This is a WebAIM Short Form Task Group Instruction (TGI) for maintenance work on the USS RAFAEL PERALTA (DDG-115). The document outlines a repair project involving the replacement of packing assemblies for stuffing tubes used in the Fuel Tank Level Indicator System for Tank Groups 5 and 6.
The scope of work includes removing and installing new packing assemblies for cable assemblies at two fuel tanks: the Fuel Receiving Tank Group 5 (Tank No. 5-308-1-F, capacity 30,038 gallons) and the Fuel Tank Group 5 (Tank No. 5-354-0-F, capacity 38,127 gallons). Work locations span multiple compartments including crew living spaces, fuel tank areas, generator room, and machinery spaces. The project requires tank preparation in accordance with specific procedures (099-902YO and 099-909YO), general cleaning to Level III standard, and gas-free inspections. The contractor work period runs from October 26, 2026 to December 4, 2026. SRF-JRMC will provide supporting services including crane and rigging, electrical utilities, water/air/steam supply, safety and gas-free inspections for employees, and quality assurance inspections. The required material is one packing assembly for a size 4A stuffing tube with 1/4-inch diameter cable (stock number LL4463061, quantity 2 per unit ordered). Technical references include NAVSEA Standard Items, Local Standard Items, MIL-STD-2003 for electrical installation standards, and Tank Level Indicators technical manual SN572-AL-MMA010.
View the file
Other files
Show 40 more
Latest 50 of 115 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
21-JAN-2026 1554
20.15.6.0.9333 (July 2025) ICN: 38K6112320 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BERTH 6 STFG TUBE AY A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: *F/O – REPL PKG ASSY OF STFG TUBE FOR CBL ASSY, FTK TLI SYS FOR TK GP-5
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 6
EB140635
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
OGAWA, SHINYA 233 9061708579 27-NOV-2025
APPROVED BY: CODE: PHONE: DATE:
KURIHARA, TAKASHI 233 8093501437 17-JAN-2026
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EB14-0635
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
SAITO, KAZUNOBU
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
123A1120
1. SCOPE/PURPOSE:
1.1 Title: Packing Assembly of Stuffing Tube for Cable Assembly, Fuel Tank Level Indicator System for Tank Group-5; replace
1.2 Location of Work:
1.2.1 Crew Living Space No. 6 (3-338-3-L)
1.2.2 Fuel Receiving Tank Group 5 (5-308-1-F)
1.2.3 Access Trunk (3-308-2-T)
1.2.4 Fuel Tank Group 5 (5-354-0-F)
1.2.5 Crew Living Space No. 4 (3-300-1-L)
1.2.6 Crew Living Space No. 7 (3-350-2-L)
TGI Short Form
21-JAN-2026 1554
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112320 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BERTH 6 STFG TUBE AY A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: *F/O – REPL PKG ASSY OF STFG TUBE FOR CBL ASSY, FTK TLI SYS FOR TK GP-5
FOUO Pg 2 of 6
CU PHASE DESCRIPTION (Cont.)
1.2.7 Passage (3-338-6-L)
1.2.8 Generator Room (3-370-0-E)
1.2.9 Air Conditioning Machinery and Pump Room (5-300-01-E)
1.3 Identification:
1.3.1 Quantity (One EA), Stuffing Tube for Cable Assembly of Fuel Receiving Tank Level Indicator System for Tank 5-308-1-F Remarks: See Sketch Enclosure-01 for location detail
1.3.2 Quantity (One EA), Stuffing Tube for Cable Assembly of Fuel Stowage Tank Level Indicator System for Tank 5-354-0-F Remarks: See Sketch Enclosure-01 for location detail
1.3.3 Quantity (One EA), Fuel Receiving Tank Group-5
Tank No.: 5-308-1-F Capacity: 30,038 Gallons
1.3.4 Quantity (One EA), Fuel Tank Group-5
Tank No.: 5-354-0-F Capacity: 38,127 Gallons
1.3.5 Quantity (One Lot/3 Tanks), Fuel Tank Group-5
Total Capacity: 69,695 Gallons Required amount of water to dewater: 69,695 Gallons
1.3.5.1 Fuel Receiving Tank Group-5
Tank No.: 5-308-1-F Capacity: 30,038 Gallons
1.3.5.2 Fuel Tank Group-5
Tank No.: 5-354-0-F Capacity: 38,127 Gallons
1.3.5.3 Fuel Expansion Seawater Overflow Tank Group-5
Tank No.: 4-370-3-F Capacity: 1,530 Gallons
1.3.6 Quantity (One Lot/3 Tanks), Fuel Tank Group-6
Total Capacity: 63,450 Gallons Required amount of water to dewater: 63,450 Gallons
1.3.6.1 Fuel Receiving Tank Group-6
Tank No.: 5-308-2-F Capacity: 30,032 Gallons
1.3.6.2 Fuel Tank Group-6
Tank No.: 5-370-0-F
21-JAN-2026 1554
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112320 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BERTH 6 STFG TUBE AY A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: *F/O – REPL PKG ASSY OF STFG TUBE FOR CBL ASSY, FTK TLI SYS FOR TK GP-5
FOUO Pg 3 of 6
CU PHASE DESCRIPTION (Cont.)
Capacity: 31,545 Gallons
1.3.6.3 Fuel Expansion Seawater Overflow Tank Group-6
Tank No.: 4-370-4-F Capacity: 1,873 Gallons
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. PROCEDURE:
2.1 Accomplish the requirements of 099-902YO of Ref. No. 2 for each tank listed in 1.3.3 and 1.3.4.
2.1.1 Accomplish the requirements of 099-909YO of Ref. No. 2 for each tank listed in 1.3.5 and 1.3.6.
2.1.1.1 Accomplish the requirements of 009-009 of Ref. No. One
2.1.2 Ensure General Cleaning must be Level III.
2.2 Remove existing and install new packing assembly of the equipment listed in 1.3.1 and 1.3.2 in accordance with Part 3 of Ref. No. 3, using Ref. No. 4 for guidance.
2.3 Notes:
2.3.1 Planner: Code 233 S. Ogawa, 090-6170-8579
Planner: Code 231B A. Suzuki, 243-0968
2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.3.3 JCN EB14-0635 is related to this TGI.
2.4 Government Furnished Material (GFM):
2.4.1 SRF-JRMC will provide GFM listed in Appendix “M”.
2.5 SRF-JRMC will provide the following service work: (TGI No. 38K6112320S01).
2.5.1 [C740] Crane and crane rigging service.
2.5.2 [X99E] Utility service, electrical.
2.5.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.
2.5.4 [C106.1] Safety inspection for SRF-JRMC employees.
Kouichi.Yoshida.ja Typewritten Text 10/26/2026
Kouichi.Yoshida.ja Typewritten Text 12/4/2026
21-JAN-2026 1554
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112320 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BERTH 6 STFG TUBE AY A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: *F/O – REPL PKG ASSY OF STFG TUBE FOR CBL ASSY, FTK TLI SYS FOR TK GP-5
FOUO Pg 4 of 6
CU PHASE DESCRIPTION (Cont.)
2.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.5.6 [C133] QA inspection for (G) symbol(s).
21-JAN-2026 1554
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112320 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BERTH 6 STFG TUBE AY A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: *F/O – REPL PKG ASSY OF STFG TUBE FOR CBL ASSY, FTK TLI SYS FOR TK GP-5
FOUO Pg 5 of 6
OTHER SPECIAL REQUIREMENTS:
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N 3 MIL MIL-STD-2003 Electric Plant Installation
Standard Methods for Surface Ships and Submarines
B N
4 TM SN572-AL-MMA-
Tank Level Indicators 2 N
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38K6112320 KEY OP: A01
21-JAN-2026 1554
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112320 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: BERTH 6 STFG TUBE AY A 0 1/1
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: *F/O – REPL PKG ASSY OF STFG TUBE FOR CBL ASSY, FTK TLI SYS FOR TK GP-5
FOUO Pg 6 of 6
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M PACKING ASSEMBLY,
PACKING ASSEMBLY, FOR
SIZE 4A STUFFING TUBE & 1/4"
DIA CABLE, MFR DWG: 162160,
REV.A,
INCLUDED PARTS NUMBER:
162607(WASHER - 1EA),
149457 (BUSHING - 1EA) &
162157 (WASHER - 2EA),
ORDERED FOR CONTRACTOR
ORIG: CODE 233 S.OGAWA
090-6170-8579
9B 5330 LL4463061 NA 4 N 2/EA
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 38K6112320A01-Sketch.pdf 25-NOV-2025 0000
38K6112320A01
SKETCH
ENCLOSURE-01 Sheet 1 of 1
CREW LIVING SPACE NO.6 (3-338-3-L)
File details come from the government source that posted it. Updated .