceptance Checks and Tests
SD-07 Certificates
2.2.2.1 GTransformer Efficiencies
SD-09 Manufacturer’s Field
Reports
2.7.1 GTransformer Test Schedule
2.7.2 GDesign Tests
2.7.3 GRoutine and Other Tests
SD-10 Operation and Maintenance
Data
1.6.1 GTransformer(s)
26 13 00 SD-02 Shop Drawings
1.5.1 GSwitchgear Drawings
SD-03 Product Data
1.5.3 GElectronic Overcurrent Control
Curves
1.6.1 GSF6/High-Firepoint Fluid
Insulated Pad-mounted Switchgear
2.1 GSF6/High-Firepoint Fluid
Insulated Pad-mounted Switchgear
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 65 PAGES
26 13 00 2.2 GInsulated High-Voltage
Connectors
2.3 GSurge Arresters
SD-06 Test Reports
3.4.1 GAcceptance Checks and Tests
SD-07 Certificates
1.5.2 GPaint Coating System
SD-09 Manufacturer’s Field
Reports
2.4.1 GSwitchgear Design and
Production Tests
26 20 00 SD-02 Shop Drawings
2.7 GPanelboards
2.8 GTransformers
2.12 GWireways
3.1.3.1 GMarking Strips
SD-03 Product Data
2.6 GReceptacles
2.7.3 GCircuit Breakers
2.8 GTransformers
2.13 GSurge Protective Devices
SD-06 Test Reports
3.5.3 GGrounding System Test
3.5.2 GTransformer Tests
SD-09 Manufacturer’s Field
Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 65 PAGES
26 20 00 2.15.1Transformer Factory Tests
26 27 14.00 20 SD-02 Shop Drawings
1.3.1 GInstallation Drawings
SD-06 Test Reports
3.2.1 GAcceptance Checks and Tests
3.2.2 GSystem Functional Verification
3.2.1 GBuilding Meter Installation Sheet, per Building
3.2.1 GCompleted Meter Installation
Schedule
3.2.1 GCompleted Meter Data Schedule
2.1.1 GMeter Configuration Template
3.2.1 GMeter Configuration Report
SD-10 Operation and Maintenance
Data
1.4.1 GElectricity Meters and
Accessories
SD-11 Closeout Submittals
3.2.2 GSystem Functional Verification
26 42 13 SD-02 Shop Drawings
1.4.3 GDrawings
2.2.4 GDielectric Gasket Kit
2.1.1 GTest Station Housing
2.2.6 GOver Voltage Protector (OVP)
2.2 GMaterials List
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 65 PAGES
26 42 13 2.1.1 GTest Station Housing
2.1.3 GTest Station Terminal Board
2.1.2 GCalibrated Shunt
2.1.3 GInsulated Ring Terminals
2.2.3 GMagnetic Switch
2.2.3 GMagnetic Switch Key
2.1.3 GPrinted Label
3.2.6 GPipe Test Lead
2.2.7 GExothermic Weld Mold
2.2.7 GExothermic Weld Charge
2.2.7 GExothermic Weld Coating
2.2.1.2.2 GGalvanic Anode Ingot
2.2.1.2.3 GGalvanic Anode Backfill
2.2.1.2.2 GGalvanic Anode Test Lead
2.2.3 GCoupon and Test Lead
2.2.4 GDielectric Gasket Kit
2.2.5 GDielectric Tubing Union
3.2.9 GDielectric Tubing Union
2.2.6 GOver Voltage Protector (OVP)
2.2.6.2 GOVP Mounting Bracket
2.2.6.3 GProtective Flange Band
SD-06 Test Reports
3.3.1.3 GFinal Compliance Test Report
3.3.1.3 GAs-built Drawings
SD-07 Certificates
1.4.2 GQualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 65 PAGES
26 42 13 SD-10 Operation and Maintenance
Data
3.3.1.3 GCathodic Protection System
3.3.1.2 GTraining Course Outline
SD-11 Closeout Submittals
3.3.1.3 GFinal Compliance Test Report
26 56 00 SD-02 Shop Drawings
1.5.1.1 GLuminaire Drawings
1.5.1.2 GPole Drawings
1.8.2 GControl System One-Line
Diagram
2.5.1 GSequence of Operation for
Exterior Lighting Control System
SD-03 Product Data
2.2 GLuminaires
2.3 GLight Sources
2.4 GLED Drivers
1.7.1 GLuminaire Warranty
1.7.2 GLighting Controls Warranty
1.7.3 GPole Warranty
2.5.2.2 GPhotosensors
2.5.2.1 GTime Clock
2.6 GPoles
2.6.2Brackets
2.6.3 GPole Foundations
2.2.2 GObstruction Marker Luminaires
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 65 PAGES
26 56 00 SD-05 Design Data
1.5.2 GLuminaire Design Data
SD-06 Test Reports
1.5.3 GANSI/IES LM-79 Test Report
1.5.4 GANSI/IES LM-80 Test Report
1.5.5 GANSI/IES TM-21 Test Report
SD-08 Manufacturer’s Instructions
2.6Poles
SD-10 Operation and Maintenance
Data
1.8.1 GLighting System
1.8.2 GExterior Lighting Control System
3.3.1.1 GMaintenance Staff Training Plan
3.3.1.2 GEnd-User Training Plan
26 56 20 SD-01 Preconstruction Submittals
1.4.4 GProtection plan
3.10.2 GTraining
SD-02 Shop Drawings
2.1 GLighting and visual navigation
aids
3.10.4 GPosted instructions
SD-03 Product Data
2.2.1 GTaxiway edge lights
2.3.3 GGuidance signs
2.4 GObstruction lighting
2.5 GLight bases
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 65 PAGES
26 56 20 2.6 GIsolation transformers
3.9.1 GConstant current regulators
2.7.2.5 GFrangible couplings
1.4.2 GMaterials and equipment
SD-06 Test Reports
3.8 GVisual inspection
3.8.1 GVisual inspection
3.8.5 GProgress testing for series
lighting circuits
3.8.4 GCounterpoise system test and
inspection
3.8.2 GOperating test
3.8.3 GDistribution conductors, 600-volt
class
3.8.6 GElectrical acceptance tests
3.8.7 GLow-voltage continuity tests
3.8.8 GHigh-voltage insulation resistance
tests
3.9.1 GConstant current regulators
SD-07 Certificates
1.4.3 GQualifications of contractor
2.8.1 GSpecial tools
3.10.2 GSpecial tools
3.2.2.2 GCrimping tool
3.2.2.3Cable penciler
3.11.1 GList of parts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 65 PAGES
26 56 20 SD-08 Manufacturer’s Instructions
3.10.4 GPosted instructions
SD-10 Operation and Maintenance
Data
3.9.1 GConstant current regulators
3.11.2 GMaintenance and repair
instructions
3.11.3Posted operations and maintenance instructions
SD-11 Closeout Submittals
3.10.3As-built drawings
31 00 00 SD-01 Preconstruction Submittals
3.1.3 GExcavation and Trenching Plan
3.2 GBorrow Plan
3.1.2.2 GDewatering Work Plan
3.10 GDisposition of Surplus Materials
1.6.4 GPreconstruction Meeting
SD-06 Test Reports
3.11 GMaterial Test Report
3.2.3 GBorrow Site Testing
3.6.1.6 GPipe Inspection Report
1.6.1 GGeotechnical Evaluation Report
3.3.3 GSubsurface Extents of Karst
Features Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 65 PAGES
31 00 00 3.3.3 GKarst Feature Repair
Methodology and Hydrogeologic
Assessment Report
31 32 19.16 SD-03 Product Data
2.1.2Thread
2.2Manufacturing Quality Control
Sampling and Testing
SD-04 Samples
3.1Quality Assurance Samples and
Tests
SD-07 Certificates
2.1.1Geotextile
31 33 10 SD-01 Preconstruction Submittals
3.1.2Grout Installation Procedure
SD-02 Shop Drawings
3.1.1Grouting Location Plan
SD-03 Product Data
3.2.2Drilling Equipment
3.2.3Grouting Equipment
3.2.3 GGrout Plant
32 01 19.61 SD-03 Product Data
2.1Sealants
3.5.2Manufacturer's
Recommendations
SD-04 Samples
2.1Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .