This is a WebAIM Short Form Task Group Instruction (TGI) for scaffolding work on the USS Rafael Peralta (DDG-115), a naval vessel undergoing maintenance at the Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC).

The work involves the installation and removal of scaffolding in Compartment 01-205-0-Q (Pallet Trunk Stowage/Battery Charging Room) to facilitate the replacement of a vent duct and heater. The contractor work period spans from October 19, 2026 to December 13, 2026. The instruction references one lot of scaffolding assembly with specific work procedures outlined in 29 CFR Part 1915.71 (Scaffolding or Staging standards). Section 2.1 requires the contractor to erect and hang the scaffolding in accordance with referenced standards, while Section 2.2 specifies removal upon completion of work when requested by SRF-JRMC via Code 333. SRF-JRMC will provide supporting services including crane and crane rigging (C740), safety inspection for SRF-JRMC employees (C106.1), and QA inspection for items marked with (G) symbols (C133). No government-furnished materials are required. The instruction was prepared by S. Yamaoka (Code 231B) on November 19, 2025 and approved by T. Takeishi (Code 231B) the same date, with related JCN EE02-1817. A sketch enclosure (38K6151101A01) provides the location details for the vent duct and heater replacement work.

View the file

Other files

File Type Posted
Attachment II Price Proposal Sheet Generator v1.3.xlsx XLSX spreadsheet
TGI_38K6112301A01_c0v0_REV2.pdf PDF
TGI_38K6158301A01_c0v0_REV2.pdf PDF
TGI_38K6112303A01_c0v0_REV2.pdf PDF
TGI_38K6112305A01_c1v0_REV2.pdf PDF
TGI_38K6165401A01_c0v0_REV2.pdf PDF
TGI_38K6112325A01_c0v0_REV2.pdf PDF
TGI_38K6112317A01_c0v0_REV2.pdf PDF
TGI_38K6112316A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360006 SF 30.pdf PDF
Solicitation Amendment N6264926RA0360004 SF 30.pdf PDF
Solicitation Amendment N6264926RA0360003 SF 30.pdf PDF
TGI_38K6112320A01_c1v1_REV1.pdf PDF
TGI_38K6112321A01_c0v0_REV1.pdf PDF
TGI_38K6112306A01_c0v1_REV1.pdf PDF
TGI_38K6112317A01_c0v0_REV1.pdf PDF
TGI_38K6112001A01_c0v0_REV1.pdf PDF
TGI_38K6158301A01_c0v0_REV1.pdf PDF
TGI_38K6165401A01_c0v0_REV1.pdf PDF
TGI_38K6186301A01_c0v0_rev1.pdf PDF
38K6112318A01_c2v2_REV2.pdf PDF
DWG 6218562_53711_-_0001_ R_-_0001.pdf PDF
TGI_38K6112301A01_c0v0_REV1.pdf PDF
TGI_38K6112305A01_c1v0_REV1.pdf PDF
TGI_38K6112304A01_c0v0_REV1.pdf PDF
TGI_38K6112316A01_c0v0_REV1.pdf PDF
TGI_38K6171101A01_c0v0_REV1.pdf PDF
TGI_38K6169901A01_c0v0_REV1.pdf PDF
TGI_38K6154101A01_c1v1_REV1.pdf PDF
Attachment IV Request for Information Form.pdf PDF
N6264926RA0360001 SF30.pdf PDF
TGI_38K6154101T01_c0v0.pdf PDF
TGI_38K6113701A01_c0v0.pdf PDF
TGI_38K6112325A01_c0v0.pdf PDF
TGI 38K6171101A01_c0v0.pdf PDF
TGI_38K6112001A01_c0v0.pdf PDF
Attachment VI Warranty Tracking Information.pdf PDF
Attachment II Proposal Sheet Generator v1.2.xlsx XLSX spreadsheet
TGI_38K6151101A01_c0v0.pdf PDF
TGI_38K6113702A01_c0v0.pdf PDF
TGI_38K6113601A01_c0v0.pdf PDF
TGI_38K6113602A01_c0v0.pdf PDF
TGI_38K6112303A01_c0v0.pdf PDF
TGI 38K6169901A01_c0v0.pdf PDF
TGI_38K6112316A01_c0v0.pdf PDF
TGI_38K6112306A01_c0v1.pdf PDF
TGI_38K6112321A01_c0v0.pdf PDF
Attachment VII QSAP.pdf PDF
Exhibit A CDRL - GFM.pdf PDF
Attachment V Source of Repair Instruction.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

21-JAN-2026 1609

20.15.6.0.9333 (July 2025) ICN: 38K6151101 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SY TST A 3 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 86511

CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM 01-205-0-Q FOR SRF-JRMC WORK

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

EE021817

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

YAMAOKA, SHINJI 231B 3152439882 19-NOV-2025

APPROVED BY: CODE: PHONE: DATE:

TAKEISHI, TAKAYUKI 231B 3152436704 19-NOV-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

EE02-1817

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

SAITO, KAZUNOBU VARIOUS U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

511A1101

1. SCOPE/PURPOSE:

1.1 Title: Scaffolding for Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Work; install and remove

1.2 Location of Work:

1.2.1 Pallet Trunk Stowage/Battery Charging Room (01-205-0-Q)

1.3 Identification:

1.3.1 Quantity (One Lot), Scaffolding Assembly for Removal and Installation of Vent Duct

Location: 1.2.1 Remarks: See Sketch Enclosure-01 for Location where Vent Duct and Heater will be replaced.

1.4 Security Classification: None.

TGI Short Form

21-JAN-2026 1609

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6151101 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SY TST A 3 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 86511

CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM 01-205-0-Q FOR SRF-JRMC WORK

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1.5 Initial Condition: None.

1.6 Contractor work start date:

1.7 Contractor work completion date:

2. PROCEDURE:

2.1 Erect/hang scaffolding listed in 1.3.1 in accordance with Ref. No. 3.

2.2 Remove scaffolding listed in 1.3.1 upon completion of the work in accordance with Ref. Ref. No. 3 when requested by SRF- JRMC via Code 333.

2.3 Notes:

2.3.1 Planner: Code 231B S. Yamaoka, 243-9882

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560

2.3.3 JCN EE02-1817 is related to this TGI.

2.4 Government Furnished Material (GFM): None.

2.5 SRF-JRMC will provide the following service work: (TGI No. 38K6151101S02)

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.3 [C133] QA Inspection for (G) symbol(s).

Kouichi.Yoshida.ja Typewritten Text 10/19/2026

Kouichi.Yoshida.ja Typewritten Text 12/13/2026

21-JAN-2026 1609

20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6151101 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SY TST A 3 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 86511

CU PHASE TITLE: *F/O - INSTALL AND REMOVE SCAFFOLDING TO/FROM 01-205-0-Q FOR SRF-JRMC WORK

FOUO Pg 3 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

3 TM 29 CFR PART

1915.71 Scaffolding or Staging - N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

ATTACHMENT LIST

TITLE FILE NAME SAVED DATE

ENCLOSURE-01 38K6151101A01-Sketch.pdf 19-NOV-2025 0000

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38K6151101 KEY OP: A01

Sheet 1 of 1

SKETCH

ENCLOSURE-0138K6151101A01

LEG

EN

D

PLAN

1-A -Vend duct and heater w ill be replaced by

SR

F-JR

M

C

File details come from the government source that posted it. Updated .