N6274221R3507_Notice 8.pdf
PDF 151 KB Posted
- Attached to
- Philippines Operations Support Contract (POSC) IV Federal contract opportunity
- Solicitation number
- N6274221R3507
About this file
This document provides answers to pre-proposal questions for solicitation N62742-21-R-3507 seeking multi-function support services including basic operational support for U.S. military forces and other federal government agencies in the Philippines. Services shall be provided at operating locations and potentially in other areas of Southeast Asia, Oceania, North East Asia and South Asia. The solicitation requires preventative maintenance of government-owned equipment such as generators and fire protection systems to be priced under specification items 3.2 and 3.3.10. Fitness and recreation center operations are required to be staffed 24/7 with the exception of an open air gym at site 1A. Ordnance movements between supported sites and outstations should be priced annually at an estimated 20 movements.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
Notice No. 8 23 July 2021
PRE-PROPOSAL QUESTIONS & ANSWERS
SOLICITATION N62742-21-R-3507
PHILIPPINES OPERATIONS SUPPORT CONTRACT (POSC IV)
NOTE: The questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
NOTICE NO. 8
275. Annex 1502000 Spec Item 3.3.10 Spec Item 3.3.10 references Generators and the workload found in J-15020000-03 References J- 15020000-04, which was removed in Amendment 8 according to Section J Documents, Exhibits, and other attachments Table of Contents. Additionally, Generators are found in both Annex 160000 and the new J-0200000-18 Tables, which is expected to be estimated and priced in Annex 15020000 Spec Item
3.2. Would the Government please clarify which Generators it would like estimated/priced in which spec item?
Answer: Preventative maintenance of Government owned equipment (i.e. generators) shall be priced at Spec Item 3.2. The provision of uninterrupted power through commercial power or operation of generators shall be priced at Annex 160000.
276. Annex 15020000 Spec Item 3.3.3 Annex 15020000 Spec Item 3.3.3 Exhaust Hoods and Ducts appears redundant with Spec Item 3.3.7 Fire Protection (Suppression) Systems and Spec Item 3.2 Preventive Maintenance as the J-0200000-18 Table Added in Amendment 8 already lists this equipment, which is supposed to be estimated per 3.2 Preventive Maintenance. Would the Government please provide clarity as to where they would like these items estimated/priced?
Answer: Preventative maintenance of Government owned equipment (i.e. Fire Protection Equipment) shall be priced at Spec Item 3.2.
277. Annex 1200000 MWR Spec Item 3.1.1 Amendment 8 per Attachment J-1200000-03 Estimated Quantities, added an Open Air Gym on Site 1A.
Spec Item 3.2.1 states that “The contractor shall ensure the fitness centers is [sic] useable 24 hours per days. The staffed hours shall be as stated in Spec Item 2.3.1”. Spec Item 2.3.1 Hours of Operation States “Fitness and Recreation Center: M-Sun, 24/7 (Staffed hours)". Currently, this reads as the Government is requiring the Open Air Gym at Site 1A to be staffed at this requirement. Was that the Government’s intention when they added the Open Air Gym in Amendment 8?
Answer: No. The Government did not identify Site 1A in Attachment J-1200000-03, Spec Item 3.2 and subordinate spec items, since the intent is not to staff Site 1A.
Subj: CONTRACT NO. N62742-21-R-3507, PHILIPPINES OPERATIONS SUPPORT CONTRACT
(POSC IV)
278. Should the change reflect a 2 month mobilization as opposed to a 3 month mobilization?.
Answer: Yes
279. Attachment J-0701000-04 -Estimated Quantities Regarding Ordnance Sites supported: 1, 1A, 3, 4, 6 and Outstations 3 and 4 - an estimate of approx. 20 movements was added but there is no specification if this is annual or monthly. Should the contractor price these for annual?
Answer: Annual