Attachment F - Section F Deliverables.pdf
PDF 761 KB Posted
- Attached to
- Base Operations Support Services For NSA Annapolis and US Naval Academy, Annapolis, Maryland
- Solicitation number
- N6247026R0017
About this file
This document is a comprehensive deliverables table for Section F (Deliveries or Performance) of a federal services contract covering multiple facility maintenance and operations annexes. The contract encompasses diverse service areas including general facility operations (Section 0200000), building maintenance (Section 1502000), pest management (Section 1503020), solid waste management (Section 1503030), special events and funeral support (Section 1503070), electrical/utilities operations (Sections 1601000-1607000), and vehicle fleet management (Section 1700000).
The deliverables specify detailed submission requirements for administrative, operational, and compliance documentation. Key recurring deliverables include monthly maintenance schedules and status reports (typically due by the 5th workday of each month), integrated maintenance program plans (due within 15-30 days of award), quality management and safety plans, environmental compliance reports, equipment inventories, operator training certifications, and system inspection results. Critical notifications require submission within hours to 48 hours of occurrence (e.g., cybersecurity incidents, facility hazards, OSHA violations, fuel spills). Most deliverables are distributed to the Contracting Officer (KO) and Contracting Officer's Representative (COR), with some submissions directed to specialized personnel such as Command Security Managers, Environmental Divisions, Fire Departments, or Utility Branch Heads. Submission frequencies range from daily (Essential Equipment Logs, meter readings) to annually (certifications, preventive maintenance programs), with most documentation on monthly or as-required bases. The document establishes accountability mechanisms for compliance with federal facility management standards across multiple operational domains.
View the file
Other files
Show 40 more
Latest 50 of 86 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F 0200000 Deliveries or Performance
DELIVERABLES
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.2.1.2 N/A Request to Work
Outside Government’s Regular Working Hours
At least seven calendar days prior to requested day.
KO and
COR
1 As required
2.3.1 N/A Sign-in Sheets and
Minutes for Review and Comments
Within three working days
KO, COR
and all attendees
1 As Required
2.3.1 N/A Sign-in Sheets and
Minutes Final Revision
Within three working days
KO, COR
and all attendees
1 As Required
2.3.4 N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO and
COR
1 As specified
2.3.5 N/A Certificate of
Insurance
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.3.5.1 N/A Written Notice of
cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
1 As required
2.6.1 N/A Plans of Action
and Milestones (POA&Ms)
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Command Security Manager
1 As required
2.6.1 N/A Cybersecurity
Incident
Immediately upon discovery during regular working hours and by 0800 the following work day for discoveries after regular working hours
KO, COR,
and
Command Security Manager
1 As required
DRAFT
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.6.4 N/A Scheduling and
Work Status Updates
Weekly, within 30 minutes of the inquiry during regular working hours, and by 08:00 the following work day for inquiries after regular working hours
KO and
COR
1 As Specified
2.6.4 N/A Work Schedules Within 15
calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.
KO and
COR
1 Monthly
2.6.4 N/A Notification of
Unsafe Conditions Report
Within two (2) hours of discovery.
KO and
COR
1 As required
2.6.5 N/A Notification of any
Difficulty in Scheduling Work
By the end of each workday
KO and
COR
1 As required
2.6.6 N/A Status of
Deliverables
Within 30 minutes of the inquiry during regular working hours, and by 0800 the following work day for inquiries after regular working hours
KO and
COR
1 As required
2.6.7 N/A Service
Interruptions
At least five working days in advance
KO and
COR
1 As required
2.6.8.2 J-0200000-13 Pipe Delimited
Flat-File
By the end of each workday
KO or a representati ve designated by the KO
1 Daily
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.6.8.2 N/A Sample Pipe
Delimited Flat-File
Within 30 calendar days prior to contract start.
KO or a representati ve designated by the KO
1 As required to demonstrate the ability to properly format the flat-file
2.6.8.2 J-0200000-13 Asset and
Specification Data When an asset is repaired, replaced, installed, or otherwise affected
KO or a representati ve designated by the KO
1 As required
2.6.8.3 N/A List of personnel
requiring access to Government’s Maximo
Within 30 calendar days prior to contract start.
KO and
COR
1 As specified
2.6.9.1 N/A Quality
Management Plan
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.6.9.1 N/A Revised Quality
Management Plan
Within seven calendar days of changes.
KO and
COR
1 As specified
2.6.9.2 N/A QC Inspection File Within five
calendar days of completion/ termination of the contract.
KO and
COR
1 As specified
2.6.9.3 N/A Contractor Quality
Inspection and Surveillance Report
First work day of each month.
KO and
COR
1 Monthly
2.6.9.4 N/A Historic Property
Work Plan
Within 45 calendar days after award.
KO and
COR
1 As specified
2.6.9.4 N/A Historic Property
Work Plan Updates
Within three working days after update completion
KO and
COR
1 As specified
2.6.9.4 N/A Historic Property
Work Plan Technical Library
Within 45 calendar days after award.
Submitted within three working days after update completion
KO and
COR
1 As specified
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.6.10 N/A Property
Management Plan
Within 45 calendar days after award.
KO and
COR
1 As specified
2.7.1 N/A List of Key
Personnel and Qualifications
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.7.1 N/A Organizational
Chart
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.7.1.5 N/A Historic Property
Project Manager Qualifications
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.7.1.5 N/A Historic Property
Project Manager Training Update
Within three working days after update completion
KO and
COR
1 As specified
2.7.1.6 N/A Technical Library
Staff Resumes and Qualifications
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.7.1.7 N/A Special Event
Coordinator
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.7.2.6 N/A Proof of Legal
Residency
Prior to be admitted to site of work.
KO and
COR
1 As specified
2.7.3 N/A Service Contract
Reporting (SCR)
No later than 31 October
KO and
COR
1 Annually for labor executed during the period of performance during each Government fiscal year
(FY)
2.8.1 N/A Employee List Within 15
calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.8.5 N/A Physical Security
Plan
Within 30 calendar days after award.
KO and
COR
1 As specified
2.8.6 N/A Key and Lock
Control Plan
Within 30 calendar days after award.
KO and
COR
1 As specified
2.8.8 N/A OF-306
Declaration for Federal Employment and Digital Fingerprints
Prior to commencement of work
KO, COR,
and
Security Manager
1 As required
2.8.9 N/A List of personnel
requiring access to and the justification for their access to Government IT, OT, and FRCS
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Security Manager
1 As required
2.9.2 N/A Accident
Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.9.3 N/A Activity Hazard
Analysis
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and
COR
1 As specified
2.9.4 N/A Compliance Plans, Programs, and Procedures
Together with the Accident Prevention Plan and within seven calendar days of and changes.
KO and
COR
1 As specified
2.9.4.7 N/A Control of
Hazardous Energy (lockout/tagout)
Within 30 calendar days after annual inspection.
KO and
COR
1 Annually
2.9.6 J-0200000-XX NAVFAC
Contractor Incident Reporting System
(CIRS)
Within five calendar days of accident.
KO and
COR
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.9.6 J-0200000-07-
Weight Handling Equipment Accident Report
Within 15 working days of accident.
KO and
COR
1 As required
2.9.6 J-0200000-07-
Crane and Rigging Gear Near Miss Report
Within 15 working days of accident.
KO and
COR
1 As required
2.9.8 N/A Monthly On-Site
Labor Report
First work day of each month.
KO and
COR
1 Monthly
2.9.9 N/A OSHA Citations
and Violations Corrective Action Report
Within 48 hours after receiving a citation.
KO and
COR
1 As required
2.9.10 N/A Safety Inspection
and Monitoring Report
Upon request. KO and
COR
1 As required
2.9.11 N/A Safety
Certifications
Within 15 calendar days prior to contract start and as old certifications, expire.
KO and
COR
1 As specified
2.10 N/A EMS Goals and
Policy Measurement Information
Upon request. KO and
COR
1 As required
2.10.1.1 N/A Water
Conservation Plan
Within 15 calendar days after award and for changes.
KO and
COR
1 As specified
2.10.2 N/A Environmental
Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.10.2.1 N/A Sampling Plan Prior to Sampling KO and
COR
1 As required
2.10.2.1 N/A Laboratory
Analysis
Upon Request KO and
COR
1 As specified
2.10.2.1 N/A List of ODS
Equipment
At start of contract and as requested
KO and
COR
2 As specified
2.10.2.1 N/A List of names of
EPA ODS
Certified Technicians
At start of contract and as requested
KO and
COR
2 As specified
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.10.2.1 N/A Refrigerant
Records Report
Within five calendar days of the month after quarter and 10 days before the end of the final contract option year.
KO and
COR
2 Quarterly and at contract conclusion/t ermination
2.10.2.1 N/A Leak Rate
Calculations Report
Within five calendar days of each month
KO, COR,
and
Installation Environmen tal
1 Monthly
2.10.2.2 N/A Class I and II ODS
Report
Within 24 hours following delivery of refrigerant to
DLA
KO and
COR
1 As required
2.10.2.3 J-0200000-07-
Solid Waste Management and Recycling Reports
First work day of each month.
KO and
COR
1 Monthly
2.10.2.3 J-0200000-07-
Summary Solid Waste Management and Recycling Report
By October 10th KO and
COR
1 Annually
2.10.2.5 N/A Waste Stream
Determination
Within 30 calendar days prior to start of contract performance and within 14 days of identification of any new waste stream.
KO and
COR
1 As required
2.10.2.7 N/A Fuel and hazardous
substance spill notification
Within 15 minutes of discovery
Regional Dispatch Center
1 As required
2.10.2.7 N/A Fuel and hazardous
substance spill notification
As soon as possible but not more 24 hours of discovery
KO and
COR
1 As required
2.10.2.7 N/A Fuel and hazardous
substance spill report
Within 48 hours of discovery
KO and
COR
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.10.2.8 N/A Emergency
Planning and Community Right- To-Know Act (EPCRA) Report
Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
1 As specified
2.10.2.8 J-0200000-16 Contractor
Hazardous Material Inventory Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
COR
1 Annually
2.10.2.12 N/A Asbestos
Containing Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written Notification within 24 hours
KO and
COR
1 As specified
2.10.2.13 N/A Hazardous Air
Pollutants Semi-annual Reports
At intervals of 160 to 200 calendar days
KO, COR,
Installation Environmen tal Division, City, State, and EPA
1 Semi-annually
2.10.2.13 N/A Hazardous Air
Pollutants Monthly Data
First workday of each month.
KO, COR,
Installation Environmen tal Division
1 Monthly
2.10.3 N/A Sustainable
Procurement and Practices Plan
Within 15 calendar days prior to contract start and within 15 calendar days after exercised option periods.
KO and
COR
1 Annually
2.10.3 N/A Sustainable
Delivery of Services Report
Within five calendar days after each contract period.
KO and
COR
1 Annually
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original
Copies (including original)
2.10.3.2 N/A Recovered
Material Certification
As specified KO and
COR
1 When a product containing recovered materials is equal to or better than the original and could be used.
2.11 N/A Mission Essential
Contractor Services Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As Required
2.11 N/A Mission
Critical/Mission Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.12 N/A Technical Library
Table of Contents
Within 15 calendar days after contract start and within seven calendar days of changes
KO and
COR
1 As specified
2.13.1 Recurring Work
Proposals
Within five calendar days following receipt of request
KO and
COR
1 As required
2.13.2 N/A Notification to the
Government for Work Above the Recurring Work Limitations and Rough Order of Magnitude
Within two hours of identification
KO and
COR
1 As required
2.14.1.1 N/A Non-Recurring
Work Quantities Ordered via FedMall
By the fifth day of the following month
KO and
COR
1 Monthly
2.14.2.1 N/A Non-Recurring
Work Proposals
Within two working days following receipt of request
KO As required
Annex/
Form Attachment
Number Deliverable Title Date (s) of Submission
Distribution
Frequency Original/ Copies
Number of Copies (including original)
1501000/ 3.2.1
N/A MAXIMO Asset Changes
By COB the third workday of each month
COR/KO
& FMD
3 Monthly
1501000/ 3.2.1
N/A MAXIMO Flat File New Record
Within 10 days of identification and or notification
COR/KO
& FMD
3 As required
Spec Item
Form Attachment
Number
Deliverable Title
Date(s) of Submission
To Frequency
1502000/ 2.2.1
N/A
Certification and Licenses
Within 15 days after award or as requested by the KO
KO/COR Once for initial submittal, then as requested
1502000/ 2.3.4
N/A Maintenance Notice Within 15 days after award
KO/OR Once for initial submittal, then as requested 1502000/
N/A PM and Repair Status Report
First workday of each month
KO/COR Monthly
1502000/ 3.1
N/A Summary Completion of Completed E/U/R Work Orders
First workday of each month
KO/COR Monthly
1502000/ 3.2
N/A Summary Completion report of completed Project work orders
First workday of each month
KO/COR Monthly
1502000/ 3.3
Preventive Maintenance (PM) Program
30 calendar days after contract award
KO/COR Annually
1502000/ 3.3
N/A Annul PM Work Schedule
15 workdays prior to the beginning of each Option year
KO/COR Annually
1502000/
N/A PM Work Schedule
Five workdays prior to the beginning of each month
KO/COR Monthly
1502000/ 3.3.5
N/A Fire Protection System Notification
Within one (1) hour of identification
KO, COR,
FOS and
Production Officer
As required
1502000/ 3.3.6
N/A VTE Maintenance Notification
Within two (2) days prior to scheduled work
KO, COR.
FOS, and Facility Manager
As required
1502000/ 3.3.8
N/A Emergency/Auxiliary Generator Load Test Report
First workday of each month
KO/COR Monthly
1502000/ 3.3.8
N/A Emergency/Auxiliary Generator Operating Log (Inspection Testing) forms
First workday of each month
KO/COR Monthly
1502000/ 3.3.11
N/A Water Chemistry Testing
Within four (4) hours of request by KO
KO/COR As required
1502000/ 3.3.11
N/A Pool and Spa Discharge Plan
30 calendar days after contract award
KO/COR As required
1502000/ 3.3.13
N/A UPS Load Test Report First workday of each month
KO/COR As required
1502000/ 3.3.20
N/A Fire Door Report First workday of each month
KO/COR As required
1502000/ 3.3.25
N/A TAB Report First workday of each month
KO/COR As required
1502000/ 3.3.26
N/A Inspections, Sampling, Testing, Chemical Levels, and Chemical Adjustments Results
First workday of each quarter
KO/COR Quarterly
1502000/ 3.3.27
N/A Roof and drainage Inspection
Within five (5) day upon completion of inspection
KO/COR As required
1502000/ 3.4
Integrated Maintenance Program Plan
30 calendar days after contract award
KO/COR Annually
1502000/ 3.4
N/A IMP Work Schedule Five workdays prior to the beginning of each month
KO/COR Monthly
1502000/ 3.4
N/A IMP Maintenance and Repair Status
Five workdays prior to the beginning of each month
KO/COR Monthly
1502000/ 3.5
Inspection, Testing, and Certification Program Summary Report
First workday of each month
KO/COR Monthly
1502000/
Inspection, Testing and Certification Schedule and Equipment Certifications
First workday of each month
KO/COR Monthly
1502000/ 3.5.3
Inspection and Test Report for Vertical Transportation Equipment
First workday of each month
KO/COR Monthly
1502000/ 3.5.4
Deficiencies, Corrective Actions Test Report
Within five (5) day upon completion of inspection
KO/COR As required
1502000/ 3.5.5
HVAC Water Treatment Test Report
First workday of each month
KO/COR Monthly
1502000/ 3.5.6
NABL Laboratory Accreditation
30 calendar days after contract award
KO/COR As required
1502000/ 3.5.6
Boiler and Steam Equipment Water Treatment Test Report
First workday of each month
KO/COR Monthly
1502000/ 3.6
Other Recurring Services Program Summary Report
First workday of each month
KO/COR Monthly
1502000/ 3.6.2
Grease Trap Schedule 30 calendar days after contract award
KO/COR As required
1502000/
Grease Trap Service/Repair Report
First workday of each month
KO/COR Monthly
State Laboratory Certification
30 calendar days after contract award
KO/COR As required
1502000/
Oil and Grease Laboratory Report
First workday of each month
KO/COR Monthly
1502000/ 3.6.11
Technical Library Updates
Withing one
(1) day of update completion
KO/COR As required
1502000/ 3.6.13
Sport Net and Wind Screen Report
First workday of each month
KO/COR Monthly
1502000/ 3.6.13
Bird Screen Report First workday of each month
KO/COR Monthly
1502000/ 3.6.15
Rowing Tank Report First workday
KO/COR Monthly
1502000/ 3.6.19
Utility Tunnel Inspection Schedule
30 calendar days after contract award
KO/COR As required
1502000/ 3.6.19
Utility Tunnel Inspection Report
Within five (5) day upon completion of inspection
Spec Item
Form
Submission
To Frequency
1502000/ 2.2.1
Licenses
Within 15 days after award or as requested by the KO
KO/COR Once for initial submittal, then as requested
1502000/ 2.3.3
Accreditation Compliance and Documentation Plan
45 calendar days after contract award
KO/COR As required
1502000/ 2.3.3.2
J-1502000.1-05 EC Inspection, Testing, and Documentation
As required KO/COR As required
1502000/ 3.1
N/A Summary Completion of Completed E/U/R Work Orders
First workday of each month
KO/COR Monthly
1502000/ 3.2
N/A Summary Completion report of completed Project work orders
First workday of each month
KO/COR Monthly
1502000/
Integrated Maintenance Program Plan
30 calendar days after contract award
KO/COR Annually
1502000/ 3.3
N/A IMP Schedule and IMP Maintenance and Repair Status
Five workdays prior to the beginning of each month
KO/COR Monthly
1502000/ 3.3.4
Lighting Testing, Report
First workday of each month
KO/COR Monthly
1502000/ 3.3.5
N/A Fire Protection System Notification
Within one (1) hour of identification
KO, COR,
NSA
Annapolis Fire Department, Facility Manager, and
FOS
As required
1502000/ 3.3.7
Medical Gas
System Verification
30 calendar days after inspection
KO/COR Annually
1502000/ 3.3.8
N/A Emergency/Auxiliary Generator Load Test Report
First workday of each month
KO/COR Monthly
1502000/ 3.3.8
N/A Emergency/Auxiliary Generator Deficiency Notification and Report
Notify within two hours of identification of deficiency and report submitted within 24 hours of discovery
KO/COR As required
1502000/ 3.3.12
N/A Roof and drainage Inspection
Within five (5) day upon completion of inspection
3.3.17
Combustion Analysis Report, Combustion Analyzer Receipts, and Oil Boiler Tune-Up Records
First workday of each month
KO/COR Monthly
1502000/ 3.4
Inspection, Testing, and Certification Program Summary Report
First workday of each month
KO/COR Monthly
1502000/ 3.4.3
Inspection and Test Report for Vertical Transportation Equipment (VTE)
First workday of each month
KO/COR Monthly
1502000/
Other Recurring Services Program Summary Report per Section
First workday of each month
KO/COR Monthly
1502000/ 3.5.1
Plaster trap cleaning and sanitizing plaster traps schedule
Five workdays prior to the beginning of each month
KO/COR Monthly
1502000/ 3.5.3
Exhaust hood and duct cleaning schedule
Five workdays prior to the beginning of each month
KO/COR Monthly
1502000/ 3.5.4
Mechanical room cleaning schedule
Five workdays prior to the beginning of each month
KO/COR Monthly
1502000/ 3.5.5
N/A HVAC water treatment test report
First workday
KO/COR Monthly DRAFT
Annex/Spec Item
Form
Submission To Frequency 1503020/
2.2.1 N/A Copy of State
Certification for Contractor Personnel
15 calendar days prior to start of work.
Copies of renewed certifications shall also be submitted.
KO, PAR,
PMC
As required
1503020/ 2.3.1
N/A Copy of Local/State Business License
Prior to contract award. Copies of renewed licenses shall also be submitted.
KO, PAR 1 per state
1503020/ 2.3.2
N/A Permits 5 days prior to the start of work requiring permits.
KO, PAR As required
1503020/ 2.3.4
N/A Ultra-Low Volume (ULV) Equipment Calibration and Droplet Analysis Report
15 days prior to the start of work and thereafter every 50 hours of ULV equipment use.
KO, PAR As required
1503020/ 2.3.5
J-1503020-03 Planned Pesticide Use Sheets including Pesticide Labels and Safety Data Sheets
(SDS)
With the proposal and annually thereafter.
Note: Any proposed changes in pesticide usage shall be submitted for approval at least 10 business days in advance of pesticide use.
KO, PAR,
PMC
1 for each pesticide per pest as required
1503020/
N/A Contractor's Work Plan With the proposal. KO, PAR 1 per proposal
1503020/
N/A Report of Conditions Conducive to Pest Infestation
1 working day after citing conditions.
KO, PAR As required
1503020/ 3, 4
N/A Five-year Termite Treatment Warranties
10 days following the treatment.
KO, PAR As required
1503020/ 3, 4
N/A Termite and Wood Decay Inspection (DD Form 1070) (per the appropriate Pest Group Sheet)
10 working days after inspection completed.
KO, PAR As required
1503020/ 3, 4
N/A Adult Mosquito Catch (per the appropriate Pest Group Sheet)
The same day as collected in a labeled, resealable plastic bag.
Installation Preventive Medicine
Department, KO, PAR
As required
1503020/ 3, 4
N/A Larval Mosquito Survey Report (per the appropriate Pest Group Sheet)
Within 1 day of the survey.
KO, PAR As required
Annex/Spec Item
Form
Submission To Frequency 1503020/
3, 4 N/A Stored Product Pest
Survey (per the appropriate Pest Group Sheet)
Within 1 day of the survey.
KO, PAR As required
1503020/ 3, 4
N/A Pharaoh Ant Treatment:
Floor Plan Diagram (per the appropriate Pest Group Sheet)
2 calendar days prior to beginning the treatment.
KO, PAR As required
1503020/ 3, 4
N/A Tick Survey Report (per the appropriate Pest Group Sheet)
Within 1 day of the survey.
Installation Preventive Medicine
Department, KO, PAR
As required
1503020/ 3, 4
N/A Mole Cricket Survey Report (per the appropriate Pest Group Sheet)
Within 1 day of the survey.
KO, PAR As required
1503020/ 3, 4
N/A Aerial Spray Operations
- FAA Approval (per the appropriate Pest Group Sheet)
24 hours prior to performing aerial operations.
KO, PAR As required
1503020/ 3.2
N/A Monthly Summary of Completed Pest Control Work Orders
By the fifth day of each month
KO, PAR,
PMC
Monthly
1503020/ 3.3
N/A Report of Pest Management Operations
Electronically once per month by the
15th of the following month (Example:
July data must be submitted by August
15) on the format approved by PMC.
KO, PAR,
PMC
Monthly
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission
Original / Copies Frequency
1503030 / 2.3.1
N/A Weight Tickets As specified KO With invoice/Monthly
1503030 / 2.3.2
N/A Disposal Permits Within fifteen (15) calendar days after contract award
KO As Required
1503030 / 3.1
N/A Solid Waste Collection Schedule
As specified KO 15 days after award/Annually
Spec Item
Form Attachment
Number Deliverable Title Date(s) of Submission Distribution Frequency 1503070/ 2.2.1
N/A Personnel, Certification, Training, and Licensing
15 calendar days before contract performance starts, and within five calendar days of any updates
KO/COR Once for initial submittal, then as requested
1503070/ 3.1
N/A Summary Completion report of completed Project work orders
First workday of each month
KO/COR Monthly
1503070/ 3.2
N/A Special Events Program
30 calendar days after contract award
KO/ COR Annually
1503070/ 3.2
N/A Event Log and After-Action Report
First workday of each month
KO/COR Monthly
1503070/ 3.3
N/A Completed Funeral Support Services
First workday of each month
Form Attachment
Number Deliverable Title
Date(s) of Submission
To Frequency
1601000 /
J-1601000-11 Essential Equipment Log (EEL) Status Updates
Prior to 0700 of each workday
KO/COR Daily
1601000 / 3.1
N/A Summary Completion of Completed E/U/R Work Orders
First workday of each month
KO/COR Monthly
1601000 / 3.2
N/A Summary Completion report of completed Project work orders
First workday of each month
KO/COR Monthly
1601000 / 3.3.1
N/A Utility Mapping First workday of each quarter and within 12 hours of any utility system component change
Utilities Branch
Head/KO
Quarterly, as required
1601000 / 3.3.3
J-1601000-07 Monthly Meter Reading Report
Within one day of scheduled meter readings
Utilities Branch
Head/KO
Monthly, as requested
1601000 / 3.3.6
N/A MAXIMO Asset Changes Report
By COB the third workday of each month
KO/COR &
FMD
Monthly
3.4 N/A System Access
Violations or Intrusions
Immediately upon discovery during working hours and by 0800 the following day for discoveries after regular working hours
KO/COR As required
3.4 N/A System Network
Accreditation
Within 30 calendar days prior to contract start and immediately following a change or update
Form Attachment
Number Deliverable Title
Date(s) of Submission
To Frequency
1602000 / 3 N/A Critical Spare Parts Inventory
15 days after award
KO Once. Update if the requirements change.
1602000 / 3.2 N/A Integrated Maintenance
Program (IMP) 15 days after award KO Annually and any time a change is made to the schedule
1602000 / 3.2 N/A Monthly IMP schedule By the 25th day of each month
KO Monthly
1602000 / 3.2 N/A Annual IMP schedule 30 calendar days after contract award
KO Annually
Form Attachment
Number
Deliverable Title Date(s) of
Submission To Frequency
1603000 / 3 N/A Natural Gas Distribution System Drawings and Diagrams
Within 15 days of a change in system description, drawings and diagrams
KO As Specified
1603000 / 3 N/A Critical Spare Parts Inventory
15 days after award KO As Specified
1603000 / 3.1 N/A Notification of Unsafe Conditions
Within 24 hours of occurrence
KO As Specified
1603000 / 3.1 N/A Standard Operating Procedures
Within 30 days of contract start and 5 days after changes
KO & On-Site As Specified
1603000 / 3.2 N/A Integrated Maintenance Program (IMP)
15 days after award KO As Specified
1603000 / 3.2 N/A IMP Schedule and IMP Maintenance and Repair Status
Five workdays prior to the beginning of each month
KO Monthly
Form Attachment
Number Deliverable Title
Date(s) of Submission
To Frequency
1604000 / 3 N/A Critical Spare Parts Inventory
15 days after award
KO Once. Update if the requirements change.
1604000 / 3.1 N/A Standard Operation Procedures
Within 30 days after contract start and within five days after making changes to any plant operating procedure, equipment or component.
KO and Onsite Once. Update if the requirements change.
1604000 / 3.1.1
N/A Effluent Sampling and Testing Schedule
2 consecutive days, once during the months of March through May and once during the months of September through November
KO As Specified
1604000 / 3.1.1
N/A Laboratory Analysis of Wastewater Effluent
Report
Within 2 days of discovery when found non-compliant.
4 days after the end of the month if compliant.
KO Monthly or within 2 days if found non-compliant
1604000 / 3.1.2
N/A Influent Sampling and Testing Schedule
2 times per week, same days of week as effluent samples and during first effluent collection of each week
KO As Specified
1604000 / 3.1.2
N/A Laboratory Analysis of Wastewater Influent
Report
Within 2 days of discovery when found non-compliant.
4 days after the end of the month if compliant.
KO Monthly or within 2 days if found non-compliant
Form Attachment
Number Deliverable Title
Date(s) of Submission
To Frequency
1604000 / 3.1.3
N/A Schedule of Operator Attendance
7 prior to the start of work
Within 2 days of Request
KO 7 prior to the start of work and as requested
1604000 / 3.1.4
N/A Sludge Analysis Reports and Sludge Generator
Reports
By May 15 of each year
KO, COR,
Utility Branch
Head, and
PWD
Environmental
Annually
1604000 / 3.1.5
N/A Sludge Disposal and Treatment
7 days prior to start of work and as requested
KO and PWD Environmental
Annually and any time a change is made 1604000 /
3.1.6 N/A Wastewater Treatment
Operating Records, Logs and Reports
3 days after the end of the month during which work is performed
KO, COR,
Utility Branch
Head, and
PWD
Environmental
Monthly
1604000 / 3.2 N/A Integrated Maintenance Program (IMP)
15 days after award
KO Annually and any time a change is made.
1604000 / 3.2 N/A Monthly IMP Schedule By the 25th day of each month KO Monthly
1604000 / 3.2 N/A IMP Maintenance and Repair Status Report
3 days after following the end of the month
KO Monthly
1604000 / 3.2.3
N/A Pre-repair and Post-repair Reports on Wet Wells
3 days after the end of the month during which work is performed
KO Monthly
1604000 / 3.3 N/A Inspection Program 15 days after award
KO Annually and any time a change is made.
1604000 / 3.3 N/A Inspection Results 15 days after performance of the work
KO As required
1604000 / 3.3.2
N/A Manhole Photographs and Reports
15 days after performance of the work
KO As required
1604000 / 3.3.3
N/A Wet Well Photographs and Reports
15 days after performance of the work
KO As required
1604000 / 3.4.1
N/A Pipeline Cleaning Schedule
15 days after award
KO Annually and any time a change is made.
1604000 /
3.4.1 N/A Sampling Records Within 2 days of
sampling KO As required
Form Attachment
Number Deliverable Title
Date(s) of Submission
To Frequency
1604000 / 3.4.2
N/A Schedule of Wet Well Services
15 days after award
KO Annually and any time a change is made.
1604000/
3.4.2.1 N/A Wet Well Volume Report 10 days after the
end of each fiscal year.
KO Annually
1604000 / 3.4.2.2
N/A Wet Well Cleaning Report
15 days after performance of the work
KO As required
1604000 / 3.4.3
N/A Storm Drainage Systems Cleaning Schedule
15 days after award
KO Annually and any time a change is made.
1604000 /
3.4.4 N/A Stormwater BMP
Inspection and Maintenance Program
15 days after award
KO Annually and any time a change is made.
Form Attachment
Number
Deliverable Title Date(s) of
Submission To Frequency
1605000 / 3 N/A Steam and Hot Water Generation Plant, Steam and Hot Water Distribution Systems, and Condensate Return System inventory, drawings and diagrams
Within 15 days of a change in system description, inventory, drawings and diagrams
KO As Specified
1605000 / 3 N/A Critical Spare Parts Inventory
By the 10th day of the preceding month
KO As Specified
1605000 / 3.1 N/A Notification of Unsafe Conditions
Within 24 hours of occurrence
KO As Specified
1605000 / 3.1 N/A Standard Operating Procedures
Within 30 days following award and within 5 days of any change.
KO & On-Site As Specified
1605000 / 3.1.4
N/A Boiler Water Testing and Treatment Program
Within 30 days following award
KO As Specified
1605000 / 3.1.4
J-1605000- 07-01
Daily and Weekly HTHW Chemistry Report
First day of performance of work following award
KO, COR,
UEM, and
Boiler Commodity
Manager
Daily and Weekly
1605000 / 3.1.4
N/A Third Party Testing Laboratory Accreditation
Within 30 days following award and within 5 days of any change
KO Annually and As Specified
1605000 / 3.1.6
N/A Operating Records, Logs, and Reports
3 days following the end of the month during which the work was performed
KO As Specified
1605000 / 3.1.6
J-1601000-11 Essential Equipment Log (EEL) Status Updates
Prior to 0700 of each workday
KO Daily
1605000 / 3.1.6
N/A Afterhours Key and Sign-in Log
Prior to 0700 of each workday
KO Daily
1605000 / 3.1.6
N/A CHP Generator Daily Log Sheet
Prior to 0700 of each workday
KO Daily
1605000 / 3.1.6
N/A Night Log Prior to 0700 of each workday
KO Daily
1605000 / 3.1.6
J-1605000- 07-02
Roving Patrol Log 3 days following the end of the month
KO Monthly
1605000 / 3.1.6
J-1605000- 07-03
Fuel Oil Delivery Report 3 days following the end of the month
KO Monthly
1605000 / 3.1.6
J-1605000- 07-04
Utility Consumption Reporting Log
3 days following the end of the month
KO Monthly
1605000 / 3.2 N/A Integrated Maintenance Program (IMP)
Within 30 days following award
KO As Specified
1605000 / 3.2 N/A Monthly IMP Schedule and IMP Maintenance and Repair Status Report
3 days following the end of the month
KO Monthly
1605000 / 3.3 N/A Inspection, Testing and Certification Program and Schedule
Within 30 days following award
KO As Specified
1605000 / 3.3 N/A Inspection, Testing and Certification Program Summary Report
Within 30 days following certification
KO As Specified
1605000 / 3.3.1
J-1605000-06 NAVFAC 9-
11014/32(09/15)
15 days after performance of the work
KO As required
1605000 / 3.4.1
N/A Central Heating Plant (CHP) HTHW Periodic Start-Up and Shutdown Standard Operating Procedures
Within 30 days following award and within 5 days of any change.
KO & On-Site As Specified
Form Attachment
Number Deliverable Title Date (s) of Submission Distribution Frequency
1606000/2.2.1 N/A Proof of all Certification, Training, and Licensing Requirements
Within 30 days following award
KO Once. Update as changes occur.
1606000/3 N/A Critical Spare Parts Inventory
Within 30 days following award
KO Once. Update if the requirements change.
1606000/3.1 N/A Standard Operating
Procedures 15 days after award and 5 days after changes
KO As required
1603000/3.1 N/A Notification of Unsafe Conditions Report
Within 24 hours of occurrence
KO As specified
1603000/3.1.1 N/A MDE Schedule of Monitoring Requirements
As specified KO As specified
1603000/3.1.1 N/A Appropriation Permit Water Withdrawals
As specified KO Semi annual
1606000/3.1.3 J-1606000-09 Operating Records, Logs, and Reports
3 days following the end of the month
1606000/3.2 N/A Integrated Maintenance Program (IMP)
Within 15 days following award
KO As specified
1606000/3.2 N/A Monthly IMP Schedule and IMP Maintenance and Repair Status Report
3 days following the end of the month
KO Monthly
1606000/3.3.1 N/A Valve Exercising Program
As specified KO As specified
1606000/3.3.1 N/A Valve Exercising Report
As specified KO Monthly
1606000 /3.3.1 N/A Unlocatable and Nonoperational Valves
Within 72 hours of discovery
KO As specified
1606000 /3.3.2 N/A Valve Exercising and Flow Test Report
First workday of each month
Spec Item
Form Attachment
Number Deliverable Title Date (s) of Submission Distribution Frequency
1607000/ 2.2.1
N/A Certification and Licensing
Within 15 days after award or as requested by the KO
KO/COR Once for initial submittal, then as requested 1607000/
N/A Changes to the Chiller Plant, and Distribution Systems, Inventory and Drawings
Within 15 days of a change in system description, inventory, and drawings
COR/KO As Specified
1607000/
N/A Critical Spare Parts Inventory
15 days after award COR/KO Once. Update if the requirements change.
1607000/ 3.1
N/A Notification of Unsafe Conditions
Within 24 hours of occurrence
COR/KO As specified
1607000/ 3.1
N/A Standard Operating Procedures
15 days after award and 5 days after changes
COR/KO After award and as required thereafter 1607000/ 3.1.2
N/A Chiller Plant and Hydronic Systems Testing and Treatment Programs
3 days following the end of the month during which work was performed
COR/KO Monthly
1607000/ 3.1.4
N/A Operating Records, Logs and Reports
3 days following the end of the month during which work was performed
COR/KO Monthly
1607000/ 3.2
N/A Preventive Maintenance Program
Within 30 days following award
COR/KO As Specified
1607000/
N/A Integrated Maintenance Program (IMP)
Within 30 days following award
COR/KO As Specified
1607000/ 3.4.1
N/A Chiller Plant and Hydronic Systems Meter Inventory, Locations and Schedule of Readings Report
By the 10th day of the preceding month
COR/KO As Specified
Spec Item
Form Attachment
Number Deliverable Title Date(s) of
Submission Distribution Frequency
3.1.1 N/A Monthly "C" Pool or
U-Drive-It Billing Monthly KO/COR Monthly
3.1.1 N/A Navy Monthly Fuel
(Gasoline/Diesel) Billing
Monthly KO/COR Monthly
3.1.6 N/A Fuel Delivery Plan By the 25th day of the
preceding month
KO/COR Monthly
3.1.6 N/A Fuel Delivery and Fuel
Accountability Reports
By the 25th day of the preceding month
KO/COR Monthly
3.2.1 N/A Motor Vehicle
Accident Reports
By 0800 following day of accident
KO/COR As required
3,2.1 J-1700000-10 Dispatcher's Log (NAVFAC Form 9- 11240/2)
As requested by the
KO
KO/COR AS Required
3.2.2.1 N/A GSA Mileage and Fuel
Usage Report
As required by the rental agreement
| 0200000 F Management and Administration |
| 1501000 F Facility Management |
| 1502000 F Facility Investment |
| 1502000.1 F Facility Investment - DHA |
| 1503020 F Pest Control |
| 1503030 F Integrated Solid Waste Management |
| 1503070 F Special Events |
| 1601000 F Utilities Management |
| 1602000 F Electrical |
| 1603000 F Natural Gas |
| 1604000 F Wastewater |
| 1605000 F Steam |
| 1606000 F Water |
| 1607000 F Chiller |
| 1700000 F BSVE |
File details come from the government source that posted it. Updated .