This is Amendment No. 0008 to a Request for Proposals (RFP) for construction of a North Aircraft Parking Ramp at Andersen Air Force Base, Guam. The amendment, effective September 15, 2026, modifies solicitation N62742-26-R-1300 by deleting and replacing multiple documents and drawings, including the Price Proposal Schedule (SF 1442), Instructions to Proposers (Document 00 21 16), Representations and Certifications (Document 00 45 00), Negotiated Contract Clauses (Document 00 70 00), and Special Contract Requirements (Document 00 73 00). Additionally, the amendment updates 28 technical drawings related to phasing plans, demolition plans, grading and drainage plans, and utility details, with most drawings revised to version 1 or 2 as of September 10, 2026, and incorporates a revised Soil Management Plan dated August 14, 2026.
The solicitation requires firm-fixed-price offers on an "all or none" basis, with pricing for a base item (entire project) plus 12 subordinate line items (SLINs) covering specialized work including karst feature mitigation using permeable and impermeable infill, cultural resources investigations and post-review discoveries, Electrical Resistivity Tomography testing, and disposal of various abandoned materials (concrete debris, hazardous waste, asbestos-containing waste, and hazardous liquid waste). Offers must be submitted by October 8, 2026, at 2:00 p.m. Hawaii Standard Time, with technical proposals, price proposals, and subcontracting plans submitted in separate sealed envelopes. The Navy (NAVFACSYSCOM Pacific) requires compliance with multiple FAR and DFARS clauses, including Buy American requirements for construction materials, CMMC Level 1 cybersecurity certification, and submission of certified cost or pricing data. Large business contractors must submit small business subcontracting plans with minimum targets of 40 percent for small businesses, 5 percent for disadvantaged small businesses, 3 percent for HUBZone small businesses, 9 percent for women-owned small businesses, and 3 percent for service-disabled veteran-owned small businesses. The evaluation is based on lowest priced technically acceptable source selection using three factors: Experience, Past Performance, and Safety.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
Created On:
16 Sep 2026, 02:31 AM Greenwich Mean Time
J 1 6
0008 15 Sep 2026 See Continuation Sheet N62742
NAVFACSYSCOM PACIFIC
258 MAKALAPA DR STE 100, JBPHH HI 96860-3134
JBPHH, HI 96860-3134
UNITED STATES
Adele Murakami, Email: adele.m.murakami.civ@us.navy.mil
SCD: PAS:
N6274226R1300
11 Feb 2026
See Section 00 70 00 - Conditions of the Contract
Amendment No. 0008 is continued on Page 2.
N6274226R13000008
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following items are applicable to this Amendment:
SOLICITATION, OFFER, AND AWARD (SF1442), PRICE PROPOSAL SCHEDULE
Delete the Solicitation, Offer and Award (Construction, Alteration, or Repair), Standard Form (SF) 1442, Price Proposal Schedule, Page 3 of 6 through Page 6 of 6 (Amendment No. 0004) and replace with the attached revised Solicitation, Offer, and Award (Construction, Alteration, or Repair), SF1442, Price Proposal Schedule, Page 3 of 6 through Page 6 of 6 (Amendment No.
0008).
DOCUMENT 00 21 16, INSTRUCTIONS TO PROPOSERS
Delete Document 00 21 16 (Amendment No. 0007) and the Table of Contents in its entirety and replace it with the attached revised Document 00 21 16 and Table of Contents (Amendment No.
0008).
DOCUMENT 00 45 00, REPRESENTATIONS AND CERTIFICATIONS FOR
CONTRACTING BY NEGOTIATION
Delete Document 00 45 00, including the Table of Contents, in its entirety and replace it with the attached revised Document 00 45 00 and the Table of Contents (Amendment No. 0008).
DOCUMENT 00 70 00, NEGOTIATED CONTRACT CLAUSES (ADVERTISE)
Delete Document 00 70 00 in its entirety and replace it with the attached revised Document 00 70 00 (Amendment No. 0008).
DOCUMENT 00 73 00, SPECIAL CONTRACT REQUIREMENTS
Delete Document 00 73 00 in its entirety and replace it with the attached revised Document 00 73 00 (Amendment No. 0008).
SPECIFICATIONS
DOCUMENT 00 01 15 – LIST OF DRAWINGS
DELETE and REPLACE the following drawings dated 10 September 2026 that accompany this Amendment:
DRAWING
NUMBER
NAVFAC
DRAWING
NUMBER REVISION NUMBER
DRAWING TITLE
GI-108 17361630 1 PHASING PLAN
V-109 17361640 1 EXISTING CONDITIONS –
AREA 8
V-110 17361641 1 EXISTING CONDITIONS –
AREA 9
V-115 17361646 1 EXISTING CONDITIONS –
AREA 14
C-001 17361680 1 GENERAL NOTES
CD101 17361681 1 OVERALL DEMOLITION
PLAN
CD109 17361689 2 DEMOLITION PLAN - AREA 8
CD110 17361690 2 DEMOLITION PLAN - AREA 9
CD115 17361694 1 DEMOLITION PLAN - AREA
CD116 17361709 1 DEMOLITION PLAN - AREA
CD121 17361699 1 DEMOLITION PLAN - AREA
CD126 17361704 1 DEMOLITION PLAN - AREA
CD127 17361705 1 DEMOLITION PLAN - AREA
CG101 17361800 1 OVERALL GRADING AND
DRAINAGE PLAN
CG109 17361808 1 GRADING AND DRAINAGE
PLAN – AREA 8
CG110 17361809 2 GRADING AND DRAINAGE
PLAN – AREA 9
CG115 17361813 1 GRADING AND DRAINAGE
PLAN – AREA 14
CG116 17361828 1 GRADING AND DRAINAGE
PLAN – AREA 15
CG119 17361816 1 GRADING AND DRAINAGE
PLAN – AREA 18
CG120 17361817 1 GRADING AND DRAINAGE
PLAN – AREA 19
CG121 17361818 1 GRADING AND DRAINAGE
PLAN – AREA 20
CG125 17361822 2 GRADING AND DRAINAGE
PLAN – AREA 24
CG126 17361823 2 GRADING AND DRAINAGE
PLAN – AREA 25
CG127 17361824 1 GRADING AND DRAINAGE
PLAN – AREA 26
CG141 17361836 1 LIMITS OF GEOSYNTHETIC
CLAY LINER
CG142 17361837 1 LAWN RESTORATION PLAN
CG147 17361842 1 TURF REINFORCEMENT
PLAN
CG211 17361854 1 DRAINAGE PROFILES
CG212 17361855 1 DRAINAGE PROFILES
CG507 17361862 1 SAND FILTER DETAILS
PROJECT TABLE OF CONTENTS
Remove Replace with
Pages 1 to 4 Page 1 to 4
Amendment No. 0003 Amendment No. 0008
SECTION 01 11 00 – SUMMARY OF WORK
Pages 1 to 2 Page 1 to 2
Amendment No. 0008
SECTION 01 14 00 – WORK RESTRICTIONS
Pages 1 to 8 Page 1 to 8
Amendment No. 0004 Amendment No. 0008
SECTION 01 33 00 – APPENDIX A – SUBMITTAL REGISTER
Pages 1 to 66 Page 1 to 64
Amendment No. 0005 Amendment No. 0008
SECTION 01 35 13.02 34 – FACILITY-RELATED CONTROL SYSTEMS (FRCS)
PROCUREMENT FOR NAVY
Add
Page 1 to 20
SECTION 01 35 13.04 30 – FACILITY-RELATED CONTROL SYSTEMS (FRCS)
PROCUREMENT FOR AIR FORCE CONTROL SYSTEMS
Remove Replace with
Pages 1 to 20 Page 1 to 20
SECTION 01 50 00 – TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
Pages 1 to 12 Page 1 to 12
SECTION 01 57 19 – TEMPORARY ENVIRONMENTAL CONTROLS
Pages 1 to 40 Page 1 to 40
Amendment No. 0004 Amendment No. 0008
SECTION 01 57 19 – ATTACHMENT
Attachment I. Application for an Underground Injection Control (UIC) Permit
Add
Page 1 to 10
SECTION 01 58 00 – ATTACHMENTS
Plate 2USAF, Plate 6, and Plate 7 Plate 1USAF, Plate 3, and Plate 4
SECTION 02 61 13 – ATTACHMENT
Attachment A. Soil Management Plan for FY24 MCAF Project P-012/AJJY183012, North Aircraft Parking Ramp, Joint Region Marianas, Andersen AFB, Guam
Remove Soil Management Plan dated 9 January 2026
Replace with Soil Management Plan dated 14 August 2026
Pages 1 to 44 Page 1 to 44
SECTION 03 30 00 – CAST-IN-PLACE CONCRETE
Pages 1 to 44 Pages 1 to 44
SECTION 26 05 73 – POWER SYSTEM STUDIES
Pages 1 to 8 Pages 1 to 8
--End of Amendment--
SOLICITATION, OFFER AND AWARD (SF 1442), CONTINUED
PRICE PROPOSAL SCHEDULE
FOR
RFP NO. N62742-26-R-1300
WON 1665555, FY24 AJJY183012 (P-012), PDI: NORTH AIRCRAFT PARKING RAMP,
ANDERSEN AIR FORCE BASE, GUAM
RFP N62742-26-R-1300
SF1442 (Continued)
ITEM
NO.
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
0001AA BASE ITEM
The basis for SLIN 0001AA is the entire work for Project P-012 (WON 1665555) complete in accordance with the drawings and specifications, except the work identified in any other CLIN/SLIN.
Note: Includes the cost for the treatment plans that are to be included in SD-01 Pre- Construction Submittals, Archaeological Monitoring and Discovery Plan.
Project
ESTIMATED
0001AB Permeable Infill Karst Feature Mitigation
The basis for SLIN 0001AB is for mitigation of Karst Features using permeable infill (Zone 2) complete in accordance with drawings and specifications, but not including work specified in any other CLIN/SLINs.
9,000
CY
$_____/CY
0001AC Impermeable Infill Karst Feature Mitigation
The basis for SLIN 0001AC is for mitigation of Karst Features using impermeable infill (Zone
1) complete in accordance with drawings and specifications, but not including work specified in any other CLIN/SLINs.
9,000
CY
$_____/CY
0001AD One-Day Cultural Resources Feature Investigations
The basis for SLIN 0001AD is for One-Day Cultural Resources Feature Investigations for project P-012 in accordance with drawings and specifications, but not including work specified in any other SLINs/CLINs.
See Note 7. below.
EA
$_____/EA
FOR
RFP NO. N62742-26-R-1300
0001AE Cultural Resources Post Review Discovery
(Small Sites)
The basis for SLIN 0001AE are Cultural Resources Post Review Discovery for small sites (equal to or less than 0.5 hectares) for project P-012 in accordance with drawings and specifications, but not including work specified in any other SLINs/CLINs.
See Note 8. below.
0001AF Cultural Resources Post Review Discovery (Large Sites)
The basis for SLIN 0001AF is a Cultural Resources Post Review Discovery for a large site (greater than 0.5 hectares) for project P- 012 in accordance with drawings and specifications, but not including work
See Note 9. below.
0001AG Cultural Resources Post Review Discovery of Human Skeletal Remains
The basis for SLIN 0001AG are Cultural Resources Post Review Discovery of Human Skeletal Remains for project P-012 in accordance with drawings and specifications, but not including work specified in any other SLINs/CLINs.
See Note 10. below.
0001AH Electrical Resistivity Tomography (ERT) Testing
The basis for SLIN 0001AH is to conduct ERT testing in areas approved by the contracting officer, in accordance with drawings and specifications, but not including work specified in any other
37,000
LF
$_____/LF
FOR
RFP NO. N62742-26-R-1300
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001AH
(Continued)
Note: ERT testing costs include all geophysicist roles, responsibilities, frequencies, and durations as identified in the specifications
0001AI Abandoned Concrete Debris/Stockpile
The basis of SLIN 0001AI is the price for all labor, temporary stockpiling, material, testing, and equipment for disposal of abandoned waste debris/ stockpiles in accordance with the drawings and specifications, but not including work
See Note 11. below.
2,000
Ton
$_____/Ton
0001AJ Abandoned Waste Debris Stockpile Excluding Concrete Debris
The basis of SLIN 0001AJ is the price for all labor, temporary stockpiling, material, testing, and equipment for disposal of abandoned waste debris stockpiles, excluding concrete debris, in accordance with the drawings and specifications, but not including work specified in any other
See Note 12. below.
0001AK Abandoned Hazardous Waste
The basis of SLIN 0001AK the price for all labor, temporary stockpiling, material, testing, and equipment for disposal of abandoned hazardous waste in accordance with the drawings and specifications, but not including work specified in any other
See Note 13. below.
FOR
RFP NO. N62742-26-R-1300
ESTIMATED
0001AL Abandoned Hazardous Liquid Waste
The basis of SLIN 0001AL is the price for all labor, temporary storage, material, testing, and equipment for disposal of abandoned hazardous liquid waste in accordance with the drawings and specifications, but not including work specified in any other SLINs/CLINs.
See Note 14. below.
55-gal drum
$_____/drum
0001AM Abandoned Asbestos Containing Waste Not Listed In Section 02 82 00
The basis of SLIN 0001AM is the price for all labor, temporary stockpiling, material, testing, and equipment for disposal of abandoned asbestos containing waste that are not listed in Section 02 82 00 ASBESTOS REMEDIATION, Part 1.3.1 Description of Work.
See Note 15. below.
TOTAL CLIN 0001
(includes SLINs 0001AA through 0001AM)
Notes:
1. See Document 00 22 00 for the Price Evaluation.
2. A firm-fixed-price is required for all line items. The following applies:
ALL OR NONE OFFERS - Offers are solicited on an “all or none” basis and FAR 52.215-1, INSTRUCTIONS TO OFFERORS- COMPETITIVE ACQUISITION in Document 00 21 16, is hereby modified. Failure to submit offers for all line items listed shall be cause for rejection of the offer.
3. The Offeror SHALL include a price for ALL CLINs/SLINs.
4. Multiple awards will not be made.
5. In the event there is a difference between a unit price (s) and the extended total(s), the unit price(s) will be held to be the intended offer and the total(s) recomputed accordingly. If an offer provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.
FOR
RFP NO. N62742-26-R-1300
6. Payment for SLINs 0001AB through 0001AM shall be for actual quantities only. The unit prices will be used to adjust the contract price for any increase or decrease in the estimated quantities subject to the following clause:
FAR 52.211-18, VARIATION IN ESTIMATED QUANTITY (APR 1984)
If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.
(End of clause)
7. 0001AD. One-Day Cultural Resources Feature Investigations – The basis for SLIN 0001AD is to inspect suspected archaeological resources, if discovered, to determine the nature, context, and preliminary significance in accordance with SOP #8 Post-Review Discovery of Archaeological Remains, including preparation and implementation of a treatment plan including testing and analysis and preparation of required reports. The data recovery plan attached in Section 01 57 19 provides general archaeological information for the site. Assume the suspected findings are small and the inspection can be completed in one day by a qualified archaeologist. Provide an inspection report including findings, preliminary significance, photographs, and recommendations. (NOTE: The treatment plan is to be included in SD-01 Pre-Construction Submittals, Archaeological Monitoring and Discovery Plan, of Section 01 57 19, and the cost included in SLIN 0001AA.) All plans and reports must be reviewed and approved by the Government and Guam SHPO.
8. 0001AE. Cultural Resources Post Review Discovery (Small Sites) - The basis for SLIN 0001AE is the Cultural Resources Post
Review Discovery located in a small site, which is equal to or less than 0.5 hectares. The data recovery shall be conducted in accordance with the SOP #8 Post-Review Discovery of Archeological Remains, including preparation and implementation of a treatment plan including testing and analysis and preparation of required reports. The data recovery plan attached in Section 01 57 19 provides general archaeological information for the site. Contractors must determine the level of effort, including the anticipated number and size of features. (NOTE: The treatment plan is to be included in SD-01 Pre- Construction Submittals, Archaeological Monitoring and Discovery Plan, of Section 01 57 19, and the cost included in SLIN 0001AA.) All plans and reports must be reviewed and approved by the Government and Guam SHPO.
9. 0001AF. Cultural Resources Post Review Discovery (Large Sites) - The basis for SLIN 0001AF is the Cultural Resources Post
Review Discovery located in a large site, which is greater than 0.5 hectares. The data recovery shall be conducted in accordance with the SOP #8 Post-Review Discovery of Archeological Remains, including preparation and implementation of a treatment plan including testing and analysis and preparation of required reports. The data recovery plan attached in Section 01 57 19 provides general archaeological information for the site. Contractors must determine the level of effort, including the anticipated number and size of features. (NOTE: The treatment plan is to be included in SD-01 Pre- Construction Submittals, Archaeological Monitoring and Discovery Plan, of Section 01 57 19, and the cost included in SLIN 0001AA.) All plans and reports must be reviewed and approved by the Government and Guam SHPO.
10. 0001AG. Cultural Resources Post Review Discovery of Human Skeletal Remains - . The basis for SLIN 0001AG is the price to recover a burial in accordance with the SOP #9 Post-Review Discovery of Human Remains. The Contractor shall prepare and implement a burial treatment plan, including testing and analysis, and preparation of required reports. (NOTE: The treatment plan is to be included in SD-01 Pre-Construction Submittals, Archaeological Monitoring and Discovery Plan, of Section 01 57 19, and the cost included in SLIN 0001AA.) All plans and reports must be reviewed and approved by the Government and Guam SHPO.
FOR
RFP NO. N62742-26-R-1300
11. 0001AI. Abandoned Concrete Debris/Stockpile – The basis for SLIN 0001AI is the price to recycle or dispose of abandoned
Concrete debris/stockpile. The cost must include waste characterization, sampling and analysis, excavation, segregation if required, stockpile management, packaging for shipping and hauling, and transportation. Assume disposal at a permitted recycling or disposal facility in Guam. It is acceptable to reuse onsite after processing concrete debris if the material meets the project requirements.
12. 0001AJ. Abandoned Waste Debris Stockpiles excluding Concrete Debris – The basis for SLIN 0001AJ is the price to dispose of abandoned waste debris stockpiles excluding concrete debris. The cost must include waste characterization, sampling and analysis, excavation, segregation if required, stockpile management, packaging for shipping and hauling, and transportation.
Assume disposal at a permitted disposal facility in Guam. The abandoned waste debris may include, but is not limited to, scrap metal, plastics, and rubber.
13. 0001AK. Abandoned Hazardous Waste – The basis for SLIN 0001AK is the price to dispose of abandoned hazardous waste. The cost must include waste characterization, sampling and analysis, excavation, segregation if required, stockpile management, packaging for shipping and hauling, and transportation. Assume disposal at a permitted hazardous waste disposal facility in the mainland, U.S.
14. 0001AL. Abandoned Hazardous Liquid Waste – The basis for SLIN 0001AL is the price to dispose of abandoned hazardous liquid waste. The cost must include waste characterization, sampling and analysis, excavation, segregation if required, storage, packaging for shipping and hauling, and transportation. Assume disposal at a permitted hazardous waste disposal facility in the mainland, U.S.
15. 0001AM. Abandoned Asbestos Containing Waste Not Listed in Section 02 82 00 – The basis for SLIN 0001AM is the price to dispose of abandoned asbestos containing waste that are not listed in Section 02 82 00 ASBESTOS REMEDIATION, Part
1.3.1 Description of Work. The cost must include worker protection, asbestos removal work, waste characterization, sampling and analysis, excavation, segregation if required, stockpile management, package for shipping and hauling, and transportation. Assume disposal of asbestos-containing waste in a permitted disposal facility in Guam.
16. DFARS 252.247-7023, TRANSPORTATION OF SUPPLIES BY SEA. Within 30 days of each shipment, the Contractor is required to provide an electronic copy of the carrier's bill of lading to the Contracting Officer and to MARAD via e-mail, Attention: Military Team. MARAD email: Cargo.Marad@dot.gov. In addition, the Contractor shall notify the Contracting Officer when oceanic shipments have been initiated within 3 working days of shipment.
FY24 AJJY183012 (P-012), PDI: NORTH AIRCRAFT PARKING RAMP WON 1665555
DOCUMENT 00 21 16 TABLE OF CONTENTS
DOCUMENT 00 21 16
INSTRUCTIONS TO PROPOSERS
10/25
1.1 NUMBER OF COPIES/TIME OF RECEIPT
1.2 INSTRUCTIONS FOR OBTAINING THE REQUEST FOR PROPOSAL
1.3 INSTRUCTIONS FOR SUBMITTING QUESTIONS REGARDING SOLICITATION
1.4 AMENDMENTS
1.5 PREAWARD SURVEY/RESPONSIBILITY DETERMINATION
1.6 PARTNERSHIPS, JOINT VENTURES (JV), LIMITED LIABILITY COMPANIES (LLC), LIMITED
PARTNERSHIPS (LP), ETC.
1.7 SUBCONTRACTING PLAN
1.8 COMPLEMENTARY PRICING INFORMATION
1.9 FAR 52.204-7, SYSTEM FOR AWARD MANAGEMENT (NOV 2024)
1.10 FAR 52.204-16, COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020)
1.11 FAR 52.211-14, NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY
PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
1.12 FAR 52.214-34, SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)
1.13 FAR 52.214-35, SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
1.14 FAR 52.215-1, INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (NOV 2021)
1.15 FAR 52.216-1, TYPE OF CONTRACT (APR 1984)
1.16 FAR 52.222-56, CERTIFICATION REGARDING TRAFFICKING IN PERSONS COMPLIANCE PLAN
(OCT 2025)
1.17 FAR 52.225-12, NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS (MAY 2014) ALTERNATE I (MAY 2014)
1.18 FAR 52.228-17, INDIVIDUAL SURETY—PLEDGE OF ASSETS (FEB 2021)
1.19 FAR 52.233-2, SERVICE OF PROTEST (SEP 2006)
1.20 FAR 52.236-27, SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)
1.21 FAR 52.236-28, PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)
1.22 DFARS 252.204-7008, COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION
CONTROLS (OCT 2016)
1.23 DFARS 252.204-7025, NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL
REQUIREMENTS (NOV 2025)
1.24 DFARS 252.215-7008, ONLY ONE OFFER (DEC 2022)
1.25 DFARS 252.215-7010, REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA
OTHER THAN CERTIFIED COST OR PRICING DATA – BASIC (MAY 2024)
DFARS 252.225-7057, PREAWARD DISCLOSURE OF EMPLOYMENT OF INDIVIDUALS WHO
WORK IN THE PEOPLE’S REPUBLIC OF CHINA (AUG 2022)
1.26 DFARS 252.236-7008, CONTRACT PRICES--BIDDING SCHEDULES (DEC 1991)
1.27 TERRITORY OF GUAM NOTICE CONCERNING TAXES, LICENSES, WITHHOLDINGS
--End Document Table of Contents--
DOCUMENT 00 21 16
DOCUMENT 00 21 16
INSTRUCTIONS TO PROPOSERS
10/25
1.1 NUMBER OF COPIES/TIME OF RECEIPT
a. PRICE PROPOSAL (PAPER): An original paper and one (1) paper copy of the price proposal shall be submitted on 8 October 2026, 2:00 p.m., H.S.T. in a sealed envelope and marked in the bottom right corner "PRICE PROPOSAL SUBMITTED UNDER RFP N62742-26-R-1300 - DO NOT OPEN IN MAILROOM." The PRICE PROPOSAL shall include the following:
(1) Pursuant to FAR 52.236-28(a) manually (wet signature) signed and completed SF 1442 (Solicitation, Offer and Award) (NOTE: SF 1442 Block 14 shall include the offeror’s name and physical address exactly as shown in the System for Award Management (SAM) registration. If mailing address is different from physical address, both addresses may be shown in Block 14; however, both addresses shall be EXACTLY as shown in SAM.)
(2) Signed and completed Bid Guarantee
(3) Representations and Certifications (See Document 00 45 00) (COMPLETE ALL PROVISIONS)
(4) Information required by paragraph 1.5, Pre-Award Survey/Responsibility Determination
(5) Information required by paragraph 1.6, Partnerships, Joint Ventures (JV), Limited Liability Companies
(LLC), Limited Partnerships (LP), etc.
(6) Information required by paragraph 1.8, Complementary Pricing Information
(7) Information required by paragraph 1.23, DFARS 252.204-7025, NOTICE OF CYBERSECURITY
MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025), paragraph (d).
b. TECHNICAL PROPOSAL (FACTORS 1, 2 AND 3) (PAPER): An original paper and three (3) paper copies of the technical proposal shall be submitted on 8 October 2026, 2:00 p.m., H.S.T. in a sealed envelope/package/box and marked in the bottom right corner "TECHNICAL PROPOSAL SUBMITTED UNDER RFP N62742-26-R-1300
- DO NOT OPEN IN MAILROOM." Identify the original proposal as "Original" on the cover of the proposal. The TECHNICAL PROPOSAL shall be submitted in a three-ring binder with table of contents and tabbed. The TECHNICAL PROPOSAL shall include the following:
(1) All information required by Factor 1 – Experience
(2) All information required by Factor 2 – Past Performance
(3) All information required by Factor 3 – Safety
c. SUBCONTRACTING PLAN (PAPER): An original paper and one (1) paper copy of the subcontracting plan shall be submitted by 9 October 2026, 2:00 p.m., H.S.T. in a sealed envelope/package/box and marked in the bottom right corner "SUBCONTRACTING PLAN SUBMITTED UNDER RFP N62742-26-R-1300 - DO NOT OPEN IN MAILROOM." Identify the original proposal as "Original" on the cover of the proposal.
(1) All information required by 1.7, Subcontracting Plan
d. PRICE AND TECHNICAL PROPOSALS (ELECTRONIC): An electronic copy of the price and technical proposals shall be submitted in .pdf format on a CD-ROM with the paper copy of the subcontracting plan. The
DOCUMENT 00 21 16
offeror is responsible for ensuring that all original paper and electronic copies are identical. Should there be a discrepancy between the paper and electronic versions, the paper copy shall govern.
e. Proposals shall be submitted as follows:
(1) If sent via U. S. Postal Mail/Express Courier:
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, PACIFIC
Construction Contracts Branch (CON33) 258 Makalapa Drive, Suite 100 Pearl Harbor, HI 96860-3134
(2) If hand-carried (Delivery hours between 7:00 AM and 2:00 PM, Monday through Friday, except Federal
Holidays)
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND, PACIFIC
Construction Contracts Branch (CON33)
4256 Radford Drive, Building 62 (if facing the building, the office is on the right. DO NOT drop-off at the Navy Federal Credit Union)
Honolulu, HI 96818-3296
1.2 INSTRUCTIONS FOR OBTAINING THE REQUEST FOR PROPOSAL
The RFP can be accessed at https://sam.gov. Printed copies of the RFP will not be issued. Contractors must register at the System for Award Management (SAM) website https://sam.gov to obtain access to the RFP documents.
Registration instructions can be found on the SAM website.
1.3 INSTRUCTIONS FOR SUBMITTING QUESTIONS REGARDING SOLICITATION
Questions regarding the solicitation shall be submitted in writing in WORD format via electronic mail to Adele Murakami, adele.m.murakami.civ@us.navy.mil. Questions shall reference the drawing/detail and/or the specification section including paragraph number. Verbal queries will not be entertained. Responses to the questions will be provided in the form of a Notice and posted to the web site https://sam.gov. The Government may not respond to questions submitted less than 10 business days before the proposal receipt due date.
1.4 AMENDMENTS
Amendments will be posted to https://sam.gov. It is highly recommended that firms register on the SAM website as an interested vendor as this will be the only planholder’s list available. It is the offeror's responsibility to check the website periodically for any amendments to the solicitation.
1.5 PREAWARD SURVEY/RESPONSIBILITY DETERMINATION
FAR §9.104 requires prospective contractors to demonstrate, among other things, that they have adequate financial resources to perform the contract or the ability to obtain them, capability to comply with the required performance schedule, a satisfactory performance record, and be otherwise eligible to receive an award under applicable laws and regulations. The pre-award survey is not a part of the technical proposal evaluation. The following information shall be submitted:
a. The offeror shall submit a document that appoints, in writing, one or more individuals, by name, each of whom will have full and independent authority to bind the offeror with respect to any act connected with this solicitation, including but not limited to: the submission and revisions of a proposal or proposals by the company, the conduct of discussion or negotiations, the submission of a Final Proposal Revision (FPR), and the execution of a contract and associated documents including bonds. Documents of appointment by a supporting resolution of the board of
DOCUMENT 00 21 16
directors in the case of a corporation and by an instrument of similarly binding character in the case of an unincorporated entity. If bonds are not signed manually (wet signature), documents of appointment must include specific authorization and corporate approval for the use of electronic and facsimile signatures by the appointed individual(s).
b. Company financial statements (balance sheets and income statements) for past three years.
c. Financial resources available to perform the contract. Submit evidence of availability of working/operating capital that will be used for the performance of the contract. If the offeror plans to rely on financial support from other sources, identify the maximum lines of credit that will be available to include documentation to support the amounts. The maximum lines of credit should be based upon the inclusion of this contract effort. For joint ventures discuss the financial responsibilities for each partner.
d. Newly-formed entities (e.g. limited liability companies (“LLC’s”), limited partnerships (“LTD’s”) and newly-created corporate subsidiaries) that is the entity liable for the contract ordinarily have no financial capability to support a responsibility determination. In such cases, the offeror may rely on the resources of the LLC member, parent, limited partner, or other entities related to the offeror for responsibility purposes where the offer submits a guaranty from the entity providing the resources. The offeror shall provide a guaranty agreement (See Form DCMA Form 1620 attached) for the contract price.
e. A list of existing commercial and government business commitments to include contract numbers, names of Contracting Officers, telephone numbers, value of contract, completion date and percent complete. If the list of existing commitments is extensive, provide the required information on at least five projects of similar dollar value and a summary of the existing commitments to include number of contracts, total dollar value of all contracts, and total dollar value of work remaining.
f. Copy of the email confirmation of receipt notification of successful submission of the VETS-4212.
g. As a part of the pre-award survey, the contracting officer will verify that summary level scores of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old unless a lesser time is specified in the solicitation) are posted in the Supplier Performance Risk Assessment (SPRS) (https://www.sprs.csd.disa.mil/) (see Document 00 45 00, DFARS 252.204-7019, Notice of NIST SP 800-171 DoD Assessment Requirements) prior to award. At minimum, a current Basic NIST SP 800-171 DoD Assessment is required prior to award.
The information submitted for the pre-award survey will not be considered in the technical proposal evaluation unless separately submitted pursuant to the technical proposal evaluation factor submission requirements.
1.6 PARTNERSHIPS, JOINT VENTURES (JV), LIMITED LIABILITY COMPANIES (LLC), LIMITED
PARTNERSHIPS (LP), ETC.
Partnerships, Joint Ventures, Limited Liability Companies, Limited Partnerships and Mentor-Protégé arrangements shall submit the following documentation regarding their business entities:
a. A copy of the Partnership Agreement, JV Agreement(s), LLC Operating Agreement(s), LP Agreement(s), and/or Mentor-Protégé Agreement(s). Contractor shall provide an updated copy whenever any change is made to the agreement.
b. The proposal and each bond or other document submitted by or on behalf of the joint venture shall be executed by each joint venture partner and shall be accompanied by evidence of the authority of the signer. That authority shall be evidenced by a document satisfactory to the Contracting Officer, which would ordinarily be, in the case of a corporate joint venture partner, a certified copy of a resolution of the board of directors, and in the case of an unincorporated joint venture partner, an instrument of similarly binding character duly executed by that entity. If one individual signs for more than one partner, the individual must sign separately for each partner which he or she represents, and must state under each signature the capacity in which he or she is signing (See FAR 4.102).
DOCUMENT 00 21 16
c. Identify (by name and title) the personnel having the authority to legally bind the Offeror (including authority to execute the contract documents and bonds).
d. Procedures in the event the entity is dissolved.
e. A detailed statement outlining the following in terms of percentages where appropriate:
(1) The relationship of the partners/parties in terms of business ownership, capital contribution, profit distribution or loss sharing.
(2) The management approach in terms of who will conduct, direct, supervise, control, and the controlling partner’s authority to obligate the entity.
(3) The structure and decision-making responsibilities of the partners/parties in terms of who will control the manner and method of performance of work.
f. Joint Ventures shall submit the following additional documentation regarding their business entities:
(1) Together with its proposal, each corporate joint venture partner shall submit evidence satisfactory to the Contracting Officer that its board of directors has approved its participation in the joint venture. Such evidence shall be in the form of a copy of a resolution of the board of directors, certified by the Secretary of the Corporation.
(2) Together with its proposal, each joint venture partner which is an unincorporated entity shall submit evidence satisfactory to the Contracting Officer that all persons or entities which must approve decisions affecting the joint venture partner have approved the participation of the joint venture partner in the joint venture.
1.7 SUBCONTRACTING PLAN
a. As stated in Document 00 22 00, paragraph 2.1, EVALUATION CRITERIA AND BASIS OF AWARD, this is a lowest priced technically acceptable source selection. Accordingly, small business subcontracting is not included as a technical evaluation factor. However, large business concerns must submit a Small Business Subcontracting Plan that addresses the following:
1. Identify in terms of dollar value and percentage of the total acquisition, the extent of work you will perform as the prime contractor. If submitting an offer as a Joint-Venture, identify the percentage of work each member will be responsible for and indicate the size status of each member, e.g., LB, SB, SDB, WOSB, HUBZone SB, etc.
2. In accordance with FAR 52.219-9, submit a Small Business Subcontracting Plan utilizing the template at the end of this section for this project. To demonstrate commitment in using small business concerns, the Small Business Subcontracting Plan may list all subcontractors by name. If the proposed Small Business Subcontracting goals do not meet the minimum NAVFAC Small Business Subcontracting Targets, include a detailed explanation describing the actions taken to arrive at that determination, along with an explanation for the goals that actually were proposed. In accordance with FAR 52.219-9, Alternate II, “failure to submit and negotiate a subcontracting plan shall make the offeror ineligible for award of a contract.”
b. NAVFAC's command-wide small business subcontracting targets are shown below. These may be higher or lower than percentages that would represent realistic, challenging small business subcontracting goals for this acquisition. Offerors shall document in their subcontracting plans the basis for all proposed goals. Plans shall be submitted with initial offers.
SB 40%
SDB 5%
HUBZone SB 3%
DOCUMENT 00 21 16
WOSB 9%
SDVOSB 3%
c. See the Small Business Subcontracting Plan (Template) at the end of Document 00 21 16 for format.
1.8 COMPLEMENTARY PRICING INFORMATION
Offeror’s are requested to submit the attached Complementary Pricing Information (Template) at the end of Document 00 21 16 with its price proposal. The Complementary Pricing Information is for Government information only and will not be used for the Price Evaluation specified in Document 00 22 00.
1.9 FAR 52.204-7, SYSTEM FOR AWARD MANAGEMENT (NOV 2024)
(a) Definitions. As used in this provision—
“Electronic Funds Transfer (EFT) indicator” means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.
Registered in the System for Award Management (SAM) means that–
(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14) into the SAM;
(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in the SAM;
(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and
(4) The Government has marked the record “Active”.
Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.
(b) (1) An Offeror is required to be registered in SAM when submitting an offer or quotation and at time of award (see FAR clause 52.204-13, System for Award Management Maintenance, for the requirement to maintain SAM registration during performance and through final payment).
(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “Unique Entity Identifier” followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in the SAM.
(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:
(1) Company legal business name.
(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(3) Company physical street address, city, state, and Zip Code.
(4) Company mailing address, city, state and Zip Code (if separate from physical).
DOCUMENT 00 21 16
(5) Company telephone number.
(6) Date the company was started.
(7) Number of employees at your location.
(8) Chief executive officer/key manager.
(9) Line of business (industry).
(10) Company headquarters name and address (reporting relationship within your entity).
(d) Processing time should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation. See https://www.sam.gov for information on registration.
1.10 FAR 52.204-16, COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020)
(a) Definition. As used in this provision –
Commercial and Government Entity (CAGE) code means–
(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location; or
(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.
(b) The Offeror shall provide its CAGE code with its offer with its name and location address or otherwise include it prominently in its proposal. The CAGE code must be for that name and location address. Insert the word “CAGE” before the number. The CAGE code is required prior to award.
(c) CAGE codes may be obtained via–
(1) Registration in the System for Award Management (SAM) at www.sam.gov. If the Offeror is located in the United States or its outlying areas and does not already have a CAGE code assigned, the DLA Commercial and Government Entity (CAGE) Branch will assign a CAGE code as a part of the SAM registration process. SAM registrants located outside the United States and its outlying areas shall obtain a NCAGE code prior to registration in SAM (see paragraph (c)(3) of this provision).
(2) The DLA Contractor and Government Entity (CAGE) Branch. If registration in SAM is not required for the subject procurement, and the Offeror does not otherwise register in SAM, an Offeror located in the United States or its outlying areas may request that a CAGE code be assigned by submitting a request at https://cage.dla.mil.
(3) The appropriate country codification bureau. Entities located outside the United States and its outlying areas may obtain an NCAGE code by contacting the Codification Bureau in the foreign entity's country if that country is a member of NATO or a sponsored nation. NCAGE codes may be obtained from the NSPA at https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx if the foreign entity’s country is not a member of NATO or a sponsored nation. Points of contact for codification bureaus, as well as additional information on obtaining NCAGE codes, are available at http://www.nato.int/structur/AC/135/main/links/contacts.htm.
(d) Additional guidance for establishing and maintaining CAGE codes is available at https://cage.dla.mil.
(e) When a CAGE code is required for the immediate owner and/or the highest-level owner by Federal Acquisition Regulation (FAR) 52.204-17 or 52.212-3(p), the Offeror shall obtain the respective CAGE code from that entity to supply the CAGE code to the Government.
(f) Do not delay submission of the offer pending receipt of a CAGE code.
(g) If the solicitation includes FAR clause 52.204-2, Security Requirements, a subcontractor requiring access to classified information under a contract shall be identified with a CAGE code on the DD Form 254. The Contractor shall require a subcontractor requiring access to classified information to provide its CAGE code with its name and location address or otherwise include it prominently in the proposal. Each location of subcontractor performance listed on the DD Form 254 is required to reflect a corresponding unique CAGE code for each listed location unless the work is being performed at a Government facility, in which case the agency location code shall be used. The CAGE code must be for that name and location address. Insert the word “CAGE” before the number. The CAGE code is required prior to award.
1.11 FAR 52.211-14, NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY
PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
Any contract awarded as a result of this solicitation will be _ DX rated order; X DO-C2 rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.
1.12 FAR 52.214-34, SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)
Offers submitted in response to this solicitation shall be in the English language. Offers received in other than English shall be rejected.
1.13 FAR 52.214-35, SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)
Offers submitted in response to this solicitation shall be in terms of U.S. dollars. Offers received in other than U.S.
dollars shall be rejected.
1.14 FAR 52.215-1, INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (NOV 2021)
(a) Definitions. As used in this provision-
Discussions are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.
In writing, "writing," or "written" means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
Proposal modification is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
Proposal revision is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
Time, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
DOCUMENT 00 21 16
(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.
Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.
(2) The first page of the proposal must show–
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
(3) Submission, modification, revision, and withdrawal of proposals. (i) Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii) (A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and-
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .