WON 1665555, FY24 AJJY183012 (P-012), PDI: NORTH AIRCRAFT PARKING RAMP, ANDERSEN AIR FORCE BASE, GUAM
Solicitation number
N62742-26-R-1300
Issued by

About this file

This is a specification document listing contract drawings and work restrictions for a construction project at Andersen Air Force Base, Guam, identified as FY24 AJJY183012 (P-012), North Aircraft Parking Ramp (WON 1665555). The document comprises two primary sections: a comprehensive drawing list with over 400 referenced drawings covering civil, structural, electrical, telecommunications, and fueling systems, and detailed work restrictions and quality control requirements governing contractor operations.

The project requires construction of an aircraft parking apron with associated taxiways, utility yards, airfield fence, hydrant fueling infrastructure, and supporting systems. Work restrictions mandate that B2616, B2619, Giant Voice systems, the airfield, and Marianas Boulevard remain operational throughout construction, with contractor access controlled through Andersen AFB security protocols including DBIDS registration and affidavits. Regular working hours are 8 hours between 6:00 a.m. and 6:00 p.m., Monday through Friday, excluding federal holidays; work outside these hours requires 30 days advance approval from the Contracting Officer. The contractor must maintain a comprehensive Quality Control program with a dedicated QC Manager holding a Bachelor's degree in engineering or construction management with 10 years relevant experience and current professional engineer registration, supported by an Alternate QC Manager, Assistant QC Manager, and specialized QC Specialists in areas including electrical, environmental, concrete, geotechnical, telecommunications, and fuels systems. All QC personnel must complete Construction Quality Management training within 90 days of award. The QC organization must perform three phases of control (preparatory, initial, and follow-up) for each definable feature of work, with daily CQC reports, weekly QC meetings, and completion inspections required throughout the contract duration.

View the file

Other files

File Type Posted
26R1300_Amd0009-Issued.pdf PDF
26R1300_Note11-Issued.pdf PDF
1-26R1300-Amd0008-Issued.pdf PDF
3-P012_Amd0008-Dwgs_09092026_Signed.pdf PDF
26R1300_Note10-Issued.pdf PDF
2-P012-Amd0008-Specs.pdf PDF
26R1300_Note9-Issued.pdf PDF
26R1300_Amd0007-Issued.pdf PDF
26R1300_Amd0006-Issued.pdf PDF
1_N6274226R13000005 SF 30 Issued.pdf PDF
2_013300-A_SubmittalRegister-Amd0005.pdf PDF
3-P012_Amend.0004_Dwgs_Signed.pdf PDF
4-P012_Amend0004_RefDwgs_HS-3_DD35-Pumphouse.pdf PDF
26R1300_Note8.pdf PDF
1-26R1300_Amd0004-Issued.pdf PDF
5-P012_Amend0004_RefDwgsHS-4_DD35-Pumphouse.pdf PDF
26R1300_Note7.pdf PDF
1-N6274226R1300_Amd0003.pdf PDF
2-P012_Amend0003_Specs.pdf PDF
3-P012_Amend0003_Dwgs_Signed.pdf PDF
26R1300_Note6-Final.docx.pdf PDF
0_N6274226R1300_Amd0002.pdf PDF
2_P012_Amend.0002_Dwgs-Signed.pdf PDF
3_P012_NorthAircraftRamp_RefDwgs-Amend0002.pdf PDF
1_P012_Specs-Amend0002.pdf PDF
26R1300_Note5.pdf PDF
26R1300_Note4.pdf PDF
N6274226R1300-Amendment 0001.pdf PDF
26R1300_Note3.pdf PDF
26R1300_Note2.pdf PDF
26R1300_Note1.pdf PDF
3-P012_DwgsPt2_BB104-CD107.pdf PDF
6-P012_DwgsPt5_CG141-CF201.pdf PDF
7-P012_DwgsPt6_CF202-EK502.pdf PDF
1-P012_Spec-Final_Signed.pdf PDF
2-P012_DwgsPt1_G001-BB103.pdf PDF
5-P012_DwgsPt4_CS501-CG140.pdf PDF
0-N6274226R1300-FrontEnd.pdf PDF
4-P012_DwgsPt3_CD108-CS312.pdf PDF
P012_Schneider-JA_Redacted.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY24 AJJY183012 (P-012), PDI: North Aircraft Parking Ramp 1665555 Andersen Air Force Base, Guam

DOCUMENT 00 01 15

LIST OF DRAWINGS

02/24

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

DWG NO. NAVFAC DWG

NO.

TITLE

G-001 17361624 COVER SHEET

G-002 17361625 SHEET INDEX

G-003 17361626 SHEET INDEX

GI001 17361627 LOCATION MAP AND HAUL ROUTE

GI002 17361628 TYPICAL SYMBOLS AND ABBREVIATIONS

GI003 17361629 ABBREVIATIONS CONTINUED

GI108 17361630 PHASING PLAN

GI109 17361631 AIRFIELD PHASING PLAN

V-101 17361632 OVERALL EXISTING CONDITIONS

V-102 17361633 EXISTING CONDITIONS - AREA 1

V-103 17361634 EXISTING CONDITIONS - AREA 2

V-104 17361635 EXISTING CONDITIONS - AREA 3

V-105 17361636 EXISTING CONDITIONS - AREA 4

V-106 17361637 EXISTING CONDITIONS - AREA 5

V-107 17361638 EXISTING CONDITIONS - AREA 6

V-108 17361639 EXISTING CONDITIONS - AREA 7

V-109 17361640 EXISTING CONDITIONS - AREA 8

V-110 17361641 EXISTING CONDITIONS - AREA 9

V-111 17361642 EXISTING CONDITIONS - AREA 10

V-112 17361643 EXISTING CONDITIONS - AREA 11

V-113 17361644 EXISTING CONDITIONS - AREA 12

V-114 17361645 EXISTING CONDITIONS - AREA 13

V-115 17361646 EXISTING CONDITIONS - AREA 14

V-116 17361647 EXISTING CONDITIONS - AREA 15

V-117 17361648 EXISTING CONDITIONS - AREA 16

V-118 17361649 EXISTING CONDITIONS - AREA 17

V-119 17361650 EXISTING CONDITIONS - AREA 18

V-120 17361651 EXISTING CONDITIONS - AREA 19

V-121 17361652 EXISTING CONDITIONS - AREA 20

V-122 17361653 EXISTING CONDITIONS - AREA 21

V-123 17361654 EXISTING CONDITIONS - AREA 22

V-124 17361655 EXISTING CONDITIONS - AREA 23

V-125 17361656 EXISTING CONDITIONS - AREA 24

V-126 17361657 EXISTING CONDITIONS - AREA 25

V-127 17361658 EXISTING CONDITIONS - AREA 26

Jacobs D3430603 DOCUMENT 00 01 15 Page 1 22 May 2026 Amendment 0004

V-128 17361659 SURVEY CONTROL PLAN

BB101 17361660 LIMITED GEOTECHNICAL FIELD WORK PLAN

BB102 17361661 PHASE 2 GEOTECHNICAL FIELD WORK

BB103 17361662 BORING LOGS

BB104 17361663 BORING LOGS

BB105 17361664 BORING LOGS

BB106 17361665 BORING LOGS

BB107 17361666 BORING LOGS

BB108 17361667 BORING LOGS

BB109 17361668 BORING LOGS

BB110 17361669 BORING LOGS

BB111 17361670 BORING LOGS

BB112 17361671 BORING LOGS

BB113 17361672 BORING LOGS

BB114 17361673 BORING LOGS

BB115 17361674 BORING LOGS

BB116 17361675 BORING LOGS

BB117 17361676 BORING LOGS

BB118 17361677 BORING LOGS

BB119 17361678 BORING LOGS

BB120 17361679 BORING LOGS

BB121 17362005 EXISTING ERT SURVEY INFORMATION

BB122 17362006 EXISTING ERT SURVEY INFORMATION

BB123 17362007 EXISTING ERT SURVEY INFORMATION

BB124 17362008 EXISTING ERT SURVEY INFORMATION

BB125 17362009 EXISTING ERT SURVEY INFORMATION

BB126 17362010 APPROXIMATE LOCATIONS OF POTENTIAL KARST FEATURES

C-001 17361680 GENERAL NOTES

CD101 17361681 OVERALL DEMOLITION PLAN

CD102 17361682 DEMOLITION PLAN - AREA 1

CD103 17361683 DEMOLITION PLAN - AREA 2

CD104 17361684 DEMOLITION PLAN - AREA 3

CD105 17361685 DEMOLITION PLAN - AREA 4

CD106 17361686 DEMOLITION PLAN - AREA 5

CD107 17361687 DEMOLITION PLAN - AREA 6

CD108 17361688 DEMOLITION PLAN - AREA 7

CD109 17361689 DEMOLITION PLAN - AREA 8

CD110 17361690 DEMOLITION PLAN - AREA 9

CD112 17361691 DEMOLITION PLAN - AREA 11

CD113 17361692 DEMOLITION PLAN - AREA 12

CD114 17361693 DEMOLITION PLAN - AREA 13

CD115 17361694 DEMOLITION PLAN - AREA 14

CD116 17361695 DEMOLITION PLAN - AREA 15

CD117 17361696 DEMOLITION PLAN - AREA 16

CD118 17361697 DEMOLITION PLAN - AREA 17

CD119 17361698 DEMOLITION PLAN - AREA 18

CD120 17361699 DEMOLITION PLAN - AREA 19

CD121 17361700 DEMOLITION PLAN - AREA 20

CD122 17361701 DEMOLITION PLAN - AREA 21

CD123 17361702 DEMOLITION PLAN - AREA 22

CD124 17361703 DEMOLITION PLAN - AREA 23

CD125 17361704 DEMOLITION PLAN - AREA 24

CD126 17361705 DEMOLITION PLAN - AREA 25

CD127 17361706 DEMOLITION PLAN - AREA 26

Jacobs D3430603 DOCUMENT 00 01 15 Page 2 22 May 2026

CD130 17361707 NOT USED

CD131 17361708 NOT USED

CD132 17361709 NOT USED

CD134 17361710 NOT USED

CD135 17361711 NOT USED

CD136 17361712 NOT USED

CD137 17361713 NOT USED

CD138 17361714 NOT USED

CD139 17361715 NOT USED

CS101 17361716 OVERALL SITE & PAVING PLAN

CS102 17361717 SITE & PAVING PLAN - AREA 1

CS103 17361718 SITE & PAVING PLAN - AREA 2

CS104 17361719 SITE & PAVING PLAN - AREA 3

CS105 17361720 SITE & PAVING PLAN - AREA 4

CS106 17361721 SITE & PAVING PLAN - AREA 5

CS107 17361722 SITE & PAVING PLAN - AREA 6

CS108 17361723 SITE & PAVING PLAN - AREA 7

CS109 17361724 SITE & PAVING PLAN - AREA 8

CS110 17361725 SITE & PAVING PLAN - AREA 9

CS111 17361726 SITE & PAVING PLAN - AREA 10

CS112 17361727 SITE & PAVING PLAN - AREA 11

CS113 17361728 SITE & PAVING PLAN - AREA 12

CS114 17361729 SITE & PAVING PLAN - AREA 13

CS115 17361730 SITE & PAVING PLAN - AREA 14

CS120 17361731 SITE & PAVING PLAN - AREA 20

CS121 17361732 SITE & PAVING PLAN - AREA 21

CS122 17361733 SITE & PAVING PLAN - AREA 22

CS123 17361734 SITE & PAVING PLAN - AREA 23

CS124 17361735 SITE & PAVING PLAN - AREA 24

CS125 17361736 SITE & PAVING PLAN - AREA 25

CS126 17361737 SITE & PAVING PLAN - AREA 26

CS130 17361738 OVERALL PAVEMENT MARKING PLAN

CS131 17361739 PAVEMENT MARKING PLAN - AREA 1

CS132 17361740 PAVEMENT MARKING PLAN - AREA 2

CS133 17361741 PAVEMENT MARKING PLAN - AREA 3

CS134 17361742 PAVEMENT MARKING PLAN - AREA 5

CS135 17361743 PAVEMENT MARKING PLAN - AREA 6

CS136 17361744 PAVEMENT MARKING PLAN - AREA 7

CS137 17361745 PAVEMENT MARKING PLAN - AREA 11

CS138 17361746 PAVEMENT MARKING PLAN - AREA 12

CS139 17361747 PAVEMENT MARKING PLAN - AREA 13

CS140 17361748 PAVEMENT MARKING PLAN - AREA 20

CS141 17361749 PAVEMENT MARKING PLAN - AREA 21

CS142 17361750 PAVEMENT MARKING PLAN - AREA 22

CS143 17361751 PAVEMENT MARKING PLAN - AREA 23

CS144 17361752 PAVEMENT MARKING PLAN - AREA 24

CS145 17361753 PAVEMENT MARKING PLAN - AREA 25

CS146 17361754 PAVEMENT MARKING PLAN - AREA 26

CS201 17361755 ROADWAY PLAN & PROFILE RW01 STA 0+00-6+25 - AREA 22

CS202 17361756 ROADWAY PLAN & PROFILE RW01 STA 6+25-12+50 - AREA 22 & 23

CS203 17361757 ROADWAY PLAN & PROFILE RW01 STA 12+50-18+75 - AREA 23 & 24

CS204 17361758 ROADWAY PLAN & PROFILE RW01 STA 18+75-25+00 - AREA 24 & 25

CS205 17361759 ROADWAY PLAN & PROFILE RW01 STA 25+00-31+25 - AREA 25 & 26

CS206 17361760 ROADWAY PLAN & PROFILE RW01 STA 31+25-37+50 - AREA 21 & 26

Jacobs D3430603 DOCUMENT 00 01 15 Page 3 22 May 2026

CS207 17361761 ROADWAY PLAN & PROFILE RW01 STA 37+50-44+00 - AREA 21

CS212 17361762 TAXILANE PLAN & PROFILE L2 STA 00+00-06+50

CS213 17361763 TAXILANE PLAN & PROFILE L2 STA 06+50-13+00

CS215 17361764 TAXILANE PLAN & PROFILE L3 STA 00+00-06+50

CS216 17361765 TAXILANE PLAN & PROFILE L3 STA 06+50-13+00

CS301 17361766 ROADWAY SECTIONS - SAMPLE LINE PLAN

CS302 17361767 ROADWAY SECTIONS - RW01

CS303 17361768 ROADWAY SECTIONS - RW01

CS304 17361769 ROADWAY SECTIONS - RW01

CS305 17361770 ROADWAY SECTIONS - RW01

CS306 17361771 ROADWAY SECTIONS - RW01

CS307 17361772 ROADWAY SECTIONS - RW01

CS308 17361773 ROADWAY SECTIONS - RW01

CS309 17361774 ROADWAY SECTIONS - RW01

CS310 17361775 APRON SECTIONS - A01

CS311 17361776 APRON SECTIONS - A02

CS312 17361777 APRON SECTIONS - A03

CS501 17361778 SITE DETAILS

CS502 17361779 SITE DETAILS

CS503 17361780 SITE DETAILS

CS504 17361781 SITE DETAILS

CS505 17361782 SITE DETAILS

CS506 17361783 SITE DETAILS

CS507 17361784 SITE DETAILS

CT101 17361785 OVERALL JOINTING PLAN

CT102 17361786 JOINTING PLAN - AREA 1

CT103 17361787 JOINT ELEVATION PLAN - AREA 1

CT104 17361788 JOINTING PLAN - AREA 2

CT105 17361789 JOINT ELEVATION PLAN - AREA 2

CT106 17361790 JOINTING PLAN - AREA 3

CT107 17361791 JOINT ELEVATION PLAN - AREA 3

CT108 17361792 JOINTING PLAN - AREA 6

CT109 17361793 JOINT ELEVATION PLAN - AREA 6

CT110 17361794 JOINTING PLAN - AREA 7

CT111 17361795 JOINT ELEVATION PLAN - AREA 7

CT112 17361796 JOINTING PLAN - AREA 12

CT113 17361797 JOINT ELEVATION PLAN - AREA 12

CT114 17361798 JOINTING PLAN - AREA 13

CT115 17361799 JOINT ELEVATION PLAN - AREA 13

CG101 17361800 OVERALL GRADING AND DRAINAGE PLAN

CG102 17361801 GRADING AND DRAINAGE PLAN - AREA 1

CG103 17361802 GRADING AND DRAINAGE PLAN - AREA 2

CG104 17361803 GRADING AND DRAINAGE PLAN - AREA 3

CG105 17361804 GRADING AND DRAINAGE PLAN - AREA 4

CG106 17361805 GRADING AND DRAINAGE PLAN - AREA 5

CG107 17361806 GRADING AND DRAINAGE PLAN - AREA 6

CG108 17361807 GRADING AND DRAINAGE PLAN - AREA 7

CG109 17361808 GRADING AND DRAINAGE PLAN - AREA 8

CG110 17361809 GRADING AND DRAINAGE PLAN - AREA 9

CG112 17361810 GRADING AND DRAINAGE PLAN - AREA 11

CG113 17361811 GRADING AND DRAINAGE PLAN - AREA 12

CG114 17361812 GRADING AND DRAINAGE PLAN - AREA 13

CG115 17361813 GRADING AND DRAINAGE PLAN - AREA 14

CG116 17361814 GRADING AND DRAINAGE PLAN - AREA15

Jacobs D3430603 DOCUMENT 00 01 15 Page 4 22 May 2026

CG117 17361815 GRADING AND DRAINAGE PLAN - AREA 16

CG118 17361816 GRADING AND DRAINAGE PLAN - AREA 17

CG119 17361817 GRADING AND DRAINAGE PLAN - AREA 18

CG120 17361818 GRADING AND DRAINAGE PLAN - AREA 19

CG121 17361819 GRADING AND DRAINAGE PLAN - AREA 20

CG122 17361820 GRADING AND DRAINAGE PLAN - AREA 21

CG123 17361821 GRADING AND DRAINAGE PLAN - AREA 22

CG124 17361822 GRADING AND DRAINAGE PLAN - AREA 23

CG125 17361823 GRADING AND DRAINAGE PLAN - AREA 24

CG126 17361824 GRADING AND DRAINAGE PLAN - AREA 25

CG127 17361825 GRADING AND DRAINAGE PLAN - AREA 26

CG130 17361826 NOT USED

CG131 17361827 NOT USED

CG132 17361828 NOT USED

CG134 17361829 NOT USED

CG135 17361830 NOT USED

CG136 17361831 NOT USED

CG137 17361832 NOT USED

CG138 17361833 NOT USED

CG139 17361834 NOT USED

CG140 17361835 LIMITS OF GEOSYNTHETIC CLAY LINER

CG141 17361836 LIMITS OF GEOSYNTHETIC CLAY LINER

CG142 17361837 LAWN RESTORATION PLAN

CG143 17361838 NOT USED

CG144 17361839 KARST FEATURES PLAN

CG145 17361840 NOT USED

CG146 17361841 KARST FEATURES DETAIL

CG147 17361842 TURF REINFORCEMENT PLAN

CG148 17361843 NOT USED

CG201 17361844 DRAINAGE PROFILES

CG202 17361845 DRAINAGE PROFILES

CG203 17361846 DRAINAGE PROFILES

CG204 17361847 DRAINAGE PROFILES

CG205 17361848 DRAINAGE PROFILES

CG206 17361849 DRAINAGE PROFILES

CG207 17361850 DRAINAGE PROFILES

CG208 17361851 DRAINAGE PROFILES

CG209 17361852 DRAINAGE PROFILES

CG210 17361853 DRAINAGE PROFILES

CG211 17361854 DRAINAGE PROFILES

CG212 17361855 DRAINAGE PROFILES

CG501 17361856 DRAINAGE DETAILS

CG502 17361857 DRAINAGE DETAILS

CG503 17361858 DRAINAGE DETAILS

CG504 17361859 DRAINAGE DETAILS

CG505 17361860 DRAINAGE DETAILS

CG506 17361861 DRAINAGE DETAILS

CG507 17361862 SAND FILTER DETAILS

CU101 17361863 OVERALL UTILITY PLAN

CU102 17361864 UTILITY PLAN - AREA 1

CU103 17361865 UTILITY PLAN - AREA 6

CU104 17361866 UTILITY PLAN - AREA 7

CU105 17361867 UTILITY PLAN - AREA 8

CU106 17361868 UTILITY PLAN - AREA 23

Jacobs D3430603 DOCUMENT 00 01 15 Page 5 22 May 2026

CU107 17361869 UTILITY PLAN - AREA 24

CU108 17361870 UTILITY PLAN - AREA 25

CU109 17361871 UTILITY PLAN - AREA 26

CU201 17361872 UTILITY PROFILES

CU202 17361873 UTILITY PROFILES

CU203 17361874 UTILITY PROFILES

CU501 17361875 UTILITY DETAILS

CU502 17361876 UTILITY DETAILS

S-001 17361877 STRUCTURAL GENERAL NOTES

S-002 17361878 STRUCTURAL GENERAL NOTES

S-101 17361879 FOUNDATION PLANS

S-501 17361880 TYPICAL CONCRETE DETAILS

S-502 17361881 TYPICAL CONCRETE DETAILS

S-503 17361882 CONCRETE SECTIONS AND DETAILS

A-001 17361883 GENERAL NOTES, SYMBOLS, AND EXTERIOR PERSPECTIVE VIEWS

A-406 17361884 DETACHED EQUIPMENT YARD

E-001 17361885 ELECTRICAL LEGEND 1 OF 2

E-002 17361886 ELECTRICAL LEGEND 2 OF 2

ED101 17361887 ELECTRICAL DEMOLITION PLAN 1

ED102 17361888 ELECTRICAL DEMOLITION PLAN 2

ED601 17361889 EXISTING DISTRIBUTION ONE LINE DIAGRAM - DEMOLITION PLAN

ES101 17361890 ELECTRICAL SITE PLAN 1

ES102 17361891 ELECTRICAL SITE PLAN 2

ES103 17361892 ELECTRICAL SITE PLAN 3

ES104 17361893 ELECTRICAL SITE PLAN 4

ES105 17361894 ENLARGED ELECTRICAL SITE PLAN

ES201 17361895 EXISTING SWITCHING STATION - 13.8KV SWITCHGEAR ARRANGEMENT

ELEV.ES501 17361896 ELECTRICAL SITE DETAILS

ES502 17361897 ELECTRICAL SITE DETAILS

ES503 17361898 ELECTRICAL SITE DETAILS

ES504 17361899 ELECTRICAL SITE DETAILS

ES505 17361900 ELECTRICAL SITE DETAILS

ES506 17361901 ELECTRICAL SITE DETAILS

ES701 17361902 HIGH MAST LIGHT POLE LOCATIONS

EP601 17361903 EXISTING DISTRUBUTION ONE LINE DIAGRAM - NEW WORK

EP602 17361904 ONE-LINE DIAGRAMS

EP701 17361905 PANELBOARD SCHEDULES

EA101 17361906 AIRFIELD ELECTRICAL PLAN 1

EA102 17361907 AIRFIELD ELECTRICAL PLAN 2

EA501 17361908 AIRFIELD LIGHTING DETAILS

EA502 17361909 AIRFIELD LIGHTING DETAILS

EA503 17361910 AIRFIELD LIGHTING DETAILS

EA504 17361911 AIRFIELD LIGHTING DETAILS

EA701 17361912 AIRFIELD LIGHTING POINTS SCHEDULE

EA702 17361913 AIRFIELD LIGHTING ONE-LINE DIAGRAMS

TS001 17361914 TELECOMMUNICATIONS SITE LEGEND

TD101 17361915 TELECOMMUNICATIONS SITE DEMOLITION PLAN 1

TD102 17361916 TELECOMMUNICATIONS SITE DEMOLITION PLAN 2

TS101 17361917 TELECOMMUNICATIONS SITE PLAN 1

TS102 17361918 TELECOMMUNICATIONS SITE PLAN 2

TS103 17361919 TELECOMMUNICATIONS SITE PLAN 3

TS104 17361920 TELECOMMUNICATIONS SITE PLAN 4

TS105 17361921 TELECOMMUNICATIONS SITE PLAN 5

TS106 17362001 TELECOMMUNICATIONS SITE PLAN 6

Jacobs D3430603 DOCUMENT 00 01 15 Page 6 22 May 2026

TS107 17362002 TELECOMMUNICATIONS SITE PLAN 7

TS108 17362003 TELECOMMUNICATIONS SITE PLAN 8

TS109 17362004 TELECOMMUNICATIONS SITE PLAN 9

TS501 17361922 TELECOMMUNICATIONS SITE DETAILS

TS502 17361923 TELECOMMUNICATIONS SITE DETAILS

TS701 17361924 TELECOMMUNICATIONS INTERBUILDING BACKBONE RISER

TS702 17362011 TELECOMMUNICATIONS INTERBUILDING BACKBONE RISER

CF101 17361925 OVERALL FUELING PLAN

CF102 17361926 OVERALL COMM PLAN

CF201 17361927 FUEL PLAN AND PROFILE - AREA 1

CF202 17361928 FUEL PLAN AND PROFILE - AREA 2

CF203 17361929 FUEL PLAN AND PROFILE - AREA 3

CF204 17361930 FUEL PLAN AND PROFILE - AREA 4

CF205 17361931 FUEL PLAN AND PROFILE - AREA 5

CF206 17361932 FUEL PLAN AND PROFILE - AREA 6

CF207 17361933 FUEL PLAN AND PROFILE - AREA 7

CF208 17361934 FUEL PLAN AND PROFILE - AREA 8

CF209 17361935 FUEL PLAN AND PROFILE - AREA 9

CF210 17361936 FUEL PLAN AND PROFILE - AREA 10

CF211 17361937 FUEL PLAN AND PROFILE - AREA 11

CF212 17361938 FUEL PLAN AND PROFILE - AREA 12

CF221 17361939 COMM PLAN - AREA 1

CF222 17361940 COMM PLAN - AREA 2

CF223 17361941 COMM PLAN - AREA 3

CF224 17361942 COMM PLAN - AREA 4

CF225 17361943 COMM PLAN - AREA 5

CF226 17361944 COMM PLAN - AREA 6

CF227 17361945 COMM PLAN - AREA 7

CF228 17361946 COMM PLAN - AREA 8

CF229 17361947 COMM PLAN - AREA 9

CF230 17361948 COMM PLAN - AREA 10

CF231 17361949 COMM PLAN - AREA 11

CF232 17361950 COMM PLAN - AREA 12

CF233 17361951 COMM PLAN - AREA 13

CF234 17361952 COMM PLAN - AREA 14

CF501 17361953 FUELING DETAILS

CF502 17361954 FUELING DETAILS

SF001 17361955 STRUCTURAL GENERAL NOTES - SHEET 1

SF002 17361956 STRUCTURAL GENERAL NOTES - SHEET 2

SF003 17361957 LEGENDS AND ABBREVIATIONS

SF101 17361958 OVERALL STRUCTURAL LAYOUT

SF111 17361959 ISOLATION VALVE VAULT 1 - PLANS

SF112 17361960 ISOLATION VALVE VAULT 2 - PLANS - SHEET 1

SF113 17361961 ISOLATION VALVE VAULT 2 - PLAN - SHEET 2

SF114 17361962 HYDRANT PIT - PLANS AND SECTIONS

SF115 17361963 HPV PITS - PLANS AND SECTIONS

SF501 17361964 STANDARD STRUCTURAL DETAILS - SHEET 1

SF502 17361965 STANDARD STRUCTURAL DETAILS - SHEET 2

SF511 17361966 ISOLATION VALVE VAULT - SECTIONS - SHEET 1

SF512 17361967 ISOLATION VALVE VAULT - SECTIONS - SHEET 2

SF513 17361968 ISOLATION VALVE VAULT - SECTIONS AND DETAILS

SF521 17361969 ROLLING COVER - SHEET 1

SF522 17361970 ROLLING COVER - SHEET 2

SF523 17361971 ROLLING COVER - SHEET 3

Jacobs D3430603 DOCUMENT 00 01 15 Page 7 22 May 2026

SF524 17361972 ROLLING COVER - SHEET 4

SF525 17361973 ROLLING COVER - SHEET 5

SF551 17361974 PIPE SUPPORT DETAILS

MF001 17361975 FUELING MECHANICAL LEGEND

MF002 17361976 FUELING MECHANICAL GENERAL NOTES

MF011 17361977 FUELING MECHANICAL FLOW DIAGRAM - OVERALL

MF101 17361978 FUELING MECHANICAL OVERALL SITE PLAN

MF501 17361979 FUELING MECHANICAL DETAILS - ISOLATION VALVE VAULT (IVV-1)

MF502 17361980 FUELING MECHANICAL DETAILS - ISOLATION VALVE VAULT (IVV-2)

MF503 17361981 FUELING MECHANICAL DETAILS

MF504 17361982 FUELING MECHANICAL DETAILS

MF505 17361983 FUELING MECHANICAL DETAILS

MF506 17361984 FUELING MECHANICAL DETAILS

MF601 17361985 FUELING MECHANICAL P&ID

EF001 17361986 ELECTRICAL FUELING LEGEND - 1

EF002 17361987 ELECTRICAL FUELING LEGEND - 2

EF011 17361988 OVERALL FUELING HAZARDOUS AREA PLAN

EF101 17361989 OVERALL FUELING ELECTRICAL SITE PLAN

EF401 17361990 ENLARGED PLAN - PUMPHOUSE

EF501 17361991 ELECTRICAL DETAILS - EPDS

EF502 17361992 ELECTRICAL DETAILS - GROUNDING

EF503 17361993 ELECTRICAL SITE DETAILS - HANDHOLES

EF504 17361994 ELECTRICAL SITE DETIALS - DUCT BANKS

EF511 17361995 ELEVATION - PUMP CONTROL PANEL

EF611 17361996 PCP - CONTROL DIAGRAM

EF621 17361997 NORTH APRON EPDS - FRONT LAYOUT

EF622 17361998 NORTH ARON EPDS WIRING - 1

EK501 17361999 CATHODIC PROTECTION DETAILS

EK501 17362000 CATHODIC PROTECTION DETAILS

1.3 REFERENCE DRAWINGS

The following reference drawings are intended only to show the original construction. Drawing are the property of the Government and must not be used for any purpose other than that intended by the contract.

Jacobs D3430603 DOCUMENT 00 01 15 Page 8 22 May 2026

NAVFAC DWG NO. TITLE

3201807 REPAIR/REPLACE OIL/WATER SEPARATORS BUILDING NO. 2550 JET

ENGINE TEST FACILITY

7320181 REPAIR/REPLACE OIL/WATER SEPARATORS BLDG NO. 2550 JET ENGINE

TEST FACILITY

AND-W-122 CONSTRUCT OIL SEPARATOR WET ENGINE TEST STAND (BLG 2550)

AND B-230 CONSTRUCT JET TEST STAND READY ROOM

AND-R-60 AIR CONDITIONING SHAW ESTES JET ENGINE TEST CELL CONTROL RM.

BLDG. 2551

1.3.1 As-Builts for Design EFSO Repairs at Various Fuels Facilities - Design EFSO Repairs to HS-3 (Hydrant System #3)

SHEET SHEET TITLE

03G-001 GENERAL SHEET INDEX, SITE, AND LOCATION MAP

03C-001 CIVIL OVERALL SITE PLAN - PUMP HOUSE 3

03C-002 CIVIL FRANGIBLE EFSO REQUIREMENT PLAN

03C-101 CIVIL SITE PLAN AND PROFILE SHEET 1

03C-102 CIVIL SITE PLAN AND PROFILE SHEET 2

03C-103 CIVIL SITE PLAN AND PROFILE SHEET 3

03C-104 CIVIL SITE PLAN AND PROFILE SHEET 4

03C-105 CIVIL SITE PLAN AND PROFILE SHEET 5

03C-106 CIVIL SITE PLAN AND PROFILE SHEET 6

03C-107 CIVIL SITE PLAN AND PROFILE SHEET 7

03C-108 CIVIL SITE PLAN AND PROFILE SHEET 8

03C-109 CIVIL SITE PLAN AND PROFILE SHEET 9

03C-110 CIVIL SITE PLAN AND PROFILE SHEET 10

03C-111 CIVIL SITE PLAN AND PROFILE SHEET 11

03C-112 CIVIL SITE PLAN AND PROFILE SHEET 12

03C-113 CIVIL SITE PLAN AND PROFILE SHEET 13

01C-031 12" TRENCHLESS CROSSING 3-1 PLAN AND PROFILE

01C-032 12" TRENCHLESS CROSSING 3-2 PLAN AND PROFILE

01C-033 12" TRENCHLESS CROSSING 3-3 PLAN AND PROFILE

01C-034 12" TRENCHLESS CROSSING 3-4 PLAN AND PROFILE

01C-035 12" TRENCHLESS CROSSING 3-5 PLAN AND PROFILE

01C-036 12" TRENCHLESS CROSSING 3-6 PLAN AND PROFILE

01C-037 12" TRENCHLESS CROSSING 3-7 PLAN AND PROFILE

FA101 PUMPHOUSE 3 FIRE ALARM PLAN

03S-101 STRUCTURAL NOTES, & ABBREVIATIONS

03S-102 STRUCTURAL EFSO POST DETAILS

03Y-101 EFSO CONTROL PANEL LAYOUT & BILL OF MATERIAL

03Y-102 EFSO FIBER NETWORK OVERVIEW

03Y-103 EFSO AND PUMP HOUSE WIRING LAYOUT

03Y-104 PUMP HOUSE I&C PLAN AND DETAILS

3.00E-01 LEGENDS SYMBOLS AND ABBREVIATIONS

03ED-201 I&C AND ELECTRICAL SITE PLAN AREA 3 - DEMOLITION

3.00E-101 OVERALL I&C AND ELECTRICAL SITE PLAN

3.00E-201 I&C AND ELECTRICAL SITE PLAN AREA 3

03E-501 ELECTRICAL DETAILS

Jacobs D3430603 DOCUMENT 00 01 15 Page 9 22 May 2026

1.3.2 As-Builts for Design EFSO Repairs at Various Fuels Facilities - Design EFSO Repairs to HS-4 (Hydrant System #4)

SHEET SHEET TITLE

04G-001 GENERAL SHEET INDEX, SITE, AND LOCATION MAP

04C-101 CIVIL SITE PLAN AND PROFILE SHEET 1

04C-102 CIVIL SITE PLAN AND PROFILE SHEET 2

04C-103 CIVIL SITE PLAN AND PROFILE SHEET 3

04C-104 CIVIL SITE PLAN AND PROFILE SHEET 4

04C-105 CIVIL SITE PLAN AND PROFILE SHEET 5

04C-106 CIVIL SITE PLAN AND PROFILE SHEET 6

04C-107 CIVIL SITE PLAN AND PROFILE SHEET 7

04C-108 CIVIL SITE PLAN AND PROFILE SHEET 8

04C-109 CIVIL SITE PLAN AND PROFILE SHEET 9

04C-110 CIVIL SITE PLAN AND PROFILE SHEET 10

04C-111 CIVIL SITE PLAN AND PROFILE SHEET 11

04C-112 CIVIL SITE PLAN AND PROFILE SHEET 12

04C-113 CIVIL SITE PLAN AND PROFILE SHEET 13

04C-114 CIVIL SITE PLAN AND PROFILE SHEET 14

04C-115 CIVIL SITE PLAN AND PROFILE SHEET 15

01C-041 12" TRENCHLESS CROSSING 4-1 PLAN AND PROFILE

01C-042 12" TRENCHLESS CROSSING 4-2 PLAN AND PROFILE

01C-043 12" TRENCHLESS CROSSING 4-3 PLAN AND PROFILE

01C-044 12" TRENCHLESS CROSSING 4-4 PLAN AND PROFILE

01C-045 12" TRENCHLESS CROSSING 4-5 PLAN AND PROFILE

01C-046 12" TRENCHLESS CROSSING 4-6 PLAN AND PROFILE

FA101 PUMPHOUSE 4 FIRE ALARM PLAN

Y-101 EFSO CONTROL PANEL LAYOUT & BILL OF MATERIAL

Y-102 EFSO FIBER NETWORK OVERVIEW

Y-103 EFSO AND PUMP HOUSE WIRING LAYOUT

Y-104 PUMP HOUSE I&C PLAN AND DETAILS

E-001 LEGENDS SYMBOLS AND ABBREVIATIONS

E-101 OVERALL I&C AND ELECTRICAL SITE PLAN

E-201 I&C AND ELECTRICAL SITE PLAN AREA 4

E-501 LEGENDS SYMBOLS AND ABBREVIATIONS

-- End of Document --

Jacobs D3430603 DOCUMENT 00 01 15 Page 10 22 May 2026

SECTION 01 14 00

WORK RESTRICTIONS

11/22, CHG 5: 05/25

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2024) Safety and Occupational Health (SOH) Requirements

1.2 DEFINITIONS

"State" when used in reference to states of the United States also include the Territory of Guam.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel

Personnel List

Free-Zone Request ; G

Vehicle List ; G

Statement Of Acknowledgement ; G

1.4 SPECIAL SCHEDULING REQUIREMENTS

a. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.

b. The B2616, B2619, the Giant Voice, the airfield, and Marianas Boulevard will remain in operation during the entire construction period. Conduct operations so as to cause the least possible interference with normal operations of the activity.

c. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

d. Andersen Air Force Base will remove existing 20 foot and 40 foot containers that are located in the IRP Building compound within 60

Jacobs D3430603 SECTION 01 14 00 Page 1 22 May 2026 calendar days after contract award.

1.5 CONTRACTOR ACCESS AND USE OF PREMISES

1.5.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Ensure all Contractor equipment, including delivery vehicles, are clearly identified with their company name.

1.5.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.5.1.2 Contractor Requirements for Access to Andersen Air Force Base

a. All Contractors shall have a sponsor to the installation on Andersen Air Force Base (AFB). Coordinate access to Andersen Air Force Base with the Contracting Officer.

b. A Contractor Affidavit is required for each person requesting access to Andersen AFB. Complete the "USAF Contractor/Sub-Contractor Access Affidavit" form, https://www.andersen.af.mil/Contact-Us/Visitor-Center/ .

c. Contractors are required to submit a paper pass/Base Pass Request with approval from their sponsor/Contracting Officer to the Visitors control Center. Submit free-zone request .

d. Contractor must submit affidavits within 45 days of contract award and plan for 30 days of Government review.

1.5.1.3 Installation Access

Obtain access to Air Force installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

No fees are associated with obtaining a DBIDS credential.

Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.

1.5.1.3.1 Registration for DBIDS

Registration for DBIDS is available at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

Procedure includes:

a. Present a letter or official award document from the Contracting

Jacobs D3430603 SECTION 01 14 00 Page 2 22 May 2026

Officer, that provides the purpose for access, to the base Visitor Control Center representative.

b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/Operations-and-Management/Base-Support/DBIDS/ .

d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.

e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.

1.5.1.3.2 DBIDS Eligibility Requirements

Throughout the year, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification.

The Government is the final authority.

1.5.1.3.3 DBIDS Notification Requirements

a. Immediately report instances of lost or stolen badges to the Contracting Officer.

b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:

(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.

1.5.1.3.4 One-Day Passes

Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

1.5.1.4 No Smoking Policy

Smoking is prohibited within and outside of all buildings on

Jacobs D3430603 SECTION 01 14 00 Page 3 22 May 2026 installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.5.2 Working Hours

Regular working hours will consist of an 8 hour period , between 6:00 a.m.

and 6:00 p.m., Monday through Friday, excluding Government holidays.

1.5.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 30 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in accordance with requirements of EM 385-1-1 . Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.5.4 Exclusionary Period

Work inside the existing airfield fence line along Taxiway D loop could be affected by exercises occurring between February and July every year and require removal and re-establishment of the free zone fence. Taxiway tie-in work must not occur during the February-July exercises without prior approval of the Contracting Officer. Notify the Contracting Officer 60 days prior if work inside the free zone along Taxiway D loop is anticipated during the exercise period.

1.5.5 Occupied Buildings

Work will be around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.

1.5.6 Utility Cutovers and Interruptions

a. Approval from the 36th CES is required in advance of any temporary or permanent work that impacts a utility system. Examples of work that requires advance approval from the 36th CES are a temporary or permanent connection to a utility, a request to energize a new facility, or work to repair, install, enlarge, demolish or modernize existing utility infrastructure. Depending on the work one or more of the following approvals is required prior to any work being conducted.

These forms and instructions are available at the Requirements Section Building 18001 or send an email to CSU Org Box:

36ces.service@us.af.mil.

(1) Project Coordination and Approval Checklist

(2) Andersen Air Base Utility Connection Permit

(3) Record Meter Change

(4) Andersen Air Base Utility Outage Request

Jacobs D3430603 SECTION 01 14 00 Page 4 22 May 2026

b. Fees: Electrical distribution services are provided by a private contractor, DZSP, hired by Andersen Air Force Base. DZSP charges for some services. Applicants should contact DZSP Customer Service in advance to determine what fees may be required.

c. Time Lines: Applicants are strongly encourage to contact 36th CES early in the process to discuss the required approvals and estimated timeline for approval. Each of the approvals listed above has established review timelines (noted in the form instructions).

However, the length of time to receive all approvals varies from case to case. Some applications are delayed because applicants do not follow instructions carefully. Sometimes additional supporting studies or tests require further review and approval by 36th CES, all of which takes additional time after the application has been submitted. Point of Contact is the Requirements and Optimization Chief who can be reached by sending an email to CSU Org Box: 36ces.service@us.af.mil.

d. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

e. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

f. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS. Such interruptions are further limited to four hours. This time limit includes time for deactivation and reactivation.

g. Operation of Station Utilities: Do not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. Notify the Contracting Officer giving reasonable advance notice when such operation is required.

1.5.7 Restrictions on Use of Yellow, Orange-Yellow, Red, and Magenta Materials

The use of yellow, yellow-orange, red and magenta materials for the following purposes is prohibited: sheeting, tarpaulins, polyethylene bottles or other containers, tapes, bags, banding of identification marks on tools, and boundary markers such as ribbons. Obtain Contracting Officer's prior approval for use of such colored materials for other purposes, such as buried vapor barrier membranes.

1.6 SECURITY REQUIREMENTS

1.6.1 Personnel List

Submit for approval, at least 15 days prior to the desired date of entry, an original alphabetical list of personnel who require entry into Government property to perform work on the project. Furnish for each person:

a. Name

Jacobs D3430603 SECTION 01 14 00 Page 5 22 May 2026

b. Date and place of birth

c. Citizenship

d. Home address

e. Social Security number

f. Current pass expiration date

g. Naturalization or Alien Registration number

h. Passport number, place of issue, and expiration date

i. Guam Police clearance report for last six months

The request for personnel passes must be accompanied with the following certification:

"I hereby certify that all personnel on this list are either born U.S.

citizens, naturalized U.S. citizens with the naturalization number shown, or legal aliens with the alien registration number indicated."

Signature/Firm Name

1.6.1.1 Citizenship Requirements

Aliens will not be admitted to the work site without approval.Clearance for aliens may require approximately 20 workdays for approval.

1.6.2 Vehicle List

Submit an original list of vehicles to be utilized at the work site with the following information for each vehicle:

a. Make

b. Year

c. Model

d. License number

e. Registered owner

1.6.3 Passess

Submit request for personnel and vehicle passes together. Include the Certificate of Insurance for Contractor and Subcontractor(s) and the Statement of Acknowledgement with the submittal. Passes will normally be issued within 21 calendar days.

1.6.3.1 Control

Maintain strict accountability over passes. Immediately report to the source of issue, passes missing or lost and the circumstances. If the Contractor has another active contract or one commencing immediately, employees' names may be transferred from one contract to the other. Final payment will not be effected until employees are transferred to another

Jacobs D3430603 SECTION 01 14 00 Page 6 22 May 2026 contract or the records are cleared. Furnish a signed letter, countersigned by the source of issue, stating that passes have been turned in.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

Jacobs D3430603 SECTION 01 14 00 Page 7 22 May 2026

THIS PAGE INTENTIONALLY LEFT BLANK

Jacobs D3430603 SECTION 01 14 00 Page 8 22 May 2026

SECTION 01 45 00

QUALITY CONTROL

08/23, CHG 3: 08/25

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2024) Safety and Occupational Health (SOH) Requirements

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 24 (2025) Standard for the Installation of Private Fire Service Mains and Their Appurtenances

1.2 PAYMENT

Separate payment will not be made for providing and maintaining an effective Quality Control program. Include all associated costs in the applicable Bid Schedule item.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES.

SD-01 Preconstruction Submittals

Contractor Quality Control (CQC) Plan ; G

SD-06 Test Reports

Verification Statement

1.4 GENERAL REQUIREMENTS

Establish and maintain an effective quality control (QC) system that complies with FAR 52.246-12 Inspection of Construction. QC is comprised of plans, procedures, and organization necessary to produce an end product that complies with the Contract requirements. The QC system covers all construction operations, both onsite and offsite, and must be keyed to the proposed construction sequence. The Quality Control Manager, Superintendent, Site Safety and Health Officer (SSHO), and all on-site supervisors are responsible for the quality of work and are subject to removal by the Contracting Officer for non-compliance with the quality requirements specified in the Contract. The Quality Control Manager must maintain a physical presence at the work site at all times and is the

Jacobs D3430603 SECTION 01 45 00 Page 1 22 May 2026 primary individual responsible for all quality control.

1.5 QUALITY CONTROL (QC) PROGRAM REQUIREMENTS

Establish and maintain a QC program as described in this section. The QC program consists of a QC Organization, QC Plan, QC Plan Meeting(s), a Coordination and Mutual Understanding Meeting, QC meetings, three phases of control, submittal review and approval, testing, completion inspections, QC certifications, independent Special Inspections in accordance with Section 01 45 35 SPECIAL INSPECTIONS, and documentation necessary to provide materials, equipment, workmanship, fabrication, construction and operations that comply with the requirements of this Contract. The QC program must cover on-site and off-site work and be keyed to the work sequence. No construction work or testing may be performed unless the QC Manager is on the work site. The QC Manager must report to an officer of the firm and not be subordinate to the Project Superintendent or the Project Manager. The QC Manager, Project Superintendent and Project Manager must work together effectively.

Although the QC Manager is the primary individual responsible for quality control, all individuals will be held responsible for the quality of work on the job.

1.5.1 Meetings

1.5.1.1 Quality Control Plan Meeting

Prior to submission of the QC Plan, the Contractor may request a meeting with the Contracting Officer to discuss the QC Plan requirements of this Contract.

The purpose of this meeting is to develop a mutual understanding of the QC Plan requirements prior to plan development and submission and to agree on the Contractor's list of Definable Feature of Work (DFOW).

1.5.1.2 Coordination and Mutual Understanding Meeting

After the Preconstruction Conference, before start of construction, and prior to acceptance by the Government of the CQC Plan, meet with the Contracting Officer and discuss the Contractor's quality control system.

During the meeting, a mutual understanding of the system details must be developed, including the forms for recording the CQC operations, control activities, testing, administration of the system for both onsite and offsite work, and the interrelationship of Contractor's Management and control with the Government's Quality Assurance. Minutes of the meeting will be prepared by the QC Manager and signed by the Contractor and the Government. Provide a copy of the signed minutes to all attendees and incorporate into the relevant QC Plan. At a minimum the Coordination and Mutual Understanding Meeting must be repeated when a new QC Manager is appointed. There can be other occasions when subsequent conferences will be called by either party to reconfirm mutual understandings or address deficiencies in the CQC system or procedures which can require corrective action by the Contractor.

1.5.1.2.1 Purpose

The purpose of this meeting is to develop a mutual understanding of the QC details, including documentation, administration for on-site and off-site work, design intent, environmental requirements and procedures, coordination of activities to be performed, Special Inspections, and the

Jacobs D3430603 SECTION 01 45 00 Page 2 22 May 2026 coordination of the Contractor's management, production, and QC personnel. At the meeting, the Contractor must explain in detail how three phases of control will be implemented for each DFOW, as well as how each DFOW will be affected by each management plan or requirement as listed below:

a. Waste Management Plan.

b. Procedures for noise and acoustics management.

c. Environmental Protection Plan.

d. Environmental regulatory requirements.

e. Special Inspections.

f. Indoor Air Quality (IAQ) Management Plan.

1.5.1.2.2 Coordination of Activities

Coordinate activities included in various sections to assure efficient and orderly installation of each component. Coordinate operations included under different sections that are dependent on each other for proper installation and operation. Schedule construction operations with consideration for indoor air quality as specified in the IAQ Management Plan. Coordinate Special Inspections.

1.5.1.2.3 Attendees

As a minimum, the Contractor's personnel required to attend include an officer of the firm, the Project Manager, Project Superintendent, QC Manager, Alternate QC Manager, Special Inspector, Environmental Manager, and subcontractor representatives. Each subcontractor who will be assigned QC responsibilities must have a principal of the firm at the meeting.

1.5.1.3 Quality Control (QC) Meetings

After the start of construction, conduct weekly QC meetings led by the QC Manager at the work site with the Project Superintendent, the Special Inspector, and the other personnel as necessary. The QC Manager is to prepare the minutes of the meeting and provide a copy to the Contracting Officer within 2 working days after the meeting. The Contracting Officer may attend these meetings. As a minimum, accomplish the following at each meeting:

a. Review the minutes of the previous meeting.

b. Review the schedule and the status of work and deficiencies/rework.

Review the most current approved schedule (in accordance with schedule specification) and the status of work and deficiencies/rework.

c. Review the status of submittals and Request For Information (RFIs).

d. Review the work to be accomplished in the next 3 weeks as defined by the schedule section paragraph WEEKLY LOOK AHEAD in Section 01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS) and all quality control documentation required for that work.

Jacobs D3430603 SECTION 01 45 00 Page 3 22 May 2026

e. Review Testing Plan and Log including status of tests performed since last QC Meeting.

f. Resolve QC and production problems. Discuss status of pending change orders.

g. Address items that may require revising the QC Plan.

h. Review Accident Prevention Plan (APP) and effectiveness of the safety program.

i. Review environmental requirements and procedures.

j. Review Environmental Management Plan.

k. Review Waste Management Plan.

l. Review the status of training completion.

m. Review IAQ Management Plan.

1.5.2 Contractor Quality Control (CQC) Plan

Submit no later than 30 days after Contract Award , the CQC Plan proposed to implement the requirements FAR 52.246-12 Inspection of Construction.

Construction will be permitted to begin only after acceptance of the CQC Plan and other Contract requirements

1.5.2.1 Content of Contractor Quality Control (CQC) Plan

Provide a CQC Plan, prior to start of construction that includes a table of contents, with major sections identified, pages numbered sequentially, and that documents the proposed methods and responsibilities for accomplishing quality control during the construction of the project. The CQC Plan must at a minimum include the following sections:

a. A description of the quality control organization and acknowledgment that the CQC staff will implement the three phase control system for all aspects of the work specified.

b. An organizational chart showing the quality control organization with individual names and job titles and lines of authority up to an executive of the company at the home office.

c. NAMES AND QUALIFICATIONS: Names and qualifications, in resume format, (including position titles and durations for qualifying experiences) for each person in the QC organization. Include the Construction Quality Management (CQM) for Contractors course certifications for the QC personnel as required by the paragraph CONSTRUCTION QUALITY

MANAGEMENT TRAINING.

d. DUTIES, RESPONSIBILITY AND AUTHORITY OF QC PERSONNEL: Duties, responsibilities, and authorities of each person in the QC organization.

e. OUTSIDE ORGANIZATIONS: A listing of outside organizations, such as architectural and consulting engineering firms, that will be employed by the Contractor and a description of the services these firms will provide.

Jacobs D3430603 SECTION 01 45 00 Page 4 22 May 2026

f. APPOINTMENT LETTERS: Letters signed by an officer of the firm appointing the QC Manager and Alternate QC Manager, and stating that they are responsible for implementing and managing the QC program as described in this Contract. Include in this letter the responsibility of the QC Manager and Alternate QC Manager to implement and manage the three phases of control, and their authority to stop work that is not in compliance with the Contract. Letters of direction are to be issued by the QC Manager to the Assistant QC Manager and all other QC Specialists or quality control representatives outlining their duties, authorities, and responsibilities. Include copies of the letters in the QC Plan.

g. SUBMITTAL PROCEDURES AND INITIAL SUBMITTAL REGISTER: Procedures for reviewing, approving, scheduling, and managing submittals, including those of subcontractors, offsite fabricators, suppliers, and purchasing agents. Provide the name(s) of the person(s) in the QC organization authorized to review and certify submittals prior to approval. Provide the initial submittal of the Submittal Register as specified in Section 01 33 00 SUBMITTAL PROCEDURES.

h. TESTING LABORATORY INFORMATION: Testing laboratory information required by the paragraph ACCREDITATION REQUIREMENTS, as applicable.

i. TESTING PLAN AND LOG: A Testing Plan and Log that includes the tests required, associated feature of work required, referenced by the specification paragraph number requiring the test, the frequency, and the person responsible for each test.

j. Procedures to complete construction deficiencies from identification through acceptable corrective action. Establish verification procedures that identified deficiencies have been corrected. This phase is performed prior to beginning work on each definable feature of work, after all required plans, documents, materials are approved, and after copies are at the work site.

k. Reporting procedures, including proposed reporting formats.

l. Procedures for submitting and reviewing design changes/variations prior to submission to the Contracting Officer.

m. LIST OF DEFINABLE FEATURES: A Definable Feature of Work (DFOW) is a task that is separate and distinct from other tasks and has control requirements and work crews unique to that task. A DFOW is identified by different trades or disciplines, or it is work by the same trade in a different environment. A DFOW is by definition any item or activity on the construction schedule, and the schedule specification provides direction regarding how the DFOWs are to be structured. Include in the list of DFOWs for all activities on the Construction Schedule.

Although each section of the specifications can generally be considered as a definable feature of work, there are frequently more than one definable features under a particular section. Identify the specification section number and schedule activity ID for each DFOW listed. The DFOW list will be reviewed in coordination with the construction schedule and agreed upon during the Coordination and Mutual Understanding Meeting.

n. PROCEDURES FOR PERFORMING AND TRACKING THE THREE PHASES OF CONTROL:

Identify procedures used to ensure the three phases of control to

Jacobs D3430603 SECTION 01 45 00 Page 5 22 May 2026 manage the quality on this project. For each Definable Feature of Work (DFOW), a Preparatory and Initial phase checklist will be filled out during the Preparatory and Initial phase meetings. Conduct the Preparatory and Initial Phases and meetings with a view towards obtaining quality construction by planning ahead and identifying potential problems for each DFOW.

o. Coordinate scheduled work with Special Inspections required by Section 01 45 35 SPECIAL INSPECTIONS, the Statement of Special Inspections and the Special Inspections Project Manual. Where the applicable code issued by the International Code Council (ICC) calls for inspections by the Building Official, the Contractor must include the inspections in the Quality Control Plan and must perform the inspections required by the applicable ICC. The Contractor must perform these inspections using independent qualified inspectors. Include the Special Inspections Project Manual requirements in the QC Plan.

p. PROCEDURES FOR COMPLETION INSPECTION: Procedures for identifying and documenting the completion inspection process. Include in these procedures the responsible party for punch out inspection, pre-final inspection, and final acceptance inspection.

q. TRAINING PROCEDURES AND TRAINING LOG: Procedures for coordinating and documenting the training of personnel required by the Contract.

r. ORGANIZATION AND PERSONNEL CERTIFICATIONS LOG: Procedures for coordinating, tracking and documenting all certifications required for entities such as subcontractors, testing laboratories, suppliers, and personnel. The QC Manager will ensure that certifications are current, appropriate for the work being performed, and will not lapse during any period of the Contract that the work is being performed.

1.5.3 Acceptance of the Quality Control (QC) Plan

The Contracting Officer's acceptance of the Contractor QC Plan is required prior to the start of construction. The Contracting Officer reserves the right to require changes in the QC Plan and operations as necessary, including removal or addition of personnel, to ensure the specified quality of work. The Contracting Officer reserves the right to interview any member of the QC organization at any time to verify the submitted qualifications.