J-0200000-20 - ELINS.xlsx

XLSX spreadsheet 375 KB Posted

Attached to
Base Operations Support Services For NSA Annapolis and US Naval Academy, Annapolis, Maryland
Solicitation number
N6247026R0017
Issued by

About this file

This is a pricing template (Attachment J-0200000-20 ELINS.xlsx) for a base operations support services contract for NSA Annapolis and the U.S. Naval Academy in Annapolis, Maryland under solicitation N62470-26-R-0017. The contract encompasses both recurring and non-recurring work across a base period and seven option periods, organized into multiple Contract Line Items (CLINs) and Exhibit Line Item Numbers (ELINs).

The recurring work (CLIN 0001 and subsequent option periods) includes facility management, facility investment, pest control, integrated solid waste management, utilities management and operations, electrical distribution, natural gas, wastewater treatment, steam systems, water systems, chiller plant operations, and transportation services across multiple regional facilities (NSA Annapolis, NAVFAC Utilities, Naval Academy, Defense Health Agency Naval Health Clinic, and Naval Academy Business Services Division). Specific recurring services include Infrastructure Condition Assessment Programs, Emergency/Urgent/Routine work orders, preventive maintenance for systems such as HVAC, fire protection, vertical transportation equipment, and integrated maintenance programs with quantities measured in monthly service periods (12 MO) or as numbered work order categories. The non-recurring work (CLIN 0002) comprises over 140 individually priced line items ranging from unit-priced labor hours (40,000 LH estimated) and direct materials (estimated at $1,400,000) to specific services such as painting, carpet replacement, ceiling tile replacement, backflow preventer repair/replacement, fire protection system components, variable frequency drive replacements, DDC system component replacements, and event support services including tents, generators, and vehicle rentals. All work orders are to be completed within timeframes specified in individual task orders, with pricing to be negotiated by the Contracting Officer for certain labor-intensive items.

View the file

Other files

File Type Posted
J-1604000-09 SAMPLE SLUDGE ANAYLSIS REPORT AND SLUDGE GENERATOR REPORT.pdf PDF
J-1503020-06 ASSET DATA AND FREQUENCIES FOR SCHEDULED WORK.xlsx XLSX spreadsheet
J-1502000.1-03 DHA ASSET DATA INDEX, SYSTEM DESCRIPTIONS AND ASSET DATA BY SYSTEM.xlsx XLSX spreadsheet
0100000 C General Information.pdf PDF
J-1605000-07-04 SAMPLE UTILITY CONSUMPTION REPORTING LOG.xlsx XLSX spreadsheet
J-1502000.1 Facility Investment - DHA.pdf PDF
J-1605000-06 SAMPLE NAVFAC BOILER AND UPV INSPECTION FORM AND INSPECTION CERTIFICATE.pdf PDF
J-0200000-07-07 Contractor Incident Report System (CIRS) Form.pdf PDF
J-1604000-14-01 STORMWATER MANAGEMENT REPORT-ANNAPOLIS JANUARY 2017.pdf PDF
J-1602000 Electrical.pdf PDF
J-1604000 Wastewater.pdf PDF
J-0200000 Management and Administration.pdf PDF
J-1607000 Chiller.pdf PDF
1501000 C Facility Management.pdf PDF
0200000 C Management and Administration.pdf PDF
N6247026R0017 Pre-Sol Notice.pdf PDF
J-1606000 Water.pdf PDF
Attachment F - Section F Deliverables.pdf PDF
J-1601000-04 SERVICE DESK GUIDE FOR UTILITY OUTAGES.pdf PDF
J-1605000-07-02 SAMPLE ROVING PATROL LOG.xlsx XLSX spreadsheet
J-1606000-03-02 WTP AND DISTRIBUTION SYSTEM DESCRIPTION 2.docx DOCX document
J-1601000-05 UTILITY INTERRUPTIONS ROAD AND PARKING LOT CLOSURE AUTHORIZATIONS REQUEST FORM.xlsx XLSX spreadsheet
1502000 C Facility Investment.pdf PDF
J-1605000-09 HISTORICAL BOILER HRSG UPV TESTING AND CERTIFICATION SCHEDULE.xlsx XLSX spreadsheet
J-1607000-08 Cooling Tower Water Testing and Treatment Asset Data.xlsx XLSX spreadsheet
J-1502000-04 FACILITY DATA.xlsx XLSX spreadsheet
DRAFT Solicitation - N6247026R0017.pdf PDF
J-1604000-14-03 STORMWATER MANAGEMENT REPORT-ANNAPOLIS JANUARY 2017.pdf PDF
J-4 Pre-Award Inquiry Form.xlsx XLSX spreadsheet
J-1503020 Pest Control.pdf PDF
J-1601000-08 EXCAVATION-UTILITY MARKING AUTHORIZATIONS REQUEST FORM.xlsx XLSX spreadsheet
J-1503070-03 Special Event Project Historical Data.xlsx XLSX spreadsheet
1700000 C BSVE.pdf PDF
J-1604000-04 WASTEWATER SYSTEM ASSET DATA.xlsx XLSX spreadsheet
1503020 C Pest Control.pdf PDF
J-1605000-04 STEAM ASSET DATA.xlsx XLSX spreadsheet
1604000 C Wastewater.pdf PDF
1601000 C Utility Management.pdf PDF
J-1604000-15 PERMEABLE PAVEMENT AREAS.pdf PDF
J-0200000-02-02 DBA WAGE DETERMINATION.pdf PDF
J-1700000-05 HISTORICAL FUEL DELIVERY QUANTITIES.xlsx XLSX spreadsheet
1606000 C Water.pdf PDF
J-1503070 Special Events.pdf PDF
J-1502000 Facility Investment.pdf PDF
J-1607000-04 Chiller Plant and Distribution System Asset Data.xlsx XLSX spreadsheet
1605000 C Steam.pdf PDF
J-1503030 Integrated Solid Waste Management.pdf PDF
J-0200000-02-01 SCA WAGE DETERMINATION.pdf PDF
J-1606000-08 MDE SCHEDULE OF MONITORING REQUIREMENTS EXAMPLE.pdf PDF
J-1601000 Utilities Management.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary - All Periods

Summary - Recurring Work
Period of PerformanceSpec Item 3
Labor HoursSpec Item 3
Labor CostSpec Item 3
Material CostSpec Item 3
Equipment CostSpec Items

1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site

CostOff-Site
CostProfit/FeeTotal PriceAverage Cost per Labor Hour
Base Period0.00$ - 0$ - 0$ - 00.00$ - 0$ - 0$ - 0$ - 0
Option Period One
Option Period Two
Option Period Three
Option Period Four
Option Period Five
Option Period Six
Option Period Seven
52.217-8 Option
Total:$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Summary - Non-recurring Work
Period of PerformanceSpec Item 3
Labor HoursSpec Item 3
Labor CostSpec Item 3
Material CostSpec Item 3
Equipment CostSpec Items

1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site

CostOff-Site
CostProfit/FeeTotal PriceAverage Cost per Labor Hour
Base Period0.00$ - 0$ - 0$ - 00.00$ - 0$ - 0$ - 0$ - 0
Option Period One
Option Period Two
Option Period Three
Option Period Four
Option Period Five
Option Period Six
Option Period Seven
52.217-8 Option
Total:$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Summary - Recurring and Non-recurring Work
Period of PerformanceSpec Item 3
Labor HoursSpec Item 3
Labor CostSpec Item 3
Material CostSpec Item 3
Equipment CostSpec Items

1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site

CostOff-Site
CostProfit/FeeTotal PriceAverage Cost per Labor Hour
Base Period0.00$ - 0$ - 0$ - 00.00$ - 0$ - 0$ - 0$ - 0
Option Period One
Option Period Two
Option Period Three
Option Period Four
Option Period Five
Option Period Six
Option Period Seven
52.217-8 Option
Total:$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

CLIN 0001 - Base Recurring

Attachment J-0200000-20
Exhibit Line Item Numbers
Solicitation/Contract No.: N62470-26-R-0017
Line Item 0001 - Recurring Work - Base Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINs A001 through A006
ELIN/
Sub-ELINAnnex/Sub-annex
Spec ItemDescriptionSpec Item 3
Labor HoursSpec Item 3
Labor CostSpec Item 3
Material CostSpec Item 3
Equipment CostSpec Items

1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site

CostOff-Site
CostProfit/FeeQuantityUnit of MeasureUnit PriceTotal Price
A001N61152 - REGION NSA ANNAPOLIS
Region - Specification 1501000 Facility Management (FP)
A001AA15010003.1Infrastructure Condition Assessment Program (ICAP)12MO
Subtotal Region Facility Management (FP) Work:
Region - Specification 1502000 Facility Investment (ST)
15020003.1Emergency, Urgent, and Routine (E/U/R) Work
A001AB15020003.1.1Emergency Work Order1,000EA
A001AC15020003.1.2Urgent Work Order4,000EA
A001AD15020003.1.3Routine Work Order9,000EA
15020003.2Project Work
A001AE15020003.2.1Project Work Orders Level 13,000EA
A001AF15020003.2.2Project Work Orders Level 2130EA
A001AG15020003.2.3Project Work Orders Level 320EA
15020003.3Preventive Maintenance
A001AH15020003.3.1Lighting Systems12MO
A001AJ15020003.3.2Photovoltaic Energy Systems12MO
A001AK15020003.3.3Cathodic Protection Systems12MO
A001AL15020003.3.4Lightning Protection Systems12MO
A001AM15020003.3.5Fire Protection Systems12MO
A001AN15020003.3.6Vertical Transportation Equipment (VTE)12MO
A001AP15020003.3.7Compressed Air Systems12MO
A001AQ15020003.3.8Auxiliary Generator Systems12MO
A001AR15020003.3.9Petroluem, Oil and Lubricant (POL) System Facilities and Distribution Systems12MO
A001AS15020003.3.10Emergency Eyewash Stations and Chemical Shower Systems12MO
A001AT15020003.3.11Pools and Spa Systems12MO
A001AU15020003.3.12Ornamental Fountain Sytems12MO
A001AV15020003.3.13Uninterrupted Power Systems (UPS)12MO
A001AW15020003.3.14Pump Systems12MO
A001AX15020003.3.15Food Service Equipment Systems12MO
A001AY15020003.3.16Chapel Organ Systems12MO
A001AZ15020003.3.17Keyless Entry Systems12MO
A001BA15020003.3.18Manual and Automated Door Systems12MO
A001BB15020003.3.19Special Care Door Systems12MO
A001BC15020003.3.20Fire Door Systems12MO
A001BD15020003.3.21Roll-Up Doors and Window Systems12MO
A001BE15020003.3.22Motorized Gate Systems12MO
A001BF15020003.3.23Baler Systems12MO
A001BG15020003.3.24Small Arms Firing Ranges (SAFR) Systems12MO
A001BH15020003.3.25Fume Hood Systems12MO
A001BJ15020003.3.26Acid Neutralization Tanks12MO
A001BK15020003.3.27Roof and Drainage Systems12MO
A001BL15020003.3.28Rowing Tank Services12MO
A001BM15020003.3.29Hydraulic Track System12MO
15020003.4Integrated Maintenance Program (IMP)
A001BN15020003.4.1HVAC and Refrigeration Systems12MO
A001BP15020003.4.2Control Systems12MO
A001BQ15020003.4.3Cybersecurity Program Support12MO
A001BR15020003.4.4Boilers and Unfired Pressure Vessels (UPVs) Systems12MO
A001BS15020003.4.5Chillers and Distribution Systems12MO
15020003.5Inspection, Testing, and Certification Program
A001BT15020003.5.1Boilers and UPVs12MO
A001BU15020003.5.2Backflow Prevention Devices12MO
A001BV15020003.5.3Vertical Transportation Equipment (VTE)12MO
A001BW15020003.5.4Petroluem, Oil and Lubricant (POL) Systems12MO
15020003.6Other Recurring Services Program
A001BX15020003.6.1Field Lighting Control Services12MO
A001BY15020003.6.2Grease Trap Services12MO
A001BZ15020003.6.3Dryer Vent Services12MO
A001CA15020003.6.4Oil Water Separator (OWS) Services12MO
A001CB15020003.6.5Exhaust Hood and Duct System Services12MO
A001CC15020003.6.6HVAC Temperature Set Point Services12MO
A001CD15020003.6.7Mechanical Room Services12MO
A001CE15020003.6.8HVAC Seasonal Start-Up and Shutdown Services12MO
A001CF15020003.6.9Facility Boiler and Steam Equipment Seasonal Start-Up and Shutdown Services12MO
A001CG15020003.6.10Irrigation System Seasonal Start-Up and Shutdown Services12MO
A001CH15020003.6.11Technical Library Services12MO
A001CJ15020003.6.12Memorial Hall Chandelier Services12MO
A001CK15020003.6.13Sports Net and Wind Screen Services12MO
A001CL15020003.6.14Water Filter Replacement Services12MO
A001CM15020003.6.15Flood Control Services12MO
A001CN15020003.6.16Utility Tunnel Services12MO
A001CP15020003.6.17HVAC Water Testing and Treatment Services12MO
A001CQ15020003.6.18Boiler and Steam Equipment Water Testing and Treatment Services12MO
Subtotal Region Facility Investment (ST) Work:
Region - Specification 1503020 Pest Control (FX)
A001CR15030203.1Pest Control Services12MO
A001CS15030203.1.2Inspection Requirements for Bed Bugs100EA
A001CT15030203.2Unscheduled Pest Control Services12MO
A001CU15030203.3Pest Management Reporting12MO
Subtotal Region Pest Control (FX) Work:
Region - Specification 1503030 Integrated Solid Waste Management (ISWM) (FX)
A001CV15030303.1Solid Waste Collection Services12MO
Subtotal Region ISWM (FX) Work:

Total Region Work:

A002NAVFAC Utilities
NAVFAC Utilities - Specification 1601000 Utility Management (UT)
16010003.1Utility Emergency, Urgent and Routine (E/U/R) Work
A002AA16010003.1.1Utility Emergency Work Order25EA
A002AB16010003.1.2Utility Urgent Work Order25EA
A002AC16010003.1.3Utility Routine Work Order50EA
16010003.2Utility Project Work
A002AD16010003.2.1Utility Project Work Order Level 125EA
A002AE16010003.2.2Utility Project Work Order Level 220EA
A002AF16010003.2.3Utility Project Work Order Level 33EA
16010003.3Utilities Operations Management
A002AG16010003.3.1Utilities Mapping12MO
A002AH16010003.3.2Utilities Outage and Road Closure Scheduling and Coordination12MO
A002AJ16010003.3.3Meter Reading12MO
A002AK16010003.3.4Excavation Permit Issuance12MO
A002AL16010003.3.5Utility Location Services12MO
A002AM16010003.3.6Inventory Management12MO
16010003.4Utility Control Systems
A002AN16010003.4.1Software Maintenance12MO
Subtotal PWD Utilities Management (UT) Work:
NAVFAC Utilities - Specification 1602000 Electrical (UT)
16020003.1Operate Electrical Power Transmission and Distribution Systems
A002AP16020003.1Operate Electrical Power Transmission and Distribution Systems12MO
16020003.2Integrated Maintenance Program (IMP)
A002AQ16020003.2Integrated Maintenance Program (Electrical Power Transmission and Distribution Systems)12MO
Subtotal PWD Electrical (UT) Work:
NAVFAC Utilities - Specification 1603000 Natural Gas (UT)
16030003.1Operation
A002AR16030003.1.1Natural Gas Distribution12MO
16030003.2Integrated Maintenance Program (IMP)
A002AS16030003.2Integrated Maintenance Program (Natural Gas Distribution and Systems)12MO
Subtotal PWD Natural Gas (UT) Work:
NAVFAC Utilities - Specification 1604000 Wastewater (UT)
16040003.1Operation
A002AT16040003.1.1Wastewater Effluent Quality, Sampling, and Testing12MO
A002AU16040003.1.2Influent Water Quality, Sampling, and Testing12MO
A002AV16040003.1.3Minimum Operator Attendance12MO
A002AW16040003.1.4Sludge Sampling and Analysis12MO
A002AX16040003.1.5Disposal of Sludge12MO
A002AY16040003.1.6Operating Records, Logs, and Reports12MO
16040003.2Integrated Maintenance Program (IMP)
A002AZ16040003.2.1Wastewater Treatment Plant (WWTP)12MO
A002BA16040003.2.2Wastewater Instrumentation Systems12MO
A002BB16040003.2.3Wet Wells12MO
A002BC16040003.2.4Sewage Pumps12MO
16040003.3Inspection Program
A002BD16040003.3.1Sewage Collection Pipelines12MO
A002BE16040003.3.2Wet Wells12MO
A002BF16040003.3.3Manholes12MO
16040003.4Other Recurring Services
A002BG16040003.4.1Cleaning of Sewer Pipeline12MO
A002BH16040003.4.2.1Wet Well Pumping12MO
A002BJ16040003.4.2.2Wet Well Cleaning12MO
A002BK16040003.4.3Wet Well Cleaning12MO
A002BL16040003.4.4.1Bioretention, Micro-Bioretention, and Raingardens12MO
A002BM16040003.4.4.2Filtraton Structures12MO
A002BN16040003.4.4.3Open Swale Systems12MO
A002BP16040003.4.4.4Porous or Permeable Pavement12MO
A002BQ16040003.4.4.5Micro-Scale Practices - Rainwater Harvesting Systems12MO
A002BR16040003.4.4.6Ponds12MO
A002BS16040003.4.4.7Stormceptor Systems12MO
Subtotal PWD Wastewater (UT) Work:
NAVFAC Utilities - Specification 1605000 Steam (UT)
16050003.1Operation
A002BT16050003.1.1Steam Quality12MO
A002BU16050003.1.2Plant Boiler Combustion Limits and Efficiencies12MO
A002BV16050003.1.3Heating and Power Boiler Minimum Operator Attendance12MO
A002BW16050003.1.4Water Testing and Treatment Program12MO
A002BX16050003.1.5Condensate Return System12MO
A002BY16050003.1.6Operating Records, Logs, and Reports12MO
16050003.2Integrated Maintenance Program (IMP)
A002BZ16050003.2Integrated Maintenance Program (Steam Generation and Distribution Systems)12MO
16050003.3Inspection, Testing, and Certification Program
A002CA16050003.3.1Power Boiler, HRSG’s, and UPV Certification Assistance12MO
16050003.4Other Recurring Services
A002CB16050003.4.1Central Heating Plant (CHP) HTHW Periodic Start-Up and Shutdown12MO
Subtotal PWD Steam (UT) Work:
NAVFAC Utilities - Specification 1606000 Water (UT)
16060003.1Operation
A002CC16060003.1.1Water Quality12MO
A002CD16060003.1.2Minimum Operator Attendance12MO
A002CE16060003.1.3Operating Records, Logs, and Reports12MO
16060003.2Integrated Maintenance Program (IMP)
A002CF16060003.2.1Water Treatment Plant (WTP)12MO
A002CG16060003.2.2Water Storage and Distribution Systems12MO
A002CH16060003.2.3Fire Hydrants12MO
16060003.3Other Recurring Services
A002CJ16060003.3.1Valve Exercising Program12MO
A002CK16060003.3.2Unidirectional Flushing (UDF)12MO
Subtotal PWD Water (UT) Work:
NAVFAC Utilities - Specification 1607000 Chiller (UT)
16070003.1Operation
A002CL16070003.1.1Chiller Plant Controls and Monitoring System12MO
A002CM16070003.1.2Chiller Plant and Hydronic Systems Testing and Treatment Programs12MO
A002CN16070003.1.3Chiller Plant Minimum Operator Attendance12MO
A002CP16070003.1.4Operating Records, Logs, and Reports12MO
16060003.2Integrated Maintenance Program (IMP)12MO
A002CQ16070003.2Integrated Maintenance Program (Chiller Plant and Distribution Systems)12MO
16070003.3Inspection, Testing, and Certification Program
A002CR16070003.3.1Cooling Tower Water Testing and Treatment Services12MO
A002CS16070003.3.2Reserved
Subtotal PWD Chiller (UT) Work:

Total PWD Utilities (UT) Work:

NAVFAC Utilities - Specification 1700000 Transportation (TR)
17000003.1Operation
A002CT17000003.1.3Fuel Delivery Service and Fuel Program Requirements12MO
Subtotal PWD Utilities (TR) Work:
Total PWD Utilities (UT and TR) Work:
A003NAVFAC PWD Transportation
NAVFAC Transportation - Specification 1700000 (TR)
17000003.1Operation
A003AA17000003.1.1Billing Services12MO
A003AB17000003.1.2Tow Truck Services12MO
17000003.2Support Services
A003AC17000003.2.1Dispatching Service12MO
A003AD17000003.2.2.1GSA Leased Vehicles12MO
A003AE17000003.2.2.2Other Commercial Leased Vehicles12MO
Total PWD TR Work:
A004N00162 - DHA / NMRTC - DEFENSE HEALTH AGENCY / NAVAL MEDICAL READINESS AND TRAINING COMMAND
DHA Naval Health Clinic - Specification 1501000 Facility Management
A004AA15010003.1Infrastructure Condition Assessment Program (ICAP)12MO
Subtotal DHA Facility Management Work:
DHA Naval Health Clinic - Specification 1502000.1 Facility Investment
1502000.13.1Emergency, Urgent, and Routine (E/U/R) Work
A004AB1502000.13.1.1Emergency Work Order5EA
A004AC1502000.13.1.2Urgent Work Order15EA
A004AD1502000.13.1.3Routine Work Order40EA
1502000.13.2Project Work
A004AE1502000.13.2.1Project Work Order Level 110EA
A004AF1502000.13.2.2Project Work Order Level 212EA
1502000.13.3Integrated Maintenance Program (IMP)
A004AG1502000.13.3.1Lighting Systems12MO
A004AH1502000.13.3.2Photovoltaic Energy Systems12MO
A004AJ1502000.13.3.3Solar Water Heating Systems12MO
A004AK1502000.13.3.4Lighting Protection Systems12MO
A004AL1502000.13.3.5Fire Protection Systems12MO
A004AM1502000.13.3.6Vertical Transportation Equipment (VTE)12MO
A004AN1502000.13.3.7Compressed Air, Medical Air, Gas, and Vacuum Systems12MO
A004AP1502000.13.3.8Auxiliary Generator Systems12MO
A004AQ1502000.13.3.9Uninterrupted Power Systems (UPS)12MO
A004AR1502000.13.3.10Pumps12MO
A004AS1502000.13.3.11Public Announcement (PA) Systems12MO
A004AT1502000.13.3.12Roof and Drainage Systems12MO
A004AU1502000.13.3.13Manual and Automated Door Systems12MO
A004AV1502000.13.3.14Roll-Up Door and Window Systems12MO
A004AW1502000.13.3.15HVAC and Refrigeration Systems12MO
A004AX1502000.13.3.16Control Systems12MO
A004AY1502000.13.3.17Cybersecurity Program Support12MO
A004AZ1502000.13.3.17Boilers and Unfired Pressure Vessels (UPVs) Systems12MO
A004BA1502000.13.3.18Chillers and Distribution Systems12MO
1502000.13.4Inspection, Testing, and Certification Program
A004BB1502000.13.4.1Boilers and UPVs12MO
A004BC1502000.13.4.2Backflow Prevention Devices12MO
A004BD1502000.13.4.3Vertical Transportation Equipment (VTE)12MO
1502000.13.5Other Recurring Services Program
A004BC1502000.13.5.1Plaster Trap Services12MO
A004BD1502000.13.5.2Exhaust Hoods and Ducts12MO
A004BE1502000.13.5.3Mechanical Room Services12MO
A004BF1502000.13.5.4HVAC Seasonal Start-Up and Shutdown Services12MO
A004BG1502000.13.5.5HVAC Water Teating and Treatment Services12MO
A004BH1502000.13.5.6Facility Steam Equipment Seasonal Start-Up and Shutdown Services12MO
A004BJ1502000.13.5.7Irrigation System Seasonal Start-Up and Shutdow12MO
A004BK1502000.13.5.8Naval Heatlh Clinic12MO
Subtotal DHA Facility Investment Work:
DHA Naval Health Clinic - Specification 1503020 Pest Control
A004BL15030203.1Pest Control Services12MO
A004BM15030203.2Pest Control Work Orders12EA
A004BN15030203.3Pest Management Reporting12MO
Subtotal DHA Pest Control Work:
Total DHA Work:
A005N00161 - NAVAL ACADEMY (USNA)
USNA - Specification 1502000 Facility Investment
15020003.1Emergency, Urgent, and Routine (E/U/R) Work
A005AA15020003.1.1Emergency Work Order20EA
A005AB15020003.1.2Urgent Work Order30EA
A005AC15020003.1.3Routine Work Order50EA
15020003.2Project Work
A005AD15020003.2.2Project Work Orders Level 210EA
Subtotal USNA Facility Investment Work:
USNA - Specification 1503070 Special Events
15030703.1Special Event Project Work Orders
A005AE15030703.1Project Work Order Category 1200EA
A005AF15030703.1Project Work Order Category 2125EA
A005AG15030703.1Project Work Order Category 355EA
A005AH15030703.1Project Work Order Category 420EA
A005AJ15030703.1Project Work Order Category 515EA
A005AK15030703.1Project Work Order Category 66EA
A005AL15030703.1Project Work Order Category 72EA
A005AM15030703.1Project Work Order Category 81EA
A005AN15030703.1Project Work Order Category 91EA
A005AP15030703.1Project Work Order Category 101EA
15030703.2Special Event Services
A005AQ15030703.2.1Alumni Hall Basketball Services12MO
A005AR15030703.2.2Alumni Hall General Event Services12MO
A005AS15030703.2.3Commencement Event Support Services12MO
A005AT15030703.2.4Blue Angel Event Services12MO
A005AU15030703.2.5Chapel Manager Services12MO
A005AV15030703.2.6Holidat Decoration Services12MO
15030703.3Funeral Support Services
A005AW15030703.3.1In-Ground Cemetery Casket Burial Services12MO
A005AX15030703.3.2In-Ground Cemetery Cremation Burila Services12MO
A005AY15030703.3.3Columbarium Cremation Internment Services12MO
Subtotal USNA Special Events Work:
USNA - Specification 1700000 Transportation
17000003.1Operations
A005AZ17000003.1.2Tow Truck Services12MO
Subtotal USNA Transportation Work:

Total USNA Work:

A006NAVAL ACADEMY BUSINESS SERVICES DIVISION (NABSD)
NABSD - Specification 150200 Facility Investment
15020003.6Other Recurring Services Program
A006AA15020003.6.2Grease Trap Services12MO
A006AB15020003.6.3Dryer Vent Services12MO
A006AC15020003.6.5Exhaust Hood and Duct System Services12MO
Total NABSD Work:

TOTAL LINE ITEM 0001 - BASE OPTION PERIOD - RECURRING WORK (ELINs A001 THRU A006)

CLIN 0002 - Base Non-Recurring

Attachment J-0200000-20
Exhibit Line Item Numbers
Solicitation/Contract No.: N62470-26-R-0017
Line Item 0002 - Non-Recurring Work - Base Period
Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4
ELIN/Sub-ELINs A700 through A845
ELINProduct Name (120 Characters)Description ExtendedSpec Item 4
Labor HoursSpec Item 4
Labor CostSpec Item 4
Material CostSpec Item 4
Equipment CostSpec Items 1 and 2

On-Site Labor Hours Spec Items 1 and 2 On-Site

CostOff-Site
CostProfit/FeeEstimated QuantityUnit of MeasureUnit PriceExtended Price
A700Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO.Perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.

40,000LH
A701Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO.Provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.

Task order completion times will be specified on each task order.1,400,000DO$ 1.001,400.000.00
A702Emergency WorkDevelop and Implement Emergency Work Orders per respective requirements in Annex 1502000, Emergency Work Orders, Spec Item 3.1.1100EA
A703Urgent WorkDevelop and Implement Urgent Work Orders per respective requirements in Annex 1502000, Urgent Work Orders, Spec Item 3.1.2100EA
A704Routine WorkDevelop and Implement Routine Work Orders per respective requirements in Annex 1502000, Routine Work Orders, Spec Item 3.1.3100EA
A705Project WorkDevelop and Implement Project Work per respective requirements in Annex 1502000, Project Work, Spec Item 3.2100EA
A706Packaged Terminal Air Conditioning Unit (PTAC)

Replace PTAC unit, up to 2 ton, using existing wall sleeve and branch circuits.

Work shall be completed within 48 hours of receipt of order.20EA
A707Packaged Terminal Air Conditioning Unit (PTAC)
Replace PTAC unit, 2 to 5 ton, using existing wall sleeve and branch circuits.
Work shall be completed within 48 hours of receipt of order.15EA
A708Temporary HVAC, up to 25 tonsProvide temporary HVAC to ensure Conditioned spaces are continuously maintained at the temperature(s) specified in J-1502000-XX.
Temporary HVAC shall be supplied within 24 hours of receipt of the order and continue until facility system is fully operational or the time specified on the order.14DA
A709Temporary HVAC, 25 to 50 tonsProvide temporary HVAC to ensure Conditioned spaces are continuously maintained at the temperature(s) specified in J-1502000-XX.
Temporary HVAC shall be supplied within 24 hours of receipt of the order and continue until facility system is fully operational or the time specified on the order.14DA
A710Temporary HVAC, 50 to 100 tonsProvide temporary HVAC to ensure Conditioned spaces are continuously maintained at the temperature(s) specified in J-1502000-XX.
Temporary HVAC shall be supplied within 24 hours of receipt of the order and continue until facility system is fully operational or the time specified on the order.14DA
A711Generator rental DHAProvide one (1) 300KVA 480V generator to include refuling service and daily operationa checks to include delivery (to and from), set-up, disassembly, and connection services.5DA
A712Generator rental service extension DHAExtension of genreator rental service for five (5) days. Rantal includes rental fee, refueling service, and daily operational checks.5DA
A713Interior PaintingProvide all labor, materials and equipment required to perform surface preparation, pre-painting, sanding, etching and finish painting of all interior surfaces specified. Surface preparation includes, but is not limited to wood, metal, sheetrock, concrete, and plaster. Related services shall include wall-papering, plastering, and dry-wall repair. The Contractor shall collect and dispose of all paint chips, dust, sand, and other waste paint materials resulting from any part of the painting process, IAW the Resource Conservation and Recovery Act and associated Federal, State, and local laws and regulations. All hazardous waste disposal shall be coordinated through the Government Representative. Work shall be ordered and priced in increments of 200 square feet (SF). Work shall be completed within the timeframe specified on the task order.
625EA
A714Furniture Move Incidental to Interior PaintingProvide all labor, materials, and equipment required to move furniture incidental to interior painting. Provide unit pricing such that each unit consists of five (5) pieces of furniture. A cubical shall be considered a single piece of furniture. Work shall be completed within the timeframe specified on the task order.
200EA
A715Exterior PaintingProvide all labor, materials and equipment required to perform surface preparation, pre-painting, sanding, etching and finish painting of all exterior surfaces specified. Surface preparation includes, but is not limited to wood, metal, concrete, and plaster. The Contractor shall collect and dispose of all paint chips, dust, sand, and other waste paint materials resulting from any part of the painting process, IAW the Resource Conservation and Recovery Act and associated Federal, State, and local laws and regulations. All hazardous waste disposal shall be coordinated through the Government Representative. Work shall be ordered with a minimum of 200 sf. Work shall be completed within the timeframe specified on the task order.200000SF
A716Painting of Swimming Pools and Ornamental FountainsProvide all labor, materials and equipment required to perform surface preparation, pre-painting, sanding, etching and finish painting of all surfaces specified. The Contractor shall collect and dispose of all paint chips, dust, sand, and other waste paint materials resulting from any part of the painting process, IAW the Resource Conservation and Recovery Act and associated Federal, State, and local laws and regulations. All hazardous waste disposal shall be coordinated through the Government Representative. Work shall be ordered per square foot (sf). Work shall be completed within the timeframe specified on the task order.12000SF
A717Asbestos Material RemovalProvide all labor, materials and equipment required to perform asbestos material removal in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order.
975SF
A718Lead Material RemovalProvide all labor, materials and equipment required to perform lead abatement in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order.
750SF
A719Replace Suspended Ceiling Tile (2'x2')Provide all labor, materials and equipment required to replace 2’x2’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 16 ceiling tiles. Work shall be completed within the timeframe specified on the task order.
2000EA
A720Replace Suspended Ceiling Tile (2'x4')Provide all labor, materials and equipment required to replace 2’x4’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 8 ceiling tiles. Work shall be completed within the timeframe specified on the task order.
2000EA
A721Replace Suspended Ceiling Grid, Cross Tee 4'Provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order.2000EA
A722Replace Suspended Ceiling Grid, Cross Tee 2'Provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order.2000EA
A723Replace Suspended Ceiling Grid, Main RunnerProvide all labor, materials and equipment required to replace suspended ceiling grid main runner for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order.
2000EA
A724Carpet Replacement (26oz)Provide all labor, materials and equipment required to install 26oz carpet for the areas designated in the task order. Carpet shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old carpet (including any padding, residual glue, tack strips, etc.) and proper installation of new carpet per manufacturer's instructions. Work shall be ordered per square yard (SY), with a minimum of 10 SY. Work shall be completed within the timeframe specified on the task order.4000SY
A725Carpet Replacement (32oz)Provide all labor, materials and equipment required to install 32oz carpet for the areas designated in the task order. Carpet shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old carpet (including any padding, residual glue, tack strips, etc.) and proper installation of new carpet per manufacturer's instructions. Work shall be ordered per square yard (SY), with a minimum of 10 SY. Work shall be completed within the timeframe specified on the task order.2000SY
A726Carpet Replacement (45oz)Provide all labor, materials and equipment required to install 45oz carpet for the areas designated in the task order. Carpet shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old carpet (including any padding, residual glue, tack strips, etc.) and proper installation of new carpet per manufacturer's instructions. Work shall be ordered per square yard (SY), with a minimum of 10 SY. Work shall be completed within the timeframe specified on the task order1500SY
A727Furniture Move Incidental to Carpet ReplacementProvide all labor, materials, and equipment required to move furniture incidental to carpet replacement. Provide unit pricing such that each unit consists of five (5) pieces of furniture. A cubical shall be considered a single piece of furniture. Work shall be completed within the timeframe specified on the task order.
200EA
A728Replace Vinyl Floor TileProvide all labor, materials and equipment required to install vinyl tile flooring for the areas designated in the task order. Vinyl shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old vinyl and proper installation of new vinyl per manufacturer's instructions. Work shall be ordered per square feet (sf), with a minimum of 50 sf. Work shall be completed within the timeframe specified on the task order.8000SF
A729Replace 4" Vinyl Cove BaseProvide all labor, materials and equipment required to install 4” vinyl cove base for the areas designated in the task order. Cove base shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old cove base, patching or repair of any damaged wall surface, and proper installation of new cove base per manufacturer's instructions. Work shall be ordered with a minimum of 30 LF. Work shall be completed within the timeframe specified on the task order.5000LF
A730Replace 6" Vinyl Cove BaseProvide all labor, materials and equipment required to install 6” vinyl cove base for the areas designated in the task order. Cove base shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old cove base, patching or repair of any damaged wall surface, and proper installation of new cove base per manufacturer's instructions. Work shall be ordered with a minimum of 30 LF. Work shall be completed within the timeframe specified on the task order.5000LF
A731Repair Backflow Preventer:
1/4 InchProvide all labor, materials and equipment required to repair and test failed 1/4 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A732Repair Backflow Preventer:
3/8 InchProvide all labor, materials and equipment required to repair and test failed 3/8 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A733Repair Backflow Preventer:
1/2 InchProvide all labor, materials and equipment required to repair and test failed 1/2 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A734Repair Backflow Preventer:
3/4 InchProvide all labor, materials and equipment required to repair and test failed 3/4 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A735Repair Backflow Preventer:
1 InchProvide all labor, materials and equipment required to repair and test failed 1 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A736Repair Backflow Preventer:
1-1/4 InchProvide all labor, materials and equipment required to repair and test failed 1-1/4 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A737Repair Backflow Preventer:
1-1/2 InchProvide all labor, materials and equipment required to repair and test failed 1-1/2 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A738Repair Backflow Preventer:
2 InchProvide all labor, materials and equipment required to repair and test failed 2 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A739Repair Backflow Preventer:
2-1/2 InchProvide all labor, materials and equipment required to repair and test failed 2-1/2 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A740Repair Backflow Preventer:
3 InchProvide all labor, materials and equipment required to repair and test failed 3 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A741Repair Backflow Preventer:
4 InchProvide all labor, materials and equipment required to repair and test failed 4 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A742Repair Backflow Preventer:
6 InchProvide all labor, materials and equipment required to repair and test failed 6 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A743Repair Backflow Preventer:
8 InchProvide all labor, materials and equipment required to repair and test failed 8 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A744Repair Backflow Preventer:
10 InchProvide all labor, materials and equipment required to repair and test failed 10 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A745Replace Backflow Preventer:
1/4 InchProvide all labor, materials and equipment required to replace and test failed 1/4 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A746Replace Backflow Preventer:
3/8 InchProvide all labor, materials and equipment required to replace and test failed 3/8 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A747Replace Backflow Preventer:
1/2 InchProvide all labor, materials and equipment required to replace and test failed 1/2 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A748Replace Backflow Preventer:
3/4 InchProvide all labor, materials and equipment required to replace and test failed 3/4 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A749Replace Backflow Preventer:
1 InchProvide all labor, materials and equipment required to replace and test failed 1 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A750Replace Backflow Preventer:
1-1/4 InchProvide all labor, materials and equipment required to replace and test failed 1-1/4 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A751Replace Backflow Preventer:
1-1/2 InchProvide all labor, materials and equipment required to replace and test failed 1-1/2 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A752Replace Backflow Preventer:
2 InchProvide all labor, materials and equipment required to replace and test failed 2 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A753Replace Backflow Preventer:
2-1/2 InchProvide all labor, materials and equipment required to replace and test failed 2-1/2 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A754Replace Backflow Preventer:
3 InchProvide all labor, materials and equipment required to replace and test failed 3 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A755Replace Backflow Preventer:
4 InchProvide all labor, materials and equipment required to replace and test failed 4 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A756Replace Backflow Preventer:
6 InchProvide all labor, materials and equipment required to replace and test failed 6 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A757Replace Backflow Preventer:
8 InchProvide all labor, materials and equipment required to replace and test failed 8 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A758Replace Backflow Preventer:
10 InchProvide all labor, materials and equipment required to replace and test failed 10 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order.
20EA
A759Replace Sprinkler Heads - Dry Pipe SystemProvide all labor, materials and equipment required to remove and replace sprinkler heads and escutcheon plates of the dry pipe system (fire suppression system) in accordance with UFC 3-601-02, EM-385-1-1, NFPA 25, and NFPA 101. The Contractor shall also replace the accelerator and trim on the dry system. The Contractor shall provide for daily outage communications with the installation Fire Department and shall complete a final hydrostatic inspection with the installation Fire Marshall. The Contractor supply manuals, instructions, and literature accompanying equipment upon job completion. Work shall be priced for 10 dry type sprinkler heads to be replaced per order. Work shall be completed within the timeframe specified on the task order.
100EA
A760Replace Sprinkler Heads - Wet Pipe SystemProvide all labor, materials and equipment required to remove and replace sprinkler heads and escutcheon plates of the wet pipe system (fire suppression system) in accordance with UFC 3-601-02, EM-385-1-1, NFPA 25, and NFPA 101. The Contractor shall provide material similar in type or superior to existing. The Contractor shall provide for daily draining and refilling of the wet system and daily outage communications with the installation Fire Department and shall complete a final hydrostatic inspection with the installation Fire Marshall. The Contractor supply manuals, instructions, and literature accompanying equipment upon job completion. Work shall be priced for 10 wet type sprinkler heads to be replaced per order. Work shall be completed within the timeframe specified on the task order.100EA
A761Replace Smoke DetectorsProvide all labor, material, and equipment required to remove and replace smoke detectors at their present locations utilizing existing wiring and mounting boxes. New smoke detectors shall be equipped with battery back-up and hush control in accordance with UFC 3-601-02, EM-385-1-1, NFPA 25, and NFPA 101. The Contractor shall test the newly installed fire alarm smoke detectors for proper operation. The work order does not include the installation of new pipe, cable, wire, boxes, or fittings. Work shall be priced for replacement of 5 smoke detectors per order. Work shall be completed within the timeframe specified on the task order.
500EA
A762Replace Fire Alarm System BatteriesProvide all labor, material, and equipment required to remove and replace batteries for the control panel and annunciator equipment of the fire alarm system in accordance with UFC 3-601-02, EM-385-1-1, NFPA 25, and NFPA 101. The Contractor shall test the fire alarm system after battery replacement to ensure proper operation. Work shall be completed within the timeframe specified on the task order.
50EA
A763Replace Fire Protection System AntennasProvide all labor, material, and equipment required to remove and replace the fire protection system antenna in accordance with UFC 3-601-02, EM-385-1-1, NFPA 25, and NFPA 101. The Contractor shall test the fire alarm system after antenna replacement to ensure proper operation. Work shall be completed within the timeframe specified on the task order.
10EA
A764Replace Elevator Door RollersProvide all labor, material, and equipment required to replace, adjust, and test for proper operation of door rollers in hoistways of elevators, passenger and freight type, in accordance with ASME Codes A17.1, A17.2, and A18.1, NFPA 70, and NAVFAC ITG Specs. Work shall be completed within the timeframe specified on the task order.
200EA
A765Replace Elevator Photoelectric Reopening DeviceProvide all labor, material, and equipment required to replace, adjust, and test for proper operation the Photoelectric Reopening Device on elevators, passenger and freight type, in accordance with ASME Codes A17.1, A17.2, and A18.1, NFPA 70, and NAVFAC Guide Specs. Work shall be completed within the timeframe specified on the task order.
5EA
A766Replace Variable Frequency Drive, Enclosed, up to 460 Volt,
5 HP motor size, NEMA 1Provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 5 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.
10EA
A767Replace Variable Frequency Drive, Enclosed, up to 460 Volt,
7.5 HP motor size, NEMA 1Provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 7.5 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.
10EA
A768Replace Variable Frequency Drive, Enclosed, up to 460 Volt,
10 HP motor size, NEMA 1Provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 10 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.
10EA
A769Replace Variable Frequency Drive, Enclosed, up to 460 Volt,
15 HP motor size, NEMA 1Provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 15 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.
5EA
A770Replace Variable Frequency Drive, Enclosed, up to 460 Volt,
20 HP motor size, NEMA 1Provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 20 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order.
5EA
A771Replace Variable Frequency Drive, Enclosed, up to 460 Volt,

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .