This is a WebAIM Short Form Task Group Instruction (TGI) for maintenance work on the USS Rafael Peralta (DDG-115), a naval destroyer. The instruction details the installation of warning placards and moisture separator/blow-in door (BID) frames across multiple gas turbine and ship service gas turbine generator intake locations aboard the vessel.
The scope requires installation of 19 CRES 316L stainless steel placards (6 inches × 3 inches × 1/8 inch thick) and eight moisture separator/BID frames with CRES 316L construction across 11 specified compartments and intake locations. Work locations include Engine Rooms 1, 2, and associated intake trunks, with placards and frames installed to Gas Turbine Modules (GTM) 1A, 1B, 2A, and 2B, as well as Ship Service Gas Turbine Generator (SSGTG) intakes numbered 1, 2, and 3. The work is scheduled to commence on August 3, 2026, with completion by September 11, 2026. The contractor is responsible for placard fabrication through in-house work (TGI No. 38K6112318F01), while the shipyard (SRF-JRMC) provides crane services, utility services including air/water/steam supply, safety and gas-free inspections, and quality assurance inspections. The work must comply with NAVSEA S9074-AR-GIB-010A/278 standards for Class M-2 machinery component fabrication, welding, and inspection. Work certification requires completion review and records review signatures from designated personnel. The instruction includes detailed engineering drawings in Enclosure-01 showing placard locations and installation specifications for each intake type.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
01-MAY-2026 1306
20.15.6.0.9333 (July 2025) ICN: 38K6112318 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: INTK MOIST PLCD AY A 0 2/2
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: *F/O - INSTALL PLACARD TO BLOW IN DOOR FRAME TO FWD/AFT GTM AND GTG INTAKE
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 5
EM011215
PREPARING ACTIVITY: STATUS: APP WORKING STATUS: PKG
PREPARED BY: CODE: PHONE: DATE:
EGUCHI, MASASHI 234 3152430978 23-JAN-2026
APPROVED BY: CODE: PHONE: DATE:
IZUMI, NORIAKI 234 3152432243 01-MAY-2026
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
EM01-1215
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
SAITO, KAZUNOBU
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
123A2118
1. SCOPE/PURPOSE:
1.1 Title: Placard to FWD and AFT Gas Turbine Module (GTM) and Ship Service Gas Turbine Generator (SSGTG) Intake Moisture Separator/Blow in Door (BID) Flame; install
1.2 Location of Work:
1.2.1 Intake Engine Room No. One (Starboard) (02-174-1-Q)
1.2.2 Intake Engine Room No. One (Port) (02-174-0-Q)
1.2.3 Intake Engine Room No.2 (02-284-0-Q)
1.2.4 Intake TRK (A) ENG Room No. 2 (1-289-2-Q) (01 Level)
1.2.5 Intake Engine Room No. 2 (01-276-0-Q)
TGI Short Form
01-MAY-2026 1306
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112318 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: INTK MOIST PLCD AY A 0 2/2
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: *F/O - INSTALL PLACARD TO BLOW IN DOOR FRAME TO FWD/AFT GTM AND GTG INTAKE
FOUO Pg 2 of 5
CU PHASE DESCRIPTION (Cont.)
1.2.6 Intake Engine Room No. 2 (02-275-0-Q)
1.2.7 Intake Engine Room No. 2 (03-274-0-Q)
1.2.8 SS GTRB Intake/Exhaust Trunk (02-161-2-Q)
1.2.9 SS GTRB GEN Intake (03-174-0-Q)
1.2.10 SS GTRB GEN Intake (01-260-1-Q)
1.2.11 SS GTRB GEN Intake TRK (01-388-2-Q)
1.3 Identification:
1.3.1 Quantity (19 EA), Placard
Material: Cres 316L Size: 6 Inch X 3 Inch THK: 1/8 Inch Remarks: See Enclosure-01 for details.
1.3.2 Quantity (4 EA), Moisture Separator/BID, 1A GTM Intake, Located in 1.2.1 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.
1.3.3 Quantity (4 EA), Moisture Separator/BID, 1B GTM Intake, Located in 1.2.2 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.
1.3.4 Quantity (4 EA), Moisture Separator/BID, 2A GTM Intake, Located in 1.2.3 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.
1.3.5 Quantity (4 EA), Moisture Separator/BID, 2B GTM Intake, Located in 1.2.6 and 1.2.7 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.
1.3.6 Quantity (One EA), Moisture Separator/BID, No. One SSGTG Intake, Located in 1.2.8 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.
1.3.7 Quantity (One EA), Moisture Separator/BID, No. 2 SSGTG Intake, Located in 1.2.10 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.
1.3.8 Quantity (One EA), Moisture Separator/BID, No. 3 SSGTG Intake, Located in 1.2.11 Frame Material: CRES 316L Remarks: See Enclosure-01 for details.
1.4 Security Classification: None.
01-MAY-2026 1306
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112318 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: INTK MOIST PLCD AY A 0 2/2
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: *F/O - INSTALL PLACARD TO BLOW IN DOOR FRAME TO FWD/AFT GTM AND GTG INTAKE
FOUO Pg 3 of 5
CU PHASE DESCRIPTION (Cont.)
1.5 Initial Condition: None.
1.6 Contractor work start date:
1.7 Contractor work complication date:
2. PROCEDURE:
2.1 Accomplish the requirements of Ref. No. 3.
(V)(G) ”GAS TURBINE MAINTENANCE PROCEDURE"
2.2 Install each new placard listed in 1.3.1 to intake BID moisture separator listed in 1.3.2 through 1.3.8 in accordance Enclosure-01.
2.2.1 Accomplish the requirements of 009-012 of Ref. No. One, including Table One, Column(s)F, Lines One through 10.
2.3 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surfaces.
2.4 Notes:
2.4.1 Planner: Code 234 M. Eguchi, 243-0978
Planner: Code 232 Y. Watanabe, 243-2375 Engineer: Code 260 Y. Hasebe, 243-4347
2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.4.3 JCN EM01-1215 is related to this TGI.
2.4.4 Fabrication of placard will be accomplished by In-house work (SRF-JRMC TGI No. 38K6112318F01).
2.5 SRF-JRMC Furnished Material (GFM): None.
2.6 SRF-JRMC will provide the following service work: (TGI No. 38K6112318S02)
2.6.1 [C740] Crane and crane rigging service.
2.6.2 [X99E] Utility service.
2.6.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.6.6 [C133] QA Inspection for (G) symbol (s).
2.6.7 [C285] Inspection for (G) symbol(s).
Kouichi.Yoshida.ja Typewritten Text 8/3/2026
Kouichi.Yoshida.ja Typewritten Text 9/11/2026
01-MAY-2026 1306
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112318 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: INTK MOIST PLCD AY A 0 2/2
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: *F/O - INSTALL PLACARD TO BLOW IN DOOR FRAME TO FWD/AFT GTM AND GTG INTAKE
FOUO Pg 4 of 5
CU PHASE DESCRIPTION (Cont.)
01-MAY-2026 1306
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112318 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: INTK MOIST PLCD AY A 0 2/2
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: *F/O - INSTALL PLACARD TO BLOW IN DOOR FRAME TO FWD/AFT GTM AND GTG INTAKE
FOUO Pg 5 of 5
OTHER SPECIAL REQUIREMENTS:
CLASS M-2
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI NSI FY-26 NAVSEA Standard Items - 1 N 2 LI LI FY-26 Local Standard Items - ORG N
3 MP LM24-K6112318-
EM011215
1A/1B/2A/2B GTM,
NO.1/NO.2/NO.3 SSGTG
INTAKE FOD PROTECTION
FOR INSTALL PLACARD
- Y ALL
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 38K6112318A01-Engrg Inst.pdf 23-JAN-2026 0000
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38K6112318 KEY OP: A01
NOTES:
1. Fabricate and install the warning placards on the blow-in door in accordance with this enclosure.
2. Fabrication, welding and inspection of class M-2 machinery components, category C shall be in accordance with NAVSEA S9074-AR-GIB-010A/278.
38K6112318A01 ENGRNG INST
ENCLOSURE-01
SHEET 1 OF 12
Co w 0 zo 0
0< -J _J
O<L10 F-OaJ
-J.
LIZ 0
ou_ 0-J 0
ELM NO. 259-250320 REV. -
ENCLOSURE (2)
CUI
38K6112318A01 ENGRNG INST
SHEET 2 OF 12
D A
N G
ER
N
O T
A N
A C
C
ES
S D
O N
O T
EN
TE
R
C U
I
C U
I
ELM NO. 259-250320 REV. -
ENCLOSURE (2)
CUI
38K6112318A01 ENGRNG INST
ENCLOSURE-01
SHEET 3 OF 12
Yuuki.Hasebe.ja Line
Yuuki.Hasebe.ja_1 Line
Yuuki.Hasebe.ja_2 Line
Yuuki.Hasebe.ja_3 Line
Yuuki.Hasebe.ja_4 Text Box
TAC WELDS
(4 PLS, TYP)
D
N G
ER
N
O T
N
C C
ES
S
D O
N O
T
EN
TE
R
C U
I
C U
I
Pl ac ar d sh al l h av e th e fo llo w in g:
Si ze
: 6 x in ch x
/8
T H
K
M at er ia l:
C or ro si on
R es is ta nc e
(C
RE
S
6L
In st al la tio n M et ho d:
S ha ll be ta ck w el de d si m ila r t o O
EM
p la ca rd
SHEET 3 of 13
M O
IS
TU
R E
SE
PA
R
AT
O R
T
YP
E A
38K6112318A01 ENGRNG INST
SHEET 4 OF 12
U
I
C U
I
Pl ac ar d sh al l h av e th e fo llo w in g:
Si ze
: 6 x in ch x
/8
T H
K
M at er ia l:
C or ro si on
R es is ta nc e
(C
RE
S
6L
In st al la tio n M et ho d:
S ha ll be ta ck w el de d si m ila r t o
O
EM
p la ca rd
D A
N G
ER
N
O T
N
C
ES
S
D O
N O
T
EN
TE
R
M O
IS
TU
R E
SE
PA
R
AT
O R
T
YP
E B
38K6112318A01 ENGRNG INST
SHEET 5 OF 12
G
TM
A
In ta ke
Fo ur
(4 ) p la ce s
C U
I
C U
I
38K6112318A01 ENGRNG INST
ENCLOSURE-01
SHEET 6 OF 12
Yuuki.Hasebe.ja_5 Line
TM
B
In ta ke
Fo ur
(4 ) p la ce s C
U I
C U
I
38K6112318A01 ENGRNG INST
ENCLOSURE-01
SHEET 7 OF 12
Yuuki.Hasebe.ja_6 Line
Th re e (3
) p la ce s:
(2 )G
TM
A (1
)G
TM
B
Th re e (3
) p la ce s:
(2 ) G
TM
A (1
) G
TM
B
G
TM
A/
2B In ta ke
C U
I
C U
I
38K6112318A01 ENGRNG INST
SHEET 8 OF 12
Tw o
(2 ) p la ce s
G
TM
B
In ta ke
C U
I
C U
I
38K6112318A01 ENGRNG INST
SHEET 9 OF 12
O ne
(1 ) p la ce
G
TG
In ta ke
C U
I
C U
I
38K6112318A01 ENGRNG INST
SHEET 10 OF 12
TG
In ta ke
C U
I
C U
I
O ne
(1 ) P la ce
38K6112318A01 ENGRNG INST
SHEET 11 OF 12
TG
In ta ke
Fo r D
D G
9A
F
C U
I
C U
I
38K6112318A01 ENGRNG INST
ENCLOSURE-01
SHEET 12 OF 12
Yuuki.Hasebe.ja_7 Text Box
MOISTURE
SEPARATOR TYPE A
File details come from the government source that posted it. Updated .