JC-2 Definition and Acronyms.pdf
PDF 44 KB Posted
- Attached to
- Philippines Operations Support Contract (POSC) IV Federal contract opportunity
- Solicitation number
- N6274221R3507
About this file
This document contains definitions and acronyms relevant to a Philippines Operations Support Contract (POSC) IV solicitation. The solicitation seeks multi-function support services including basic operational support for U.S. Military Forces or other Federal Government agencies supporting Indo-Pacific Command under mutual defense agreements. Services will be provided at operating locations in the Philippines with potential future support in Southeast Asia, Oceania, North East Asia and South Asia. Definitions cover terms like competent person, confined work space, construction equipment, contracting officer, hazardous materials and waste, inspections, regulated waste and universal waste. Acronyms defined include ACO, BW, CDR, CIA, CIMU, CMMS, CNSSI, COR, DBH, DoD, DoDI, DoN, DRMO, EPA, EPCRA, FAR, FIFRA, FSC, FSCM, GIS, GFE, GFF, GFM, HCA, ICAP, ICP, IDIQ, iNFADS, IPM, IPMIS, IPMP, KO, LAN, M, MAP, MDI, MEP, MPAS, MRI, MSDS, NAVFAC, NIST, NIST SP, NMCI, NOSC, PM, PRCSP, PWS, PWO, QC, RPIE, RSL, SC, SM, SPAR, TE, VIQ, WBS.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J-0200000-01 Definitions and Acronyms
Definition Description Competent Person A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment.
One who can identify existing and predictable hazards in the working environment or working conditions that are dangerous to personnel and who has authorization to take prompt corrective measures to eliminate them.
Confined Work Space A space that is large enough and so configured that a person may bodily enter a space (such as in tanks, vessels, silos, storage bins, hoppers, vaults, pits, and like spaces where there is limited means of entry) and is hindered or restricted from escaping during an emergency.
Construction Equipment Construction equipment refers to specialized heavy machinery that covers one industry and is specifically designed for executing construction work. Construction equipment requirements shall include a list of equipment establishing the size, quality, number of units, and unit prices. Construction equipment prices provided by the Contractor shall be the lowest price available considering the availability of equipment and the time constraints of the job. The direct equipment price shall be adjusted by all discounts and rebates that accrue to the Contractor.
All indirect cost associated with construction equipment, such as: the Contractor’s hourly composite trade wage, adjusted to allow for workforce productivity; sub-contractor cost, costs for pre-expended bin materials, shipping and handling, union agreements, crew sizes, hand tools, universal equipment (excluding construction equipment), mobilization, demobilization, payroll burdens and fringes, overtime, job (field) overhead (including clerical support, supervision, inspection, fees, taxes, licenses, permits, and insurance), general and administrative (home office) overhead, profit, and all other associated markups shall not be included in the equipment price since the cost for these items were included in the labor hour unit price bid. Additionally, time for job preparation, safety standby personnel, and similar indirect labor elements shall not be included.
Contracting Officer (KO) That individual with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.
Contracting Officer’s Representative (COR)
The individual appointed by the KO responsible for monitoring the Contractor’s technical compliance and progress, relative to assigned contract(s)/orders(s), based on the contract requirements specified in the PWS and in accordance with the PAP. The COR performs a variety of contract administration duties that includes oversight of PA, documenting and rating Contractor performance, reviewing invoices, and acceptance of work. Assignment as a COR is a collateral duty typically performed by the FSCM or
SPAR.
Contractor That entity or its representative responsible for the delivery of the services or materials specified in this contract, as designated by contract award. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall insure that subcontractors comply with the provision of this contract.
Contractor Representative That individual appointed by the Contractor, either orally or in writing, who has been assigned responsibility for executing the requirements of this contract.
Direct Material Costs The actual vendor invoice charges for materials used for performance of work under this contract. Direct material costs shall include transportation charges when such charges are included on the invoice by the vendor, as well as any discounts allowed for prompt payment and discounts or rebates for core value or salvage value that accrue to the Contractor. When questions arise concerning the cost of materials, material costs will be based on the lowest of quotes provided by the Contractor from at least three different commercial vendors for the direct material cost. The Government retains the right to obtain additional quotes in questionable situations. The lowest price will be used.
Electronic Operation And Maintenance And Support Information (eOMSI)
A set of consultant-prepared data and document files that contain detailed, as-built technical information that describes the efficient, economical and safe operation, maintenance and repair of a facility, plant, equipment or system throughout its life cycle.
Generally, it is prepared during construction and submitted upon completion of a new facility or major facility upgrade. eOMSI’s typically include asset information, staffing and budgeting information, supply support including critical spare parts, operating procedures, troubleshooting and diagnostic guides, extended warranty data, maintenance task frequencies and documentation, technical data, repair procedures and manufacturer’s product data. eOMSI data and document files are provided in electronic formats.
Equipment Tangible asset that is functionally complete for its intended purpose, durable, and non-expendable.
Facility A building or structure designed and created to serve a particular function.
Government Furnished Property (GFP)
Property in the possession of, or directly acquired by, the Government and subsequently furnished to the contractor for performance of a contract. Government furnished property includes, but is not limited to, spares and property furnished for repairs, maintenance, overhaul, or modification. Government furnished property also includes contractor acquired property if the contractor acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Hazardous Material (HM) A material that because of its quality, concentration, physical, chemical or infectious nature may pose a threat to human health or the environment if released or spilled into the environment or any material designated by the Department of Transportation (DOT) or any materials that require a SDS form as posing a potential threat while being transported. Hazardous materials are listed in 49 CFR Part 172.
Hazardous Waste (HW) Any discarded solid waste (liquid, semi-solid, solid, or gaseous) that meets the definition of a hazardous waste by USEPA, state authorities, or the Navy. In accordance with RCRA, a solid waste is a listed hazardous waste if it is specifically listed, or it is a characteristic hazardous waste if it exhibits the characteristics of ignitability, corrosivity, reactivity, or toxicity.
Hazardous Waste Management Plan
In accordance with OPNAVINST 5090.1C, every Navy shore activity that generates HW shall develop and use a Hazardous Waste Management Plan or a Hazardous Waste management component in its P2 Plan and EMS. A Hazardous Waste Management Plan shall:
Identify applicable federal, state, and local regulations pertaining to the generation and management of hazardous waste.
Identify training requirements and describe procedures for obtaining training and maintaining training records.
Assign responsibilities for the generation, designation, handling, storage, treatment, disposal, and all documentation.
Describe all hazardous waste generation and management procedures.
Include or reference the hazardous waste minimization plan and goals.
Include or reference contingency plans and emergency response procedures.
The plan shall be kept up to date to include changes in hazardous waste generation and management procedures, as well as changes in applicable federal, state, and local hazardous waste regulations. The plan shall include or reference minimization procedures sufficient to achieve DOD minimization goals. Tenant activities are covered by the host CO's Hazardous Waste Management Plan.
Hazardous Waste Manifest
A hazardous waste manifest as defined in 40 CFR 260 is required for the transport of hazardous waste. The installation commanding officer (ICO) or the ICO’s designated representative shall retain signature authority for hazardous waste manifests.
Inspection A rigorous, detailed assessment of the condition of a facility performed to generate a fundable scope and cost estimate for prioritization and funding of maintenance and repair.
Maintenance And Repair The preservation or restoration of a piece of equipment, system, or facility to such condition that it may be effectively used for its designated purposes. Maintenance/repair may be adjustment, overhaul, reprocessing, or replacement of constituent parts or materials that are missing or have deteriorated by action of the elements or usage, or replacement of the entire unit or system if beyond economical repair.
Monthly On-Site Labor Report
A compilation of all Contractor and subcontractor employee-hours involved in delivering contract services on a Government property.
Non-RCRA Regulated Waste
Waste that is not regulated as a hazardous waste under RCRA; however, is waste may be regulated by other federal, state or local regulations including but not limited to TSCA, Clean Air Act, Clean Water Act or other regulations and statues. Examples include Used Oil, Universal Waste, Oily Water, antifreeze, etc.
Non-RCRA regulated waste (while not meeting the definition of a Hazardous Waste) must be managed according to its applicable regulations and may not be discarded into the general trash.
Non-Regulated Solid Waste (Debris and Rubbish)
Waste not associated with an industrial process such as refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food. Non-hazardous construction and demolition wastes such as dimension and non-dimension lumber, plywood, chipboard, and hardboard are included.
Partnering The terms “partnering” and “partnership” used herein shall mean a relationship of open communication and close cooperation that involves both Government and Contractor personnel working together for the purpose of establishing a mutually beneficial, proactive, cooperative environment within which to achieve contract objectives and resolve issues and implementing actions as required.
Performance Assessment A method used by the Government to provide some measure of control over the quality of purchased goods and services received.
Performance Assessment Representative (PAR)
The individual(s) assigned as a Technical Point of Contact (TPOC) / Subject Matter Expert (SME) to the COR to perform duties as the on-site representative who assesses Contractor performance. The PAR periodically observes Contractor performance, reviews delivered services, reviews quality management corrective actions, periodically assesses and documents Contractor performance on PAWs and the MPAS, and communicates findings as necessary with the Contractor, SPAR, and COR.
Pre-Expended Bin Materials And Supplies
The minor materials and supplies that are incidental to the job, for which the total direct cost of any one material line item shown on the material estimate is $10.00 or less.
Examples of pre-expended bin materials and supplies include, but are not limited to, solder, lead, flux, electrical connectors, electrical tape, fuses, nails, screws, bolts, nuts, washers, spacers, masking tape, sand paper, solvent, cleaners, lubricants, grease, oil, rags, mops, glue, epoxy, spackling compound, joint tape, plumbers tape and compound, clips, welding rods, and touch up paint.
Property Administrator An authorized representative of the Contracting Officer who is responsible for administering contract property requirements, terms and conditions of the contract
Property Management Program
A Government program established for the purpose of reviewing and approving the Contractor’s Property Management Plan and System through performance of a system analysis whenever government property is in the possession of the Contractor.
Quality Assurance (QA) The planned and systematic activities implemented in a quality system so that quality requirements for a product or service will be fulfilled.
Quality Control (QC) The observation techniques and activities used to fulfill requirements for quality.
R. S. Means A data collection and organization system developed by R. S. Means Company which can be used to prepare accurate, dependable construction estimates and budgets in a variety of ways. The Contractor shall use the latest edition. Material prices are based on a national average and computed labor costs are based on a 30-city national average.
An estimate prepared using this data is called a "Means estimate"; data may simply be referred to as "Means".
Regulated Waste Any hazardous, non-hazardous, industrial process waste (aka special waste), e-waste, and/or off-specification HM, which because of its physical characteristics, chemical make-up or biological nature requires either special handling procedures and permitting, or poses an unusual threat to human health, equipment, property, or the environment.
Examples include (but are not limited to) liquid sludge, pastes, and/or filter cakes, chemical compounds and/or petroleum products, fine powders or highly dusty materials, spent blast media and/or grit, demolition wastes from industrial facilities, debris and/or residues from spill cleanup work, underground storage tank remediation materials, pollution control wastes, ash from fires, furnaces, boilers or incinerators, off-specification products, other materials that have the potential to be a hazardous waste.
All RW may be used or unused excess hazardous materials. Laboratory analysis may be required to verify the waste is not a RCRA-regulated hazardous waste.
Response Time The time allowed the Contractor after initial notification of a work requirement to be physically on the premises at the work site with appropriate personnel, tools, equipment, and materials, ready to perform the work required.
Sampling Plan Plan and procedures to conduct sampling, field testing and laboratory analysis for a defined testing objective.
Satellite Accumulation Areas
Designated approved areas, at or near the point of generation and under the control of the operator generating the waste, where no more than 55 gallons (cumulative total) of all types of HW or 1 quart of acutely HW may be accumulated. The 55-gallon limit does not include non RCRA regulated waste, universal waste and used oil etc.
Spill Prevention Control and Countermeasure (SPCC) Plan
The SPCC Plan establishes engineering controls including procedures, methods, equipment and other requirements to prevent the discharge of oil into or upon navigable waters. The Plan includes procedures for oil spill prevention, measures to contain spills and an established spill drill exercises to ensure effective countermeasures in the event of oil spill.
System An assemblage of mechanically and/or electrically interlocked parts, equipment and/or components forming a unitary whole.
Universal Waste (UW) Universal Waste (UW) (defined in 40 CFR Part 273) means batteries, fluorescent lamps, some pesticides, and mercury-containing equipment formally classified as a HW, but that are now subject to less stringent regulations, when recycled if recycling is available.
Acronym Title ACO Administrative Contracting Officer BW Biweekly CDR Contract Discrepancy Report CIA Controlled Industrial Area CIMU Component Inventory Management Unit CMMS Computerized Maintenance Management System CNSSI Committee on National Security Systems Instruction COR Contracting Officer Representative COR Condition of Readiness DBH Diameter at Breast Height DCR Direct Condition Rating DoD Department of Defense DoDI Department of Defense Instruction DoN Department of Navy DRMO Defense Reutilization Management Office EPA Environmental Protection Agency EPCRA Emergency Planning and Community Right-to-Know Act FAR Federal Acquisition Regulation FFP Firm Fixed Price FIFRA Federal Insecticide, Fungicide, and Rodenticide Act FSC Facility Support Contract FSCM Facility Support Contract Manager GIS Geospatial Information System GFE Government-furnished Equipment GFF Government-furnished Facilities GFM Government-furnished Materials HCA Head Contracting Agency ICAP Infrastructure Condition Assessment Program ICP Integrated Contingency Plan IDIQ Indefinite Delivery Indefinite Quantity iNFADS Internet Navy Facilities Asset Data Store IPM Integrated Pest Management IPMIS Integrated Pest Management Information System IPMP Integrated Pest Management Plan KO Contracting Officer LAN Local Area Network M Monthly MAP Maintenance Action Plan MDI Mission Dependency Index MEP Mechanical, Electrical and Plumbing MPAS Monthly Performance Assessment Summary MRI Mission Readiness Index MSDS Material Safety Data Sheets NAVFAC Naval Facilities Engineering Command NIST National Institute of Standards and Technology NIST SP National Institute of Standards and Technology Special Publication NMCI Navy Marine Corps Intranet NOSC Navy-On-Scene Coordinator PAP Performance Assessment Plan PAR Performance Assessment Representative PAW Performance Assessment Worksheet
Acronym Title PM Project Manager PM Planned Maintenance or Preventative Maintenance PRCSP Permit Required Confined Space Program PWS Performance Work Statement PWO Public Works Officer Q Quarterly QC Quality Control RPIE Real Property Inventory Equipment RSL Remaining Service Life SC Security Clearances SM Semimonthly SPAR Senior Performance Assessment Representative TE Technical Exhibit VIQ Variation in Quantity WBS Work Breakdown Structure