This is a WebAIM Short Form Task Group Instruction (TGI) for maintenance work on the USS Rafael Peralta (DDG-115), a Navy destroyer. The document provides detailed specifications for fabricating and installing warning placards on moisture separator/blow-in door (BID) frames across multiple gas turbine intake locations aboard the vessel.

The work scope includes installing 19 placard units (6 inch x 3 inch, 1/8 inch thick, constructed from CRES 316L material) and eight moisture separator/BID frames at designated engine room and gas turbine compartments throughout the ship. Specific installation locations are identified for Forward/Aft Gas Turbine Modules (GTM) 1A, 1B, 2A, and 2B, as well as Ship Service Gas Turbine Generators (SSGTG) No. 1, 2, and 3. The placard displays "DANGER—NOT AN ACCESS—DO NOT ENTER" warnings. The contractor work period spans from October 26, 2026 to December 4, 2026. Supporting service work including crane rigging, utility services (air, water, steam supply), safety and gas-free inspections, and QA inspections will be provided by SRF-JRMC under a separate task group instruction. All fabrication, welding, and inspection must comply with NAVSEA S9074-AR-GIB-010A/278 standards for Class M-2 machinery components, Category C. Engineering instruction enclosures provide detailed drawings and installation specifications for each intake location and separator type.

View the file

Other files

File Type Posted
TGI_38K6112304A01_c0v0_REV2.pdf PDF
TGI_38K6113701A01_c0v0_REV2.pdf PDF
TGI_38K6154101A01_c1v1_REV2.pdf PDF
TGI_38K6112320A01_c1v1_REV2.pdf PDF
TGI_38K6112001A01_c0v0_REV2.pdf PDF
TGI_38K6113702A01_c0v0_REV2.pdf PDF
TGI_38K6144104A01_c0v0_REV2.pdf PDF
TGI_38K6171101A01_c0v0_REV2.pdf PDF
TGI_38K6113601A01_c0v0_REV2.pdf PDF
TGI_38K6112321A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360005 SF 30.pdf PDF
TGI_38K6112301A01_c0v0_REV1.pdf PDF
TGI_38K6112305A01_c1v0_REV1.pdf PDF
TGI_38K6112304A01_c0v0_REV1.pdf PDF
TGI_38K6112316A01_c0v0_REV1.pdf PDF
TGI_38K6171101A01_c0v0_REV1.pdf PDF
TGI_38K6169901A01_c0v0_REV1.pdf PDF
TGI_38K6154101A01_c1v1_REV1.pdf PDF
7027318_53711_-_0001_ G_-_0001.pdf PDF
MP LM19-K6112303-ES01NA54_r3.pdf PDF
TGI 38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6113701A01_c0v0_REV1.pdf PDF
TGI_38K6113801A01_c1v0_REV1.pdf PDF
TGI_38K6152101A02_c0v0_REV1.pdf PDF
TGI_38K6145601A01_c0v0_REV1.pdf PDF
TGI_38K6164401A01_c1v2_REV1.pdf PDF
Solicitation Amendment N6264926RA0360002 SF 30.pdf PDF
TGI_38K6151101A01_c0v0.pdf PDF
TGI_38K6113702A01_c0v0.pdf PDF
TGI_38K6113601A01_c0v0.pdf PDF
TGI_38K6113602A01_c0v0.pdf PDF
TGI_38K6112303A01_c0v0.pdf PDF
TGI 38K6169901A01_c0v0.pdf PDF
TGI_38K6112316A01_c0v0.pdf PDF
TGI_38K6112306A01_c0v1.pdf PDF
TGI_38K6112321A01_c0v0.pdf PDF
Attachment VII QSAP.pdf PDF
Exhibit A CDRL - GFM.pdf PDF
Attachment V Source of Repair Instruction.pdf PDF
TGI_38K6113801A01_c1v0.pdf PDF
TGI_38K6145601A01_c0v0.pdf PDF
TGI_38K6112318A01_c0v0.pdf PDF
TGI 38K6186301A01_c0v0.pdf PDF
TGI_38K6112320A01_c1v1.pdf PDF
TGI_38K6112305A01_c1v0.pdf PDF
TGI 38K6144104A01_c0v0.pdf PDF
Attachment III Request for Information Sheet (Fillable).pdf PDF
TGI_38K6154101T01_c0v0.pdf PDF
TGI_38K6113701A01_c0v0.pdf PDF
TGI_38K6112325A01_c0v0.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

01-MAY-2026 1306

20.15.6.0.9333 (July 2025) ICN: 38K6112318 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: INTK MOIST PLCD AY A 0 2/2

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: *F/O - INSTALL PLACARD TO BLOW IN DOOR FRAME TO FWD/AFT GTM AND GTG INTAKE

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 5

EM011215

PREPARING ACTIVITY: STATUS: APP WORKING STATUS: PKG

PREPARED BY: CODE: PHONE: DATE:

EGUCHI, MASASHI 234 3152430978 23-JAN-2026

APPROVED BY: CODE: PHONE: DATE:

IZUMI, NORIAKI 234 3152432243 01-MAY-2026

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EM01-1215

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

SAITO, KAZUNOBU

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

123A2118

1. SCOPE/PURPOSE:

1.1 Title: Placard to FWD and AFT Gas Turbine Module (GTM) and Ship Service Gas Turbine Generator (SSGTG) Intake Moisture Separator/Blow in Door (BID) Flame; install

1.2 Location of Work:

1.2.1 Intake Engine Room No. One (Starboard) (02-174-1-Q)

1.2.2 Intake Engine Room No. One (Port) (02-174-0-Q)

1.2.3 Intake Engine Room No.2 (02-284-0-Q)

1.2.4 Intake TRK (A) ENG Room No. 2 (1-289-2-Q) (01 Level)

1.2.5 Intake Engine Room No. 2 (01-276-0-Q)

TGI Short Form

01-MAY-2026 1306

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112318 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: INTK MOIST PLCD AY A 0 2/2

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: *F/O - INSTALL PLACARD TO BLOW IN DOOR FRAME TO FWD/AFT GTM AND GTG INTAKE

FOUO Pg 2 of 5

CU PHASE DESCRIPTION (Cont.)

1.2.6 Intake Engine Room No. 2 (02-275-0-Q)

1.2.7 Intake Engine Room No. 2 (03-274-0-Q)

1.2.8 SS GTRB Intake/Exhaust Trunk (02-161-2-Q)

1.2.9 SS GTRB GEN Intake (03-174-0-Q)

1.2.10 SS GTRB GEN Intake (01-260-1-Q)

1.2.11 SS GTRB GEN Intake TRK (01-388-2-Q)

1.3 Identification:

1.3.1 Quantity (19 EA), Placard

Material: Cres 316L Size: 6 Inch X 3 Inch THK: 1/8 Inch Remarks: See Enclosure-01 for details.

1.3.2 Quantity (4 EA), Moisture Separator/BID, 1A GTM Intake, Located in 1.2.1 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.

1.3.3 Quantity (4 EA), Moisture Separator/BID, 1B GTM Intake, Located in 1.2.2 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.

1.3.4 Quantity (4 EA), Moisture Separator/BID, 2A GTM Intake, Located in 1.2.3 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.

1.3.5 Quantity (4 EA), Moisture Separator/BID, 2B GTM Intake, Located in 1.2.6 and 1.2.7 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.

1.3.6 Quantity (One EA), Moisture Separator/BID, No. One SSGTG Intake, Located in 1.2.8 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.

1.3.7 Quantity (One EA), Moisture Separator/BID, No. 2 SSGTG Intake, Located in 1.2.10 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.

1.3.8 Quantity (One EA), Moisture Separator/BID, No. 3 SSGTG Intake, Located in 1.2.11 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.

1.4 Security Classification: None.

01-MAY-2026 1306

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112318 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: INTK MOIST PLCD AY A 0 2/2

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: *F/O - INSTALL PLACARD TO BLOW IN DOOR FRAME TO FWD/AFT GTM AND GTG INTAKE

FOUO Pg 3 of 5

CU PHASE DESCRIPTION (Cont.)

1.5 Initial Condition: None.

1.6 Contractor work start date:

1.7 Contractor work complication date:

2. PROCEDURE:

2.1 Accomplish the requirements of Ref. No. 3.

(V)(G) ”GAS TURBINE MAINTENANCE PROCEDURE"

2.2 Install each new placard listed in 1.3.1 to intake BID moisture separator listed in 1.3.2 through 1.3.8 in accordance Enclosure-01.

2.2.1 Accomplish the requirements of 009-012 of Ref. No. One, including Table One, Column(s)F, Lines One through 10.

2.3 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surfaces.

2.4 Notes:

2.4.1 Planner: Code 234 M. Eguchi, 243-0978

Planner: Code 232 Y. Watanabe, 243-2375 Engineer: Code 260 Y. Hasebe, 243-4347

2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.4.3 JCN EM01-1215 is related to this TGI.

2.4.4 Fabrication of placard will be accomplished by In-house work (SRF-JRMC TGI No. 38K6112318F01).

2.5 SRF-JRMC Furnished Material (GFM): None.

2.6 SRF-JRMC will provide the following service work: (TGI No. 38K6112318S02)

2.6.1 [C740] Crane and crane rigging service.

2.6.2 [X99E] Utility service.

2.6.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.6.6 [C133] QA Inspection for (G) symbol (s).

2.6.7 [C285] Inspection for (G) symbol(s).

Kouichi.Yoshida.ja Typewritten Text 10/26/2026

Kouichi.Yoshida.ja Typewritten Text 12/4/2026

01-MAY-2026 1306

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112318 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: INTK MOIST PLCD AY A 0 2/2

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: *F/O - INSTALL PLACARD TO BLOW IN DOOR FRAME TO FWD/AFT GTM AND GTG INTAKE

FOUO Pg 4 of 5

CU PHASE DESCRIPTION (Cont.)

01-MAY-2026 1306

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112318 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: INTK MOIST PLCD AY A 0 2/2

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: *F/O - INSTALL PLACARD TO BLOW IN DOOR FRAME TO FWD/AFT GTM AND GTG INTAKE

FOUO Pg 5 of 5

OTHER SPECIAL REQUIREMENTS:

CLASS M-2

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI NSI FY-26 NAVSEA Standard Items - 1 N 2 LI LI FY-26 Local Standard Items - ORG N

3 MP LM24-K6112318-

EM011215

1A/1B/2A/2B GTM,

NO.1/NO.2/NO.3 SSGTG

INTAKE FOD PROTECTION

FOR INSTALL PLACARD

- Y ALL

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 38K6112318A01-Engrg Inst.pdf 23-JAN-2026 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38K6112318 KEY OP: A01

NOTES:

1. Fabricate and install the warning placards on the blow-in door in accordance with this enclosure.

2. Fabrication, welding and inspection of class M-2 machinery components, category C shall be in accordance with NAVSEA S9074-AR-GIB-010A/278.

38K6112318A01 ENGRNG INST

ENCLOSURE-01

SHEET 1 OF 12

Co w 0 zo 0

0< -J _J

O<L10 F-OaJ

-J.

LIZ 0

ou_ 0-J 0

ELM NO. 259-250320 REV. -

ENCLOSURE (2)

CUI

38K6112318A01 ENGRNG INST

SHEET 2 OF 12

D A

N G

ER

N

O T

A N

A C

C

ES

S D

O N

O T

EN

TE

R

C U

I

C U

I

ELM NO. 259-250320 REV. -

ENCLOSURE (2)

CUI

38K6112318A01 ENGRNG INST

ENCLOSURE-01

SHEET 3 OF 12

Yuuki.Hasebe.ja Line

Yuuki.Hasebe.ja_1 Line

Yuuki.Hasebe.ja_2 Line

Yuuki.Hasebe.ja_3 Line

Yuuki.Hasebe.ja_4 Text Box

TAC WELDS

(4 PLS, TYP)

D

N G

ER

N

O T

N

C C

ES

S

D O

N O

T

EN

TE

R

C U

I

C U

I

Pl ac ar d sh al l h av e th e fo llo w in g:

Si ze

: 6 x in ch x

/8

T H

K

M at er ia l:

C or ro si on

R es is ta nc e

(C

RE

S

6L

In st al la tio n M et ho d:

S ha ll be ta ck w el de d si m ila r t o O

EM

p la ca rd

SHEET 3 of 13

M O

IS

TU

R E

SE

PA

R

AT

O R

T

YP

E A

38K6112318A01 ENGRNG INST

SHEET 4 OF 12

U

I

C U

I

Pl ac ar d sh al l h av e th e fo llo w in g:

Si ze

: 6 x in ch x

/8

T H

K

M at er ia l:

C or ro si on

R es is ta nc e

(C

RE

S

6L

In st al la tio n M et ho d:

S ha ll be ta ck w el de d si m ila r t o

O

EM

p la ca rd

D A

N G

ER

N

O T

N

C

ES

S

D O

N O

T

EN

TE

R

M O

IS

TU

R E

SE

PA

R

AT

O R

T

YP

E B

38K6112318A01 ENGRNG INST

SHEET 5 OF 12

G

TM

A

In ta ke

Fo ur

(4 ) p la ce s

C U

I

C U

I

38K6112318A01 ENGRNG INST

ENCLOSURE-01

SHEET 6 OF 12

Yuuki.Hasebe.ja_5 Line

TM

B

In ta ke

Fo ur

(4 ) p la ce s C

U I

C U

I

38K6112318A01 ENGRNG INST

ENCLOSURE-01

SHEET 7 OF 12

Yuuki.Hasebe.ja_6 Line

Th re e (3

) p la ce s:

(2 )G

TM

A (1

)G

TM

B

Th re e (3

) p la ce s:

(2 ) G

TM

A (1

) G

TM

B

G

TM

A/

2B In ta ke

C U

I

C U

I

38K6112318A01 ENGRNG INST

SHEET 8 OF 12

Tw o

(2 ) p la ce s

G

TM

B

In ta ke

C U

I

C U

I

38K6112318A01 ENGRNG INST

SHEET 9 OF 12

O ne

(1 ) p la ce

G

TG

In ta ke

C U

I

C U

I

38K6112318A01 ENGRNG INST

SHEET 10 OF 12

TG

In ta ke

C U

I

C U

I

O ne

(1 ) P la ce

38K6112318A01 ENGRNG INST

SHEET 11 OF 12

TG

In ta ke

Fo r D

D G

9A

F

C U

I

C U

I

38K6112318A01 ENGRNG INST

ENCLOSURE-01

SHEET 12 OF 12

Yuuki.Hasebe.ja_7 Text Box

MOISTURE

SEPARATOR TYPE A

File details come from the government source that posted it. Updated .