This is a WebAIM Short Form Task Group Instruction (TGI) for naval ship maintenance work on USS RAFAEL PERALTA (DDG-115). The document details temporary staging and scaffolding installation and removal services required to support Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) maintenance and preservation work on the vessel.

The scope encompasses erecting and removing scaffolding assemblies in two locations: Freeboard Weather between Frames 308 and 338 on the Port side, and the Torpedo Missile and Rocket Magazine (1-304-2-M) on the Main Deck between Frames 308 and 338. Scaffolding work must be performed in accordance with Title 29 CFR Part 1915.71 (Scaffolding or Staging) standards. The contractor work start date is 10/19/2026 with a completion date of 12/13/2026. SRF-JRMC will provide supporting services including crane and crane rigging service, safety inspection for SRF-JRMC employees, and QA inspection for designated symbols. The document references NAVSEA Standard Items (NSI FY-26) and Local Standard Items (LI FY-26) as applicable material standards. The planning point of contact is Code 231B T. Ando (243-4372), and the Work Integration Manager is Code 333 T. Yaginuma (080-6522-9560). The work is classified as non-security sensitive and carries Job Summary ID 120A0001.

View the file

Other files

File Type Posted
TGI_38K6158301A01_c0v0_REV2.pdf PDF
TGI_38K6112317A01_c0v0_REV2.pdf PDF
TGI_38K6113601A01_c0v0_REV2.pdf PDF
TGI_38K6112305A01_c1v0_REV2.pdf PDF
TGI_38K6169901A01_c0v0_REV2.pdf PDF
TGI_38K6113701A01_c0v0_REV2.pdf PDF
TGI_38K6112304A01_c0v0_REV2.pdf PDF
TGI_38K6112325A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360006 SF 30.pdf PDF
TGI_38K6112303A01_c0v0_REV2.pdf PDF
TGI_38K6165401A01_c0v0_REV2.pdf PDF
TGI_38K6113702A01_c0v0_REV2.pdf PDF
TGI_38K6171101A01_c0v0_REV2.pdf PDF
TGI_38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6112321A01_c0v0_REV2.pdf PDF
TGI_38K6154101A01_c1v1_REV2.pdf PDF
Attachment II Price Proposal Sheet Generator v1.3.xlsx XLSX spreadsheet
TGI_38K6144104A01_c0v0_REV2.pdf PDF
TGI_38K6112301A01_c0v0_REV2.pdf PDF
TGI_38K6112316A01_c0v0_REV2.pdf PDF
TGI_38K6151101A01_c0v0_REV2.pdf PDF
Solicitation Amendment N6264926RA0360005 SF 30.pdf PDF
TGI_38K6112320A01_c1v1_REV2.pdf PDF
TGI_38K6145601A01_c0v0_REV2.pdf PDF
TGI_38K6152101A02_c0v0_REV2.pdf PDF
TGI_38K6113602A01_c0v0_REV2.pdf PDF
TGI_38K6164401A01_c1v2_REV2.pdf PDF
TGI_38K6112306A01_c0v1_REV2.pdf PDF
TGI_38K6154103A02_c0v0_REV2.pdf PDF
TGI_38K6186301A01_c0v0_rev2.pdf PDF
TGI_38K6113801A01_c1v0_REV2.pdf PDF
Attachment I Bundle_1_POP_LIST.xlsx XLSX spreadsheet
Solicitation Amendment N6264926RA0360004 SF 30.pdf PDF
Solicitation Amendment N6264926RA0360003 SF 30.pdf PDF
DWG 6218562_53711_-_0001_ R_-_0001.pdf PDF
TGI_38K6112306A01_c0v1_REV1.pdf PDF
TGI_38K6113801A01_c1v0_REV1.pdf PDF
TGI_38K6144104A01_c0v0_REV1.pdf PDF
TGI_38K6145601A01_c0v0_REV1.pdf PDF
38K6112318A01_c2v2_REV2.pdf PDF
TGI_38K6158301A01_c0v0_REV1.pdf PDF
TGI 38K6112318A01_c2v2_REV2.pdf PDF
Solicitation Amendment N6264926RA0360002 SF 30.pdf PDF
TGI_38K6113701A01_c0v0_REV1.pdf PDF
TGI_38K6112305A01_c1v0_REV1.pdf PDF
7027318_53711_-_0001_ G_-_0001.pdf PDF
TGI_38K6171101A01_c0v0_REV1.pdf PDF
MP LM19-K6112303-ES01NA54_r3.pdf PDF
TGI_38K6112320A01_c1v1_REV1.pdf PDF
TGI_38K6165401A01_c0v0_REV1.pdf PDF
Show 40 more

Latest 50 of 115 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

29-JAN-2026 0905

20.14.15.2.9333 (September 2024) ICN: 38K6112001 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SY TST A 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 86511

CU PHASE TITLE: *F/O - INSTL & RMV SCAFFOLDING TO/FROM FREEBD WEA & 1-304-2-M FOR SRF-JRMC WORK

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

CG030737

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

ANDO, TOMOHIKO 231B 3152434372 17-NOV-2025

APPROVED BY: CODE: PHONE: DATE:

TAKEISHI, TAKAYUKI 231B 3152436704 17-NOV-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

CG03-0737

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

SAITO, KAZUNOBU VARIOUS U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

120A0001

1. SCOPE/PURPOSE:

1.1 Title: Scaffolding for Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC) Work; install and remove

1.2 Location of Work:

1.2.1 Freeboard Weather, Frames between 308 and 338, Port

1.2.2 Torpedo Missile and Rocket Magazine (1-304-2-M)

1.3 Identification:

1.3.1 Quantity (One Lot), Scaffolding Assembly

Location: 1.2.1 Remarks: Maintenance / Preservation work of blowout hatch will be accomplished by SRF-JRMC.

TGI Short Form

29-JAN-2026 0905

20.14.15.2.9333 (September 2024) (Continued) ICN: 38K6112001 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SY TST A 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 86511

CU PHASE TITLE: *F/O - INSTL & RMV SCAFFOLDING TO/FROM FREEBD WEA & 1-304-2-M FOR SRF-JRMC WORK

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1.3.2 Quantity (One Lot), Scaffolding Assembly

Location: 1.2.2, Main Deck Frames between 308 and 338 Remarks: Maintenance / Preservation work of blowout hatch will be accomplished by SRF-JRMC.

1.4 Security Classification: None.

1.5 Initial Condition: None.

1.6 Contractor work start date:

1.7 Contractor work completion date:

2. PROCEDURE:

2.1 Erect/hang scaffolding listed in 1.3.1 and 1.3.2 in accordance with Ref. No. 3.

2.2 Remove scaffolding listed in 1.3.1 and 1.3.2 upon completion of the work in accordance with Ref. Ref. No. 3 when requested by SRF-JRMC via Code 333.

2.3 Notes:

2.3.1 Planner: Code 231B T. Ando, 243-4372

2.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-6522-9560

2.3.3 JCN CG03-0737 is related to this TGI.

2.4 Government Furnished Material (GFM): None.

2.5 SRF-JRMC will provide the following service work: (TGI No. 38K6112001S02)

2.5.1 [C740] Crane and crane rigging service.

2.5.2 [C106.1] Safety inspection for SRF-JRMC employees.

2.5.3 [C133] QA inspection for (G) symbol(s).

Kouichi.Yoshida.ja Typewritten Text 10/19/2026

Kouichi.Yoshida.ja Typewritten Text 12/13/2026

29-JAN-2026 0905

20.14.15.2.9333 (September 2024) (Continued) ICN: 38K6112001 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: TEMPORARY STAGING SY TST A 1 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-115 USS RAFAEL PERALTA K61 86511

CU PHASE TITLE: *F/O - INSTL & RMV SCAFFOLDING TO/FROM FREEBD WEA & 1-304-2-M FOR SRF-JRMC WORK

FOUO Pg 3 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N

3 TM 29 CFR PART

1915.71 Scaffolding or Staging - N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/