J-0200000-20 - ELINS.xlsx
XLSX spreadsheet 375 KB Posted
- Attached to
- Base Operations Support Services For NSA Annapolis and US Naval Academy, Annapolis, Maryland
- Solicitation number
- N6247026R0017
About this file
This is a pricing template (Attachment J-0200000-20 ELINS.xlsx) for a base operations support services contract for NSA Annapolis and the U.S. Naval Academy in Annapolis, Maryland under solicitation N62470-26-R-0017. The contract encompasses both recurring and non-recurring work across a base period and seven option periods, organized into multiple Contract Line Items (CLINs) and Exhibit Line Item Numbers (ELINs).
The recurring work (CLIN 0001 and subsequent option periods) includes facility management, facility investment, pest control, integrated solid waste management, utilities management and operations, electrical distribution, natural gas, wastewater treatment, steam systems, water systems, chiller plant operations, and transportation services across multiple regional facilities (NSA Annapolis, NAVFAC Utilities, Naval Academy, Defense Health Agency Naval Health Clinic, and Naval Academy Business Services Division). Specific recurring services include Infrastructure Condition Assessment Programs, Emergency/Urgent/Routine work orders, preventive maintenance for systems such as HVAC, fire protection, vertical transportation equipment, and integrated maintenance programs with quantities measured in monthly service periods (12 MO) or as numbered work order categories. The non-recurring work (CLIN 0002) comprises over 140 individually priced line items ranging from unit-priced labor hours (40,000 LH estimated) and direct materials (estimated at $1,400,000) to specific services such as painting, carpet replacement, ceiling tile replacement, backflow preventer repair/replacement, fire protection system components, variable frequency drive replacements, DDC system component replacements, and event support services including tents, generators, and vehicle rentals. All work orders are to be completed within timeframes specified in individual task orders, with pricing to be negotiated by the Contracting Officer for certain labor-intensive items.
View the file
Other files
Show 40 more
Latest 50 of 86 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary - All Periods
| Summary - Recurring Work | ||
| Period of Performance | Spec Item 3 | |
| Labor Hours | Spec Item 3 | |
| Labor Cost | Spec Item 3 | |
| Material Cost | Spec Item 3 | |
| Equipment Cost | Spec Items |
1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | |||||||||
| Cost | Profit/Fee | Total Price | Average Cost per Labor Hour | |||||||
| Base Period | 0.00 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Option Period One | ||||||||||
| Option Period Two | ||||||||||
| Option Period Three | ||||||||||
| Option Period Four | ||||||||||
| Option Period Five | ||||||||||
| Option Period Six | ||||||||||
| Option Period Seven | ||||||||||
| 52.217-8 Option | ||||||||||
| Total: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Summary - Non-recurring Work | ||
| Period of Performance | Spec Item 3 | |
| Labor Hours | Spec Item 3 | |
| Labor Cost | Spec Item 3 | |
| Material Cost | Spec Item 3 | |
| Equipment Cost | Spec Items |
1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | |||||||||
| Cost | Profit/Fee | Total Price | Average Cost per Labor Hour | |||||||
| Base Period | 0.00 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Option Period One | ||||||||||
| Option Period Two | ||||||||||
| Option Period Three | ||||||||||
| Option Period Four | ||||||||||
| Option Period Five | ||||||||||
| Option Period Six | ||||||||||
| Option Period Seven | ||||||||||
| 52.217-8 Option | ||||||||||
| Total: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Summary - Recurring and Non-recurring Work | ||
| Period of Performance | Spec Item 3 | |
| Labor Hours | Spec Item 3 | |
| Labor Cost | Spec Item 3 | |
| Material Cost | Spec Item 3 | |
| Equipment Cost | Spec Items |
1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | |||||||||
| Cost | Profit/Fee | Total Price | Average Cost per Labor Hour | |||||||
| Base Period | 0.00 | $ - 0 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Option Period One | ||||||||||
| Option Period Two | ||||||||||
| Option Period Three | ||||||||||
| Option Period Four | ||||||||||
| Option Period Five | ||||||||||
| Option Period Six | ||||||||||
| Option Period Seven | ||||||||||
| 52.217-8 Option | ||||||||||
| Total: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
CLIN 0001 - Base Recurring
| Attachment J-0200000-20 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N62470-26-R-0017 |
| Line Item 0001 - Recurring Work - Base Period | |||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||
| ELIN/Sub-ELINs A001 through A006 | |||
| ELIN/ | |||
| Sub-ELIN | Annex/Sub-annex | ||
| Spec Item | Description | Spec Item 3 | |
| Labor Hours | Spec Item 3 | ||
| Labor Cost | Spec Item 3 | ||
| Material Cost | Spec Item 3 | ||
| Equipment Cost | Spec Items |
1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||||
| Cost | Profit/Fee | Quantity | Unit of Measure | Unit Price | Total Price | ||
| A001 | N61152 - REGION NSA ANNAPOLIS | ||||||
| Region - Specification 1501000 Facility Management (FP) | |||||||
| A001AA | 1501000 | 3.1 | Infrastructure Condition Assessment Program (ICAP) | 12 | MO | ||
| Subtotal Region Facility Management (FP) Work: |
| Region - Specification 1502000 Facility Investment (ST) | |||||
| 1502000 | 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | |||
| A001AB | 1502000 | 3.1.1 | Emergency Work Order | 1,000 | EA |
| A001AC | 1502000 | 3.1.2 | Urgent Work Order | 4,000 | EA |
| A001AD | 1502000 | 3.1.3 | Routine Work Order | 9,000 | EA |
| 1502000 | 3.2 | Project Work | |||
| A001AE | 1502000 | 3.2.1 | Project Work Orders Level 1 | 3,000 | EA |
| A001AF | 1502000 | 3.2.2 | Project Work Orders Level 2 | 130 | EA |
| A001AG | 1502000 | 3.2.3 | Project Work Orders Level 3 | 20 | EA |
| 1502000 | 3.3 | Preventive Maintenance | |||
| A001AH | 1502000 | 3.3.1 | Lighting Systems | 12 | MO |
| A001AJ | 1502000 | 3.3.2 | Photovoltaic Energy Systems | 12 | MO |
| A001AK | 1502000 | 3.3.3 | Cathodic Protection Systems | 12 | MO |
| A001AL | 1502000 | 3.3.4 | Lightning Protection Systems | 12 | MO |
| A001AM | 1502000 | 3.3.5 | Fire Protection Systems | 12 | MO |
| A001AN | 1502000 | 3.3.6 | Vertical Transportation Equipment (VTE) | 12 | MO |
| A001AP | 1502000 | 3.3.7 | Compressed Air Systems | 12 | MO |
| A001AQ | 1502000 | 3.3.8 | Auxiliary Generator Systems | 12 | MO |
| A001AR | 1502000 | 3.3.9 | Petroluem, Oil and Lubricant (POL) System Facilities and Distribution Systems | 12 | MO |
| A001AS | 1502000 | 3.3.10 | Emergency Eyewash Stations and Chemical Shower Systems | 12 | MO |
| A001AT | 1502000 | 3.3.11 | Pools and Spa Systems | 12 | MO |
| A001AU | 1502000 | 3.3.12 | Ornamental Fountain Sytems | 12 | MO |
| A001AV | 1502000 | 3.3.13 | Uninterrupted Power Systems (UPS) | 12 | MO |
| A001AW | 1502000 | 3.3.14 | Pump Systems | 12 | MO |
| A001AX | 1502000 | 3.3.15 | Food Service Equipment Systems | 12 | MO |
| A001AY | 1502000 | 3.3.16 | Chapel Organ Systems | 12 | MO |
| A001AZ | 1502000 | 3.3.17 | Keyless Entry Systems | 12 | MO |
| A001BA | 1502000 | 3.3.18 | Manual and Automated Door Systems | 12 | MO |
| A001BB | 1502000 | 3.3.19 | Special Care Door Systems | 12 | MO |
| A001BC | 1502000 | 3.3.20 | Fire Door Systems | 12 | MO |
| A001BD | 1502000 | 3.3.21 | Roll-Up Doors and Window Systems | 12 | MO |
| A001BE | 1502000 | 3.3.22 | Motorized Gate Systems | 12 | MO |
| A001BF | 1502000 | 3.3.23 | Baler Systems | 12 | MO |
| A001BG | 1502000 | 3.3.24 | Small Arms Firing Ranges (SAFR) Systems | 12 | MO |
| A001BH | 1502000 | 3.3.25 | Fume Hood Systems | 12 | MO |
| A001BJ | 1502000 | 3.3.26 | Acid Neutralization Tanks | 12 | MO |
| A001BK | 1502000 | 3.3.27 | Roof and Drainage Systems | 12 | MO |
| A001BL | 1502000 | 3.3.28 | Rowing Tank Services | 12 | MO |
| A001BM | 1502000 | 3.3.29 | Hydraulic Track System | 12 | MO |
| 1502000 | 3.4 | Integrated Maintenance Program (IMP) | |||
| A001BN | 1502000 | 3.4.1 | HVAC and Refrigeration Systems | 12 | MO |
| A001BP | 1502000 | 3.4.2 | Control Systems | 12 | MO |
| A001BQ | 1502000 | 3.4.3 | Cybersecurity Program Support | 12 | MO |
| A001BR | 1502000 | 3.4.4 | Boilers and Unfired Pressure Vessels (UPVs) Systems | 12 | MO |
| A001BS | 1502000 | 3.4.5 | Chillers and Distribution Systems | 12 | MO |
| 1502000 | 3.5 | Inspection, Testing, and Certification Program | |||
| A001BT | 1502000 | 3.5.1 | Boilers and UPVs | 12 | MO |
| A001BU | 1502000 | 3.5.2 | Backflow Prevention Devices | 12 | MO |
| A001BV | 1502000 | 3.5.3 | Vertical Transportation Equipment (VTE) | 12 | MO |
| A001BW | 1502000 | 3.5.4 | Petroluem, Oil and Lubricant (POL) Systems | 12 | MO |
| 1502000 | 3.6 | Other Recurring Services Program | |||
| A001BX | 1502000 | 3.6.1 | Field Lighting Control Services | 12 | MO |
| A001BY | 1502000 | 3.6.2 | Grease Trap Services | 12 | MO |
| A001BZ | 1502000 | 3.6.3 | Dryer Vent Services | 12 | MO |
| A001CA | 1502000 | 3.6.4 | Oil Water Separator (OWS) Services | 12 | MO |
| A001CB | 1502000 | 3.6.5 | Exhaust Hood and Duct System Services | 12 | MO |
| A001CC | 1502000 | 3.6.6 | HVAC Temperature Set Point Services | 12 | MO |
| A001CD | 1502000 | 3.6.7 | Mechanical Room Services | 12 | MO |
| A001CE | 1502000 | 3.6.8 | HVAC Seasonal Start-Up and Shutdown Services | 12 | MO |
| A001CF | 1502000 | 3.6.9 | Facility Boiler and Steam Equipment Seasonal Start-Up and Shutdown Services | 12 | MO |
| A001CG | 1502000 | 3.6.10 | Irrigation System Seasonal Start-Up and Shutdown Services | 12 | MO |
| A001CH | 1502000 | 3.6.11 | Technical Library Services | 12 | MO |
| A001CJ | 1502000 | 3.6.12 | Memorial Hall Chandelier Services | 12 | MO |
| A001CK | 1502000 | 3.6.13 | Sports Net and Wind Screen Services | 12 | MO |
| A001CL | 1502000 | 3.6.14 | Water Filter Replacement Services | 12 | MO |
| A001CM | 1502000 | 3.6.15 | Flood Control Services | 12 | MO |
| A001CN | 1502000 | 3.6.16 | Utility Tunnel Services | 12 | MO |
| A001CP | 1502000 | 3.6.17 | HVAC Water Testing and Treatment Services | 12 | MO |
| A001CQ | 1502000 | 3.6.18 | Boiler and Steam Equipment Water Testing and Treatment Services | 12 | MO |
| Subtotal Region Facility Investment (ST) Work: |
| Region - Specification 1503020 Pest Control (FX) | |||||
| A001CR | 1503020 | 3.1 | Pest Control Services | 12 | MO |
| A001CS | 1503020 | 3.1.2 | Inspection Requirements for Bed Bugs | 100 | EA |
| A001CT | 1503020 | 3.2 | Unscheduled Pest Control Services | 12 | MO |
| A001CU | 1503020 | 3.3 | Pest Management Reporting | 12 | MO |
| Subtotal Region Pest Control (FX) Work: |
| Region - Specification 1503030 Integrated Solid Waste Management (ISWM) (FX) | |||||
| A001CV | 1503030 | 3.1 | Solid Waste Collection Services | 12 | MO |
| Subtotal Region ISWM (FX) Work: |
Total Region Work:
| A002 | NAVFAC Utilities | ||||
| NAVFAC Utilities - Specification 1601000 Utility Management (UT) | |||||
| 1601000 | 3.1 | Utility Emergency, Urgent and Routine (E/U/R) Work | |||
| A002AA | 1601000 | 3.1.1 | Utility Emergency Work Order | 25 | EA |
| A002AB | 1601000 | 3.1.2 | Utility Urgent Work Order | 25 | EA |
| A002AC | 1601000 | 3.1.3 | Utility Routine Work Order | 50 | EA |
| 1601000 | 3.2 | Utility Project Work | |||
| A002AD | 1601000 | 3.2.1 | Utility Project Work Order Level 1 | 25 | EA |
| A002AE | 1601000 | 3.2.2 | Utility Project Work Order Level 2 | 20 | EA |
| A002AF | 1601000 | 3.2.3 | Utility Project Work Order Level 3 | 3 | EA |
| 1601000 | 3.3 | Utilities Operations Management | |||
| A002AG | 1601000 | 3.3.1 | Utilities Mapping | 12 | MO |
| A002AH | 1601000 | 3.3.2 | Utilities Outage and Road Closure Scheduling and Coordination | 12 | MO |
| A002AJ | 1601000 | 3.3.3 | Meter Reading | 12 | MO |
| A002AK | 1601000 | 3.3.4 | Excavation Permit Issuance | 12 | MO |
| A002AL | 1601000 | 3.3.5 | Utility Location Services | 12 | MO |
| A002AM | 1601000 | 3.3.6 | Inventory Management | 12 | MO |
| 1601000 | 3.4 | Utility Control Systems | |||
| A002AN | 1601000 | 3.4.1 | Software Maintenance | 12 | MO |
| Subtotal PWD Utilities Management (UT) Work: |
| NAVFAC Utilities - Specification 1602000 Electrical (UT) | |||||
| 1602000 | 3.1 | Operate Electrical Power Transmission and Distribution Systems | |||
| A002AP | 1602000 | 3.1 | Operate Electrical Power Transmission and Distribution Systems | 12 | MO |
| 1602000 | 3.2 | Integrated Maintenance Program (IMP) | |||
| A002AQ | 1602000 | 3.2 | Integrated Maintenance Program (Electrical Power Transmission and Distribution Systems) | 12 | MO |
| Subtotal PWD Electrical (UT) Work: |
| NAVFAC Utilities - Specification 1603000 Natural Gas (UT) | |||||
| 1603000 | 3.1 | Operation | |||
| A002AR | 1603000 | 3.1.1 | Natural Gas Distribution | 12 | MO |
| 1603000 | 3.2 | Integrated Maintenance Program (IMP) | |||
| A002AS | 1603000 | 3.2 | Integrated Maintenance Program (Natural Gas Distribution and Systems) | 12 | MO |
| Subtotal PWD Natural Gas (UT) Work: |
| NAVFAC Utilities - Specification 1604000 Wastewater (UT) | |||||
| 1604000 | 3.1 | Operation | |||
| A002AT | 1604000 | 3.1.1 | Wastewater Effluent Quality, Sampling, and Testing | 12 | MO |
| A002AU | 1604000 | 3.1.2 | Influent Water Quality, Sampling, and Testing | 12 | MO |
| A002AV | 1604000 | 3.1.3 | Minimum Operator Attendance | 12 | MO |
| A002AW | 1604000 | 3.1.4 | Sludge Sampling and Analysis | 12 | MO |
| A002AX | 1604000 | 3.1.5 | Disposal of Sludge | 12 | MO |
| A002AY | 1604000 | 3.1.6 | Operating Records, Logs, and Reports | 12 | MO |
| 1604000 | 3.2 | Integrated Maintenance Program (IMP) | |||
| A002AZ | 1604000 | 3.2.1 | Wastewater Treatment Plant (WWTP) | 12 | MO |
| A002BA | 1604000 | 3.2.2 | Wastewater Instrumentation Systems | 12 | MO |
| A002BB | 1604000 | 3.2.3 | Wet Wells | 12 | MO |
| A002BC | 1604000 | 3.2.4 | Sewage Pumps | 12 | MO |
| 1604000 | 3.3 | Inspection Program | |||
| A002BD | 1604000 | 3.3.1 | Sewage Collection Pipelines | 12 | MO |
| A002BE | 1604000 | 3.3.2 | Wet Wells | 12 | MO |
| A002BF | 1604000 | 3.3.3 | Manholes | 12 | MO |
| 1604000 | 3.4 | Other Recurring Services | |||
| A002BG | 1604000 | 3.4.1 | Cleaning of Sewer Pipeline | 12 | MO |
| A002BH | 1604000 | 3.4.2.1 | Wet Well Pumping | 12 | MO |
| A002BJ | 1604000 | 3.4.2.2 | Wet Well Cleaning | 12 | MO |
| A002BK | 1604000 | 3.4.3 | Wet Well Cleaning | 12 | MO |
| A002BL | 1604000 | 3.4.4.1 | Bioretention, Micro-Bioretention, and Raingardens | 12 | MO |
| A002BM | 1604000 | 3.4.4.2 | Filtraton Structures | 12 | MO |
| A002BN | 1604000 | 3.4.4.3 | Open Swale Systems | 12 | MO |
| A002BP | 1604000 | 3.4.4.4 | Porous or Permeable Pavement | 12 | MO |
| A002BQ | 1604000 | 3.4.4.5 | Micro-Scale Practices - Rainwater Harvesting Systems | 12 | MO |
| A002BR | 1604000 | 3.4.4.6 | Ponds | 12 | MO |
| A002BS | 1604000 | 3.4.4.7 | Stormceptor Systems | 12 | MO |
| Subtotal PWD Wastewater (UT) Work: |
| NAVFAC Utilities - Specification 1605000 Steam (UT) | |||||
| 1605000 | 3.1 | Operation | |||
| A002BT | 1605000 | 3.1.1 | Steam Quality | 12 | MO |
| A002BU | 1605000 | 3.1.2 | Plant Boiler Combustion Limits and Efficiencies | 12 | MO |
| A002BV | 1605000 | 3.1.3 | Heating and Power Boiler Minimum Operator Attendance | 12 | MO |
| A002BW | 1605000 | 3.1.4 | Water Testing and Treatment Program | 12 | MO |
| A002BX | 1605000 | 3.1.5 | Condensate Return System | 12 | MO |
| A002BY | 1605000 | 3.1.6 | Operating Records, Logs, and Reports | 12 | MO |
| 1605000 | 3.2 | Integrated Maintenance Program (IMP) | |||
| A002BZ | 1605000 | 3.2 | Integrated Maintenance Program (Steam Generation and Distribution Systems) | 12 | MO |
| 1605000 | 3.3 | Inspection, Testing, and Certification Program | |||
| A002CA | 1605000 | 3.3.1 | Power Boiler, HRSG’s, and UPV Certification Assistance | 12 | MO |
| 1605000 | 3.4 | Other Recurring Services | |||
| A002CB | 1605000 | 3.4.1 | Central Heating Plant (CHP) HTHW Periodic Start-Up and Shutdown | 12 | MO |
| Subtotal PWD Steam (UT) Work: |
| NAVFAC Utilities - Specification 1606000 Water (UT) | |||||
| 1606000 | 3.1 | Operation | |||
| A002CC | 1606000 | 3.1.1 | Water Quality | 12 | MO |
| A002CD | 1606000 | 3.1.2 | Minimum Operator Attendance | 12 | MO |
| A002CE | 1606000 | 3.1.3 | Operating Records, Logs, and Reports | 12 | MO |
| 1606000 | 3.2 | Integrated Maintenance Program (IMP) | |||
| A002CF | 1606000 | 3.2.1 | Water Treatment Plant (WTP) | 12 | MO |
| A002CG | 1606000 | 3.2.2 | Water Storage and Distribution Systems | 12 | MO |
| A002CH | 1606000 | 3.2.3 | Fire Hydrants | 12 | MO |
| 1606000 | 3.3 | Other Recurring Services | |||
| A002CJ | 1606000 | 3.3.1 | Valve Exercising Program | 12 | MO |
| A002CK | 1606000 | 3.3.2 | Unidirectional Flushing (UDF) | 12 | MO |
| Subtotal PWD Water (UT) Work: |
| NAVFAC Utilities - Specification 1607000 Chiller (UT) | |||||
| 1607000 | 3.1 | Operation | |||
| A002CL | 1607000 | 3.1.1 | Chiller Plant Controls and Monitoring System | 12 | MO |
| A002CM | 1607000 | 3.1.2 | Chiller Plant and Hydronic Systems Testing and Treatment Programs | 12 | MO |
| A002CN | 1607000 | 3.1.3 | Chiller Plant Minimum Operator Attendance | 12 | MO |
| A002CP | 1607000 | 3.1.4 | Operating Records, Logs, and Reports | 12 | MO |
| 1606000 | 3.2 | Integrated Maintenance Program (IMP) | 12 | MO | |
| A002CQ | 1607000 | 3.2 | Integrated Maintenance Program (Chiller Plant and Distribution Systems) | 12 | MO |
| 1607000 | 3.3 | Inspection, Testing, and Certification Program | |||
| A002CR | 1607000 | 3.3.1 | Cooling Tower Water Testing and Treatment Services | 12 | MO |
| A002CS | 1607000 | 3.3.2 | Reserved | ||
| Subtotal PWD Chiller (UT) Work: |
Total PWD Utilities (UT) Work:
| NAVFAC Utilities - Specification 1700000 Transportation (TR) | |||||
| 1700000 | 3.1 | Operation | |||
| A002CT | 1700000 | 3.1.3 | Fuel Delivery Service and Fuel Program Requirements | 12 | MO |
| Subtotal PWD Utilities (TR) Work: |
| Total PWD Utilities (UT and TR) Work: | |||||
| A003 | NAVFAC PWD Transportation | ||||
| NAVFAC Transportation - Specification 1700000 (TR) | |||||
| 1700000 | 3.1 | Operation | |||
| A003AA | 1700000 | 3.1.1 | Billing Services | 12 | MO |
| A003AB | 1700000 | 3.1.2 | Tow Truck Services | 12 | MO |
| 1700000 | 3.2 | Support Services | |||
| A003AC | 1700000 | 3.2.1 | Dispatching Service | 12 | MO |
| A003AD | 1700000 | 3.2.2.1 | GSA Leased Vehicles | 12 | MO |
| A003AE | 1700000 | 3.2.2.2 | Other Commercial Leased Vehicles | 12 | MO |
| Total PWD TR Work: | |||||
| A004 | N00162 - DHA / NMRTC - DEFENSE HEALTH AGENCY / NAVAL MEDICAL READINESS AND TRAINING COMMAND | ||||
| DHA Naval Health Clinic - Specification 1501000 Facility Management | |||||
| A004AA | 1501000 | 3.1 | Infrastructure Condition Assessment Program (ICAP) | 12 | MO |
| Subtotal DHA Facility Management Work: | |||||
| DHA Naval Health Clinic - Specification 1502000.1 Facility Investment | |||||
| 1502000.1 | 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | |||
| A004AB | 1502000.1 | 3.1.1 | Emergency Work Order | 5 | EA |
| A004AC | 1502000.1 | 3.1.2 | Urgent Work Order | 15 | EA |
| A004AD | 1502000.1 | 3.1.3 | Routine Work Order | 40 | EA |
| 1502000.1 | 3.2 | Project Work | |||
| A004AE | 1502000.1 | 3.2.1 | Project Work Order Level 1 | 10 | EA |
| A004AF | 1502000.1 | 3.2.2 | Project Work Order Level 2 | 12 | EA |
| 1502000.1 | 3.3 | Integrated Maintenance Program (IMP) | |||
| A004AG | 1502000.1 | 3.3.1 | Lighting Systems | 12 | MO |
| A004AH | 1502000.1 | 3.3.2 | Photovoltaic Energy Systems | 12 | MO |
| A004AJ | 1502000.1 | 3.3.3 | Solar Water Heating Systems | 12 | MO |
| A004AK | 1502000.1 | 3.3.4 | Lighting Protection Systems | 12 | MO |
| A004AL | 1502000.1 | 3.3.5 | Fire Protection Systems | 12 | MO |
| A004AM | 1502000.1 | 3.3.6 | Vertical Transportation Equipment (VTE) | 12 | MO |
| A004AN | 1502000.1 | 3.3.7 | Compressed Air, Medical Air, Gas, and Vacuum Systems | 12 | MO |
| A004AP | 1502000.1 | 3.3.8 | Auxiliary Generator Systems | 12 | MO |
| A004AQ | 1502000.1 | 3.3.9 | Uninterrupted Power Systems (UPS) | 12 | MO |
| A004AR | 1502000.1 | 3.3.10 | Pumps | 12 | MO |
| A004AS | 1502000.1 | 3.3.11 | Public Announcement (PA) Systems | 12 | MO |
| A004AT | 1502000.1 | 3.3.12 | Roof and Drainage Systems | 12 | MO |
| A004AU | 1502000.1 | 3.3.13 | Manual and Automated Door Systems | 12 | MO |
| A004AV | 1502000.1 | 3.3.14 | Roll-Up Door and Window Systems | 12 | MO |
| A004AW | 1502000.1 | 3.3.15 | HVAC and Refrigeration Systems | 12 | MO |
| A004AX | 1502000.1 | 3.3.16 | Control Systems | 12 | MO |
| A004AY | 1502000.1 | 3.3.17 | Cybersecurity Program Support | 12 | MO |
| A004AZ | 1502000.1 | 3.3.17 | Boilers and Unfired Pressure Vessels (UPVs) Systems | 12 | MO |
| A004BA | 1502000.1 | 3.3.18 | Chillers and Distribution Systems | 12 | MO |
| 1502000.1 | 3.4 | Inspection, Testing, and Certification Program | |||
| A004BB | 1502000.1 | 3.4.1 | Boilers and UPVs | 12 | MO |
| A004BC | 1502000.1 | 3.4.2 | Backflow Prevention Devices | 12 | MO |
| A004BD | 1502000.1 | 3.4.3 | Vertical Transportation Equipment (VTE) | 12 | MO |
| 1502000.1 | 3.5 | Other Recurring Services Program | |||
| A004BC | 1502000.1 | 3.5.1 | Plaster Trap Services | 12 | MO |
| A004BD | 1502000.1 | 3.5.2 | Exhaust Hoods and Ducts | 12 | MO |
| A004BE | 1502000.1 | 3.5.3 | Mechanical Room Services | 12 | MO |
| A004BF | 1502000.1 | 3.5.4 | HVAC Seasonal Start-Up and Shutdown Services | 12 | MO |
| A004BG | 1502000.1 | 3.5.5 | HVAC Water Teating and Treatment Services | 12 | MO |
| A004BH | 1502000.1 | 3.5.6 | Facility Steam Equipment Seasonal Start-Up and Shutdown Services | 12 | MO |
| A004BJ | 1502000.1 | 3.5.7 | Irrigation System Seasonal Start-Up and Shutdow | 12 | MO |
| A004BK | 1502000.1 | 3.5.8 | Naval Heatlh Clinic | 12 | MO |
| Subtotal DHA Facility Investment Work: | |||||
| DHA Naval Health Clinic - Specification 1503020 Pest Control | |||||
| A004BL | 1503020 | 3.1 | Pest Control Services | 12 | MO |
| A004BM | 1503020 | 3.2 | Pest Control Work Orders | 12 | EA |
| A004BN | 1503020 | 3.3 | Pest Management Reporting | 12 | MO |
| Subtotal DHA Pest Control Work: | |||||
| Total DHA Work: |
| A005 | N00161 - NAVAL ACADEMY (USNA) | ||||
| USNA - Specification 1502000 Facility Investment | |||||
| 1502000 | 3.1 | Emergency, Urgent, and Routine (E/U/R) Work | |||
| A005AA | 1502000 | 3.1.1 | Emergency Work Order | 20 | EA |
| A005AB | 1502000 | 3.1.2 | Urgent Work Order | 30 | EA |
| A005AC | 1502000 | 3.1.3 | Routine Work Order | 50 | EA |
| 1502000 | 3.2 | Project Work | |||
| A005AD | 1502000 | 3.2.2 | Project Work Orders Level 2 | 10 | EA |
| Subtotal USNA Facility Investment Work: |
| USNA - Specification 1503070 Special Events | |||||
| 1503070 | 3.1 | Special Event Project Work Orders | |||
| A005AE | 1503070 | 3.1 | Project Work Order Category 1 | 200 | EA |
| A005AF | 1503070 | 3.1 | Project Work Order Category 2 | 125 | EA |
| A005AG | 1503070 | 3.1 | Project Work Order Category 3 | 55 | EA |
| A005AH | 1503070 | 3.1 | Project Work Order Category 4 | 20 | EA |
| A005AJ | 1503070 | 3.1 | Project Work Order Category 5 | 15 | EA |
| A005AK | 1503070 | 3.1 | Project Work Order Category 6 | 6 | EA |
| A005AL | 1503070 | 3.1 | Project Work Order Category 7 | 2 | EA |
| A005AM | 1503070 | 3.1 | Project Work Order Category 8 | 1 | EA |
| A005AN | 1503070 | 3.1 | Project Work Order Category 9 | 1 | EA |
| A005AP | 1503070 | 3.1 | Project Work Order Category 10 | 1 | EA |
| 1503070 | 3.2 | Special Event Services | |||
| A005AQ | 1503070 | 3.2.1 | Alumni Hall Basketball Services | 12 | MO |
| A005AR | 1503070 | 3.2.2 | Alumni Hall General Event Services | 12 | MO |
| A005AS | 1503070 | 3.2.3 | Commencement Event Support Services | 12 | MO |
| A005AT | 1503070 | 3.2.4 | Blue Angel Event Services | 12 | MO |
| A005AU | 1503070 | 3.2.5 | Chapel Manager Services | 12 | MO |
| A005AV | 1503070 | 3.2.6 | Holidat Decoration Services | 12 | MO |
| 1503070 | 3.3 | Funeral Support Services | |||
| A005AW | 1503070 | 3.3.1 | In-Ground Cemetery Casket Burial Services | 12 | MO |
| A005AX | 1503070 | 3.3.2 | In-Ground Cemetery Cremation Burila Services | 12 | MO |
| A005AY | 1503070 | 3.3.3 | Columbarium Cremation Internment Services | 12 | MO |
| Subtotal USNA Special Events Work: |
| USNA - Specification 1700000 Transportation | |||||
| 1700000 | 3.1 | Operations | |||
| A005AZ | 1700000 | 3.1.2 | Tow Truck Services | 12 | MO |
| Subtotal USNA Transportation Work: |
Total USNA Work:
| A006 | NAVAL ACADEMY BUSINESS SERVICES DIVISION (NABSD) | ||||
| NABSD - Specification 150200 Facility Investment | |||||
| 1502000 | 3.6 | Other Recurring Services Program | |||
| A006AA | 1502000 | 3.6.2 | Grease Trap Services | 12 | MO |
| A006AB | 1502000 | 3.6.3 | Dryer Vent Services | 12 | MO |
| A006AC | 1502000 | 3.6.5 | Exhaust Hood and Duct System Services | 12 | MO |
| Total NABSD Work: |
TOTAL LINE ITEM 0001 - BASE OPTION PERIOD - RECURRING WORK (ELINs A001 THRU A006)
CLIN 0002 - Base Non-Recurring
| Attachment J-0200000-20 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N62470-26-R-0017 |
| Line Item 0002 - Non-Recurring Work - Base Period | ||||
| Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4 | ||||
| ELIN/Sub-ELINs A700 through A845 | ||||
| ELIN | Product Name (120 Characters) | Description Extended | Spec Item 4 | |
| Labor Hours | Spec Item 4 | |||
| Labor Cost | Spec Item 4 | |||
| Material Cost | Spec Item 4 | |||
| Equipment Cost | Spec Items 1 and 2 |
On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||
| Cost | Profit/Fee | Estimated Quantity | Unit of Measure | Unit Price | Extended Price |
| A700 | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | Perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
Task order completion times will be specified on each task order.
| 40,000 | LH | |||
| A701 | Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. | Provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
| Task order completion times will be specified on each task order. | 1,400,000 | DO | $ 1.00 | 1,400.000.00 | ||||
| A702 | Emergency Work | Develop and Implement Emergency Work Orders per respective requirements in Annex 1502000, Emergency Work Orders, Spec Item 3.1.1 | 100 | EA | ||||
| A703 | Urgent Work | Develop and Implement Urgent Work Orders per respective requirements in Annex 1502000, Urgent Work Orders, Spec Item 3.1.2 | 100 | EA | ||||
| A704 | Routine Work | Develop and Implement Routine Work Orders per respective requirements in Annex 1502000, Routine Work Orders, Spec Item 3.1.3 | 100 | EA | ||||
| A705 | Project Work | Develop and Implement Project Work per respective requirements in Annex 1502000, Project Work, Spec Item 3.2 | 100 | EA | ||||
| A706 | Packaged Terminal Air Conditioning Unit (PTAC) |
Replace PTAC unit, up to 2 ton, using existing wall sleeve and branch circuits.
| Work shall be completed within 48 hours of receipt of order. | 20 | EA | ||
| A707 | Packaged Terminal Air Conditioning Unit (PTAC) | |||
| Replace PTAC unit, 2 to 5 ton, using existing wall sleeve and branch circuits. |
| Work shall be completed within 48 hours of receipt of order. | 15 | EA | |||
| A708 | Temporary HVAC, up to 25 tons | Provide temporary HVAC to ensure Conditioned spaces are continuously maintained at the temperature(s) specified in J-1502000-XX. |
| Temporary HVAC shall be supplied within 24 hours of receipt of the order and continue until facility system is fully operational or the time specified on the order. | 14 | DA | |||
| A709 | Temporary HVAC, 25 to 50 tons | Provide temporary HVAC to ensure Conditioned spaces are continuously maintained at the temperature(s) specified in J-1502000-XX. |
| Temporary HVAC shall be supplied within 24 hours of receipt of the order and continue until facility system is fully operational or the time specified on the order. | 14 | DA | |||
| A710 | Temporary HVAC, 50 to 100 tons | Provide temporary HVAC to ensure Conditioned spaces are continuously maintained at the temperature(s) specified in J-1502000-XX. |
| Temporary HVAC shall be supplied within 24 hours of receipt of the order and continue until facility system is fully operational or the time specified on the order. | 14 | DA | |||||
| A711 | Generator rental DHA | Provide one (1) 300KVA 480V generator to include refuling service and daily operationa checks to include delivery (to and from), set-up, disassembly, and connection services. | 5 | DA | |||
| A712 | Generator rental service extension DHA | Extension of genreator rental service for five (5) days. Rantal includes rental fee, refueling service, and daily operational checks. | 5 | DA | |||
| A713 | Interior Painting | Provide all labor, materials and equipment required to perform surface preparation, pre-painting, sanding, etching and finish painting of all interior surfaces specified. Surface preparation includes, but is not limited to wood, metal, sheetrock, concrete, and plaster. Related services shall include wall-papering, plastering, and dry-wall repair. The Contractor shall collect and dispose of all paint chips, dust, sand, and other waste paint materials resulting from any part of the painting process, IAW the Resource Conservation and Recovery Act and associated Federal, State, and local laws and regulations. All hazardous waste disposal shall be coordinated through the Government Representative. Work shall be ordered and priced in increments of 200 square feet (SF). Work shall be completed within the timeframe specified on the task order. | |||||
| 625 | EA | ||||||
| A714 | Furniture Move Incidental to Interior Painting | Provide all labor, materials, and equipment required to move furniture incidental to interior painting. Provide unit pricing such that each unit consists of five (5) pieces of furniture. A cubical shall be considered a single piece of furniture. Work shall be completed within the timeframe specified on the task order. | |||||
| 200 | EA | ||||||
| A715 | Exterior Painting | Provide all labor, materials and equipment required to perform surface preparation, pre-painting, sanding, etching and finish painting of all exterior surfaces specified. Surface preparation includes, but is not limited to wood, metal, concrete, and plaster. The Contractor shall collect and dispose of all paint chips, dust, sand, and other waste paint materials resulting from any part of the painting process, IAW the Resource Conservation and Recovery Act and associated Federal, State, and local laws and regulations. All hazardous waste disposal shall be coordinated through the Government Representative. Work shall be ordered with a minimum of 200 sf. Work shall be completed within the timeframe specified on the task order. | 200000 | SF | |||
| A716 | Painting of Swimming Pools and Ornamental Fountains | Provide all labor, materials and equipment required to perform surface preparation, pre-painting, sanding, etching and finish painting of all surfaces specified. The Contractor shall collect and dispose of all paint chips, dust, sand, and other waste paint materials resulting from any part of the painting process, IAW the Resource Conservation and Recovery Act and associated Federal, State, and local laws and regulations. All hazardous waste disposal shall be coordinated through the Government Representative. Work shall be ordered per square foot (sf). Work shall be completed within the timeframe specified on the task order. | 12000 | SF | |||
| A717 | Asbestos Material Removal | Provide all labor, materials and equipment required to perform asbestos material removal in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order. | |||||
| 975 | SF | ||||||
| A718 | Lead Material Removal | Provide all labor, materials and equipment required to perform lead abatement in accordance with State and Federal regulations, this includes an abatement plan that must be approved by the Government Representative. License and certification requirements are listed in Annex 1502000, Spec Item 2.2.1. Work shall be ordered per square feet (sf). Work shall be completed with the timeframe specified on the task order. | |||||
| 750 | SF | ||||||
| A719 | Replace Suspended Ceiling Tile (2'x2') | Provide all labor, materials and equipment required to replace 2’x2’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 16 ceiling tiles. Work shall be completed within the timeframe specified on the task order. | |||||
| 2000 | EA | ||||||
| A720 | Replace Suspended Ceiling Tile (2'x4') | Provide all labor, materials and equipment required to replace 2’x4’ lay-in suspended ceiling tiles for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from ceiling tile replacement. Work shall be ordered per tile, with a minimum of 8 ceiling tiles. Work shall be completed within the timeframe specified on the task order. | |||||
| 2000 | EA | ||||||
| A721 | Replace Suspended Ceiling Grid, Cross Tee 4' | Provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order. | 2000 | EA | |||
| A722 | Replace Suspended Ceiling Grid, Cross Tee 2' | Provide all labor, materials and equipment required to replace suspended ceiling grid cross tee for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order. | 2000 | EA | |||
| A723 | Replace Suspended Ceiling Grid, Main Runner | Provide all labor, materials and equipment required to replace suspended ceiling grid main runner for ceiling height up to 10 feet. The Contractor shall collect and dispose of all waste materials resulting from suspended grid replacement. Work shall be completed within the timeframe specified on the task order. | |||||
| 2000 | EA | ||||||
| A724 | Carpet Replacement (26oz) | Provide all labor, materials and equipment required to install 26oz carpet for the areas designated in the task order. Carpet shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old carpet (including any padding, residual glue, tack strips, etc.) and proper installation of new carpet per manufacturer's instructions. Work shall be ordered per square yard (SY), with a minimum of 10 SY. Work shall be completed within the timeframe specified on the task order. | 4000 | SY | |||
| A725 | Carpet Replacement (32oz) | Provide all labor, materials and equipment required to install 32oz carpet for the areas designated in the task order. Carpet shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old carpet (including any padding, residual glue, tack strips, etc.) and proper installation of new carpet per manufacturer's instructions. Work shall be ordered per square yard (SY), with a minimum of 10 SY. Work shall be completed within the timeframe specified on the task order. | 2000 | SY | |||
| A726 | Carpet Replacement (45oz) | Provide all labor, materials and equipment required to install 45oz carpet for the areas designated in the task order. Carpet shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old carpet (including any padding, residual glue, tack strips, etc.) and proper installation of new carpet per manufacturer's instructions. Work shall be ordered per square yard (SY), with a minimum of 10 SY. Work shall be completed within the timeframe specified on the task order | 1500 | SY | |||
| A727 | Furniture Move Incidental to Carpet Replacement | Provide all labor, materials, and equipment required to move furniture incidental to carpet replacement. Provide unit pricing such that each unit consists of five (5) pieces of furniture. A cubical shall be considered a single piece of furniture. Work shall be completed within the timeframe specified on the task order. | |||||
| 200 | EA | ||||||
| A728 | Replace Vinyl Floor Tile | Provide all labor, materials and equipment required to install vinyl tile flooring for the areas designated in the task order. Vinyl shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old vinyl and proper installation of new vinyl per manufacturer's instructions. Work shall be ordered per square feet (sf), with a minimum of 50 sf. Work shall be completed within the timeframe specified on the task order. | 8000 | SF | |||
| A729 | Replace 4" Vinyl Cove Base | Provide all labor, materials and equipment required to install 4” vinyl cove base for the areas designated in the task order. Cove base shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old cove base, patching or repair of any damaged wall surface, and proper installation of new cove base per manufacturer's instructions. Work shall be ordered with a minimum of 30 LF. Work shall be completed within the timeframe specified on the task order. | 5000 | LF | |||
| A730 | Replace 6" Vinyl Cove Base | Provide all labor, materials and equipment required to install 6” vinyl cove base for the areas designated in the task order. Cove base shall be replaced with the same quality, style, and color as currently installed unless otherwise designated in the task order. Work shall include removal and proper disposal of old cove base, patching or repair of any damaged wall surface, and proper installation of new cove base per manufacturer's instructions. Work shall be ordered with a minimum of 30 LF. Work shall be completed within the timeframe specified on the task order. | 5000 | LF | |||
| A731 | Repair Backflow Preventer: | ||||||
| 1/4 Inch | Provide all labor, materials and equipment required to repair and test failed 1/4 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A732 | Repair Backflow Preventer: | ||||||
| 3/8 Inch | Provide all labor, materials and equipment required to repair and test failed 3/8 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A733 | Repair Backflow Preventer: | ||||||
| 1/2 Inch | Provide all labor, materials and equipment required to repair and test failed 1/2 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A734 | Repair Backflow Preventer: | ||||||
| 3/4 Inch | Provide all labor, materials and equipment required to repair and test failed 3/4 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A735 | Repair Backflow Preventer: | ||||||
| 1 Inch | Provide all labor, materials and equipment required to repair and test failed 1 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A736 | Repair Backflow Preventer: | ||||||
| 1-1/4 Inch | Provide all labor, materials and equipment required to repair and test failed 1-1/4 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A737 | Repair Backflow Preventer: | ||||||
| 1-1/2 Inch | Provide all labor, materials and equipment required to repair and test failed 1-1/2 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A738 | Repair Backflow Preventer: | ||||||
| 2 Inch | Provide all labor, materials and equipment required to repair and test failed 2 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A739 | Repair Backflow Preventer: | ||||||
| 2-1/2 Inch | Provide all labor, materials and equipment required to repair and test failed 2-1/2 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A740 | Repair Backflow Preventer: | ||||||
| 3 Inch | Provide all labor, materials and equipment required to repair and test failed 3 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A741 | Repair Backflow Preventer: | ||||||
| 4 Inch | Provide all labor, materials and equipment required to repair and test failed 4 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A742 | Repair Backflow Preventer: | ||||||
| 6 Inch | Provide all labor, materials and equipment required to repair and test failed 6 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A743 | Repair Backflow Preventer: | ||||||
| 8 Inch | Provide all labor, materials and equipment required to repair and test failed 8 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A744 | Repair Backflow Preventer: | ||||||
| 10 Inch | Provide all labor, materials and equipment required to repair and test failed 10 Inch backflow preventer, to include material, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A745 | Replace Backflow Preventer: | ||||||
| 1/4 Inch | Provide all labor, materials and equipment required to replace and test failed 1/4 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A746 | Replace Backflow Preventer: | ||||||
| 3/8 Inch | Provide all labor, materials and equipment required to replace and test failed 3/8 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A747 | Replace Backflow Preventer: | ||||||
| 1/2 Inch | Provide all labor, materials and equipment required to replace and test failed 1/2 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A748 | Replace Backflow Preventer: | ||||||
| 3/4 Inch | Provide all labor, materials and equipment required to replace and test failed 3/4 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A749 | Replace Backflow Preventer: | ||||||
| 1 Inch | Provide all labor, materials and equipment required to replace and test failed 1 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A750 | Replace Backflow Preventer: | ||||||
| 1-1/4 Inch | Provide all labor, materials and equipment required to replace and test failed 1-1/4 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A751 | Replace Backflow Preventer: | ||||||
| 1-1/2 Inch | Provide all labor, materials and equipment required to replace and test failed 1-1/2 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A752 | Replace Backflow Preventer: | ||||||
| 2 Inch | Provide all labor, materials and equipment required to replace and test failed 2 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A753 | Replace Backflow Preventer: | ||||||
| 2-1/2 Inch | Provide all labor, materials and equipment required to replace and test failed 2-1/2 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A754 | Replace Backflow Preventer: | ||||||
| 3 Inch | Provide all labor, materials and equipment required to replace and test failed 3 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A755 | Replace Backflow Preventer: | ||||||
| 4 Inch | Provide all labor, materials and equipment required to replace and test failed 4 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A756 | Replace Backflow Preventer: | ||||||
| 6 Inch | Provide all labor, materials and equipment required to replace and test failed 6 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A757 | Replace Backflow Preventer: | ||||||
| 8 Inch | Provide all labor, materials and equipment required to replace and test failed 8 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A758 | Replace Backflow Preventer: | ||||||
| 10 Inch | Provide all labor, materials and equipment required to replace and test failed 10 Inch backflow preventer, after repair attempt, to include materials, acceptable replacement, test report and testing form. Work shall be completed within the timeframe specified on the task order. | ||||||
| 20 | EA | ||||||
| A759 | Replace Sprinkler Heads - Dry Pipe System | Provide all labor, materials and equipment required to remove and replace sprinkler heads and escutcheon plates of the dry pipe system (fire suppression system) in accordance with UFC 3-601-02, EM-385-1-1, NFPA 25, and NFPA 101. The Contractor shall also replace the accelerator and trim on the dry system. The Contractor shall provide for daily outage communications with the installation Fire Department and shall complete a final hydrostatic inspection with the installation Fire Marshall. The Contractor supply manuals, instructions, and literature accompanying equipment upon job completion. Work shall be priced for 10 dry type sprinkler heads to be replaced per order. Work shall be completed within the timeframe specified on the task order. | |||||
| 100 | EA | ||||||
| A760 | Replace Sprinkler Heads - Wet Pipe System | Provide all labor, materials and equipment required to remove and replace sprinkler heads and escutcheon plates of the wet pipe system (fire suppression system) in accordance with UFC 3-601-02, EM-385-1-1, NFPA 25, and NFPA 101. The Contractor shall provide material similar in type or superior to existing. The Contractor shall provide for daily draining and refilling of the wet system and daily outage communications with the installation Fire Department and shall complete a final hydrostatic inspection with the installation Fire Marshall. The Contractor supply manuals, instructions, and literature accompanying equipment upon job completion. Work shall be priced for 10 wet type sprinkler heads to be replaced per order. Work shall be completed within the timeframe specified on the task order. | 100 | EA | |||
| A761 | Replace Smoke Detectors | Provide all labor, material, and equipment required to remove and replace smoke detectors at their present locations utilizing existing wiring and mounting boxes. New smoke detectors shall be equipped with battery back-up and hush control in accordance with UFC 3-601-02, EM-385-1-1, NFPA 25, and NFPA 101. The Contractor shall test the newly installed fire alarm smoke detectors for proper operation. The work order does not include the installation of new pipe, cable, wire, boxes, or fittings. Work shall be priced for replacement of 5 smoke detectors per order. Work shall be completed within the timeframe specified on the task order. | |||||
| 500 | EA | ||||||
| A762 | Replace Fire Alarm System Batteries | Provide all labor, material, and equipment required to remove and replace batteries for the control panel and annunciator equipment of the fire alarm system in accordance with UFC 3-601-02, EM-385-1-1, NFPA 25, and NFPA 101. The Contractor shall test the fire alarm system after battery replacement to ensure proper operation. Work shall be completed within the timeframe specified on the task order. | |||||
| 50 | EA | ||||||
| A763 | Replace Fire Protection System Antennas | Provide all labor, material, and equipment required to remove and replace the fire protection system antenna in accordance with UFC 3-601-02, EM-385-1-1, NFPA 25, and NFPA 101. The Contractor shall test the fire alarm system after antenna replacement to ensure proper operation. Work shall be completed within the timeframe specified on the task order. |
| 10 | EA | ||||
| A764 | Replace Elevator Door Rollers | Provide all labor, material, and equipment required to replace, adjust, and test for proper operation of door rollers in hoistways of elevators, passenger and freight type, in accordance with ASME Codes A17.1, A17.2, and A18.1, NFPA 70, and NAVFAC ITG Specs. Work shall be completed within the timeframe specified on the task order. | |||
| 200 | EA | ||||
| A765 | Replace Elevator Photoelectric Reopening Device | Provide all labor, material, and equipment required to replace, adjust, and test for proper operation the Photoelectric Reopening Device on elevators, passenger and freight type, in accordance with ASME Codes A17.1, A17.2, and A18.1, NFPA 70, and NAVFAC Guide Specs. Work shall be completed within the timeframe specified on the task order. | |||
| 5 | EA | ||||
| A766 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, | ||||
| 5 HP motor size, NEMA 1 | Provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 5 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order. | ||||
| 10 | EA | ||||
| A767 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, | ||||
| 7.5 HP motor size, NEMA 1 | Provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 7.5 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order. | ||||
| 10 | EA | ||||
| A768 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, | ||||
| 10 HP motor size, NEMA 1 | Provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 10 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order. | ||||
| 10 | EA | ||||
| A769 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, | ||||
| 15 HP motor size, NEMA 1 | Provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 15 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order. | ||||
| 5 | EA | ||||
| A770 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, | ||||
| 20 HP motor size, NEMA 1 | Provide all labor, material, and equipment required to remove and replace a failed Variable Frequency Drive (VFD) (Enclosed, up to 460 Volt, 20 HP motor size, NEMA 1) in accordance with ANSI/AHRI 1210-2011, NEMA Applicable Guide for AC Adjustable Speed Drive, EM 385-1, and 29 CFR 1910.147 lockout and tag-out procedures. Make necessary modifications to the existing mounting hardware and power and control wiring to successfully install and connect the new VFD. Configure the new VFD to meet the application according to manufacturer’s specifications. Test VFD for proper response through Building Automation System. Work shall be completed within the timeframe specified on the task order. | ||||
| 5 | EA | ||||
| A771 | Replace Variable Frequency Drive, Enclosed, up to 460 Volt, |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .