This is a Task Group Instruction (TGI) for repair work on the USS RAFAEL PERALTA (DDG-115), a naval destroyer. The instruction, designated STRL MBR 3-338-10-L, authorizes the repair of a corroded transverse watertight bulkhead plate at Frame 338 in compartment 3-338-10-L. The work was prepared by Shuuichi Ootsubo (Code 231B) and approved by Ryouta Takagi (Code 231B) on November 18, 2025, with a change instruction effective January 19, 2026, deleting requirements for NSIs 009-107 and 009-009 per Memorandum Ser240/002.
The scope of work encompasses multiple locations including crew wash rooms, living spaces, fuel service tanks, and machinery rooms. Specific work tasks include tank dewatering (up to 48,000 gallons for certain tank groups), removal and replacement of the bulkhead plate using HTS material per MIL-S-22698 Grade DH-36, welding per NSI 009-012 with zero allowable leakage, and surface preparation per NSI 009-032. Special requirements mandate fabrication of a non-flammable closure due to fire zone boundary impacts and Level II-III piping cleanliness standards. The contractor work period runs from October 26, 2026, to December 4, 2026. Materials required include plate steel (8 square feet) and adhesive for seal joints. Supporting services provided by SRF-JRMC include crane operations, utilities, safety and gas-free inspections, QA inspection, and on-site engineering support under TGI No. 38K6164401S02. Physical inspection is not required per the acceptance criteria.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: STRL MBR 3-338-10-L AY A 0 1
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61
CU PHASE TITLE:
F/O - REPAIR TRANSVERSE BULKHEAD PLATE FR 338 IN 3-338-10-L
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
SHUUICHI OOTSUBO 231B. 315-243-7152 18-NOV-2025
APPROVED BY: CODE PHONE DATE
RYOUTA TAKAGI 231B. 315-243-4502 18-NOV-2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
Required to delete the requirements of NSIs 009-107 and 009-009 in Paragraph 5.1 per Memorandum Ser240/002
CHANGE INSTRUCTIONS:
CH1: Revise Paragraph 5.1 to delete the requirements of NSIs 009-107 and 009-009. (01/19/2026)
SPECIAL REQUIREMENTS:
This Work Affects a Fire Zone Boundary. Fabrication and/or Staging of a Non-Flammable Closure is Required.
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL II and III
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: STRL MBR 3-338-10-L AY A 0
FOUO
SHIP: DDG-115 CHG/VER: 1/2
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 J 1-2 M-1
1. SCOPE/PURPOSE
1.1 Title: Transverse Bulkhead Plate Frame 338 in 3-338-10-L; repair
1.2 Location of Work:
1.2.1 Crew Wash Room, Water Coset, and Shower (3-338-10-L)
1.2.2 Crew Living Space No. 5 (3-310-2-L)
1.2.3 Fuel Service Tank (5-300-2-F)
1.2.4 Fuel Receiving Tank Group -6 (5-308-2-F)
1.2.5 Access Trunk (3-308-2-T)
1.2.6 Crew Living Space No. 4 (3-300-1-L)
1.2.7 Crew Living Space No. 6 (3-338-3-L)
1.2.8 Crew Living Space No. 7 (3-350-2-L)
1.2.9 Passage (3-338-6-L)
1.2.10 Generator Room (3-370-0-E)
1.2.11 Air Conditioning Machinery and Pump Room (5-300-01-E)
1.3 Identification:
1.3.1 Quantity (One EA), Fuel Service Tank
Tank No.: 5-300-2-F Capacity: 20,277 Gallons
1.3.2 Quantity (One EA), Fuel Receiving Tank Group-6
Tank No.: 5-308-2-F Capacity: 30,032 Gallons
1.3.3 Quantity (One Lot/3 Tanks), Fuel Tank Group-5
Total Capacity: 69,695 Gallons Required amount of water to dewater: 48,000 Gallons
1.3.3.1 Fuel Receiving Tank Group-5
Tank No.: 5-308-1-F
FOUO
SHIP: DDG-115 CHG/VER: 1/2
Capacity: 30,038 Gallons
1.3.3.2 Fuel Tank Group-5
Tank No.: 5-354-0-F Capacity: 38,127 Gallons
1.3.3.3 Fuel Expansion Seawater Overflow Tank Group-5
Tank No.: 4-370-3-F Capacity: 1,530 Gallons
1.3.4 Quantity (One Lot/3 Tanks), Fuel Tank Group-6
Total Capacity: 63,450 Gallons Required amount of water to dewater: 48,000 Gallons
1.3.4.1 Fuel Receiving Tank Group-6
Tank No.: 5-308-2-F Capacity: 30,032 Gallons
1.3.4.2 Fuel Tank Group-6
Tank No.: 5-370-0-F Capacity: 31,545 Gallons
1.3.4.3 Fuel Expansion Seawater Overflow Tank Group-6
Tank No.: 4-370-4-F Capacity: 1,873 Gallons
1.3.5 Quantity (One Lot), Bulkhead Plate, Transverse Watertight Bulkhead, Frame 338 in 3-338-10-L and 3-310-2-L
Material: HTS, MIL-S-22698 GR DH-36, 7.65 LBs Plate Remarks: See 2.3 for details
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard.
1.6 Contractor work start date:
1.7 Contractor work completion date:
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 PDD 100-
ELM-260008
REPAIR PLAN OF CORRODED
TRANSV WTRTT BHD 338 IN
CREW WC & SH (3-338-10-L)
- Y AL
L
Kouichi.Yoshida.ja Typewritten Text 10/26/2026
Kouichi.Yoshida.ja
12/4/2026
FOUO
SHIP: DDG-115 CHG/VER: 1/2
3. APPENDICES:
3.1 Appendix “J” TGI Job Summary Information Sheet
3.2 Appendix "M" TGI Material List
3.3 Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1 Not Applicable.
5. PROCEDURE:
5.1 Accomplish the requirements of 099-902YO of 2.2 for each tank listed in 1.3.1 and 1.3.2.
5.1.1 Accomplish the requirements of 099-909YO of 2.2 for each tank listed in 1.3.3 and 1.3.4.
5.1.1.1 Accomplish the requirements of 009-009 of 2.1.
5.1.2 Ensure General Cleaning must be Level II for each tank listed in 1.3.1.
5.1.3 Ensure General Cleaning must be Level III for each tank listed in 1.3.2.
5.2 Prior to cutting of each existing bulkhead plate listed in 1.3.5, contact Code 250 to clarify actual defect location in accordance with Note 7 of 2.3.
5.3 Remove existing, fabricate and install new each bulkhead plate listed in 1.3.5 in accordance with 2.3.
5.3.1 Accomplish the requirements of 009-012 of 2.1, including Table 2, Column(s) A, Lines One through 7.
5.3.2 Accomplish the requirements of 009-025 of 2.1 for a local air hose test of each new weld of bulkhead plate listed in 1.3.5. Allowable leakage: None.
5.4 Accomplish the requirements of 009-032 of 2.1 for each new and disturbed surface.
5.5 Notes:
5.5.1 Planner: Code 231B S. Ootsubo, 243-7152
Planner: Code 231B A. Suzuki, 243-0968 Planner: Code 233 M. Takemura, 080-9350-1458
5.5.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
5.5.3 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
5.5.4 JCN OD01-1024 are related to this TGI.
5.6 Government Furnished Material (GFM):
5.6.1 SRF-JRMC will provide GFM listed in Appendix ”M”.
Kouichi.Yoshida.ja Cross-Out
Kouichi.Yoshida.ja
1/27/2026 C1209.2 K. YOSHIDA
FOUO
SHIP: DDG-115 CHG/VER: 1/2
5.7 SRF-JRMC will provide the following service work: (TGI No. 38K6164401S02)
5.7.1 [C740] Crane and crane rigging service.
5.7.2 [X99E] Utility service, electrical.
5.7.3 [X99M] Utilities service, including low pressure air supply, water supply, and steam supply.
5.7.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.7.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.7.6 [C133] QA inspection for (G) symbol(s).
5.7.7 [C250] On-site engineering support for clarification of actual defect location.
FOUO
M-1
SHIP: DDG-115 CHG/VER: 1/2
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
STRL MBR 3-338-10-L AY A 0 2
CU PHASE TITLE:
F/O - REPAIR TRANSVERSE BULKHEAD PLATE FR 338 IN 3-338-10-L
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
38K6164401 A01
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M PLATE,ME, ORDER FOR KTR
SIZE: 4' X 2' =1 EA
ORIG: C231B, S. OOTSUBO,
243-7152
9B 9515 002375350 NA 4 N 53185056 8/SF
002 M ADHESIVE, ORDER FOR KTR
USE FOR SEAL JOINER
BULKHEAD WET SPACE
ORIG: C231B, S. OOTSUBO,
243-7152
9B 8040 001429823 NA 4 Y 53285130 5/KT
NOTES:
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-115 STRL MBR 3-338-10-L AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
38K6164401 A01
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
DDG-115 STRL MBR 3-338-10-L AY A 0