TGI_38K6112306A01_c0v1_REV2.pdf
PDF 1 MB Posted
- Attached to
- USS RAFAEL PERALTA (DDG-115) FY26 SIA BUNDLE #1
- Solicitation number
- N6264926RA036
About this file
This is a Task Group Instruction (TGI) for naval maintenance work on the USS RAFAEL PERALTA (DDG-115). The work involves the replacement of watertight door 03-178-1, an 18-inch by 36-inch steel door with six individually dogged dogs located at 03 Level Weather, Frame 178, Starboard in the Ship Service Gas Turbine Generator Intake area. The work is scheduled to commence on October 26, 2026, and be completed by December 4, 2026. The instruction was prepared by TOORU SUZUKI (Code 231B) on November 7, 2025, and approved by RYOUTA TAKAGI (Code 231B) on the same date.
The work scope includes fabricating and installing six new door brackets (HTS, MIL-S-22698 GR-DH36), removing and installing a new hook and bumper assembly (CRES material), removing and installing a new gasket conforming to A-A-59588 Class 3B Grade 30, and installing two new aluminum alloy label plates. All procedures must comply with referenced specifications including welding requirements (009-012 of reference 2.1), air hose testing for welds (009-025 of 2.1 with no allowable leakage), chalk testing, operational testing with no allowable sticking or binding, and painting per standard 009-032 of 2.1. A critical special requirement mandates that because the work affects a fire zone boundary, a non-flammable closure must be fabricated and staged near the access per COMNAVSEASYSCOM MSG R 261400Z JUL 12, with hot work in magazine spaces governed by S6740-AA-SAF-010 and NAVSEA OP 4. Government-furnished materials will be provided by SRF-JRMC, along with support services including crane rigging, utilities, safety inspection, gas-free inspection, and QA/inspection services.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: WT DOOR 03-178-1 AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE:
*F/O - REPLACE WATERTIGHT DOOR 03-178-1
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
TOORU SUZUKI 231B. 315-243-7793 7-NOV-2025
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B. 315-243-4502 7-NOV-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
HOT WORK IN MAGAZINE AND ADJACENT SPACES IAW S6740-AA-SAF-010 AND NAVSEA OP 4
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: WT DOOR 03-178-1 AY A 0
FOUO
SHIP: DDG-115 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 J-1 M-1
1. SCOPE/PURPOSE
1.1 Title: Watertight Door 03-178-1; replace
1.2 Location of Work:
1.2.1 03 Level Weather, Frame 178, Starboard
1.2.2 Ship Service Gas Turbine Generator Intake (03-174-0-Q)
1.2.3 Ship Service Gas Turbine Generator Intake/Exhaust Trunk (02-161-2-Q)
1.3 Identification:
1.3.1 Quantity (One EA), Door, Watertight
Door No. : 03-178-1 Size: 18 Inches x 36 Inches Material: Steel Type: Individually Dogged, 6 Dogs, Left Hand
1.3.1.1 Quantity (6 EA), Door Bracket
Material: HTS, MIL-S-22698 GR-DH36, 10.2 LBs Plate
1.3.1.2 Quantity (One AY), Hook and Bumper Assembly
Material: CRES Remarks: See Sheet 11A and 11C of 2.4 for detail
1.3.2 Quantity (2 EA), Label Plate, Watertight Door
1.3.2.1 Quantity (One EA), Label Plate, Exterior
Material: Aluminum Alloy, Type-I of 2.8 Inscription: 1st. Line: 03-178-1 2nd. Line: SS GTRB GENERATOR 3rd. Line: INTAKE 4th. Line: 03-174-0-Q
1.3.2.2 Quantity (One EA), Label Plate, Damage Control Closure Classification, Exterior
Material: Aluminum Alloy, Type-I of 2.8 Remarks: Figure-D of 2.8
1.3.3 Quantity (One SF), Knife Edge of Watertight Door 03-178-1
Remarks: The area where rubber tile is installed.
FOUO
SHIP: DDG-115 CHG/VER: 0/0
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 MP AL14-
K6112306-
ES01NA5E
NR.1 SSGTG SYS FOD
PROTECTION FOR WATERTIGHT
DOOR REPLACEMENT (03-178-1)
- Y AL
L
4 DWG 168-
8546662
STRUCTURAL DOOR LIST SSRD A Y SE
E N
OT
E
5 DWG 803-
6397261
WATERTIGHT, INDIVIDUALLY
DOGGED ARRANGEMENT
B N
6 DWG 803-
6397262
WATERTIGHT, INDIVIDUALLY
DOGGED SUB-ASSY & DETAILS
B N
7 DWG 150-
7026718
UNIT STRL ARR DWG ASSY UNIT
K Y 5-
8 PDD 602-
ELM-150531
SRF-JRMC STD ELM LABEL
PLATE FOR CLOSURE
A Y AL
L
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirements of 2.3.
(V)(G) “GAS TURBINE MAINTENANCE PROCEDURE”
5.2 Remove existing and install new each door listed in 1.3.1 in accordance with 2.4 through 2.6, using 2.7 for guidance.
5.2.1 Fabricate each new door bracket listed in 1.3.1.1.
5.2.2 Remove existing and install new hook staple of bumper assembly.
5.2.3 Lubricate each new dogging mechanisms.
Kouichi.Yoshida.ja Typewritten Text 10/26/2026
Kouichi.Yoshida.ja Typewritten Text 12/4/2026
Kouichi.Yoshida.ja Cross-Out
Kouichi.Yoshida.ja Typewritten Text
1/24/2026 C1209.2 K. YOSHIDA
FOUO
SHIP: DDG-115 CHG/VER: 0/0
5.2.4 Remove existing, fabricate and install new gasket conforming to A-A-59588 Class 3B Grade 30.
5.2.5 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A and D, Lines One through 7.
5.2.6 Accomplish the requirements of 009-025 of 2.1 for a local air hose test of each new weld of each door frame.
Allowable leakage: None.
5.2.7 Adjust each dogging mechanism for unobstructed operation and to obtain 100 percent centered contact with the imprint of chalk in the center three-fifths of the gasket.
5.3 Accomplish the requirements of 009-025 of 2.1 for a chalk test of each door listed in 1.3.1.
5.4 Accomplish the requirements of 009-025 of 2.1 for a local air hose test of door panel gasket and knife edge mating area of each door listed in 1.3.1. Allowable leakage: None.
5.5 Accomplish an operational test of each door listed in 1.3.1 to assure unobstructed operation. Allowable sticking or binding: None.
(V)(G) “OPERATION TEST”
5.6 Remove existing, fabricate and install new each label plate listed in 1.3.2 in accordance with 2.8.
5.7 Accomplish the requirements of 009-032 of 2.1, including Table 2, Line(s) 46, for each area listed in 1.3.3.
5.8 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.
5.9 Notes:
5.9.1 Planner: Code 231B T. Suzuki, 243-7793
5.9.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560
5.9.3 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.9.4 Removal and installation of rubber tile on knife edge of each door listed in 1.3.1 will be covered by TGI No(s).
38K6112306U01 and 38K6112306R01 (SRF-JRMC TGI).
5.9.5 This TGI is in response to CCIMS report No. CCIMS-G1N6-DDG115-054-24 from TGI No. 3815C11003I03.
5.9.6 This TGI clears DFS DDG-115-1004-2024 in its entirety.
5.9.7 WPC will copy the following pages in reference.
REF 2.4: Pages 10A, 10B, 10C, 10D, 10E, 10F, 10G, 10H, 10J, 10K, 11A, and 11C.
5.9.8 JCN ES01-NA5E is related to this TGI.
5.10 Government Furnished Material (GFM):
5.10.1 SRF-JRMC will provide GFM listed in Appendix “M”.
FOUO
SHIP: DDG-115 CHG/VER: 0/0
5.11 SRF-JRMC will provide the following service work: (TGI No. 38K6112306S02).
5.11.1 [C740] Crane and crane rigging service.
5.11.2 [X99E] Utility service, electrical.
5.11.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.
5.11.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.11.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.11.6 [C133] QA Inspection for (G) symbol(s).
5.11.7 [C285] Inspection for (G) symbol(s).
FOUO
M-1
SHIP: DDG-115 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
WT DOOR 03-178-1 AY A 0 0
CU PHASE TITLE:
*F/O - REPLACE WATERTIGHT DOOR 03-178-1
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38K6112306 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M DOOR,METAL,MARINE S,
ORDERED FOR KTR
ORIG: C231B T. SUZUKI 243-
3B 2040 009125756 NA 4 N 52495025 1/EA
002 M HOOK AND, HOOK AND
BUMPER ASSEMBLY, SIZE:
12"LG, MATL: CRES, IN
ACCORDANCE WITH STD
DWG: 803-6397269 ASSY LL
(HOOK) AND ASSY MM
(BUMPER).DETAIL: 79-E
ORDERED FOR KTR
ORIG: C231B T. SUZUKI 243-
9B 5340 LL4597782 NA 4 N 1/AY
003 M PLATE,ME, 2 SF X 3 SF X 1 PM
ORDERED FOR KTR
ORIG: C231B T. SUZUKI 243-
9B 9515 002243086 NA 4 N 6/SF
004 M RUBBER S, ORDERED FOR
KTR
ORIG: C231B T. SUZUKI 243-
9B 5330 013717183 NA 4 N 15/FT
NOTES:
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-115 WT DOOR 03-178-1 AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38K6112306 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-115 WT DOOR 03-178-1 AY A 0
File details come from the government source that posted it. Updated .