J-1607000 Chiller.pdf

PDF 845 KB Posted

Attached to
Base Operations Support Services For NSA Annapolis and US Naval Academy, Annapolis, Maryland
Solicitation number
N6247026R0017
Issued by

About this file

This document is Section J-1607000 of a federal contract solicitation detailing chiller plant and distribution system requirements for Naval Support Activity Annapolis (NSAA) serving the United States Naval Academy.

The chiller plant and distribution system encompasses all mechanically and electrically interlocked components required for safe and continuous chilled water production, treatment, storage, and distribution, including chillers, pumps, cooling towers, actuators, valves, controls, monitoring systems (computers, workstations, servers, and software), piping, insulation, chemical systems, and ventilation. The system serves approximately 33 facilities across NSAA, operating two main chilled water plants (CHWPs) with a closed-loop configuration containing greater than 1.25 million gallons of chemically treated water maintained at 42 degrees Fahrenheit 24 hours daily, seven days weekly. Approximately 58,578 linear feet of piping comprise the distribution system (29,289 linear feet each of supply and return piping). The Rickover Plant (USNA-590A) has a total rated capacity of 5,000 tons distributed across two 1,250-ton chillers and one 2,500-ton centrifugal chiller, with the 1,250-ton chillers operational year-round and the 2,500-ton chiller typically utilized during summer cooling season (March-November). The LeJeune Plant (597U) has a total rated capacity of 7,500 tons from three 2,500-ton centrifugal chillers, with one operating year-round and the plant acting in tandem with 590A during summer months to support an approximate yard cooling load of 8,500-10,000 tons. Attachment J-1607000-06 provides historical temperature and humidity control requirements for 33 facilities with cooling loads ranging from 21 to 845 tons and maintained temperatures between 74°F and 76°F. Additional detailed asset data, utility overview documents, sample daily logs, and cooling tower water testing information are provided in referenced separate attachments.

View the file

Other files

File Type Posted
J-1604000-09 SAMPLE SLUDGE ANAYLSIS REPORT AND SLUDGE GENERATOR REPORT.pdf PDF
J-1503020-06 ASSET DATA AND FREQUENCIES FOR SCHEDULED WORK.xlsx XLSX spreadsheet
J-1502000.1-03 DHA ASSET DATA INDEX, SYSTEM DESCRIPTIONS AND ASSET DATA BY SYSTEM.xlsx XLSX spreadsheet
0100000 C General Information.pdf PDF
J-1605000-07-04 SAMPLE UTILITY CONSUMPTION REPORTING LOG.xlsx XLSX spreadsheet
J-1502000.1 Facility Investment - DHA.pdf PDF
J-1605000-06 SAMPLE NAVFAC BOILER AND UPV INSPECTION FORM AND INSPECTION CERTIFICATE.pdf PDF
J-0200000-07-07 Contractor Incident Report System (CIRS) Form.pdf PDF
J-1604000-14-01 STORMWATER MANAGEMENT REPORT-ANNAPOLIS JANUARY 2017.pdf PDF
J-1602000 Electrical.pdf PDF
J-1604000 Wastewater.pdf PDF
J-0200000 Management and Administration.pdf PDF
1501000 C Facility Management.pdf PDF
0200000 C Management and Administration.pdf PDF
N6247026R0017 Pre-Sol Notice.pdf PDF
J-1606000 Water.pdf PDF
Attachment F - Section F Deliverables.pdf PDF
J-1601000-04 SERVICE DESK GUIDE FOR UTILITY OUTAGES.pdf PDF
J-1605000-07-02 SAMPLE ROVING PATROL LOG.xlsx XLSX spreadsheet
J-1606000-03-02 WTP AND DISTRIBUTION SYSTEM DESCRIPTION 2.docx DOCX document
J-1601000-05 UTILITY INTERRUPTIONS ROAD AND PARKING LOT CLOSURE AUTHORIZATIONS REQUEST FORM.xlsx XLSX spreadsheet
1502000 C Facility Investment.pdf PDF
J-0200000-20 - ELINS.xlsx XLSX spreadsheet
J-1605000-09 HISTORICAL BOILER HRSG UPV TESTING AND CERTIFICATION SCHEDULE.xlsx XLSX spreadsheet
J-1607000-08 Cooling Tower Water Testing and Treatment Asset Data.xlsx XLSX spreadsheet
J-1502000-04 FACILITY DATA.xlsx XLSX spreadsheet
DRAFT Solicitation - N6247026R0017.pdf PDF
J-1604000-14-03 STORMWATER MANAGEMENT REPORT-ANNAPOLIS JANUARY 2017.pdf PDF
J-4 Pre-Award Inquiry Form.xlsx XLSX spreadsheet
J-1503020 Pest Control.pdf PDF
J-1601000-08 EXCAVATION-UTILITY MARKING AUTHORIZATIONS REQUEST FORM.xlsx XLSX spreadsheet
J-1503070-03 Special Event Project Historical Data.xlsx XLSX spreadsheet
1700000 C BSVE.pdf PDF
J-1604000-04 WASTEWATER SYSTEM ASSET DATA.xlsx XLSX spreadsheet
1503020 C Pest Control.pdf PDF
J-1605000-04 STEAM ASSET DATA.xlsx XLSX spreadsheet
1604000 C Wastewater.pdf PDF
1601000 C Utility Management.pdf PDF
J-1604000-15 PERMEABLE PAVEMENT AREAS.pdf PDF
J-0200000-02-02 DBA WAGE DETERMINATION.pdf PDF
J-1700000-05 HISTORICAL FUEL DELIVERY QUANTITIES.xlsx XLSX spreadsheet
1606000 C Water.pdf PDF
J-1503070 Special Events.pdf PDF
J-1502000 Facility Investment.pdf PDF
J-1607000-04 Chiller Plant and Distribution System Asset Data.xlsx XLSX spreadsheet
1605000 C Steam.pdf PDF
J-1503030 Integrated Solid Waste Management.pdf PDF
J-0200000-02-01 SCA WAGE DETERMINATION.pdf PDF
J-1606000-08 MDE SCHEDULE OF MONITORING REQUIREMENTS EXAMPLE.pdf PDF
J-1601000 Utilities Management.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J-1607000

CHILLER

ATTACHMENT

NUMBER

ATTACHMENT TITLE

J-1607000-01 DEFINITIONS AND ACRONYMS

J-1607000-02 REFERENCES AND TECHNICAL DOCUMENTS

J-1607000-03 CHILLER PLANT AND DISTRIBUTION SYSTEM DESCRIPTION

J-1607000-04 CHILLER PLANT AND DISTRIBUTION SYSTEM ASSET DATA

J-1607000-05 CHILLER UTILITIES OVERVIEW DOCUMENT

J-1607000-06 HISTORICAL TEMPERATURE AND HUMIDITY CONTROL

REQUIREMENTS

J-1607000-07 SAMPLE DAILY LOG

J-1607000-08 COOLING TOWER WATER TESTING AND TREATMENT ASSET DATA

ATTACHMENT J-1607000-01

DEFINITIONS AND ACRONYMS

SEE SEPARATE ATTACHMENT J-0200000-01

ATTACHMENT J-1607000-02

REFERENCES AND TECHNICAL DOCUMENTS

SEE SEPARATE ATTACHMENT J-0200000-03

ATTACHMENT J-1607000-03

CHILLER PLANT AND DISTRIBUTION SYSTEM DESCRIPTION

The NSAA chiller plant and distribution system includes all mechanically and electrically interlocked ancillary parts, equipment and components required for safe and continuous operation of chilled water production, treatment, storage, and distribution including but not limited to: chillers, pumps, cooling towers, actuators, valves, controls, monitoring systems (to include computers, workstations, servers, and software), piping, insulation, chemical systems, ventilation and temperature control for plants.

The chiller plant and distribution system serve the United States Naval Academy by generating and distributing chilled water to approximately 33 facilities throughout Naval Support Activity Annapolis. There are two main chilled water plants (CHWPs). Both CHWPs utilize a closed loop system for operation. This system contains greater than 1.25 million gallons of chemically treated water maintained at 42 degrees Fahrenheit 24 hours per day, seven days per week. There is approximately 29,289 linear feet of piping within the closed loop consisting of approximately 29,289 linear feet of supply piping and approximately 29,289 linear feet of return piping.

The first chiller plant is located at USNA-590A and is also known as the Rickover Plant or “Old 572U”. This plant has a total rated capacity of 5,000 tons. This capacity is spread across (2) 1,250-ton & (1) 2,500-ton centrifugal chillers. Two 1,250-ton chillers in 590A may be operated 24 hours per day, seven days per week. The 2,500-ton chiller in tandem with one 1,250-ton chiller is typically utilized when in summer/cooling season (usually March- November).

The second chiller plant is located at 597U and is also known as the LeJeune Plant or Chiller Plant II. This plant has a total rated capacity of 7,500 tons from three 2,500-ton centrifugal chillers. One 2,500-ton chiller in 597U may be operated 24 hours per day, seven days per week, 365 days a year. This plant acts in tandem with CHWP 590A during summer months to support an approximate yard cooling load of 8,500-10,000 tons.

Refer to attachment J-1607000-04 for Chiller Plant Asset Data.

Graphic overview documents expanding on chiller and EMCS utilities are also provided upon request as separate attachments after award. These documents are purely supplemental and diagrammatical in nature. They are not necessarily an accurate representation of the current system configuration but may assist in understanding the overall system. Refer to J-1607000-05-01 Chiller Utilities Overview Document and J-1607000-05-02 EMCS Utilities Overview Document.

ATTACHMENT J-1607000-04

CHILLER PLANT AND DISTRIBUTION SYSTEM ASSET DATA

SEE SEPARATE ATTACHMENT J-1607000-04

ATTACHMENT J-1607000-05

WATER UTILITIES OVERVIEW DOCUMENT

J-1607000-05-01 CHILLER UTILITIES OVERVIEW DOCUMENT

J-1607000-05-01 IS TO BE PROVIDED UPON REQUEST AFTER AWARD

J-1607000-05-02 EMCS UTILITIES OVERVIEW DOCUMENT

J-1607000-05-02 IS TO BE PROVIDED UPON REQUEST AFTER AWARD

ATTACHMENT J-1607000-07

SAMPLE DAILY LOG

SEE SEPARATE ATTACHMENT J-1607000-07

ATTACHMENT J-1607000-08

COOLING TOWER WATER TESTING AND TREATMENT ASSET DATA

SEE SEPARATE ATTACHMENT J-1607000-08

File details come from the government source that posted it. Updated .