TGI_38K6186301A01_c0v0_rev2.pdf
PDF 2 MB Posted
- Attached to
- USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1
- Solicitation number
- N6264926RA036
About this file
This is a WebAIM Short Form Task Group Instruction (TGI) for temporary service work on the USS RAFAEL PERALTA (DDG-115). The document, issued January 21, 2026, with identification number ICN: 38K6186301, authorizes contractor work to provide KTR (Kraft Temporary Rigging) service for temporary utility service installations and maintenance aboard the naval vessel.
The scope of work requires installation, fabrication, and maintenance of three primary components: (1) temporary service ways for utility service located across multiple deck levels (04 Level Weather frames 145-150; 02 Level Weather frames 120-395; 01 Level Weather frames 15-350; and Main Deck Weather frames 425-435, all port and starboard sides); (2) temporary enclosures with openable tops for utility service; and (3) temporary enclosures for utility service. Work procedures include installing temporary service ways and enclosures per specifications, maintaining these installations a total of two times upon Project Team request, and removing installations when directed. The contractor work schedule runs from October 19, 2026, to December 15, 2026. Supporting services will be provided by SRF-JRMC, including crane and crane rigger service, electrical utility service, low-pressure air supply, water supply, steam supply, safety inspection for SRF-JRMC employees, and QA inspection. Work must comply with 29 CFR Part 1915.71 (scaffolding or staging standards). No Government Furnished Material is required, and no security classification applies to this work. Detailed location sketches are provided in Enclosure-01 (38K6186301A01-Sketch.pdf).
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
21-JAN-2026 1552
20.15.6.0.9333 (July 2025) ICN: 38K6186301 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY SERVICE SV A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61 86491
CU PHASE TITLE: F/O - PROVIDE KTR SERVICE WORK FOR TMPORARY UTILLITY SERVICE
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 4
EXSYL068
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
HAYASHI, MOTONORI 231B 3152436145 07-NOV-2025
APPROVED BY: CODE: PHONE: DATE:
TAKAGI, RYOUTA 231B 3152434502 07-NOV-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EXSY-L068
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
SAITO, KAZUNOBU VARIOUS U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
863A5101
1 SCOPE/PURPOSE:
1.1 Title: KTR Service Work for Temporary Utility Service; provide
1.2 Location of Work:
1.2.1 04 Level Weather, Frames between 145 and 150, Port and Starboard (Stbd)
1.2.2 02 Level Weather, Frames between 120 and 395, Port and Stbd
1.2.3 01 Level Weather, Frames between 15 and 350, Port and Stbd
1.2.4 Main Deck Weather, Frames between 425 and 435, Port and Stbd
1.3 Identification:
1.3.1 Quantity (One Lot), Temporary Service Way for Utility Service
TGI Short Form
21-JAN-2026 1552
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6186301 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY SERVICE SV A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61 86491
CU PHASE TITLE: F/O - PROVIDE KTR SERVICE WORK FOR TMPORARY UTILLITY SERVICE
FOUO Pg 2 of 4
CU PHASE DESCRIPTION (Cont.)
Remarks: See Sketch Enclosure-01 for location details.
1.3.2 Quantity (One Lot), Temporary Enclosure with Openable Top for Utility Service
Remarks: See Sketch Enclosure-01 for location details.
1.3.3 Quantity (One Lot), Temporary Enclosure for Utility Service
Remarks: See Sketch Enclosure-01 for location details.
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor Work start date:
1.7 Contractor Work completion date:
2 PROCEDURE:
2.1 Install each temporary service way listed in 1.3.1 in accordance with Ref. No. 3, using Enclosure-01 for guidance.
2.2 Fabricate and install each temporary enclosure listed in 1.3.2 and 1.3.3 in accordance with Ref. No. 3, using Enclosure-01 for guidance.
2.3 Maintain each temporary service way and temporary enclosure listed in 1.3.1 through 1.3.3 for a total 2 times when requested by Project Team in accordance with Ref. No. 3.
2.4 Remove each temporary service way and temporary enclosure listed in 1.3.1 through 1.3.3 in accordance with Ref. No. 3 when requested by Project Team.
2.5 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surface.
2.6 Notes:
2.6.1 Planner: Code 231B M. Hayashi, 243-6145
2.6.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.6.3 Exact installation, modification, and removal of area, detail, and date of temporary service way and temporary enclosure will be directed by the Project Team.
2.6.4 JCN EXSY-L068 is related to this TGI.
2.7 Government Furnished Material (GFM): None.
2.8 SRF-JRMC will provide the following service work: (TGI No. 38K6186301S02)
Kouichi.Yoshida.ja Typewritten Text 10/19/2026
Kouichi.Yoshida.ja Typewritten Text 12/15/2026
21-JAN-2026 1552
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6186301 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY SERVICE SV A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61 86491
CU PHASE TITLE: F/O - PROVIDE KTR SERVICE WORK FOR TMPORARY UTILLITY SERVICE
FOUO Pg 3 of 4
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
2.8.1 [C740] Crane and crane rigger service.
2.8.2 [X99E] Utility service, electrical.
2.8.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.8.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.8.5 [C133] QA inspection for (G) symbol(s).
21-JAN-2026 1552
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6186301 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY SERVICE SV A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61 86491
CU PHASE TITLE: F/O - PROVIDE KTR SERVICE WORK FOR TMPORARY UTILLITY SERVICE
FOUO Pg 4 of 4
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 TM 29 CFR PART
1915.71 Scaffolding or Staging - N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 38K6186301A01-Sketch.pdf 06-NOV-2025 0000
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38K6186301 KEY OP: A01
38K6186301A01 SKETCH
ENCLOSURE-01
Sheet 1 of 4
Sheet 2 of 4
Sheet 3 of 4
Sheet 4 of 4
File details come from the government source that posted it. Updated .