This is a WebAIM Short Form Task Group Instruction (TGI) for shipboard maintenance work aboard USS RAFAEL PERALTA (DDG-115). The instruction, prepared on November 29, 2025, and dated January 21, 2026, directs the installation of a 1A Gas Turbine Module (GTM) Moisture Separator Bonding Strap with work occurring in Intake Engine Room No. One Dirty Side (compartment 02-174-1-Q), Passage (01-118-1-L), and Deck Gear Locker (01-174-1-A). The work involves installing one bonding strap assembly of corrosion-resistant steel (CRES Type-I, Standard Size B per MIL-DTL-24749C) with a welded attachment using a 1/8 inch fillet weld to a CRES 316L boss on the 02 Level Deck Plating, per MIL-STD-22D weld joint design specifications.
The contractor work period runs from October 26, 2026 through December 4, 2026, with an estimated 24 hours of FOD (Foreign Object Debris) Protection work required. The instruction identifies an initial hazard condition involving potential asbestos exposure. Government-furnished material will be provided by SRF-JRMC, along with support services including crane and rigging, electrical utility, low pressure air/water/steam supply, safety and gas-free inspections for SRF-JRMC employees, and quality assurance inspections. The material list specifies four items including bonding strips, screws, sleeves, and insulation materials to be ordered for the contractor. References include the Gas Turbine Maintenance Procedure, MIL-STD-1310 (Shipboard Bonding, Grounding standards), and related drawings. The work requires a nonflammable closure to maintain fire zone integrity per COMNAVSEASYSCOM guidance.
View the file
Other files
Show 40 more
Latest 50 of 115 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
WebAIM Short Form TASK GROUP INSTRUCTION
21-JAN-2026 1543
20.15.6.0.9333 (July 2025) ICN: 38K6112304 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: #1A GTM INTAKE IT A 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61 25131
CU PHASE TITLE: F/O – INSTALL 1A GTM INTAKE MOISTURE SEPARATOR BONDING STRAP, 02-174-1-Q
WORK CERTIFICATION SIGNATURES: DLs
COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:
FOUO Pg 1 of 5
ES01NA5U
PREPARING ACTIVITY: STATUS: APP WORKING STATUS:
PREPARED BY: CODE: PHONE: DATE:
WATANABE, YOSHIO 232 3152432375 29-NOV-2025
APPROVED BY: CODE: PHONE: DATE:
SENDA, HIDEMI 232 3152432496 29-NOV-2025
CONCURRED BY: CODE: PHONE: DATE:
REASON FOR WORK/NEED FOR CHANGE:
JCN:
ES01-NA5U
SPECIAL REQUIREMENTS:
CU PHASE DESCRIPTION:
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
SAITO, KAZUNOBU VARIOUS U
JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:
123A2104
1 SCOPE/PURPOSE:
1.1 Title: 1A Gas Turbine Module (GTM) Moisture Separator Bonding Strap; install
1.2 Location of Work:
1.2.1 Intake Engine Room No. One Dirty Side (02-174-1-Q)
1.2.2 Passage (01-118-1-L)
1.2.3 Deck Gear Locker (01-174-1-A)
1.3 Identification:
1.3.1 Quantity (One AY), Bonding Strap Assembly of Blow in Door Panel, Moisture Separator, Type-C in 02-174-1-Q, Frames between 186 and 188, Starboard
TGI Short Form
21-JAN-2026 1543
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112304 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: #1A GTM INTAKE IT A 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61 25131
CU PHASE TITLE: F/O – INSTALL 1A GTM INTAKE MOISTURE SEPARATOR BONDING STRAP, 02-174-1-Q
FOUO Pg 2 of 5
CU PHASE DESCRIPTION (Cont.)
Attachment Method: Method 3 on Figure 11 of Ref. No. 5, Welded Weld Joint Design of Boss: PT1S.1 of MIL-STD-22D Fillet Weld Size: 1/8 Inch Remarks: See Sketch Enclosure-01 for location detail
1.3.1.1 Quantity (One EA), Bonding Strap
Material: CRES, Type-I, Standard Size B of MIL-DTL-24749C
1.3.1.2 Quantity (One EA), Boss on 02 Level Deck Plating
Material: CRES 316L
1.4 Security Classification: None.
1.5 Initial Condition:
1.5.1 Potential Asbestos Hazard
1.6 Contractor work start date:
1.7 Contractor work completion date:
2 PROCEDURE:
2.1 Accomplish the requirements of Ref. No. 3.
(V)(G) “GAS TURBINE MAINTENANCE PROCEDURE”
2.2 Install each new bonding strap assembly listed in 1.3.1 in accordance with Ref. No. 4 and Ref. No. 5, using Ref. No. 6 for guidance.
2.2.1 Accomplish the requirements of 009-012 of Ref. No. One, including Table 2, Column(s) D, Lines One through 7.
2.3 Accomplish the requirements of 009-032 of Ref. No. One for each new and disturbed surface.
2.4 Notes:
2.4.1 Planner: Code 232 Y. Watanabe, 243-2375
Planner: Code 231B Y. Koyama, 243-9937 Engineer: Code 260 T, Ito, 243-4173
2.4.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598
2.4.3 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper
Kouichi.Yoshida.ja Typewritten Text 10/26/2026
Kouichi.Yoshida.ja Typewritten Text 12/4/2026
21-JAN-2026 1543
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112304 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: #1A GTM INTAKE IT A 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61 25131
CU PHASE TITLE: F/O – INSTALL 1A GTM INTAKE MOISTURE SEPARATOR BONDING STRAP, 02-174-1-Q
FOUO Pg 3 of 5
CU PHASE DESCRIPTION (Cont.)
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
air flow onboard the ship.
2.4.4 WPC will copy the following pages in reference.
2.4.5 JCN ES01-NA5U is related to this TGI.
2.5 Government Furnished Material (GFM):
2.5.1 SRF-JRMC will provide GFM listed in the Material List.
2.6 SRF-JRMC will provide the following service work: (TGI No. 38K61123S02)
2.6.1 [C740] Crane and rigging service.
2.6.2 [X99E] Utility service, electrical.
2.6.3 [X99M] Provide utility service, including low pressure air supply, water supply, and steam supply.
2.6.4 [C106.1] Safety inspection for SRF-JRMC employees.
2.6.5 [C106.2] Gas free inspection for SRF-JRMC employees.
2.6.6 [C133] QA inspection for (G) symbol(s).
2.6.7 [C285] Inspection for (G) symbol(s).
21-JAN-2026 1543
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112304 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: #1A GTM INTAKE IT A 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61 25131
CU PHASE TITLE: F/O – INSTALL 1A GTM INTAKE MOISTURE SEPARATOR BONDING STRAP, 02-174-1-Q
FOUO Pg 4 of 5
Ref.
No.
Document/Drawing Number DOCUMENT/DRAWING TITLE REV
CHG
NO.
CPY
REQ PARAGRAPH SECT PG CHPT
1 NSI FY-26 NAVSEA Standard Items - 1 N 2 LI FY-26 Local Standard Items - ORG N
3 MP LM24-K6112304-
ES01NA5U
1A GTM INTAKE SYSTEM
FOD PROTECTION FOR
MOISTURE
SEPARATOR/BLOW-IN PANEL
BONDING
- Y ALL
4 DWG 300-7028673 SCHEDULE OF BONDING
AND GROUNDING
(INCLUDING CONDUCTIVE
CAULKING)
C Y SH:
5 MIL MIL-STD-1310 Shipboard Bonding, Grounding, and Other Techniques for EMP Mitigation and Safety
H N
6 DWG 150-7026722 UNIT STRL ARR DWG ASSY
UNIT 4310
H Y SH
3-
TASK NAME / TASK DESCRIPTION
SHOP/
TSD TS
SF
WC
CREW
# MHRS RWRK
2.1. FOD Protection Work 24HRs
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
100 M STRIP,EL, ORIG: C231B, Y.
KOYAMA 070-7787-2059
ORDERED FOR KTR
9B 5999 013438667 NA 4 N 53175503 1/EA
101 M SCREW,CA, ORIG: C231B, Y.
KOYAMA 070-7787-2059
ORDERED FOR KTR
9B 5305 014535741 NA 4 N 53175380 1/EA
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE
REV
ICN: 38K6112304 KEY OP: A01
21-JAN-2026 1543
20.15.6.0.9333 (July 2025) (Continued) ICN: 38K6112304 KeyOp: A01
COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: #1A GTM INTAKE IT A 1 0/0
SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:
DDG-115 USS RAFAEL PERALTA K61 25131
CU PHASE TITLE: F/O – INSTALL 1A GTM INTAKE MOISTURE SEPARATOR BONDING STRAP, 02-174-1-Q
FOUO Pg 5 of 5
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
102 M NUT,SLEE, ORIG: C231B, Y.
KOYAMA 070-7787-2059
ORDERED FOR KTR
9B 5310 014231667 NA 4 N 53175506 1/EA
103 M INSULATI, ORIG: C231B, Y.
KOYAMA 070-7787-2059
ORDERED FOR KTR
9Q 5640 013713262 NA 4 N 53175510 1/SH
104 M INSULATI, ORIG: C231B, Y.
KOYAMA 070-7787-2059
ORDERED FOR KTR
9Q 5640 013713263 NA 4 N 53175513 1/SH
ATTACHMENT LIST
TITLE FILE NAME SAVED DATE
ENCLOSURE-01 38K6112304A01-Sketch.pdf 22-NOV-2025 0000
38K6112304A01
SKETCH
ENCLOSURE-01 SHEET 1 OF 1
LOCATION DETAIL OF BOSS FOR BONDING STRAP
FWD →
PLAN VIEW
02 LEVEL DECK WEATHER, FR 175 – 230, STBD
DETAIL 1-A
DETAIL 1-A
BOSS FOR BONDING STRAP ON 02 LEVEL DECK PLATING
BOSS