This is a WebAIM Short Form Task Group Instruction (TGI) for naval ship maintenance work on USS RAFAEL PERALTA (DDG-115).

The instruction details scaffolding installation and removal work for the AS-3851/SPY-1D Antenna Array staging assessment. The work scope encompasses four scaffolding assembly lots to be erected and removed across specified locations on the vessel: between 02 and 04 levels at frames 125-142 (port and starboard), and between 03 and 05 levels at frames 158-174 (port and starboard). The contractor work is scheduled to commence on 10/19/2026 and be completed by 12/13/2026. The scaffolding must be erected in accordance with 29 CFR Part 1915.71 (Scaffolding or Staging) and referenced procedures. Upon completion of assessment work by the Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC), the scaffolding is to be removed upon request via Code 333. SRF-JRMC will provide supporting services including crane and crane rigger support, safety inspection for their employees, and QA inspection for designated symbols. The document cites applicable standards including NSI FY-26 NAVSEA Standard Items, LI FY-26 Local Standard Items, and AEGIS RADAR SPY ANTENNA ARRAY SCAFFOLDING procedures (MP PM 240-0049). The planner and Work Integration Manager contact information are identified for coordination purposes. No Government Furnished Material is specified for this work.

View the file

Other files

File Type Posted
TGI_38K6158301A01_c0v0_REV2.pdf PDF
TGI_38K6112317A01_c0v0_REV2.pdf PDF
TGI_38K6113601A01_c0v0_REV2.pdf PDF
TGI_38K6112305A01_c1v0_REV2.pdf PDF
TGI_38K6169901A01_c0v0_REV2.pdf PDF
TGI_38K6113701A01_c0v0_REV2.pdf PDF
TGI_38K6112304A01_c0v0_REV2.pdf PDF
TGI_38K6112325A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360006 SF 30.pdf PDF
TGI_38K6112303A01_c0v0_REV2.pdf PDF
TGI_38K6165401A01_c0v0_REV2.pdf PDF
TGI_38K6113702A01_c0v0_REV2.pdf PDF
TGI_38K6171101A01_c0v0_REV2.pdf PDF
TGI_38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6112321A01_c0v0_REV2.pdf PDF
TGI_38K6112001A01_c0v0_REV2.pdf PDF
TGI_38K6154101A01_c1v1_REV2.pdf PDF
Attachment II Price Proposal Sheet Generator v1.3.xlsx XLSX spreadsheet
TGI_38K6144104A01_c0v0_REV2.pdf PDF
TGI_38K6112301A01_c0v0_REV2.pdf PDF
TGI_38K6112316A01_c0v0_REV2.pdf PDF
TGI_38K6151101A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360005 SF 30.pdf PDF
TGI_38K6112320A01_c1v1_REV2.pdf PDF
TGI_38K6152101A02_c0v0_REV2.pdf PDF
TGI_38K6113602A01_c0v0_REV2.pdf PDF
TGI_38K6164401A01_c1v2_REV2.pdf PDF
TGI_38K6112306A01_c0v1_REV2.pdf PDF
TGI_38K6154103A02_c0v0_REV2.pdf PDF
TGI_38K6186301A01_c0v0_rev2.pdf PDF
TGI_38K6113801A01_c1v0_REV2.pdf PDF
Attachment I Bundle_1_POP_LIST.xlsx XLSX spreadsheet
Solicitation Amendment N6264926RA0360004 SF 30.pdf PDF
Solicitation Amendment N6264926RA0360003 SF 30.pdf PDF
DWG 6218562_53711_-_0001_ R_-_0001.pdf PDF
TGI_38K6112306A01_c0v1_REV1.pdf PDF
TGI_38K6113801A01_c1v0_REV1.pdf PDF
TGI_38K6144104A01_c0v0_REV1.pdf PDF
TGI_38K6145601A01_c0v0_REV1.pdf PDF
38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6158301A01_c0v0_REV1.pdf PDF
TGI 38K6112318A01_c2v2_REV2.pdf PDF
Solicitation Amendment N6264926RA0360002 SF 30.pdf PDF
TGI_38K6113701A01_c0v0_REV1.pdf PDF
TGI_38K6112305A01_c1v0_REV1.pdf PDF
7027318_53711_-_0001_ G_-_0001.pdf PDF
TGI_38K6171101A01_c0v0_REV1.pdf PDF
MP LM19-K6112303-ES01NA54_r3.pdf PDF
TGI_38K6112320A01_c1v1_REV1.pdf PDF
TGI_38K6165401A01_c0v0_REV1.pdf PDF
Show 40 more

Latest 50 of 115 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

21-JAN-2026 1609

20.15.6.0.9333 (July 2025) ICN: 38K6145601 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: SPY ANT STAGING AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: *F/O - INSTL & RMV SCAFFOLDING TO/FROM AS-3851/SPY-1D ANT ARRAY

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

CF01ZA64

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

KUROKAWA, NAOKI 231B 3152430108 30-SEP-2025

APPROVED BY: CODE: PHONE: DATE:

TAKEISHI, TAKAYUKI 231B 3152436704 30-SEP-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

CF01-ZA64

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

SAITO, KAZUNOBU

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

456A0101

1. SCOPE/PURPOSE:

1.1 Title: Scaffolding for Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Work; install and remove

1.2 Location of Work:

1.2.1 Between 02 Level and 04 Level Weather, Frames between 125 and 142, Port

1.2.2 Between 02 Level and 04 Level Weather, Frames between 125 and 142, Starboard (Stbd)

1.2.3 Between 03 Level and 05 Level Weather, Frames between 158 and 174, Port

1.2.4 Between 03 Level and 05 Level Weather, Frames between 158 and 174, Stbd

1.3 Identification:

1.3.1 Quantity (4 Lot), Scaffolding Assembly

TGI Short Form

21-JAN-2026 1609

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6145601 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: SPY ANT STAGING AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: *F/O - INSTL & RMV SCAFFOLDING TO/FROM AS-3851/SPY-1D ANT ARRAY

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

Location: 1.2.1 through 1.2.4 Remarks: Assessment work of AS-3851/SPY-1D Antenna Array will be accomplished by SRF-JRMC.

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor Work start date:

1.7 Contractor Work completion date:

2. PROCEDURE:

2.1 Erect/hang scaffolding listed in 1.3.1 in accordance with Ref. No. 3 and Ref. No. 4.

2.2 Remove scaffolding listed in 1.3.1 upon completion of the work in accordance with Ref. No. 3 and Ref. No. 4 when requested by SRF-JRMC via Code 333.

2.3 Notes:

2.3.1 Planner: Code 231B N. Kurokawa, 243-0108

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560

2.3.3 JCN CF01-ZA64 is related to this TGI.

2.4 Government Furnished Material (GFM): None.

2.5 SRF-JRMC will provide the following service work: (TGI No. 38K6145601S02)

2.5.1 [C740] Crane and crane rigger service.

2.5.2 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.3 [C133] QA inspection for (G) symbol(s).

Kouichi.Yoshida.ja Typewritten Text 10/19/2026

Kouichi.Yoshida.ja Typewritten Text 12/13/2026

21-JAN-2026 1609

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6145601 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: SPY ANT STAGING AY A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61

CU PHASE TITLE: *F/O - INSTL & RMV SCAFFOLDING TO/FROM AS-3851/SPY-1D ANT ARRAY

FOUO Pg 3 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

3 TM 29 CFR PART

1915.71 Scaffolding or Staging - N

4 MP PM 240-0049,

SURF

AEGIS RADAR SPY ANTENNA

ARRAY SCAFFOLDING

A Y ALL

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38K6145601 KEY OP: A01