J-1503070 Special Events.pdf

PDF 163 KB Posted

Attached to
Base Operations Support Services For NSA Annapolis and US Naval Academy, Annapolis, Maryland
Solicitation number
N6247026R0017
Issued by

About this file

Section J – 1503070: Special Events

This document is Section J of a federal contract solicitation that defines work categories, service requirements, and historical data for special events support services. The section establishes ten project work order categories with annual quantities and liability limits ranging from Category 1 (200 orders at $300 liability) through Category 10 (1 order at $35,000 liability). Four primary service types are detailed: Commencement Event Support Services requiring setup of 25 Captain's chairs, diploma tables, podiums, planter boxes, and transportation of graduation stage equipment; Airshow Event Services involving setup and management of bleachers, snow fencing, stages, generators, tents, portable toilets, and trash services across multiple fields (Ingram, Farragut, Hospital Point, Dewey, and Chauvenet/Michelson Terrace); and Funeral Support Services including In-Ground Cemetery Casket Burial, In-Ground Cemetery Cremation Burial, and Columbarium Cremation Interment operations.

Funeral services historical data shows annual volumes ranging from 171 to 220 total services across the three burial types during reporting periods from July 2021 through June 2025, with columbarium cremation interments representing the largest volume category. Special event project work spans monthly volumes of 11 to 60 orders based on 2023-2024 historical data. Government-furnished items include burial templates, casket carriers, concrete liners, chairs, tents, portable bleachers, stages, generators, and various interment equipment. Contractor responsibilities include excavation, site preparation, equipment setup and breakdown, maintenance of equipment and grounds, and cleanup services. All services require coordination with Government Memorial Affairs staff for funeral services and specified Government personnel for event services.

View the file

Other files

File Type Posted
J-1604000-09 SAMPLE SLUDGE ANAYLSIS REPORT AND SLUDGE GENERATOR REPORT.pdf PDF
J-1503020-06 ASSET DATA AND FREQUENCIES FOR SCHEDULED WORK.xlsx XLSX spreadsheet
J-1502000.1-03 DHA ASSET DATA INDEX, SYSTEM DESCRIPTIONS AND ASSET DATA BY SYSTEM.xlsx XLSX spreadsheet
0100000 C General Information.pdf PDF
J-1605000-07-04 SAMPLE UTILITY CONSUMPTION REPORTING LOG.xlsx XLSX spreadsheet
J-1502000.1 Facility Investment - DHA.pdf PDF
J-1605000-06 SAMPLE NAVFAC BOILER AND UPV INSPECTION FORM AND INSPECTION CERTIFICATE.pdf PDF
J-0200000-07-07 Contractor Incident Report System (CIRS) Form.pdf PDF
J-1604000-14-01 STORMWATER MANAGEMENT REPORT-ANNAPOLIS JANUARY 2017.pdf PDF
J-1602000 Electrical.pdf PDF
J-1604000 Wastewater.pdf PDF
J-0200000 Management and Administration.pdf PDF
J-1607000 Chiller.pdf PDF
1501000 C Facility Management.pdf PDF
0200000 C Management and Administration.pdf PDF
N6247026R0017 Pre-Sol Notice.pdf PDF
J-1606000 Water.pdf PDF
Attachment F - Section F Deliverables.pdf PDF
J-1601000-04 SERVICE DESK GUIDE FOR UTILITY OUTAGES.pdf PDF
J-1605000-07-02 SAMPLE ROVING PATROL LOG.xlsx XLSX spreadsheet
J-1606000-03-02 WTP AND DISTRIBUTION SYSTEM DESCRIPTION 2.docx DOCX document
J-1601000-05 UTILITY INTERRUPTIONS ROAD AND PARKING LOT CLOSURE AUTHORIZATIONS REQUEST FORM.xlsx XLSX spreadsheet
1502000 C Facility Investment.pdf PDF
J-0200000-20 - ELINS.xlsx XLSX spreadsheet
J-1605000-09 HISTORICAL BOILER HRSG UPV TESTING AND CERTIFICATION SCHEDULE.xlsx XLSX spreadsheet
J-1607000-08 Cooling Tower Water Testing and Treatment Asset Data.xlsx XLSX spreadsheet
J-1502000-04 FACILITY DATA.xlsx XLSX spreadsheet
DRAFT Solicitation - N6247026R0017.pdf PDF
J-1604000-14-03 STORMWATER MANAGEMENT REPORT-ANNAPOLIS JANUARY 2017.pdf PDF
J-4 Pre-Award Inquiry Form.xlsx XLSX spreadsheet
J-1503020 Pest Control.pdf PDF
J-1601000-08 EXCAVATION-UTILITY MARKING AUTHORIZATIONS REQUEST FORM.xlsx XLSX spreadsheet
J-1503070-03 Special Event Project Historical Data.xlsx XLSX spreadsheet
1700000 C BSVE.pdf PDF
J-1604000-04 WASTEWATER SYSTEM ASSET DATA.xlsx XLSX spreadsheet
1503020 C Pest Control.pdf PDF
J-1605000-04 STEAM ASSET DATA.xlsx XLSX spreadsheet
1604000 C Wastewater.pdf PDF
1601000 C Utility Management.pdf PDF
J-1604000-15 PERMEABLE PAVEMENT AREAS.pdf PDF
J-0200000-02-02 DBA WAGE DETERMINATION.pdf PDF
J-1700000-05 HISTORICAL FUEL DELIVERY QUANTITIES.xlsx XLSX spreadsheet
1606000 C Water.pdf PDF
J-1502000 Facility Investment.pdf PDF
J-1607000-04 Chiller Plant and Distribution System Asset Data.xlsx XLSX spreadsheet
1605000 C Steam.pdf PDF
J-1503030 Integrated Solid Waste Management.pdf PDF
J-0200000-02-01 SCA WAGE DETERMINATION.pdf PDF
J-1606000-08 MDE SCHEDULE OF MONITORING REQUIREMENTS EXAMPLE.pdf PDF
J-1601000 Utilities Management.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J – 1503070 Special Events

Attachment Number Attachment Title J-1503070-01 Definitions And Acronyms J-1503070-02 Special Events Project Work Categories, Quantities and Limits of Liability J-1503070-03 Historical Data J-1503070-04 Commencement Event Support Services J-1503070-05 Airshow Event Services J-1503070-06 Funeral Support Services Historical Data J-1503070-07 In-Ground Cemetery Casket Burial Services J-1503070-08 In-Ground Cemetery Cremation Burial Services J-1503070-09 Columbarium Cremation Interment Services

J-1503070-01

DEFINITIONS AND ACRONYMS

See Attachment J-0200000-01 for Definitions and Acronyms

Attachment J-1503070-02 Special Events Project Work Categories, Quantities and Limits of Liability

Project Work Order Categories Annual Quantity Limits of Liability (for Direct Labor and Direct Material Cost)

Category 1 200 $300 Category 2 125 $500 Category 3 55 $700 Category 4 20 $2,000 Category 5 15 $2,500 Category 6 6 $5,000 Category 7 2 $10,000 Category 8 1 $25,000 Category 9 1 $30,000 Category 10 1 $35,000

Attachment J-1503070-03 Special Event Project Historical Data

Month 2023 Totals 2024 Totals January 25 25

February 25 23 March 20 28 April 45 56 May 60 49 June 11 17 July 17 14

August 40 43 September 43 32

October 41 45 November 31 29 December 15 21

See Excel Spreadsheet

J-1503070-03 Special Event Project Historical Data

Attachment J-1503070-04 Commencement Event Support Services

Services support shall include:

Twenty-five (25) Captain’s Chairs Two (2) Blue Diploma Tables Two (2) Podiums Four (4) Planter Boxes Transport and deliver of the graduation stage and steps to the Stadium and placed in designated area.

Informational Note:

Event equipment listed above is Government-Furnished

Attachment J-1503070-05 Airshow Event Services

Event services shall be completed one day prior to the air show start or as specified below.

Equipment shall remain until the specified dates and times listed below Ingram Field – The Contractor shall provide set-up services.

Turn sixteen (16) portable bleachers along Ingram Field to face the Severn River no later than 1500.

Turn sixteen (16) portable bleachers back to original position after 1600 on Day 3.

Informational Note:

Portable bleachers are Government-furnished

Farragut Field – The Contractor shall provide equipment, material and set up:

Set up approximately 500 feet snow fence barricade on Farragut Field no later than 1800. The barricade shall start approximately 350 feet before the intersection of Bronson and Santee Roads.

Barricade should be removed between 1600 and 1700 on Day 3.

Hospital Point – The Contractor shall provide equipment, material, and set up:

Contractor shall set up approximately 1300 feet snow fence barricade on Hospital Point by 1400.

Barricade shall remain in place until 1700 on Day 3.

Hospital Point U.S. Navy Band Cruisers Support – The Contractor shall provide equipment, material, and set up prior to no later than 0900 on Day 2:

Set up stanchions with rope around a designated 20 x 30-yard area.

Set up a 28’ x 28’ stage in the designated area. Stage shall be leveled and sturdy to hold band members, musical instruments and sound equipment with all stage sections secure and properly interlocked.

Set up 30’ x 30’ x 10’ high tent. Coordinate with Navy Band Operations at (202) 433-3676 for exact tent set up location and requirements.

Provide one (1) Generator 25KWwith 50-amp cable.

Provide two (2) 8 cu yd dumpsters for use Day 2 and Day 3.

Empty dumpsters as required.

Provide fifteen (15) portable toilets at Hospital Point (near Navy Band stage)

Dewey Field – The Contractor shall provide equipment, material, and qualified personnel prior to:

Set up and test microphone, speakers, PA/sound system and outputs

Provide one (1) Generator with 50-amp cable.

Provide one (1) 8' x 8' dark colored, three-sided tent for the FAA/TRACON

Provide two (2) 12' x 12' tents to be located on Dewey Field

Provide five (5) 24” x 60” tables

Provide twenty (20) chairs

Provide one (1) portable toilet located inside fence line near announcer's table

The Contractor shall provide the following set-up services no later than 0900 on both Day 2 and Day 3:

Provide one (1) 5 gallon can of gasoline inside fence line

Provide two (2) cases (24-packs) of water in coolers with ice inside fence line.

Radford (Chauvenet/ Michelson) Terrace – The Contractor shall provide equipment, material and set up no later than 1500 on Day 2:

Set up two (2) risers on terrace - one (1) 16”h riser 4' x 8' high and one (1) 8” h riser 4' x 8' high in front of first riser

Set up stanchions with rope around media area with appropriate signs posted on stanchions

Set up stanchions with rope around VIP seating areas

Set up 300 chairs for general VIP seating, Set up 120 chairs for VIP Blue Angel guests

Set up 420 chairs for VIP commandant's guests.

Set up signs to clearly designate each seating area

Provide towels for all VIP’s and Contractor personnel to distribute in the event of inclement weather.

Provide eight (8) portable toilets in Mid-Store parking lot with the backs to the steps leading to Chauvenet Hall

Risers are Government-furnished

Miscellaneous Requirements:

The Contractor shall provide delivery and set-up for:

Trash Services:

Set up and place at designated areas, seventy (70) large, disposable, cardboard trash receptacles, with appropriately sized trash bags including extra trash bags for replacement.

Empty trash receptacles and replace trash bags as necessary during the event.

Cardboard trash receptacles shall be replaced (if necessary) each day if damaged, dirty, have unpleasant odors or have become wet after weather events.

Remove trash receptacles and trash after event concludes on Day 3.

Upon conclusion of event, services are removed by COB on Day 4.

Attachment J-1503070-06 Funeral Support Services Historical Data

Reporting Period In-Ground Burial

Cemetery Cremation Columbarium Cremation Total

JUL 2021 – JUN 2022 9 6 167 182

JUL 2022 – JUN 2023 7 8 156 171

JUL 2023 – JUN 2024 4 5 163 172

JUL 2024– JUN 2025 14 11 195 220

Attachment J-1503070-07 In-Ground Cemetery Casket Burial Services

Services shall include:

Government’s survey results are available and utilized to mark the burial gravesite before excavation.

Coordination with a member of the Memorial Affairs staff to confirm the exact location of the burial gravesite before excavation.

A burial template shall be used and left in place beneath the casket carrier for support. The burial template and casket carrier are Government-furnished.

Graves shall be excavated at a depth of six (6) feet, to accommodate standard-size concrete burial vaults, unless larger vaults are specified. Soil shall be removed by truck to a location out of sight of the immediate area until the ceremony has been completed. Corners shall be squared (with large rocks and debris removed) and the bottom of graves shall be leveled. If grave excavation requires the burial of two vaults on top of one another, the grave depth shall be increased as required to accommodate both vaults.

The requirements will be specified by the Memorial Affairs staff.

Install a concrete grave liner furnished by the Government in grave.

Place green carpets around the grave. Carpets shall neatly cover the wood frame, lowering apparatus, and concrete liner. Carpets must be clean and in good condition prior to use.

The Contractor shall arrange twenty (20) white chairs neatly and securely around the gravesite.

If temperatures are expected to exceed 89 degrees Fahrenheit, if rain or snow is forecasted, or as specified by the Memorial Affairs staff, a tent (approx. 20’ x 20’) shall be assembled over the grave site or at site of interment.

Remove all equipment and soil out of the line of sight before the funeral. Workers shall vacate the area and out of plain view of attendees until everyone has left the grave site.

Upon funeral service completion, lower the casket into the liner and place the concrete lid securely over the liner. Ensure the casket, liner and lid are properly set in place and sealed prior to adding sand and soil to the grave.

Provide a layer of sand around and on top of the casket liner before filling the remainder of the grave with soil. Ensure the soil evenly places around the vault to minimize settlement.

The soil shall be tamped over the grave and soil added if required.

Place new sod over exposed soil area(s) and water the sod for proper hydration.

Clean and return equipment to storage.

Informational Note:

The Government will provide the following:

burial template casket carrier concrete grave liner green carpet tent white chairs

Attachment J-1503070-08 In-Ground Cemetery Cremation Burial Services

Services shall include:

Government’s survey results are available and utilized to mark the burial gravesite before excavation.

Coordination with a member of the Memorial Affairs staff to confirm the exact location of the burial gravesite before excavation.

Graves shall be excavated to accommodate Government-furnished standard-size concrete urn liners.

Depth must allow for a minimum of one (1) foot of soil over the top of the liner, Install a Government-furnished concrete urn liner in the grave.

Place a folding table at the grave location with a tablecloth large enough to drape to the ground and around the table. Ensure the tablecloth is cleaned, pressed and in good condition before each use.

The Contractor shall arrange twenty (20) white chairs neatly and securely around the gravesite.

If temperatures are expected to exceed 89 degrees Fahrenheit, if rain or snow is forecasted, or as specified by the Memorial Affairs staff, a tent (approx. 20’ x 20’) shall be assembled over the grave site or at site of interment.

Remove all equipment and soil out of the line of sight before the funeral. Workers shall vacate the area and out of plain view of attendees until everyone has left the grave site.

Upon funeral service completion, lower the urn into the liner and place the concrete lid securely over the liner. Ensure the urn liner and lid are properly set in place and sealed prior to adding sand and soil to the grave.

Fill the grave area around the liner with soil evenly to minimize settlement.

The soil shall be tamped over the grave and soil added if required.

Place new sod over exposed soil area(s) and water the sod for proper hydration..

Clean and return equipment to storage.

The Government will provide the following:

concrete urn liner folding table tablecloth tent white chairs

Attachment J-1503070-09 Columbarium Cremation Interment Services

Services shall include:

Provide all necessary tools and equipment to open and secure the Columbarium niches without damaging any surfaces and support internments.

On the day of the funeral services:

o Open and clean out the designated niche o Remove all debris from the covered seating area o Clean and wipe down the altar o Remove all tools from the site and vacate the area.

Replace rubber grommets for the niche covers while the niche is open prior to each interment ceremony.

Install a Government furnished flag/flower holder on the upper right side of each niche when it is open, prior to each interment ceremony.

Install a Government-Furnished curtain across the open niche to block the view into the niche. Ensure the curtain is cleaned, pressed and in good condition before each use.

Upon funeral service completion the Contractor shall close the niche, remove any trash or debris from the site.

Clean and return equipment to storage.

The Government will provide the following:

• flag/flower holder

• curtain

File details come from the government source that posted it. Updated .