This is a WebAIM Short Form Task Group Instruction (TGI) for naval ship maintenance work. The document provides work instructions for the installation and removal of scaffolding for the AS-3851/SPY-1D Antenna Array on USS RAFAEL PERALTA (DDG-115). The work is prepared by the Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) and covers four scaffolding assembly locations: between 02 and 04 Levels Weather at Frames 125-142 (Port and Starboard) and between 03 and 05 Levels Weather at Frames 158-174 (Port and Starboard).
The scope requires erection and hanging of four scaffolding assemblies in accordance with 29 CFR Part 1915.71 (Scaffolding or Staging) and MP PM 240-0049, SURF (AEGIS Radar SPY Antenna Array Scaffolding). Work is scheduled to begin on 7/29/2026 and be completed by 9/22/2026. SRF-JRMC will provide supporting services including crane and crane rigger service (C740), safety inspection for SRF-JRMC employees (C106.1), and QA inspection for applicable symbols (C133). The document references NAVSEA Standard Items and Local Standard Items but contains no Government Furnished Material. Contact information for the Planner (Code 231B N. Kurokawa) and Work Integration Manager (Code 333 T. Yaginuma) is provided, with JCN CF01-ZA64 related to this task group instruction.
View the file
Other files
Show 40 more
Latest 50 of 115 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
21-JAN-2026 1609
20.15.6.0.9333 (July 2025) ICN: 38K6145601 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: SPY ANT STAGING AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: *F/O - INSTL & RMV SCAFFOLDING TO/FROM AS-3851/SPY-1D ANT ARRAY
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 3
CF01ZA64
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
KUROKAWA, NAOKI 231B 3152430108 30-SEP-2025
APPROVED BY: CODE: PHONE: DATE:
TAKEISHI, TAKAYUKI 231B 3152436704 30-SEP-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
CF01-ZA64
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
SAITO, KAZUNOBU
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
456A0101
1. SCOPE/PURPOSE:
1.1 Title: Scaffolding for Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Work; install and remove
1.2 Location of Work:
1.2.1 Between 02 Level and 04 Level Weather, Frames between 125 and 142, Port
1.2.2 Between 02 Level and 04 Level Weather, Frames between 125 and 142, Starboard (Stbd)
1.2.3 Between 03 Level and 05 Level Weather, Frames between 158 and 174, Port
1.2.4 Between 03 Level and 05 Level Weather, Frames between 158 and 174, Stbd
1.3 Identification:
1.3.1 Quantity (4 Lot), Scaffolding Assembly
TGI Short Form
21-JAN-2026 1609
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6145601 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: SPY ANT STAGING AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: *F/O - INSTL & RMV SCAFFOLDING TO/FROM AS-3851/SPY-1D ANT ARRAY
FOUO Pg 2 of 3
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
Location: 1.2.1 through 1.2.4 Remarks: Assessment work of AS-3851/SPY-1D Antenna Array will be accomplished by SRF-JRMC.
1.4 Security Classification: None.
1.5 Initial Condition: None.
1.6 Contractor Work start date:
1.7 Contractor Work completion date:
2. PROCEDURE:
2.1 Erect/hang scaffolding listed in 1.3.1 in accordance with Ref. No. 3 and Ref. No. 4.
2.2 Remove scaffolding listed in 1.3.1 upon completion of the work in accordance with Ref. No. 3 and Ref. No. 4 when requested by SRF-JRMC via Code 333.
2.3 Notes:
2.3.1 Planner: Code 231B N. Kurokawa, 243-0108
2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560
2.3.3 JCN CF01-ZA64 is related to this TGI.
2.4 Government Furnished Material (GFM): None.
2.5 SRF-JRMC will provide the following service work: (TGI No. 38K6145601S02)
2.5.1 [C740] Crane and crane rigger service.
2.5.2 [C106.1] Safety inspection for SRF-JRMC employees.
2.5.3 [C133] QA inspection for (G) symbol(s).
Kouichi.Yoshida.ja Typewritten Text 7/29/2026
Kouichi.Yoshida.ja Typewritten Text 9/22/2026
21-JAN-2026 1609
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6145601 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: SPY ANT STAGING AY A 0 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE: *F/O - INSTL & RMV SCAFFOLDING TO/FROM AS-3851/SPY-1D ANT ARRAY
FOUO Pg 3 of 3
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 TM 29 CFR PART
1915.71 Scaffolding or Staging - N
4 MP PM 240-0049,
SURF
AEGIS RADAR SPY ANTENNA
ARRAY SCAFFOLDING
A Y ALL
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38K6145601 KEY OP: A01